(K) RFI Form.pdf
PDF 430 KB Posted
- Solicitation number
- 5997283
About this file
This document is a request for information (RFI) form related to solicitation number 5997283 for site development services at the Naval Submarine Base New London. The RFI seeks information and recommended solutions regarding drawings, details, specifications, or cost impacts related to contract activity number and CPM. Responses are requested by a specified date. The form provides fields for the prime contractor and subcontractor/supplier to submit the RFI and recommendation. It notes that a response does not constitute authorization to proceed or basis for change order. The distribution list includes the file, resident engineer, civil engineer, construction representative, and contracting offices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Price Proposal Form.docx | DOCX document | |
| Amendment 0004.pdf | ||
| Wage Determ.docx | DOCX document | |
| (AA) Soil Report 2019.pdf | ||
| Amendment 0003.pdf | ||
| RFI Responses.pdf | ||
| (AI) Geotech Report 2023.pdf | ||
| (AC) Soil Report 2022b.pdf | ||
| (AD) Soil Summary.pdf | ||
| (AF) Utlility Map 2020.pdf | ||
| (AE) Soil Mgmt Plan.pdf | ||
| (AB) Soil Report 2022a.pdf | ||
| (AG) Utility Map 2021.pdf | ||
| (AH) Geotech Report 2021.pdf | ||
| (A) MACC RFP NPT NLON Rev 1.pdf | ||
| Amendment 0002.pdf | ||
| Site Visit Log.pdf | ||
| Amendment 0001.pdf | ||
| (H) General Requirements.pdf | ||
| (N) Building Contractors Guide to Taxes.pdf | ||
| (A) MACC RFP NPT NLON.docx | DOCX document | |
| (E) Site Approval.pdf | ||
| (L) ECMS.pdf | ||
| (O) 2016-R-0149.pdf | ||
| (G) Price Proposal Form.doc | DOC document | |
| (M) 52.204-24.pdf | ||
| (I) Base Map.pdf | ||
| (P) CERT-141.pdf | ||
| (C) Drawings.pdf | ||
| (B) Specifications.pdf | ||
| (D) NEPA.pdf | ||
| (J) Map to B135.pdf | ||
| (F) DB Wages 16 JUN 2023.docx | DOCX document |
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER:
RFP 5997283
REQUEST FOR INFORMATION RFI NUMBER:
CONTRACT TITLE:
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY NUMBER:
COST EFFECT: INCREASE: DECREASE: NONE:
INFORMATION REQUESTED & RECOMMENDED SOLUTION:
Date Response Required By: Date: Signature:
From:
To: Field Office Code
RECOMMENDATION:
Date: Signature:
From: Field Office To: Prime Contractor
REPLY:
Date: Signature:
This reply is given with the expressed understanding that it does not constitute basis for change in the amount or time of subject contract. If you do not concur, DO NOT PROCEED, and notify this office immediately.
Please assign PC # to this change. It is requested that a proposal be forwarded by . THIS DOES NOT
CONSTITUTE AUTHORIZATION TO PROCEED.
copy to: File 2L
Supv Civil Engineer Construction Representative
DLA Site Development
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.
DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER
File details come from the government source that posted it. Updated .