This NEPA Environmental Checklist is used by the Department of the Navy Naval Facilities Engineering Command to determine the environmental requirements for a proposed DLA Storage Facility project at Naval Submarine Base New London in Groton, Connecticut. The checklist identifies the project as a new pre-engineered metal storage building to provide approximately 6,000 square feet of space for DLA storage needs. It requires completion of a Categorical Exclusion for compliance with the National Environmental Policy Act and adherence to requirements for stormwater management, waste disposal, cultural resources review, and soil handling at the work site, which includes an Installation Restoration area. Additional design considerations include protections for dewatering activities, management of regulated waste, and use of exterior storage areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Price Proposal Form.docx | DOCX document | |
| Amendment 0004.pdf | ||
| Wage Determ.docx | DOCX document | |
| (AA) Soil Report 2019.pdf | ||
| Amendment 0003.pdf | ||
| RFI Responses.pdf | ||
| (AI) Geotech Report 2023.pdf | ||
| (AC) Soil Report 2022b.pdf | ||
| (AD) Soil Summary.pdf | ||
| (AF) Utlility Map 2020.pdf | ||
| (AE) Soil Mgmt Plan.pdf | ||
| (AB) Soil Report 2022a.pdf | ||
| (AG) Utility Map 2021.pdf | ||
| (AH) Geotech Report 2021.pdf | ||
| (A) MACC RFP NPT NLON Rev 1.pdf | ||
| Amendment 0002.pdf | ||
| Site Visit Log.pdf | ||
| Amendment 0001.pdf | ||
| (H) General Requirements.pdf | ||
| (N) Building Contractors Guide to Taxes.pdf | ||
| (A) MACC RFP NPT NLON.docx | DOCX document | |
| (E) Site Approval.pdf | ||
| (L) ECMS.pdf | ||
| (O) 2016-R-0149.pdf | ||
| (G) Price Proposal Form.doc | DOC document | |
| (M) 52.204-24.pdf | ||
| (I) Base Map.pdf | ||
| (P) CERT-141.pdf | ||
| (C) Drawings.pdf | ||
| (B) Specifications.pdf | ||
| (K) RFI Form.pdf | ||
| (J) Map to B135.pdf | ||
| (F) DB Wages 16 JUN 2023.docx | DOCX document |
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON
NEW FORM EFFECTIVE 07/10/2020. This NEPA Environmental Checklist (EC) is used to determine the environmental requirements associated with a proposed project. Complete the first 2 pages of the form, attach a site map and a SOW or 1391, and then submit to the PWD Environmental Division (EV). A complete EC with required attachments should be submitted a minimum of 15 days prior to project’s scheduled start date. If the project scope is modified or if project work has not been initiated within 1 year of the signature date, please contact EV for review/approval prior to initiating project activities.
GENERAL PROJECT INFORMATION
1 Activity Requesting: FEAD
2 Activity POC / Phone / email: Michael Crooks / 860-694-2079 / sherwin.m.crooks.civ@us.navy.mil
3 Name of Project: DLA Storage Facility
4 Project Number (if any): WON 1665401
5 Project Location: SUBASE NLON Fuel Farm
6 Project Type: New Construction
7 Description of the Project: New pre-engineered metal storage building
8 Why is this project needed? Required to facilitate mission requirements at Fuel Farm.
9 Date project scheduled to begin? Spring 2023
PLANNING QUESTIONS
10a Total Project Area (sq. ft.) - (Include clear zones, soil disruption/disturbance area, lay down areas, etc)
Approximately 6,000 sq. ft. (see additional comments)
10b Percentage of Project Area - that is currently Impervious (asphalt, bldgs, etc.) 10% (600 sq. ft.)
10c Percentage of Project Area - that will be Impervious once project completed 42% (2,500 sq. ft.)
10d Percentage of Project Area - that will be disturbed (excavated, graded, etc) 60% (3,600 sq. ft.)
11 How will Stormwater be managed in the long-term (post-construction)? Grading to existing swales and catch basins
12 How will Sanitary Sewage (wastewater) be managed in the long-term? Floor drain tied to existing sanitary
13 Will there be actions conducted in the water (dredging, new pilings, removal etc.)? If so indicate state what action(s). No
14 Will there be actions conducted in an area under an Agriculture outlease? No
DESIGN RELATED QUESTIONS YES NO UNSURE
15 Will trees be removed? X
16 Will emission-generating equipment (e.g. bull dozer, back hoe, etc.) be utilized during construction? If yes, please list equipment. See additional comments X
17 Will the project remove, install or utilize a petroleum storage tank, that is >=55-gallons? X
18 Will the project remove or install an Oil Water Separator? X
19 Will the project relocate excavated material at the Installation? If yes where is it going? See additional comments X
Will the construction / repair actions generate by-products (power washing water, haz. waste, state regulated waste such as asbestos, PCB items, transformers, capacitors, switches, light ballasts, lead paint chips, florescent bulbs, waste oil, solvents, etc)? If so indicate what type of waste(s) will be generated.
X
21 Will the construction / repair actions require de-watering from excavations, trenches or manholes? If yes, circle where de-watering will occur? See additional comments X
DESIGN RELATED QUESTIONS YES NO UNSURE
22 Will there be new hard pipe connections or modifications to existing hard pipe connections using water from Groton Utilities, the Thames, or wells? X
Will new hard pipe connections or modifications to existing hard pipe connections discharge wastewater to the sanitary sewer, storm sewer or the Thames River? If so circle discharge type. See additional comments
X
24 Will there be UST or AST installation, modification, or removal? If so indicate which type of tank and which action. X
25 Will there be installation, repair, modification or removal of any system containing refrigerants
(e. g. freon, halon)? X
26 Will there be modifications, destruction, or disturbance of the shoreline, streams, groundwater tables, surface water bodies, or wetlands? If so, explain. X
Will there be any excavation and/or dewatering with the potential to impact the designated CT Coastal Zone (i.e., 1,000 feet inland from the MHW line)? If so, what type of activity will occur that can potentially impact the coastal zone area?
X
28 New proposed use and/or application of pesticides, rodenticides and herbicides? If so, indicate which type. X
29 Will the project require pile driving? X
OPERATIONAL RELATED QUESTIONS YES NO UNSURE
30 Will emission-generating equipment be installed (ex. paint booth, emergency generators)? If so, what type of equipment will be installed? X
31 Will there be any new processes or maintenance activities conducted? If so, describe what they are. X
ADDITIONAL COMMENTS
Type here:
The area of disturbance is shown on sheets C-105/106 of the construction drawings.
#16 – backhoe, small crane.
#19 – off-base.
#20 – possibly contaminated soil.
#21 – at building footprint.
#23 – new trench drain tying into oil water separator.
SAME 20 JUL 2022
Checklist Preparer, phone number and e-mail (if Same as Question #2 – Type “SAME”) Date
NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON
SUMMARY OF ENVIRONMENTAL REQUIREMENTS
(To Be Completed by Environmental Division Only) PLEASE NOTE: The Environmental review provided is only valid for 1 year. If the project scope has been modified or checklist has expired, please contact the SUBASENLON PW Environmental Division to re-evaluate the project.
Name of Project: DLA Storage Facility Project Number: WON 1665401
PLANNING REQUIREMENTS (Issues That Can Effect the Project’s Timeline, Cost, or Site Location) Environmental Aspect YES NO Environmental Requirement Project Impacts
National Env Policy Act (NEPA) CATEX CATEX = 1 week; EA = 12 months; EIS = 24 months Can’t award till NEPA complete
Threatened or Endangered Species Consultation with USFWS and/or NMFS required. Process may take 6 months
Marine Mammal Protection Act IHA or LOA Consultation with NMFS May take 4 to 18 months
Wetland Impacts Permits and possibly mitigation required. May take 7 months after
NEPA
Navigable Water Impacts Permits required. Takes 2-7 months after
NEPA
Agriculture Outlease Consultations with NAVFAC Real Estate required. Process may take 1 to 3 months.
Tree Mitigation Compensation for tree loss or mitigation is required. This may add costs to project.
Coastal Zone Mgmt Act Coastal Consistency Determination (CCD) is required. Process takes 90 days.
Cultural Resources Consultations with SHPO required. Process may take 1 to 6 months
Major Air Emission Source Permit is required. Process takes 6 months
Construction Emissions Refer to Comment 2. This process takes a week.
Installation Restoration Refer to Requir 1. Process may take 4 months
Petroleum Contamination Follow guidance in CNRMA POL SOP. This may add costs to project.
DESIGN REQUIREMENTS (Issues To Be Addressed In Design Phase) Storm Water Best Mgmt
Practices, Erosion & Sediment Control
Required for projects that include excavation or other land disturbance. Refer to Requir 2. Incorporate into the design.
CT Storm Water Mgmt Permit Required for projects that will disturb ≥ 1 acre of land. Obtain before construction.
De-watering, Wastewater Mgmt Protective measures required for managing excess waters. Refer to Requir 3. Incorporate into the design.
Beach & Dune Management Protective measures required for impact beaches & dunes Incorporate into the design.
Spill Preventative Measures Secondary containment required for tanks ≥ 55 gal Incorporate into the design.
OPERATIONAL REQUIREMENTS (Issues To Be Addressed Prior To Use)
New Industrial Process Environmental Department Site Inspection required. Required before operation.
New Waste Generating Activity Environmental Department Site Inspection required. Required before operation.
ADDITIONAL REQUIREMENTS or COMMENTS Comment 1 The proposed action is within the scope of CATEX #33: New construction that is similar to or compatible with existing land use (i.e., site and scale of construction are consistent with those of existing adjacent or nearby facilities) and, when completed, the use or operation of which complies with existing regulatory requirements (e.g., a building within a cantonment area with associated discharges and runoff within existing handling capacities). None of the exclusions from reliance on a CATEX applies in this case. A Record of Categorical Exclusion is required, but further NEPA analysis is not warranted. The applicability of this CATEX determination is based on the full implementation of all environmental requirements identified below.
Comment 2 A Record of Non-Applicability was completed to document compliance with the General Conformity Rule, Section 176(c) of the Clean Air Act. The proposed action is exempted from a conformity analysis as the emissions will not exceed the de minimis ozone threshold level and the emissions are not considered regionally significant.
Requir 1 Work will occur in IR Site 23. A dig permit shall be obtained from and approved by the PWD prior to initiation of any ground-disturbing activities. Soil management procedures as detailed in the dig permit and the SUBASE Soil Management SOP shall be followed. Soil that cannot be returned to its original location may need to be disposed of off-base at the contractor's expense and shall be considered contaminated unless analytical data show otherwise. Oil or other contaminated groundwater may be encountered during excavation activities. Groundwater from an IR zone/site shall not be discharged to ground. Groundwater may need to be containerized and disposed of off-site at the contractor’s expense.
Requir 2 Work shall be executed in full compliance with the provisions of the General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems (MS4 Permit), the SUBASENLON Stormwater Pollution Prevention Plan, and the SUBASENLON Stormwater Management Plan. Appropriate erosion and sediment control measures shall be used when performing work under the scope of this project.
Requir 3 PW NLON EV Division shall be notified immediately of any actions that require dewatering activities under the scope of this project. No discharges shall occur without prior approval from the PW NLON EV Division Wastewater Program Manager (x2525). Dewatering is NOT authorized for discharge to ground in IR sites. Wastewater may need to be containerized and disposed of off-site or may be eligible for discharge to the sanitary sewer, pending CT DEEP approval. If discharging to the sanitary sewer, the contractor shall obtain separate permitting at their own expense and shall provide monitoring data prior to discharge in accordance with CT DEEP requirements.
Requir 4 Radon testing per Navy requirements shall be conducted if facility will be routinely occupied, i.e., for 4 hours per day.
Contact the PW NLON EV Division (x5140) prior to conducting radon testing.
Requir 5 Disposal of any regulated waste shall be coordinated in advance with the PW NLON EV Division Hazardous Waste Program Office (x4298).
- All regulated waste shall be manifested through the Hazardous Waste Program Office.
- Any regulated waste generated under the scope of this project shall be managed, stored, and disposed of in accordance with the SUBASENLON Hazardous Waste Management Plan and SUBASENLON policies and instructions. Hazardous waste shall not be stored at the work site overnight.
- Non-regulated solid waste (i.e., general trash, construction debris, and recyclable items) shall be properly managed and disposed of in accordance with Federal, State, Navy, and local regulations.
Requir 6 Use of exterior storage and laydown areas in support of this project shall be done in compliance with SUBASENLON instructions and policies. Site must be evident of good housekeeping practices consistent with proper storm water management and control.
CDR Christopher Sandmel; x4480;
christopher.a.sandmel.mil@us.navy.mil
Environmental POC; phone number and email Signature and Date mailto:christopher.a.sandmel.mil@us.navy.mil
RECORD OF CATEGORICAL EXCLUSION
Ser N45 1 August 2022
DEPARTMENT OF THE NAVY
Naval Submarine Base New London
NATIONAL ENVIRONMENTAL POLICY ACT OF 1969
ENVIRONMENTAL IMPACT ASSESSMENT
RECORD OF CATEGORICAL EXCLUSION
This document memorializes the determination of the below-named action proponent, as per Chief of Naval Operations Instruction M-5090.1, Chapter 10, that neither an Environmental Assessment nor Environmental Impact Statement need be prepared for the following proposed action: DLA Storage Facility.
Action Proponent: Kenneth M. Curtin, Jr., Commanding Officer, Naval Submarine Base New London (SUBASENLON), Groton, CT.
Description of Proposed Action: The DLA facility requires a dedicated storage facility. The proposed action involves the installation of a pre-engineered metal storage building using high-quality roofing, structural, and insulating materials. The building will be approximately 20 feet by 40 feet.
Applicable Categorical Exclusion: The action proponent has determined that the following Categorical Exclusion (CATEX) is applicable to the proposed action: CATEX #33 – New construction that is similar to or compatible with existing land use (i.e., site and scale of construction are consistent with those of existing adjacent or nearby facilities) and, when completed, the use or operation of which complies with existing regulatory requirements (e.g., a building within a cantonment area with associated discharges and runoff within existing handling capacities).
Facts Supporting Categorical Exclusion: The construction of the new storage facility will provide the space required by DLA for storage racks and associated equipment. The new storage facility will be located in an area supporting existing DLA facilities.
The proposed action may be categorically excluded because it is not of a kind likely to significantly affect the quality of the human environment; does not result in any significant change from conditions existing at the site of the proposed action; and will result in effects that are primarily economic or social.
RECORD OF CATEGORICAL EXCLUSION
Consideration of Circumstances Precluding Categorical Exclusion:
A proposed action shall not be categorically excluded if it:
(1). Would adversely affect public health or safety;
(2). Involves effects on the human environment that are highly uncertain, involve unique or unknown risks, or which are scientifically controversial;
(3). Establishes precedents or make decisions in principle for future actions that have the potential for significant impacts;
(4). Threatens a violation of Federal, State, or local environmental laws applicable to the Department of the Navy; or
(5). Involves an action that, as determined in coordination with the appropriate resource agency, may:
a) Have an adverse effect on Federally-listed endangered/threatened species or marine mammals;
b) Have an adverse effect on coral reefs or on Federally-designated wilderness areas, wildlife refuges, marine sanctuaries, or parklands;
c) Adversely affect the size, function, or biological value of wetlands, and is not covered by a Nation-wide or Regional permit;
d) Have an adverse effect on archaeological resources, or resources (including but not limited to ships, aircraft, vessels and equipment) listed or determined eligible for listing on the National Register of Historic Places; or
e) Result in an uncontrolled or unpermitted release of hazardous substances or require a conformity determination under standards of the Clean Air Act General Conformity Rule.
None of the foregoing conditions are present in this case.
Retention: This document shall be retained for a period of not less than 6 years.
CHRISTOPHER SANDMEL
Commander, U.S. Navy Public Works Officer By direction
| DESIGN RELATED QUESTIONS |
| DESIGN RELATED QUESTIONS |
| 2022-09-05T21:07:23-0400 | |
| SANDMEL.CHRISTOPHER.ADAM.1266626238 |
| 2022-09-05T21:06:58-0400 | |
| SANDMEL.CHRISTOPHER.ADAM.1266626238 |
File details come from the government source that posted it. Updated .