RFI Responses.pdf

PDF 204 KB Posted

Attached to
DLA Site Development, Naval Submarine Base New London
Solicitation number
5997283
Issued by

About this file

This document contains responses to a request for information related to solicitation number 5997283 for DLA Site Development at Naval Submarine Base New London. Soil reports, utility maps, geotechnical reports and other drawings were provided as attachments in response to questions about site conditions including soil testing results, unsuitable soil disposal locations, existing underground utilities, trailer locations, asphalt conditions, depth to groundwater along the new utility route, and corrections to elevation drawing labels. The responses addressed requirements for excavation and installation of a new two-bay metal building and associated electrical duct bank.

View the file

Other files

File Type Posted
Price Proposal Form.docx DOCX document
Amendment 0004.pdf PDF
Wage Determ.docx DOCX document
(AA) Soil Report 2019.pdf PDF
Amendment 0003.pdf PDF
(AI) Geotech Report 2023.pdf PDF
(AC) Soil Report 2022b.pdf PDF
(AD) Soil Summary.pdf PDF
(AF) Utlility Map 2020.pdf PDF
(AE) Soil Mgmt Plan.pdf PDF
(AB) Soil Report 2022a.pdf PDF
(AG) Utility Map 2021.pdf PDF
(AH) Geotech Report 2021.pdf PDF
(A) MACC RFP NPT NLON Rev 1.pdf PDF
Amendment 0002.pdf PDF
Site Visit Log.pdf PDF
Amendment 0001.pdf PDF
(H) General Requirements.pdf PDF
(N) Building Contractors Guide to Taxes.pdf PDF
(A) MACC RFP NPT NLON.docx DOCX document
(E) Site Approval.pdf PDF
(L) ECMS.pdf PDF
(O) 2016-R-0149.pdf PDF
(G) Price Proposal Form.doc DOC document
(M) 52.204-24.pdf PDF
(I) Base Map.pdf PDF
(P) CERT-141.pdf PDF
(C) Drawings.pdf PDF
(B) Specifications.pdf PDF
(D) NEPA.pdf PDF
(K) RFI Form.pdf PDF
(J) Map to B135.pdf PDF
(F) DB Wages 16 JUN 2023.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DLA Site Improvements RFI:

1. Please provide all soils testing that relates to the location this building is to be installed. (SOW pg. 5, Part 2.1, Spec 31 23 00.00 20)

Response: Soil reports from the surrounding areas are attached. See Attachments (AA) Soil Report 2019, (AB) Soil Report 2022a, (AC) Soil Report 2022b, & (AD) Soil Summary.

2. Where, on facility, can the “unsuitable" soils be disposed? (SOW pg. 5, Part 2.1, Spec 31 23 00.00 20)

Response: All excess soil must be removed and disposed offsite per the Soil Management Plan.

See Attachment (AE) Soil Mgmt Plan.

3. Please provide Existing/As-built drawings of all underground Utilities within the Excavation area for DLA Site Development (2 Bay Metal Building). This is to include, but is not limited to, the following:

Sewer lines, Telecom Lines, Diesel Fuel Lines. (Drawings C103/C104)

Response: Available utility drawings are attached. See Attachments (AF) Utility Map 2020 and (AG) Utility Map 2021.

4. Please provide existing trailer support conditions (for trailer being moved). (Drawings C103/C104)

Response: Trailer has been relocated by SUBASE.

5. Please provide a new trailer location and confirm the trailer is not being put back in original location.

(Drawings C103/C104)

Response: Trailer has been relocated by SUBASE.

6. What are the existing Asphalt conditions (Depth of Asphalt and Subbase stone)? (Drawings C502)

Response: Existing pavement consists of 8” processed gravel subbase, 3” bituminous base and 2” overlay.

7. Please provide a complete drawing set of the Existing Underground Utilities along the path of the new electrical Duct Bank (electrical service to the 2-bay new structure). These drawings need to include the type of utility crossings, Depth to top of utility and material of construction of the utility. (Drawings C107/C108)

Response: Available utility drawings are attached. See Attachments (AF) Utility Map 2020 and (AG) Utility Map 2021.

8. Please provide Depth to Groundwater along the new Utility Duct Bank route. (Drawings C107/C108) Response: Groundwater from a 2021 investigation was between 3.5’ to 4’ below grade and from a 2023 investigation was between 5’ to 8’ below grade. Note that groundwater fluctuates with seasonal variations in rainfall. See Attachments (AH) Geotech Report 2021 & (AI) Geotech Report 2023.

9. The Floor Plan is oriented with NORTH at the bottom of the drawing sheet. Drawings A-201 Exterior Elevations and A-251 Interior Elevations are named opposite of what they appear on the floor plans.

Please acknowledge our assumption is correct as this is confusing and could lead to errors during construction. Please review. (Drawings A201 & A251)

Response: The north arrow indicated on plan is correct. The elevations are labeled incorrectly on drawings A-201 and A-251.