(E) Site Approval.pdf
PDF 878 KB Posted
- Solicitation number
- 5997283
About this file
This document is a Site Approval Request form for the construction of a storage facility for the Defense Logistics Agency at Naval Submarine Base New London. The project involves constructing a 910 square foot storage building, along with approximately 30 square yards of adjacent sidewalks and 100 square yards of connecting pavement. Additional site work includes running electrical service from an existing fuel operations building, installing new sewer and telecommunications connections, and placing 95 linear feet of security fencing with a sliding gate at the entrance. The request is categorized as a Category A non-explosive site approval. It provides project details, coordinates agency reviews, and recommends approval of the request by the installation commanding officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Price Proposal Form.docx | DOCX document | |
| Amendment 0004.pdf | ||
| Wage Determ.docx | DOCX document | |
| (AA) Soil Report 2019.pdf | ||
| Amendment 0003.pdf | ||
| RFI Responses.pdf | ||
| (AI) Geotech Report 2023.pdf | ||
| (AC) Soil Report 2022b.pdf | ||
| (AD) Soil Summary.pdf | ||
| (AF) Utlility Map 2020.pdf | ||
| (AE) Soil Mgmt Plan.pdf | ||
| (AB) Soil Report 2022a.pdf | ||
| (AG) Utility Map 2021.pdf | ||
| (AH) Geotech Report 2021.pdf | ||
| (A) MACC RFP NPT NLON Rev 1.pdf | ||
| Amendment 0002.pdf | ||
| Site Visit Log.pdf | ||
| Amendment 0001.pdf | ||
| (H) General Requirements.pdf | ||
| (N) Building Contractors Guide to Taxes.pdf | ||
| (A) MACC RFP NPT NLON.docx | DOCX document | |
| (L) ECMS.pdf | ||
| (O) 2016-R-0149.pdf | ||
| (G) Price Proposal Form.doc | DOC document | |
| (M) 52.204-24.pdf | ||
| (I) Base Map.pdf | ||
| (P) CERT-141.pdf | ||
| (C) Drawings.pdf | ||
| (B) Specifications.pdf | ||
| (D) NEPA.pdf | ||
| (K) RFI Form.pdf | ||
| (J) Map to B135.pdf | ||
| (F) DB Wages 16 JUN 2023.docx | DOCX document |
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC 11010/31, PART I
REQUEST FOR PROJECT SITE APPROVAL
NAVFACINST 11010.45A
Per NAVFACINST 11010.45A, Site Approval Request Process, NAVFAC 11010/31, Part 1, is required for both Category A and Category B Site Approval Requests (SAR), for both facilities and certain types of events, including those requiring waivers or exemptions. Site approvals are granted based on the conditions and circumstances shown in the SAR. The site approval becomes invalid if any of those conditions change.
Approvals become invalid if the project scope or location is altered in any manner from the information on which the SAR, certification, or endorsement was granted. Approvals become invalid if project proponent or owner fails to comply with conditions stipulated in the SAR. Category 2 SAR certifications, including requests for waivers and exemptions and other conditional endorsements, (e.g., explosive safety related site approvals granted under Safety Assessment for Explosives Risk (SAFER), Airfield Safety Waivers, etc.), may require periodic reviews and re-certification. Refer to Unified Facilities Criteria (UFC) 2-000-05N and other applicable versions, the NAVFAC Business Management System (BMS) for SARs, Installation Development Plan (IDP), other Systems Command (SYSCOM) and NAVFAC guidance, for additional information. (Complete this form using the PDF/electronic version and forward a copy of the final to all stakeholders for their records).
SECTION A - PROJECT INFORMATION (TO BE COMPLETED BY SAR POC)
Activity SAR Number: Date:
1. To:(Host Command): 2. From:(Sponsor):
3. Installation UIC: 4. Special Area Code: 5. SUID Code: 6. Building Number:
7.
Fiscal Year:
8.
eProjects Work Order No.:
9.
Project Amount($000):
10.
Navy "P" Number
11. Latitude: 12. Longitude: 13. Ground Elevation:
14. Project Name/Title: 15. Category Code:
16. Type of Project/Event (Check all that apply):
Repair Maintenance Construction Addition to Existing Facility Demolition
Event Change of Use (Category Code) Relocatable (Temporary Facility)
New Footprint Other (Specify)
NAVFAC 11010/31, Part I
Enclosure 1
17. Project/ Event Description:
NAVFACINST
11010.45A
NAVFACINST 11010.45A
18. Type of Request/Certification/Waiver and responsible authorities:
18(a) Category A, including events of temporary duration (e.g. Air Shows), and re-submittals:
YES NO
18(b) Category B SAR:
Airfield
Explosives
EMR (HERP/HERF/HERO)
EMR (EMI)
Radiological
Small Arms Range/Outdoor Live-Fire Range
Re-Submittal (Category B)
OTHER
N/A
18(c) Responsible authority(ies) for Category B SAR. (Check all that may apply):
Host Command (Category A)
FEC
REGCOM
NAVAIR
NAVSEA (NOSSA)
NAVSEA (NSWCDD)
NAVSEA (RASSO)
SPAWARSYSCEN (Atlantic)
CNIC
OPNAV
CNO
DUSD (I&E)
OTHER (Specify in Block 20)
N/A
18(d) Specify:
19. If construction related (or event), specify duration in which the certification, waiver, is required (Days/Weeks/Months). If "Permanent", so indicate. Otherwise, enter "Not Applicable":
20. Determination of Category of SAR, siting rationale, justification for request for endorsement, waiver, exemption, impact if not approved, etc:
23. Date SAR validated, forwarded for Signature/Endorsement/Certification, or Action Suspended:
24. Name/Title/E-mail Address(of PWD SAR POC):
25. Name/Title/E-mail Address (of SAR POC
SUPERVISOR):
SECTION B - PRELIMINARY EVALUATION OF CATEGORY B IMPACTS
(TO BE COMPLETED BY SAR POC)
NAVFACINST 11010.45A
NOTE: If Category A, skip Section B and C and complete applicable portions of Section D (Host Command Summary and Final Site Approval Request Action).
SECTION B(1) - AIRFIELD SAFETY
1. Is NAVAIR Airfield Safety Waiver required for a facility, construction, crane, or other event, including air shows.
Are there potential impacts to instrument approach/departure procedures? (If YES, complete Section B(1) and request NAVAIR airfield safety waiver and other clearance(s) via ICO memo using NAVAIR IBONS and other SYSCOM processes:
YES
NO
2. Is FAA OE/AAA (Notice of Proposed Construction) Required? (If YES, provide data to CPLO and attach FAA permit):
YES
NO
3.
Runway Number:
4. Select Runway Type (Class "A" or "B"):
5.
Airfield Elevation (ft):
For the following set of questions (Block 6 - 20), enter "N/A" for "Not Applicable", if that is the case:
6. Maximum Height of Facility (ft):
7. Maximum Height of Equipment at Location (ft):
8. Lateral Distance from Runway Centerline (ft):
9. Horizontal Distance to Runway Primary Surface (ft):
10.
Horizontal Distance from Clear Zone (ft):
11.
Horizontal Distance to Edge of Parking Apron (ft):
12. Allowable Height Based on Transitional Surface (ft):
13. Allowable Height Based on Approach-Departure Surface (ft):
14.
Allowable Height Based on Apron Clearance Criteria (ft):
15. Allowable Distance Based on Taxiway Clearance (ft)
16.
Existing Waiver Number
17.
Existing Waiver
18. Indicate Type of Construction Airfield Safety Waiver of interest. (Construction waiver includes request related to a facility violating airfield safety criteria):
Repair
Maintenance
Construction
Event (e.g. Air Show)
Other (Specify in Block 19)
Not Applicable
19. Airfield Safety Waiver (Other):
Contingency
Aids-to-Navigation
RDT&E
Other
20. If construction related (or event), specify duration of ASW (Days/Weeks/Months).
NOTE: A NAVAIR ASW is not a substitute for a UFC criteria waiver/exemption (e.g. Design waiver). The airfield safety waiver and FAA OE/AAA permit require coordination by AIROPS, Control Tower, CPLO, NAVREP, NAVFIG, CPLO, Base Security, Explosives Safety Officer, Base Communications, Public Works Utilities, etc. See Asset Management Bulletin 2013-03 for more information.
NAVFAC 11010/31, Part I
SECTION B(2) - EXPLOSIVES SAFETY
1. In coordination with Explosives Safety Officer, AIROPS, Port Ops, Base Communication, etc, are there potential impacts to/of explosives safety (or fuels)? (If there are no explosives safety impacts, check "No" and skip to next section).
YES
NO
2. What type of project or event is triggering review for explosives safety impacts?
(Select all that apply):
Repair
Renovation
Equipment Installation
Changes in operation(s)
New Construction
3. If there are explosives safety impacts, what type of NOSSA review is/are required for certification? (Select all that apply)
Construction Worker Authorization
Preliminary Explosives Safety Certification
Final Explosives Safety Certification
SAFER (Site Approval by Safety Assessment for Explosives Risk)
Deviation (from Explosives Safety Criteria)
NOTE (EXPLOSIVES SAFETY): Per Section B(2), if there are explosives safety impact(s), attach copy of NAVFAC 11010/31, Part I, GeoReadiness-generated Site Plan(s), and Automated Explosives Safety Site Planning (AESSP)-generated explosives quantity-distance arcs/maps endorsed by Explosives Safety Officer (ESO), etc. Forward request to NOSSA though ICO using WebSAR, the NOSSA online application for explosives SARS. WebSAR will automatically route and complete the NOSSA Part II, NOSSA Form 8020.22. Use this link for access to WebSAR.
SECTION B(3) - ELECTROMAGNETIC RADIATION (HERP, HERF, HERO & EMI) SAFETY
1. In coordination with Base Communication and the Spectrum Manager, are there potential EMR impacts (HERP, HERF, HERO, EMI)? (If there are no EMR impacts, skip to next section).
YES
NO
2.
System Location (Physical Address, and Zip Code):
3.
Type of Transmitter:
4. Distance to Nearest Fueling Facility Operation (ft). Enter N/A, if not applicable:
NOTE 1 (HERP, HERF, HERO): Attach copy of NAVFAC 11010/31, Part I, copy of EMR Data Form, site plan, etc., and forward the request for impacts of Hazards of Electromagnetic Radiation to Personnel (HERP), Hazards of Electromagnetic Radiation to Fuels (HERF), and Hazards of Electromagnetic Radiation to Ordnance (HERO) for all Navy site approval requests through the Chain-of-Command to Naval Surface Warfare Center, Dahlgren Division (NSWCDD), using the Electromagnetic Environmental Effects, E3 Online LINK, off the NSWCDD website.
NOTE 2 (EMI): Attach copy of NAVFAC 11010/31, Part I, copy of EMR Data Form, site plan, etc., and forward the request for impacts of Hazards of Electromagnetic Radiation, Electromagnetic Interference (EMI), for all Navy site approval requests through the Chain-of-Command to SPAWARSYSCEN Atlantic: SPACE AND Naval Warfare Systems Center, SPAWARSYSCEN Atlantic, ATTN CODE 59440, PO Box 190022, North Charleston, SC 29419-9022 (Phone: (843) 218-5273;
DSN: 588-5273)).
NAVFAC 11010/31, Part I
Enclosure 1 https://nossa.nmci.navy.mil https://e3.nswc.navy.mil
SECTION B(4) - SMALL ARMS RANGE
1. Does the project construct a new weapons range or add to the capacity of an existing weapons range.
YES
NO
2. In coordination with Weapons Officer, Range Safety Officer, Industrial Hygienist, Explosives Safety Officer, AIROPS, Port Ops, Base Communication, CPLO, etc, are there potential impacts on an existing range?:
YES
NO
NOTE (SMALL ARMS RANGE): If answer to Block 1 or 2 is "YES", attach copy of NAVFAC 11010/31, Part I, site plan, etc., and forward SAR memo to CNO through the Chain-of-Command.
SECTION B(5) - RADIOLOGICAL SAFETY
1. In coordination with activity CROPM (Contractor Radiological Oversight Program Manager), COT (the Contractor Oversight Technicians (COT), NAVFAC Safety Officer, Industrial Hygienist, Base Communication, etc., does the project install, impact, or provide capabilities for the operation of radioactive materials or radiation-generating devices? (If "NO", skip to next section).
YE
S
NO
NOTE (RADIOLOGICAL SAFETY): If answer to Block 1 is "YES", provide copy of NAVFAC 11010/31, Part I, site plan, etc., to activity CROPM, per NAVFACINST 5104.1. The CROPM will initiate memo for approval by by ICO or NAVSEA/ Radiological Affairs Support Office (RASO), depending on determination by CROPM and COT at the installation.
SECTION B(6) - ADDITIONAL COMMENTS
1. Provide name of organization at Activity and POC, and comments:
2. Provide name of organization at Activity and POC, and comments:
3. Provide name of organization at Activity and POC, and comments:
NAVFAC 11010/31, Part I
SECTION C - FEC/LANT/PAC/SYSCOM EXTERNAL REVIEW FOR
CATEGORY B SAR (TO BE COMPLETED BY REVIEW/ENDORSEMENT/
CERTIFICATION AUTHORITY)
NAVFACINST 11010.45A
In accordance with NAVFAC Instruction 11010.3/11010.45A, for program management and reporting purposes, please provide a brief summary of your review actions on this form, prior final review and approval of SAR by the ICO (in Section D). Please make a copy and attach to NAVFAC SAR package, if additional reviews are required by agency(ies)).
1. Review Agency (Name of Agency) 1(1) Date Received
1(2) Summary Evaluation of Category B SAR:
1(3) Reviewer's Name/Code/Phone No./E-Mail Address: 1(4) Date Forwarded
2. Review Agency (Name of Agency) 2(1) Date Received
2(2) Summary Evaluation of Category B SAR:
2(3) Reviewer's Name/Code/Phone No./E-Mail Address: 2(4) Date Forwarded
3. Review Agency (Name of Agency prior to submittal to ICO) 3(1) Date Received
3(2) Summary Evaluation of Category B SAR:
3(3) Final Determination by Review/Endorsement/Certification Organization/Agency
Endorsed/Certified (Forwarded to Activity)
Not Endorsed (Activity to Re-Submit)
Not Endorsed (Returned to Activity)
3(4) Reviewer's Name/Code/Phone No./E-Mail Address: 3(5) Date Forwarded to
ICO
SECTION D - HOST COMMAND SUMMARY & FINAL SITE APPROVAL ACTION
1. Date Received 2. What Category SAR? (If A, proceed to Block 5:
A B
3. Category B SAR Endorsement/Certification Received from (Attach copy of documentation):
FEC NAVFAC LANT NAVFAC PAC REGCOM NAVAIR NAVSEA (NOSSA) NAVSEA (NSWCDD)
NAVSEA (RASO) SPAWARSYSCEN (Atlantic) CNIC OPNAV CNO DUSD (I&E) OTHER
4. Type of Category B SAR Endorsed/Certified
4(1). Airfield Safety Waiver (ASW
Repair
Maintenance
Construction
Contingency
Aids-to-Navigation
RDT&E
Other Event
Not Applicable
4(2). Explosive Safety Certification
Construction Waiver Authorization
Preliminary Explosives Safety Certification
Final Explosives Safety Certification
Not Applicable
4(3). Electromagnetic Radiation (NAVSEA)
HERO
HERP
HERF
Not Applicable
4(4). Electromagnetic Radiation (SPAWARSYSCEN (Atlantic))
EMI
Not Applicable
4(5). Small Arms Range Safety
YES
Not Applicable
4(6). Radiological YES
Not Applicable
5(1). Duration/Begin Date. (Enter N/A if Not Applicable):
5(2). Duration/End Date. (Enter N/A if Not Applicable):
6. If SAR is being recommended for approval (with/without condition(s), briefly state:
7. Recommendation by Public Works Officer, Asset Management Branch Head, or Delegated Authority (Name/Title/E-mail Address/Signature):
8.
Date:
NAVFAC 11010/31, Part I
9. Host Command Final Decision on Site Approval Request (*Select one action item):
Approved Disapproved Deferred/Returned
10. Comments
11. Name/Title/Signature of ICO (or Delegated Authority):
12. Date
*To be signed by Installation Commanding Officer (ICO), or Delegated Authority, for both Category A and B SAR. To complete the electronic signature, sign using your DOD CAC card, then lock the document. Signature should be visible on the completed form.
For addition information and assistance, visit the Site Approval Request webpage on the HQ NAVFAC/Asset Management portal (https://hub.navfac.navy.mil/webcenter/portal/am/).
(Version 2.0) 17 May, 2018 https://hub.navfac.navy.mil/webcenter/portal/am/page1848/page139?_afrLoop=191605820565554&addToRoster=y&_adf.ctrl-state=16mw1wkvgy_4#!%40%40%3F_afrLoop%3D191605820565554%26addToRoster%3Dy%26centerWidth%3D100%2525%26lastReviewedDate%3D10%252F02%252F14%26leftWidth%3D0%2525%26pocEmail%3Dkofi.newman%2540navy.mil%26rightWidth%3D0%2525%26showFooter%3Dfalse%26showHeader%3Dfalse%26_adf.ctrl-state%3D1b6j68ci8u_117
Site Plan NF20-1644 (DLA Storage Facility)
8 FOOT HIGH
CHAIN LINK FENCE
BITUMINOUS CONCRETE AT
EXISTING PAVEMENT (TYP.) C-502
A2
BITUMINOUS CONCRETE
PAVEMENT (TYP.) C-502
A1
C-502
B1 CONCRETE WALKWAY
(TYP.)
REPAIR ALL DISTURBED
LANDSCAPE AREAS WITH
LOAM AND SEED (TYP.)
LANDING AT
BUILDING ENTRANCES
(TYP.)
C-502
A5
4.5' X 2.5' CONCRETE
EQUIPMENTC-502
B5
BOLLARD
(TYP. @ 4)C-502
C1
LANDING AT BUILDING
ENTRANCES (TYP.)C-502
A5
C-502
B1CONCRETE WALKWAY
(TYP.)
REPAIR ALL DISTURBED
LANDSCAPE AREAS WITH
LOAM AND SEED (TYP.)
MATCHLINE
SEE SHEET C-106
CANTILEVERED
SLIDING GATEC-503
C1
BITUMINOUS CONCRETE AT
EXISTING PAVEMENT (TYP.) C-502
A2
BITUMINOUS CONCRETE A1
5.
0'
2.
0'
4.5'12.0'9.5'12.0'4.5'
5.
0'
5.0' 5.0'
4' SINGLE LEAF SWING
GATE W/ LATCH AND
DROP BARS
C-503 A1
C-503 A1
BOLLARD
(TYP. @ 4)C-502
C1
3.0'
3.
0'
R6.0'R6.0'
R6.0'
R3.0'
.0
12.0'
.0
11.0'
C-503 A3
C-503 B3
25.0'
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
C O
M M
AN
D
M
ID
-A
TL
AN
TI
C
D
LA
S
IT
E D
E V
E
LO
P M
E N
T A
N D
S
TO
R A
G E
FA
C
IL
IT
Y
DCC
1665401
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
D
ES
IG
N
SU
BM
IS
SI
ON
/11 /20
S
UB
MI
SS
IO
N
II
/16
/20
S
UB
MI
SS
IO
N
III
/25 /20
PR
E-
FI
NA
L S
UB
MI
SS
IO
N
/10 /20
0% F
IN
AL
S
UB
MI
SS
IO
N
/24
/20
12345
NLEGEND
NOTES:
1. DIMENSIONS SHOWN OFF THE BUILDING ARE FROM THE EXTERIOR
FACE OF THE FOUNDATION WALL.
2. DIMENSIONS SHOWN IN THE PARKING LOTS AND ROADWAYS ARE
FROM THE FACE OF CURB, CENTERLINE OF STRIPING, AND EDGE OF
PAVEMENT.
3. DIMENSIONS SHOWN IN THE CONCRETE WALKWAYS ARE FROM
SCORE JOINTS, EXPANSIONS JOINTS, AND EDGE OF CONCRETE.
4. COORDINATE THE EXACT LOCATION OF THE MECHANICAL
EQUIPMENT AND PAD WITH THE MECHANICAL PLANS. CONFIRM PAD
SIZE WITH THE SELECTED PRODUCT(S) PRIOR TO INSTALLING.
5. SEE ARCHITECTURAL PLANS FOR EXACT BUILDING DIMENSIONS
AND LOCATIONS OF DOORS.
6. INSTALL SITE FEATURES AND FURNISHINGS TO MEET ABA
REQUIREMENTS FOR ACCESSIBILITY. NOTIFY THE CONTRACTING
OFFICER OF POTENTIAL CONFLICTS PRIOR TO INSTALLING.
7. PRIOR TO SOIL REUSE AND/OR DISPOSAL, OBTAIN APPROVAL FROM
NAVFAC PW: NSB-NLON ENVIRONMENTAL RESTORATIONS DIVISION PER
SUBASENLON INSTRUCTIONS, POLICIES, AND PROCEDURES.
CONCRETE EQUIPMENT PAD
CONCRETE WALKWAY
SEED
BOLLARD
LA
YO
UT
A
ND
M
AT
ER
IA
LS
P
LA
N I
1" = 10'
C-105
B
PROPOSED BUILDING
BITUMINOUS CONCRETE
PAVEMENT
CHAIN LINK FENCE
OVERHEAD ROLLER GATE
12848440
AutoCAD SHX Text
CONNECTICUT COORDINATE SYSTEM (NAD83 2011 (EPOCH 2010.00)
AutoCAD SHX Text
STATION #1 SPIKE SET N 703304.26 E 1183256.08 ELEV=24.91
AutoCAD SHX Text
STATION #3 SPIKE SET N 703184.01 E 1183200.42 ELEV=22.06
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text
CPAD W/ MONITORING WELL
AutoCAD SHX Text
CONCRETE WALL(TYP.)
AutoCAD SHX Text
UNK(GPR)
AutoCAD SHX Text
UNK(GPR)
AutoCAD SHX Text
DO (GPR)
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text
EMH
AutoCAD SHX Text S(R)
AutoCAD SHX Text S(R)
AutoCAD SHX Text
BCC
AutoCAD SHX Text
CC
AutoCAD SHX Text
CC
AutoCAD SHX Text
EOP
AutoCAD SHX Text
BCD
AutoCAD SHX Text
PIV
AutoCAD SHX Text S(R)
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
BCD
AutoCAD SHX Text
EOP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
LP/BASE
AutoCAD SHX Text
CC
AutoCAD SHX Text
8'CLF
AutoCAD SHX Text
CC
AutoCAD SHX Text
CC
AutoCAD SHX Text
BCD
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
EOP
AutoCAD SHX Text
8'CLF
AutoCAD SHX Text 24"D
AutoCAD SHX Text 24"D
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CC
AutoCAD SHX Text
CC
AutoCAD SHX Text
COLUMN
AutoCAD SHX Text
COLUMN
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
OVHD
AutoCAD SHX Text
8'CLF
AutoCAD SHX Text
SWLL
AutoCAD SHX Text
SWLL
AutoCAD SHX Text W(R)
AutoCAD SHX Text
CC
AutoCAD SHX Text
LPB
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
EMH
AutoCAD SHX Text
CPAD
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
UNK(GPR)
AutoCAD SHX Text
OVERHANG
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
UG FUEL VAULT
AutoCAD SHX Text
CP TEST
AutoCAD SHX Text
CPAD
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| Site_Approval_Request_(DLA Storage Facility)_10Nov2022.pdf |
| Site_Plan_NF20-1644_10Nov2022.pdf |
| Drawing_C-105.pdf |
| Activity SAR Number:_07T8KUmhxBgMEsX*VYkGLQ: 1750683 |
| Date:_9raaILJXFt5nsiK31ZuxOA: 11/10/2022 |
| _1_ To:(Host Command):_SKcnDLJpySRbrGqInPLxxQ: Naval Submarine Base New London |
| _2_ From:(Sponsor):_JOiqPt1YMoLGWAdKvbinyQ: Public Works Department New London |
NAVFAC MIDLANT
| _3_ Installation UIC:_s-d5i4bwrqEHUf5u4GcGgw: N00129 |
| _4_ Special Area Code:_nuty67RBgqats6AdFAwUig: Main |
| _5_ SUID Code:_Pn81u0BevGRBlnUK0fWT7w: NA |
| _6_ Building Number:_XOM1Fiwz3cmNcJxzs*9ZcA: TBD |
| _7_ Fiscal Year:_EiZIfDZJH56yooIbncimBQ: 2023 |
| _8_ eProjects Work Order No_:_3Fn5YIRzq-*3ty*9dEr9LQ: 1750683 |
| _9_ Project Amount($000):_6jzr3whNbjNeXwhTwXX9TQ: 943 |
| _10_ Navy _P_ Number_TOwgMqObk56zIRvKTcS3QQ: NF20-1644 |
| _11_ Latitude:_S5CvwyCe-o4gDbYXRhAULA: |
| _12_ Longitude:_mpo96252hY4Zx8stDkhPGQ: |
| _13_ Ground Elevation:_4cayEVFTrq4twKwCgD44hg: |
| _14_ Project Name/Title:_CwJeA3dqSuRBESkj2C2T3g: DLA Storage Facility |
| _15_ Category Code:_rn6z3QCSfmZaVOZcws6egw: 218-77 |
| Type of Project/Event (Check a_0_I6DP1cpQ9Gwm4AneGjB3cQ: Off |
| Type of Project/Event (Check a_1_I6DP1cpQ9Gwm4AneGjB3cQ: Off |
| Type of Project/Event (Check a_2_I6DP1cpQ9Gwm4AneGjB3cQ: Yes |
| Type of Project/Event (Check a_3_I6DP1cpQ9Gwm4AneGjB3cQ: Off |
| Type of Project/Event (Check a_4_I6DP1cpQ9Gwm4AneGjB3cQ: Off |
| Type of Project/Event (Check a_5_I6DP1cpQ9Gwm4AneGjB3cQ: Off |
| Type of Project/Event (Check a_6_I6DP1cpQ9Gwm4AneGjB3cQ: Off |
| Type of Project/Event (Check a_7_I6DP1cpQ9Gwm4AneGjB3cQ: Off |
| Type of Project/Event (Check a_8_I6DP1cpQ9Gwm4AneGjB3cQ: Yes |
| Type of Project/Event (Check a_9_I6DP1cpQ9Gwm4AneGjB3cQ: Off |
| Type of Project/Event (Check a_edit;_I6DP1cpQ9Gwm4AneGjB3cQ: |
| _17_ Project/Event Descriptio_nSsJ7XG1wYZYD2Ycuu0y-A: This project constructs a storage facility of approximately 910 SF for DLA. The proposed storage building includes architectural, structural, mechanical, plumbing, life safety, fire alarm, electrical, and site work/improvements. |
Approximately 30 SY of sidewalks will be constructed adjacent to the new facility. The sidewalks lead from the east and west pedestrian exit doors and connect to the pavement on the south side of the building. Approximately 100 SY of pavement will be constructed on the south side of the building. The new pavement will connect building to the DLA access roadway.
Electrical service will be run underground and will be fed from DLA building 549 (Fuel Operation Building). Sewer and telecommunictions will enter the building on the south side and connect to existing sewer and telecommunications utilities.
A new sliding gate will also be installed at the entrance to the DLA site and approximately 95 LF of security fencing will be installed.
| _18(a) Category A, including e_GK8rO9asRv1JX3RWhw6AfQ: YES |
| _18(b) Category B SAR:_0_RH3Ry5UpG*4OzzdNTxgT-g: Off |
| _18(b) Category B SAR:_1_RH3Ry5UpG*4OzzdNTxgT-g: Off |
| _18(b) Category B SAR:_2_RH3Ry5UpG*4OzzdNTxgT-g: Off |
| _18(b) Category B SAR:_3_RH3Ry5UpG*4OzzdNTxgT-g: Off |
| _18(b) Category B SAR:_4_RH3Ry5UpG*4OzzdNTxgT-g: Off |
| _18(b) Category B SAR:_5_RH3Ry5UpG*4OzzdNTxgT-g: Off |
| _18(b) Category B SAR:_6_RH3Ry5UpG*4OzzdNTxgT-g: Off |
| _18(b) Category B SAR:_7_RH3Ry5UpG*4OzzdNTxgT-g: Off |
| _18(b) Category B SAR:_8_RH3Ry5UpG*4OzzdNTxgT-g: Off |
| _18(c) Responsible authority(_0_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_1_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_2_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_3_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_4_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_5_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_6_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_7_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_8_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_9_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_10_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_11_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_12_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(c) Responsible authority(_13_5ggdCI2sZrnx4ERwNFCAuA: Off |
| _18(d) Specify:_mVijHHfOUcZSiWfBWvnk9A: |
| If construction related (or ev_XLALOi-f0cfpyCwbOCNWgg: Not Applicable |
| Determination of Category of S_Q4xmjMLS5zpsqWpg7VvvPQ: COMNAVREGMIDLANTISNT 11011.11B requires a site approval when: |
3(d) Any project, real estate action, or proposed use of property that proposes changing the functional use of a facility, or the land use, or physical layout of an area.
3(e) Any proposed use of property, permanent or temporary, that involves placing or removing a facility or structure.
This is a category A site approval (non-explosive safety)
| Date SAR validated, forwarded _iFoCXg1tcl-GmrtNG551MA: 11/10/2022 |
| Name/Title/E-mail Address(of P_B3MkWjo30r3I34o2a0GIzg: Jim Gentry/Facility Planner/james.e.gentry8.civ@us.navy.mil |
| _25_ Name/Title/E-mail Addres_ACWmZRT8n425XydwNdz6yQ: Peter Daddona/Asset Management Branch Head/peter.c.daddona.civ@us.navy.mil |
| Is NAVAIR Airfield Safety Waiv_3M*c4eO5eWX-yqSEygDC9g: Off |
| _2_ Is FAA OE/AAA (Notice of _qXpOvC2m3PEXUJ-yqfp3Hw: Off |
| _3_ Runway Number:_1oHRIlLDZyj8IvxH9YAVww: |
| _4_ Select Runway Type (Class_2cj56JhJx*fgCCdHt0fwgQ: [] |
| _5_ Airfield Elevation (ft):_fv9x249NZyD9pjmIxasIRA: |
| _6_ Maximum Height of Facilit_44URD54jS5e9n*G*HXlOKg: |
| _7_ Maximum Height of Equipme_R05OVXvDkhoIBfi5F3QJOw: |
| _8_ Lateral Distance from Run_fzpaAnP8gTWhBjud9I0jQg: |
| _9_ Horizontal Distance to Run_CtF3lWOG3sUl4NYAS7kYpA: |
| _10_ Horizontal Distance from _2KBbdqiDLP3jZA9VorLaqQ: |
| _11_ Horizontal Distance to Ed_2mMWQWHtFy3B8sNzspR*bQ: |
| _12_ Allowable Height Based o_BjxUkEWHMyZ29oaHDYpiSg: |
| _13_ Allowable Height Based o_aNBm2i-MwoHuS*U26HJhfA: |
| _14_ Allowable Height Based _ORGtYw4Wc7GDrB1BZOx1Sg: |
| _15_ Allowable Distance Based_38NlRR-yIqkxRIVf6TNoJA: |
| _16_ Existing Waiver Number _5EjsS29n9407nUPDehqyFQ: |
| _17_ Existing Waiver _1G7vJ2olk68M05Wy4Vr1dw: |
| _18_ Indicate Type of Constru_pbuuYjRrhcevE2uMf3jxvw: Off |
| _19_ Airfield Safety Waiver (_0_AhvIsuti6Ya3LIl19MlVDA: Off |
| _19_ Airfield Safety Waiver (_1_AhvIsuti6Ya3LIl19MlVDA: Off |
| _19_ Airfield Safety Waiver (_2_AhvIsuti6Ya3LIl19MlVDA: Off |
| _19_ Airfield Safety Waiver (_3_AhvIsuti6Ya3LIl19MlVDA: Off |
| If construction related (or ev_oJDnQg5U0qyO080Z5SZxEA: |
| _1_ In coordination with Expl_9mNqUOjCONRfRQ06b4wCMw: Off |
| _2_ What type of project or e_0_5Do4grOL-ob2tQuAD9zumQ: Off |
| _2_ What type of project or e_1_5Do4grOL-ob2tQuAD9zumQ: Off |
| _2_ What type of project or e_2_5Do4grOL-ob2tQuAD9zumQ: Off |
| _2_ What type of project or e_3_5Do4grOL-ob2tQuAD9zumQ: Off |
| _2_ What type of project or e_4_5Do4grOL-ob2tQuAD9zumQ: Off |
| _3_ If there are explosives s_0_RV8Yd8yWZMnFx5kcIULxqA: Off |
| _3_ If there are explosives s_1_RV8Yd8yWZMnFx5kcIULxqA: Off |
| _3_ If there are explosives s_2_RV8Yd8yWZMnFx5kcIULxqA: Off |
| _3_ If there are explosives s_3_RV8Yd8yWZMnFx5kcIULxqA: Off |
| _3_ If there are explosives s_4_RV8Yd8yWZMnFx5kcIULxqA: Off |
| _1_ In coordination with Base_pZDhEiXg6IYfL8ioiyi*sw: Off |
| _2_ System Location (Physical _Pt6TiGghkemXt1BXsyHFXw: |
| _3_ Type of Transmitter:_DVJJ9CPvuN*xzCfoVSsJTQ: [] |
| _3_ Type of Transmitter:_edit;_DVJJ9CPvuN*xzCfoVSsJTQ: |
| _4_ Distance to Nearest Fueli_XOzpajtAsf1eup7cwZt94A: |
| _1_ Does the project construc_5PKzS1iaJwMrRICaMt2Qfw: Off |
| _2_ In coordination with Weap_2jwqxUGeuD3Mrxlk06QoEQ: Off |
| _1_ In coordination with acti_yhehf0vx97Lq860O1UmH9w: Off |
| _1_ Provide name of organizat_fYvpf-IZGSVnSy8pMvV50w: |
| _2_ Provide name of organizat_dXxizVvMNvTToFa-TfE2-g: |
| _3_ Provide name of organizat_FK7ZolhHt9eQPf8qXMYgkA: |
| _1_ Review Agency (Name of Age_6gv2m1tDSydJZCHBVFaMpA: |
| _1(1) Date Received_FAYwHpCdH3PZAx7zUOrlzg: |
| _1(2) Summary Evaluation of Ca_1YNtNQ46fVl16EVzlfRPdg: |
| _1(3) Reviewer_s Name/Code/Ph_o5NiPncIRIIlm7DCsWnHRg: |
| _1(4) Date Forwarded_e8xEqil8io1CP5e*mfeb9g: |
| _2_ Review Agency (Name of Age_xcow0*jh-3wUQaDlycc8mA: |
| _2(1) Date Received_abkyUtkVM89uAa3os1YgSQ: |
| _2(2) Summary Evaluation of C_zbmguxz4Zylvxfsg-P9c4A: |
| _2(3) Reviewer_s Name/Code/Ph_MA7jGR4SdM*4svxV101BHA: |
| _2(4) Date Forwarded_h08oLdTNOqg3esDO6VVDHQ: |
| _3_ Review Agency (Name of Age_RrmsDK4mYGHNybs88T6uHw: |
| _3(1) Date Received_1pCA8SyyDE3UfuXCcvCT6g: |
| _3(2) Summary Evaluation of C_j9AdEv9lVVVMNsf8dgoIZA: |
| _3(3) Final Determination by _6whJJkpdC2dYOpTqtX5WXg: Off |
| _3(4) Reviewer_s Name/Code/Ph_wIYDEhdoKuStxTG*txqF5Q: |
| _3(5) Date Forwarded to ICO_XeoANWoNZB9kx1yiAyq9Aw: |
| _1_ Date Received_vDf1rs82h79TZBZmtXw*NA: 11/10/2022 |
| _2_ What Category SAR? (If A,_9Ee3EsCbyrTHh0F43rGNOQ: A |
| _3_ Category B SAR Endorsemen_0_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_1_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_2_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_3_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_4_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_5_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_6_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_7_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_8_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_9_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_10_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_11_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_12_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _3_ Category B SAR Endorsemen_13_Ycn1gyLK1syi1SlHDwd1SA: Off |
| _4(1)_ Airfield Safety Waiver_*AXofAEzlk3bMM3ceZEiyg: Off |
| _4(2)_ Explosive Safety Certi_0_*qqcrz4lfLQGlvE*z93*-w: Off |
| _4(2)_ Explosive Safety Certi_1_*qqcrz4lfLQGlvE*z93*-w: Off |
| _4(2)_ Explosive Safety Certi_2_*qqcrz4lfLQGlvE*z93*-w: Off |
| _4(2)_ Explosive Safety Certi_3_*qqcrz4lfLQGlvE*z93*-w: Off |
| _4(3)_ Electromagnetic Radiat_0_Iuy0gJdEnPiO20hASvzo9g: Off |
| _4(3)_ Electromagnetic Radiat_1_Iuy0gJdEnPiO20hASvzo9g: Off |
| _4(3)_ Electromagnetic Radiat_2_Iuy0gJdEnPiO20hASvzo9g: Off |
| _4(3)_ Electromagnetic Radiat_3_Iuy0gJdEnPiO20hASvzo9g: Off |
| _4(4)_ Electromagnetic Radiat_3amZHa2uGj67ax1peL871g: Off |
| _4(5)_ Small Arms Range Safet_s21forf8gy9rryAB9Fg6DQ: Off |
| _4(6)_ Radiological_73CslwFgaYuyM2ea9aPh4Q: Off |
| _5(1)_ Duration/Begin Date_ (_JFntR3HRyNp2XDHo7EphqA: 02/01/2023 |
| _5(2)_ Duration/End Date_ (En_iwzlgVetwHAo09TsbyV8NQ: 12/31/2024 |
| _6_ If SAR is being recommend_YvWmzH7xGhs1D2hOa6EQng: Category A (non-explosive) site approval request recommended for approval without conditions. Project is consistent with Installation Development Plan. |
| _7_ Recommendation by Public _uZgmerUuoElLWZGp5Xr6kQ: Recommend approval. |
Peter Daddona/Asset Management Branch Head/peter.c.daddona.civ@us.navy.mil
| _8_ Date:_d5aHbBXsCmseFwLbipulQw: 11/10/2022 | |
| singleselectfield_hrUzwDsCemDgP2im-xpIFA: Approved | |
| Comments_QzWkkKxeHxUSJbHYVvLfGg: | |
| _12_ Date_NB*sMLtygyGTJ0HVXLZMuQ: | |
| fc-int01-generateAppearances: | |
| 2022-12-05T12:02:26-0500 | |
| CURTIN.KENNETH.M.1025344517 |
File details come from the government source that posted it. Updated .