Amendment 0003.pdf
PDF 739 KB Posted
- Solicitation number
- 5997283
About this file
This document is an amendment to solicitation number 5997283 issued by the Naval Facilities Engineering Command Mid-Atlantic Public Works Department for site development at the Naval Submarine Base New London in Groton, Connecticut. The amendment provides responses to requests for information submitted by prospective offerors. It notifies offerors that responses to questions raised are available in the attached documents labeled RFI Responses and appendices AA through AI. The hour and date for receipt of offers is not extended by this amendment. No other changes are made to the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Price Proposal Form.docx | DOCX document | |
| Amendment 0004.pdf | ||
| Wage Determ.docx | DOCX document | |
| (AA) Soil Report 2019.pdf | ||
| RFI Responses.pdf | ||
| (AI) Geotech Report 2023.pdf | ||
| (AC) Soil Report 2022b.pdf | ||
| (AD) Soil Summary.pdf | ||
| (AF) Utlility Map 2020.pdf | ||
| (AE) Soil Mgmt Plan.pdf | ||
| (AB) Soil Report 2022a.pdf | ||
| (AG) Utility Map 2021.pdf | ||
| (AH) Geotech Report 2021.pdf | ||
| (A) MACC RFP NPT NLON Rev 1.pdf | ||
| Amendment 0002.pdf | ||
| Site Visit Log.pdf | ||
| Amendment 0001.pdf | ||
| (H) General Requirements.pdf | ||
| (N) Building Contractors Guide to Taxes.pdf | ||
| (A) MACC RFP NPT NLON.docx | DOCX document | |
| (E) Site Approval.pdf | ||
| (L) ECMS.pdf | ||
| (O) 2016-R-0149.pdf | ||
| (G) Price Proposal Form.doc | DOC document | |
| (M) 52.204-24.pdf | ||
| (I) Base Map.pdf | ||
| (P) CERT-141.pdf | ||
| (C) Drawings.pdf | ||
| (B) Specifications.pdf | ||
| (D) NEPA.pdf | ||
| (K) RFI Form.pdf | ||
| (J) Map to B135.pdf | ||
| (F) DB Wages 16 JUN 2023.docx | DOCX document |
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
1.2
C:\PERFORM\FORMS\S30.FRP
Forms Management
C:PERFORMFORMSS30.FRP
Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004
C:PERFORMFORMSS30.FRP
Standard Form 30 - Amendment of Solicitation/Modification of Contract Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6)
CODE
STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY
CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer) Previous edition unusable
| 9A. AMENDMENT OF SOLICITATION NUMBER: 0003 |
| 9A. AMENDMENT OF SOLICITATION NUMBER: 5997283 |
| 7. CODE: |
| 12. ACCOUNTING AND APPROPRIATION DATA (If required): |
| 13A. THIS CHANGE ORDER IS ISSUED PURSUANT TO. Specify authority. THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.: |
| 13C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: |
| 13D. OTHER. Specify type of modification and authority.: |
| 15A. NAME AND TITLE OF SIGNER. Type or print.: |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER. Type or print.: |
| 14. DESCRIPTION OF AMENDMENT OR MODIFICATION (Organized by UCF section headings, including solicitation or contract subject matter where feasible.): Solicitation 5997283 - DLA Site Development at Naval Submarine Base New London |
RFI Responses are now available. See RFI Responses document and related attachments AA through AI.
| FACILITY CODE: |
| 6. ISSUED BY: NAVFACSYSCOM MID ATLANTIC PWD NEW LONDON |
BOX 400, BLDG 135
NAVAL SUBMARINE BASE NEW LONDON GROTON CT
06349-5026
| 8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code): |
| 7. ADMINISTERED BY (If other than Item 6): See Item #6 |
| 1. CONTRACT ID CODE: |
| 4. REQUISITION/PURCHASE REQUISITION NUMBER: |
| 10A. MODIFICATION OF CONTRACT/ORDER NUMBER: |
| 5. PROJECT NUMBER. If applicable.: |
| PAGE: 1 |
| PAGES: 1 |
| 3. EFFECTIVE DATE. Enter 2 digit month, 2 digit day and 4 digit year.: 2023-08-02 |
| 9B. DATED. SEE ITEM 11. Enter 2 digit month, 2 digit day and 4 digit year.: 2023-07-06 |
| 10B. DATED. SEE ITEM 13. Enter 2 digit month, 2 digit day and 4 digit year.: |
| 9A. AMENDMENT OF SOLICITATION NUMBER: 0 |
| 10A. MODIFICATION OF CONTRACT/ORDER NUMBER: 0 |
| 11. The above numbered solicitation is amended as set forth in Item 14. : 1 |
| 13A. THIS CHANGE ORDER IS ISSUED PURSUANT TO. Specify authority. THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.: 0 |
| 13B. THE ABOVE NUMBERED CONTRACT OR ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES. Such as changes in paying office, appropriation date, etc. SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103b.: 0 |
| 13C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: 0 |
| 13D. OTHER Specify type of modification and authority.: 0 |
| 13E. IMPORTANT: Contractor is not required to sign this document and return copies to the issuing office.: 0 |
| 13E. IMPORTANT: Contractor is required to sign this document and return copies to the issuing office.: 0 |
| 11. The hour and date specified for receipt of Offers is extended : 0 |
| 11. The hour and date specified for receipt of Offers is not extended : 1 |
| 15B. CONTRACTOR OR OFFEROR. Signature of person authorized to sign. Digital Signature.: |
| 16C. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.: |
| number of copies: 1.00000000 |
| number of copies: |