(E) Site Approval.pdf

PDF 878 KB Posted

Attached to
DLA Site Development, Naval Submarine Base New London
Solicitation number
5997283
Issued by

About this file

This document is a Site Approval Request form for the construction of a storage facility for the Defense Logistics Agency at Naval Submarine Base New London. The project involves constructing a 910 square foot storage building, along with approximately 30 square yards of adjacent sidewalks and 100 square yards of connecting pavement. Additional site work includes running electrical service from an existing fuel operations building, installing new sewer and telecommunications connections, and placing 95 linear feet of security fencing with a sliding gate at the entrance. The request is categorized as a Category A non-explosive site approval. It provides project details, coordinates agency reviews, and recommends approval of the request by the installation commanding officer.

View the file

Other files

File Type Posted
Price Proposal Form.docx DOCX document
Amendment 0004.pdf PDF
Wage Determ.docx DOCX document
(AA) Soil Report 2019.pdf PDF
Amendment 0003.pdf PDF
RFI Responses.pdf PDF
(AI) Geotech Report 2023.pdf PDF
(AC) Soil Report 2022b.pdf PDF
(AD) Soil Summary.pdf PDF
(AF) Utlility Map 2020.pdf PDF
(AE) Soil Mgmt Plan.pdf PDF
(AB) Soil Report 2022a.pdf PDF
(AG) Utility Map 2021.pdf PDF
(AH) Geotech Report 2021.pdf PDF
(A) MACC RFP NPT NLON Rev 1.pdf PDF
Amendment 0002.pdf PDF
Site Visit Log.pdf PDF
Amendment 0001.pdf PDF
(H) General Requirements.pdf PDF
(N) Building Contractors Guide to Taxes.pdf PDF
(A) MACC RFP NPT NLON.docx DOCX document
(L) ECMS.pdf PDF
(O) 2016-R-0149.pdf PDF
(G) Price Proposal Form.doc DOC document
(M) 52.204-24.pdf PDF
(I) Base Map.pdf PDF
(P) CERT-141.pdf PDF
(C) Drawings.pdf PDF
(B) Specifications.pdf PDF
(D) NEPA.pdf PDF
(K) RFI Form.pdf PDF
(J) Map to B135.pdf PDF
(F) DB Wages 16 JUN 2023.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC 11010/31, PART I

REQUEST FOR PROJECT SITE APPROVAL

NAVFACINST 11010.45A

Per NAVFACINST 11010.45A, Site Approval Request Process, NAVFAC 11010/31, Part 1, is required for both Category A and Category B Site Approval Requests (SAR), for both facilities and certain types of events, including those requiring waivers or exemptions. Site approvals are granted based on the conditions and circumstances shown in the SAR. The site approval becomes invalid if any of those conditions change.

Approvals become invalid if the project scope or location is altered in any manner from the information on which the SAR, certification, or endorsement was granted. Approvals become invalid if project proponent or owner fails to comply with conditions stipulated in the SAR. Category 2 SAR certifications, including requests for waivers and exemptions and other conditional endorsements, (e.g., explosive safety related site approvals granted under Safety Assessment for Explosives Risk (SAFER), Airfield Safety Waivers, etc.), may require periodic reviews and re-certification. Refer to Unified Facilities Criteria (UFC) 2-000-05N and other applicable versions, the NAVFAC Business Management System (BMS) for SARs, Installation Development Plan (IDP), other Systems Command (SYSCOM) and NAVFAC guidance, for additional information. (Complete this form using the PDF/electronic version and forward a copy of the final to all stakeholders for their records).

SECTION A - PROJECT INFORMATION (TO BE COMPLETED BY SAR POC)

Activity SAR Number: Date:

1. To:(Host Command): 2. From:(Sponsor):

3. Installation UIC: 4. Special Area Code: 5. SUID Code: 6. Building Number:

7.

Fiscal Year:

8.

eProjects Work Order No.:

9.

Project Amount($000):

10.

Navy "P" Number

11. Latitude: 12. Longitude: 13. Ground Elevation:

14. Project Name/Title: 15. Category Code:

16. Type of Project/Event (Check all that apply):

Repair Maintenance Construction Addition to Existing Facility Demolition

Event Change of Use (Category Code) Relocatable (Temporary Facility)

New Footprint Other (Specify)

NAVFAC 11010/31, Part I

Enclosure 1

17. Project/ Event Description:

NAVFACINST

11010.45A

NAVFACINST 11010.45A

18. Type of Request/Certification/Waiver and responsible authorities:

18(a) Category A, including events of temporary duration (e.g. Air Shows), and re-submittals:

YES NO

18(b) Category B SAR:

Airfield

Explosives

EMR (HERP/HERF/HERO)

EMR (EMI)

Radiological

Small Arms Range/Outdoor Live-Fire Range

Re-Submittal (Category B)

OTHER

N/A

18(c) Responsible authority(ies) for Category B SAR. (Check all that may apply):

Host Command (Category A)

FEC

REGCOM

NAVAIR

NAVSEA (NOSSA)

NAVSEA (NSWCDD)

NAVSEA (RASSO)

SPAWARSYSCEN (Atlantic)

CNIC

OPNAV

CNO

DUSD (I&E)

OTHER (Specify in Block 20)

N/A

18(d) Specify:

19. If construction related (or event), specify duration in which the certification, waiver, is required (Days/Weeks/Months). If "Permanent", so indicate. Otherwise, enter "Not Applicable":

20. Determination of Category of SAR, siting rationale, justification for request for endorsement, waiver, exemption, impact if not approved, etc:

23. Date SAR validated, forwarded for Signature/Endorsement/Certification, or Action Suspended:

24. Name/Title/E-mail Address(of PWD SAR POC):

25. Name/Title/E-mail Address (of SAR POC

SUPERVISOR):

SECTION B - PRELIMINARY EVALUATION OF CATEGORY B IMPACTS

(TO BE COMPLETED BY SAR POC)

NAVFACINST 11010.45A

NOTE: If Category A, skip Section B and C and complete applicable portions of Section D (Host Command Summary and Final Site Approval Request Action).

SECTION B(1) - AIRFIELD SAFETY

1. Is NAVAIR Airfield Safety Waiver required for a facility, construction, crane, or other event, including air shows.

Are there potential impacts to instrument approach/departure procedures? (If YES, complete Section B(1) and request NAVAIR airfield safety waiver and other clearance(s) via ICO memo using NAVAIR IBONS and other SYSCOM processes:

YES

NO

2. Is FAA OE/AAA (Notice of Proposed Construction) Required? (If YES, provide data to CPLO and attach FAA permit):

YES

NO

3.

Runway Number:

4. Select Runway Type (Class "A" or "B"):

5.

Airfield Elevation (ft):

For the following set of questions (Block 6 - 20), enter "N/A" for "Not Applicable", if that is the case:

6. Maximum Height of Facility (ft):

7. Maximum Height of Equipment at Location (ft):

8. Lateral Distance from Runway Centerline (ft):

9. Horizontal Distance to Runway Primary Surface (ft):

10.

Horizontal Distance from Clear Zone (ft):

11.

Horizontal Distance to Edge of Parking Apron (ft):

12. Allowable Height Based on Transitional Surface (ft):

13. Allowable Height Based on Approach-Departure Surface (ft):

14.

Allowable Height Based on Apron Clearance Criteria (ft):

15. Allowable Distance Based on Taxiway Clearance (ft)

16.

Existing Waiver Number

17.

Existing Waiver

18. Indicate Type of Construction Airfield Safety Waiver of interest. (Construction waiver includes request related to a facility violating airfield safety criteria):

Repair

Maintenance

Construction

Event (e.g. Air Show)

Other (Specify in Block 19)

Not Applicable

19. Airfield Safety Waiver (Other):

Contingency

Aids-to-Navigation

RDT&E

Other

20. If construction related (or event), specify duration of ASW (Days/Weeks/Months).

NOTE: A NAVAIR ASW is not a substitute for a UFC criteria waiver/exemption (e.g. Design waiver). The airfield safety waiver and FAA OE/AAA permit require coordination by AIROPS, Control Tower, CPLO, NAVREP, NAVFIG, CPLO, Base Security, Explosives Safety Officer, Base Communications, Public Works Utilities, etc. See Asset Management Bulletin 2013-03 for more information.

NAVFAC 11010/31, Part I

SECTION B(2) - EXPLOSIVES SAFETY

1. In coordination with Explosives Safety Officer, AIROPS, Port Ops, Base Communication, etc, are there potential impacts to/of explosives safety (or fuels)? (If there are no explosives safety impacts, check "No" and skip to next section).

YES

NO

2. What type of project or event is triggering review for explosives safety impacts?

(Select all that apply):

Repair

Renovation

Equipment Installation

Changes in operation(s)

New Construction

3. If there are explosives safety impacts, what type of NOSSA review is/are required for certification? (Select all that apply)

Construction Worker Authorization

Preliminary Explosives Safety Certification

Final Explosives Safety Certification

SAFER (Site Approval by Safety Assessment for Explosives Risk)

Deviation (from Explosives Safety Criteria)

NOTE (EXPLOSIVES SAFETY): Per Section B(2), if there are explosives safety impact(s), attach copy of NAVFAC 11010/31, Part I, GeoReadiness-generated Site Plan(s), and Automated Explosives Safety Site Planning (AESSP)-generated explosives quantity-distance arcs/maps endorsed by Explosives Safety Officer (ESO), etc. Forward request to NOSSA though ICO using WebSAR, the NOSSA online application for explosives SARS. WebSAR will automatically route and complete the NOSSA Part II, NOSSA Form 8020.22. Use this link for access to WebSAR.

SECTION B(3) - ELECTROMAGNETIC RADIATION (HERP, HERF, HERO & EMI) SAFETY

1. In coordination with Base Communication and the Spectrum Manager, are there potential EMR impacts (HERP, HERF, HERO, EMI)? (If there are no EMR impacts, skip to next section).

YES

NO

2.

System Location (Physical Address, and Zip Code):

3.

Type of Transmitter:

4. Distance to Nearest Fueling Facility Operation (ft). Enter N/A, if not applicable:

NOTE 1 (HERP, HERF, HERO): Attach copy of NAVFAC 11010/31, Part I, copy of EMR Data Form, site plan, etc., and forward the request for impacts of Hazards of Electromagnetic Radiation to Personnel (HERP), Hazards of Electromagnetic Radiation to Fuels (HERF), and Hazards of Electromagnetic Radiation to Ordnance (HERO) for all Navy site approval requests through the Chain-of-Command to Naval Surface Warfare Center, Dahlgren Division (NSWCDD), using the Electromagnetic Environmental Effects, E3 Online LINK, off the NSWCDD website.

NOTE 2 (EMI): Attach copy of NAVFAC 11010/31, Part I, copy of EMR Data Form, site plan, etc., and forward the request for impacts of Hazards of Electromagnetic Radiation, Electromagnetic Interference (EMI), for all Navy site approval requests through the Chain-of-Command to SPAWARSYSCEN Atlantic: SPACE AND Naval Warfare Systems Center, SPAWARSYSCEN Atlantic, ATTN CODE 59440, PO Box 190022, North Charleston, SC 29419-9022 (Phone: (843) 218-5273;

DSN: 588-5273)).

NAVFAC 11010/31, Part I

Enclosure 1 https://nossa.nmci.navy.mil https://e3.nswc.navy.mil

SECTION B(4) - SMALL ARMS RANGE

1. Does the project construct a new weapons range or add to the capacity of an existing weapons range.

YES

NO

2. In coordination with Weapons Officer, Range Safety Officer, Industrial Hygienist, Explosives Safety Officer, AIROPS, Port Ops, Base Communication, CPLO, etc, are there potential impacts on an existing range?:

YES

NO

NOTE (SMALL ARMS RANGE): If answer to Block 1 or 2 is "YES", attach copy of NAVFAC 11010/31, Part I, site plan, etc., and forward SAR memo to CNO through the Chain-of-Command.

SECTION B(5) - RADIOLOGICAL SAFETY

1. In coordination with activity CROPM (Contractor Radiological Oversight Program Manager), COT (the Contractor Oversight Technicians (COT), NAVFAC Safety Officer, Industrial Hygienist, Base Communication, etc., does the project install, impact, or provide capabilities for the operation of radioactive materials or radiation-generating devices? (If "NO", skip to next section).

YE

S

NO

NOTE (RADIOLOGICAL SAFETY): If answer to Block 1 is "YES", provide copy of NAVFAC 11010/31, Part I, site plan, etc., to activity CROPM, per NAVFACINST 5104.1. The CROPM will initiate memo for approval by by ICO or NAVSEA/ Radiological Affairs Support Office (RASO), depending on determination by CROPM and COT at the installation.

SECTION B(6) - ADDITIONAL COMMENTS

1. Provide name of organization at Activity and POC, and comments:

2. Provide name of organization at Activity and POC, and comments:

3. Provide name of organization at Activity and POC, and comments:

NAVFAC 11010/31, Part I

SECTION C - FEC/LANT/PAC/SYSCOM EXTERNAL REVIEW FOR

CATEGORY B SAR (TO BE COMPLETED BY REVIEW/ENDORSEMENT/

CERTIFICATION AUTHORITY)

NAVFACINST 11010.45A

In accordance with NAVFAC Instruction 11010.3/11010.45A, for program management and reporting purposes, please provide a brief summary of your review actions on this form, prior final review and approval of SAR by the ICO (in Section D). Please make a copy and attach to NAVFAC SAR package, if additional reviews are required by agency(ies)).

1. Review Agency (Name of Agency) 1(1) Date Received

1(2) Summary Evaluation of Category B SAR:

1(3) Reviewer's Name/Code/Phone No./E-Mail Address: 1(4) Date Forwarded

2. Review Agency (Name of Agency) 2(1) Date Received

2(2) Summary Evaluation of Category B SAR:

2(3) Reviewer's Name/Code/Phone No./E-Mail Address: 2(4) Date Forwarded

3. Review Agency (Name of Agency prior to submittal to ICO) 3(1) Date Received

3(2) Summary Evaluation of Category B SAR:

3(3) Final Determination by Review/Endorsement/Certification Organization/Agency

Endorsed/Certified (Forwarded to Activity)

Not Endorsed (Activity to Re-Submit)

Not Endorsed (Returned to Activity)

3(4) Reviewer's Name/Code/Phone No./E-Mail Address: 3(5) Date Forwarded to

ICO

SECTION D - HOST COMMAND SUMMARY & FINAL SITE APPROVAL ACTION

1. Date Received 2. What Category SAR? (If A, proceed to Block 5:

A B

3. Category B SAR Endorsement/Certification Received from (Attach copy of documentation):

FEC NAVFAC LANT NAVFAC PAC REGCOM NAVAIR NAVSEA (NOSSA) NAVSEA (NSWCDD)

NAVSEA (RASO) SPAWARSYSCEN (Atlantic) CNIC OPNAV CNO DUSD (I&E) OTHER

4. Type of Category B SAR Endorsed/Certified

4(1). Airfield Safety Waiver (ASW

Repair

Maintenance

Construction

Contingency

Aids-to-Navigation

RDT&E

Other Event

Not Applicable

4(2). Explosive Safety Certification

Construction Waiver Authorization

Preliminary Explosives Safety Certification

Final Explosives Safety Certification

Not Applicable

4(3). Electromagnetic Radiation (NAVSEA)

HERO

HERP

HERF

Not Applicable

4(4). Electromagnetic Radiation (SPAWARSYSCEN (Atlantic))

EMI

Not Applicable

4(5). Small Arms Range Safety

YES

Not Applicable

4(6). Radiological YES

Not Applicable

5(1). Duration/Begin Date. (Enter N/A if Not Applicable):

5(2). Duration/End Date. (Enter N/A if Not Applicable):

6. If SAR is being recommended for approval (with/without condition(s), briefly state:

7. Recommendation by Public Works Officer, Asset Management Branch Head, or Delegated Authority (Name/Title/E-mail Address/Signature):

8.

Date:

NAVFAC 11010/31, Part I

9. Host Command Final Decision on Site Approval Request (*Select one action item):

Approved Disapproved Deferred/Returned

10. Comments

11. Name/Title/Signature of ICO (or Delegated Authority):

12. Date

*To be signed by Installation Commanding Officer (ICO), or Delegated Authority, for both Category A and B SAR. To complete the electronic signature, sign using your DOD CAC card, then lock the document. Signature should be visible on the completed form.

For addition information and assistance, visit the Site Approval Request webpage on the HQ NAVFAC/Asset Management portal (https://hub.navfac.navy.mil/webcenter/portal/am/).

(Version 2.0) 17 May, 2018 https://hub.navfac.navy.mil/webcenter/portal/am/page1848/page139?_afrLoop=191605820565554&addToRoster=y&_adf.ctrl-state=16mw1wkvgy_4#!%40%40%3F_afrLoop%3D191605820565554%26addToRoster%3Dy%26centerWidth%3D100%2525%26lastReviewedDate%3D10%252F02%252F14%26leftWidth%3D0%2525%26pocEmail%3Dkofi.newman%2540navy.mil%26rightWidth%3D0%2525%26showFooter%3Dfalse%26showHeader%3Dfalse%26_adf.ctrl-state%3D1b6j68ci8u_117

Site Plan NF20-1644 (DLA Storage Facility)

8 FOOT HIGH

CHAIN LINK FENCE

BITUMINOUS CONCRETE AT

EXISTING PAVEMENT (TYP.) C-502

A2

BITUMINOUS CONCRETE

PAVEMENT (TYP.) C-502

A1

C-502

B1 CONCRETE WALKWAY

(TYP.)

REPAIR ALL DISTURBED

LANDSCAPE AREAS WITH

LOAM AND SEED (TYP.)

LANDING AT

BUILDING ENTRANCES

(TYP.)

C-502

A5

4.5' X 2.5' CONCRETE

EQUIPMENTC-502

B5

BOLLARD

(TYP. @ 4)C-502

C1

LANDING AT BUILDING

ENTRANCES (TYP.)C-502

A5

C-502

B1CONCRETE WALKWAY

(TYP.)

REPAIR ALL DISTURBED

LANDSCAPE AREAS WITH

LOAM AND SEED (TYP.)

MATCHLINE

SEE SHEET C-106

CANTILEVERED

SLIDING GATEC-503

C1

BITUMINOUS CONCRETE AT

EXISTING PAVEMENT (TYP.) C-502

A2

BITUMINOUS CONCRETE A1

5.

0'

2.

0'

4.5'12.0'9.5'12.0'4.5'

5.

0'

5.0' 5.0'

4' SINGLE LEAF SWING

GATE W/ LATCH AND

DROP BARS

C-503 A1

C-503 A1

BOLLARD

(TYP. @ 4)C-502

C1

3.0'

3.

0'

R6.0'R6.0'

R6.0'

R3.0'

.0

12.0'

.0

11.0'

C-503 A3

C-503 B3

25.0'

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 7 FEBRUARY 2019

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

D

LA

S

IT

E D

E V

E

LO

P M

E N

T A

N D

S

TO

R A

G E

FA

C

IL

IT

Y

DCC

1665401

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

UNCLASSIFIED

UNCLASSIFIED

UN

CL

AS

SI

FI

ED

D

ES

IG

N

SU

BM

IS

SI

ON

/11 /20

S

UB

MI

SS

IO

N

II

/16

/20

S

UB

MI

SS

IO

N

III

/25 /20

PR

E-

FI

NA

L S

UB

MI

SS

IO

N

/10 /20

0% F

IN

AL

S

UB

MI

SS

IO

N

/24

/20

12345

NLEGEND

NOTES:

1. DIMENSIONS SHOWN OFF THE BUILDING ARE FROM THE EXTERIOR

FACE OF THE FOUNDATION WALL.

2. DIMENSIONS SHOWN IN THE PARKING LOTS AND ROADWAYS ARE

FROM THE FACE OF CURB, CENTERLINE OF STRIPING, AND EDGE OF

PAVEMENT.

3. DIMENSIONS SHOWN IN THE CONCRETE WALKWAYS ARE FROM

SCORE JOINTS, EXPANSIONS JOINTS, AND EDGE OF CONCRETE.

4. COORDINATE THE EXACT LOCATION OF THE MECHANICAL

EQUIPMENT AND PAD WITH THE MECHANICAL PLANS. CONFIRM PAD

SIZE WITH THE SELECTED PRODUCT(S) PRIOR TO INSTALLING.

5. SEE ARCHITECTURAL PLANS FOR EXACT BUILDING DIMENSIONS

AND LOCATIONS OF DOORS.

6. INSTALL SITE FEATURES AND FURNISHINGS TO MEET ABA

REQUIREMENTS FOR ACCESSIBILITY. NOTIFY THE CONTRACTING

OFFICER OF POTENTIAL CONFLICTS PRIOR TO INSTALLING.

7. PRIOR TO SOIL REUSE AND/OR DISPOSAL, OBTAIN APPROVAL FROM

NAVFAC PW: NSB-NLON ENVIRONMENTAL RESTORATIONS DIVISION PER

SUBASENLON INSTRUCTIONS, POLICIES, AND PROCEDURES.

CONCRETE EQUIPMENT PAD

CONCRETE WALKWAY

SEED

BOLLARD

LA

YO

UT

A

ND

M

AT

ER

IA

LS

P

LA

N I

1" = 10'

C-105

B

PROPOSED BUILDING

BITUMINOUS CONCRETE

PAVEMENT

CHAIN LINK FENCE

OVERHEAD ROLLER GATE

12848440

AutoCAD SHX Text

CONNECTICUT COORDINATE SYSTEM (NAD83 2011 (EPOCH 2010.00)

AutoCAD SHX Text

STATION #1 SPIKE SET N 703304.26 E 1183256.08 ELEV=24.91

AutoCAD SHX Text

STATION #3 SPIKE SET N 703184.01 E 1183200.42 ELEV=22.06

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text

CPAD W/ MONITORING WELL

AutoCAD SHX Text

CONCRETE WALL(TYP.)

AutoCAD SHX Text

UNK(GPR)

AutoCAD SHX Text

UNK(GPR)

AutoCAD SHX Text

DO (GPR)

AutoCAD SHX Text

8"PVC

AutoCAD SHX Text

CONCRETE WALK

AutoCAD SHX Text

EMH

AutoCAD SHX Text S(R)

AutoCAD SHX Text S(R)

AutoCAD SHX Text

BCC

AutoCAD SHX Text

CC

AutoCAD SHX Text

CC

AutoCAD SHX Text

EOP

AutoCAD SHX Text

BCD

AutoCAD SHX Text

PIV

AutoCAD SHX Text S(R)

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

BCD

AutoCAD SHX Text

EOP

AutoCAD SHX Text

GP

AutoCAD SHX Text

GP

AutoCAD SHX Text

GP

AutoCAD SHX Text

GP

AutoCAD SHX Text

GP

AutoCAD SHX Text

GP

AutoCAD SHX Text

LP/BASE

AutoCAD SHX Text

CC

AutoCAD SHX Text

8'CLF

AutoCAD SHX Text

CC

AutoCAD SHX Text

CC

AutoCAD SHX Text

BCD

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

EOP

AutoCAD SHX Text

8'CLF

AutoCAD SHX Text 24"D

AutoCAD SHX Text 24"D

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

GATE

AutoCAD SHX Text

CC

AutoCAD SHX Text

CC

AutoCAD SHX Text

COLUMN

AutoCAD SHX Text

COLUMN

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

OVHD

AutoCAD SHX Text

8'CLF

AutoCAD SHX Text

SWLL

AutoCAD SHX Text

SWLL

AutoCAD SHX Text W(R)

AutoCAD SHX Text

CC

AutoCAD SHX Text

LPB

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

EMH

AutoCAD SHX Text

CPAD

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

ST

AutoCAD SHX Text

ST

AutoCAD SHX Text

UNK(GPR)

AutoCAD SHX Text

OVERHANG

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

UG FUEL VAULT

AutoCAD SHX Text

CP TEST

AutoCAD SHX Text

CPAD

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Site_Approval_Request_(DLA Storage Facility)_10Nov2022.pdf
Site_Plan_NF20-1644_10Nov2022.pdf
Drawing_C-105.pdf
Activity SAR Number:_07T8KUmhxBgMEsX*VYkGLQ: 1750683
Date:_9raaILJXFt5nsiK31ZuxOA: 11/10/2022
_1_ To:(Host Command):_SKcnDLJpySRbrGqInPLxxQ: Naval Submarine Base New London
_2_ From:(Sponsor):_JOiqPt1YMoLGWAdKvbinyQ: Public Works Department New London

NAVFAC MIDLANT

_3_ Installation UIC:_s-d5i4bwrqEHUf5u4GcGgw: N00129
_4_ Special Area Code:_nuty67RBgqats6AdFAwUig: Main
_5_ SUID Code:_Pn81u0BevGRBlnUK0fWT7w: NA
_6_ Building Number:_XOM1Fiwz3cmNcJxzs*9ZcA: TBD
_7_ Fiscal Year:_EiZIfDZJH56yooIbncimBQ: 2023
_8_ eProjects Work Order No_:_3Fn5YIRzq-*3ty*9dEr9LQ: 1750683
_9_ Project Amount($000):_6jzr3whNbjNeXwhTwXX9TQ: 943
_10_ Navy _P_ Number_TOwgMqObk56zIRvKTcS3QQ: NF20-1644
_11_ Latitude:_S5CvwyCe-o4gDbYXRhAULA:
_12_ Longitude:_mpo96252hY4Zx8stDkhPGQ:
_13_ Ground Elevation:_4cayEVFTrq4twKwCgD44hg:
_14_ Project Name/Title:_CwJeA3dqSuRBESkj2C2T3g: DLA Storage Facility
_15_ Category Code:_rn6z3QCSfmZaVOZcws6egw: 218-77
Type of Project/Event (Check a_0_I6DP1cpQ9Gwm4AneGjB3cQ: Off
Type of Project/Event (Check a_1_I6DP1cpQ9Gwm4AneGjB3cQ: Off
Type of Project/Event (Check a_2_I6DP1cpQ9Gwm4AneGjB3cQ: Yes
Type of Project/Event (Check a_3_I6DP1cpQ9Gwm4AneGjB3cQ: Off
Type of Project/Event (Check a_4_I6DP1cpQ9Gwm4AneGjB3cQ: Off
Type of Project/Event (Check a_5_I6DP1cpQ9Gwm4AneGjB3cQ: Off
Type of Project/Event (Check a_6_I6DP1cpQ9Gwm4AneGjB3cQ: Off
Type of Project/Event (Check a_7_I6DP1cpQ9Gwm4AneGjB3cQ: Off
Type of Project/Event (Check a_8_I6DP1cpQ9Gwm4AneGjB3cQ: Yes
Type of Project/Event (Check a_9_I6DP1cpQ9Gwm4AneGjB3cQ: Off
Type of Project/Event (Check a_edit;_I6DP1cpQ9Gwm4AneGjB3cQ:
_17_ Project/Event Descriptio_nSsJ7XG1wYZYD2Ycuu0y-A: This project constructs a storage facility of approximately 910 SF for DLA. The proposed storage building includes architectural, structural, mechanical, plumbing, life safety, fire alarm, electrical, and site work/improvements.

Approximately 30 SY of sidewalks will be constructed adjacent to the new facility. The sidewalks lead from the east and west pedestrian exit doors and connect to the pavement on the south side of the building. Approximately 100 SY of pavement will be constructed on the south side of the building. The new pavement will connect building to the DLA access roadway.

Electrical service will be run underground and will be fed from DLA building 549 (Fuel Operation Building). Sewer and telecommunictions will enter the building on the south side and connect to existing sewer and telecommunications utilities.

A new sliding gate will also be installed at the entrance to the DLA site and approximately 95 LF of security fencing will be installed.

_18(a) Category A, including e_GK8rO9asRv1JX3RWhw6AfQ: YES
_18(b) Category B SAR:_0_RH3Ry5UpG*4OzzdNTxgT-g: Off
_18(b) Category B SAR:_1_RH3Ry5UpG*4OzzdNTxgT-g: Off
_18(b) Category B SAR:_2_RH3Ry5UpG*4OzzdNTxgT-g: Off
_18(b) Category B SAR:_3_RH3Ry5UpG*4OzzdNTxgT-g: Off
_18(b) Category B SAR:_4_RH3Ry5UpG*4OzzdNTxgT-g: Off
_18(b) Category B SAR:_5_RH3Ry5UpG*4OzzdNTxgT-g: Off
_18(b) Category B SAR:_6_RH3Ry5UpG*4OzzdNTxgT-g: Off
_18(b) Category B SAR:_7_RH3Ry5UpG*4OzzdNTxgT-g: Off
_18(b) Category B SAR:_8_RH3Ry5UpG*4OzzdNTxgT-g: Off
_18(c) Responsible authority(_0_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_1_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_2_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_3_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_4_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_5_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_6_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_7_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_8_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_9_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_10_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_11_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_12_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(c) Responsible authority(_13_5ggdCI2sZrnx4ERwNFCAuA: Off
_18(d) Specify:_mVijHHfOUcZSiWfBWvnk9A:
If construction related (or ev_XLALOi-f0cfpyCwbOCNWgg: Not Applicable
Determination of Category of S_Q4xmjMLS5zpsqWpg7VvvPQ: COMNAVREGMIDLANTISNT 11011.11B requires a site approval when:

3(d) Any project, real estate action, or proposed use of property that proposes changing the functional use of a facility, or the land use, or physical layout of an area.

3(e) Any proposed use of property, permanent or temporary, that involves placing or removing a facility or structure.

This is a category A site approval (non-explosive safety)

Date SAR validated, forwarded _iFoCXg1tcl-GmrtNG551MA: 11/10/2022
Name/Title/E-mail Address(of P_B3MkWjo30r3I34o2a0GIzg: Jim Gentry/Facility Planner/james.e.gentry8.civ@us.navy.mil
_25_ Name/Title/E-mail Addres_ACWmZRT8n425XydwNdz6yQ: Peter Daddona/Asset Management Branch Head/peter.c.daddona.civ@us.navy.mil
Is NAVAIR Airfield Safety Waiv_3M*c4eO5eWX-yqSEygDC9g: Off
_2_ Is FAA OE/AAA (Notice of _qXpOvC2m3PEXUJ-yqfp3Hw: Off
_3_ Runway Number:_1oHRIlLDZyj8IvxH9YAVww:
_4_ Select Runway Type (Class_2cj56JhJx*fgCCdHt0fwgQ: []
_5_ Airfield Elevation (ft):_fv9x249NZyD9pjmIxasIRA:
_6_ Maximum Height of Facilit_44URD54jS5e9n*G*HXlOKg:
_7_ Maximum Height of Equipme_R05OVXvDkhoIBfi5F3QJOw:
_8_ Lateral Distance from Run_fzpaAnP8gTWhBjud9I0jQg:
_9_ Horizontal Distance to Run_CtF3lWOG3sUl4NYAS7kYpA:
_10_ Horizontal Distance from _2KBbdqiDLP3jZA9VorLaqQ:
_11_ Horizontal Distance to Ed_2mMWQWHtFy3B8sNzspR*bQ:
_12_ Allowable Height Based o_BjxUkEWHMyZ29oaHDYpiSg:
_13_ Allowable Height Based o_aNBm2i-MwoHuS*U26HJhfA:
_14_ Allowable Height Based _ORGtYw4Wc7GDrB1BZOx1Sg:
_15_ Allowable Distance Based_38NlRR-yIqkxRIVf6TNoJA:
_16_ Existing Waiver Number _5EjsS29n9407nUPDehqyFQ:
_17_ Existing Waiver _1G7vJ2olk68M05Wy4Vr1dw:
_18_ Indicate Type of Constru_pbuuYjRrhcevE2uMf3jxvw: Off
_19_ Airfield Safety Waiver (_0_AhvIsuti6Ya3LIl19MlVDA: Off
_19_ Airfield Safety Waiver (_1_AhvIsuti6Ya3LIl19MlVDA: Off
_19_ Airfield Safety Waiver (_2_AhvIsuti6Ya3LIl19MlVDA: Off
_19_ Airfield Safety Waiver (_3_AhvIsuti6Ya3LIl19MlVDA: Off
If construction related (or ev_oJDnQg5U0qyO080Z5SZxEA:
_1_ In coordination with Expl_9mNqUOjCONRfRQ06b4wCMw: Off
_2_ What type of project or e_0_5Do4grOL-ob2tQuAD9zumQ: Off
_2_ What type of project or e_1_5Do4grOL-ob2tQuAD9zumQ: Off
_2_ What type of project or e_2_5Do4grOL-ob2tQuAD9zumQ: Off
_2_ What type of project or e_3_5Do4grOL-ob2tQuAD9zumQ: Off
_2_ What type of project or e_4_5Do4grOL-ob2tQuAD9zumQ: Off
_3_ If there are explosives s_0_RV8Yd8yWZMnFx5kcIULxqA: Off
_3_ If there are explosives s_1_RV8Yd8yWZMnFx5kcIULxqA: Off
_3_ If there are explosives s_2_RV8Yd8yWZMnFx5kcIULxqA: Off
_3_ If there are explosives s_3_RV8Yd8yWZMnFx5kcIULxqA: Off
_3_ If there are explosives s_4_RV8Yd8yWZMnFx5kcIULxqA: Off
_1_ In coordination with Base_pZDhEiXg6IYfL8ioiyi*sw: Off
_2_ System Location (Physical _Pt6TiGghkemXt1BXsyHFXw:
_3_ Type of Transmitter:_DVJJ9CPvuN*xzCfoVSsJTQ: []
_3_ Type of Transmitter:_edit;_DVJJ9CPvuN*xzCfoVSsJTQ:
_4_ Distance to Nearest Fueli_XOzpajtAsf1eup7cwZt94A:
_1_ Does the project construc_5PKzS1iaJwMrRICaMt2Qfw: Off
_2_ In coordination with Weap_2jwqxUGeuD3Mrxlk06QoEQ: Off
_1_ In coordination with acti_yhehf0vx97Lq860O1UmH9w: Off
_1_ Provide name of organizat_fYvpf-IZGSVnSy8pMvV50w:
_2_ Provide name of organizat_dXxizVvMNvTToFa-TfE2-g:
_3_ Provide name of organizat_FK7ZolhHt9eQPf8qXMYgkA:
_1_ Review Agency (Name of Age_6gv2m1tDSydJZCHBVFaMpA:
_1(1) Date Received_FAYwHpCdH3PZAx7zUOrlzg:
_1(2) Summary Evaluation of Ca_1YNtNQ46fVl16EVzlfRPdg:
_1(3) Reviewer_s Name/Code/Ph_o5NiPncIRIIlm7DCsWnHRg:
_1(4) Date Forwarded_e8xEqil8io1CP5e*mfeb9g:
_2_ Review Agency (Name of Age_xcow0*jh-3wUQaDlycc8mA:
_2(1) Date Received_abkyUtkVM89uAa3os1YgSQ:
_2(2) Summary Evaluation of C_zbmguxz4Zylvxfsg-P9c4A:
_2(3) Reviewer_s Name/Code/Ph_MA7jGR4SdM*4svxV101BHA:
_2(4) Date Forwarded_h08oLdTNOqg3esDO6VVDHQ:
_3_ Review Agency (Name of Age_RrmsDK4mYGHNybs88T6uHw:
_3(1) Date Received_1pCA8SyyDE3UfuXCcvCT6g:
_3(2) Summary Evaluation of C_j9AdEv9lVVVMNsf8dgoIZA:
_3(3) Final Determination by _6whJJkpdC2dYOpTqtX5WXg: Off
_3(4) Reviewer_s Name/Code/Ph_wIYDEhdoKuStxTG*txqF5Q:
_3(5) Date Forwarded to ICO_XeoANWoNZB9kx1yiAyq9Aw:
_1_ Date Received_vDf1rs82h79TZBZmtXw*NA: 11/10/2022
_2_ What Category SAR? (If A,_9Ee3EsCbyrTHh0F43rGNOQ: A
_3_ Category B SAR Endorsemen_0_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_1_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_2_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_3_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_4_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_5_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_6_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_7_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_8_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_9_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_10_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_11_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_12_Ycn1gyLK1syi1SlHDwd1SA: Off
_3_ Category B SAR Endorsemen_13_Ycn1gyLK1syi1SlHDwd1SA: Off
_4(1)_ Airfield Safety Waiver_*AXofAEzlk3bMM3ceZEiyg: Off
_4(2)_ Explosive Safety Certi_0_*qqcrz4lfLQGlvE*z93*-w: Off
_4(2)_ Explosive Safety Certi_1_*qqcrz4lfLQGlvE*z93*-w: Off
_4(2)_ Explosive Safety Certi_2_*qqcrz4lfLQGlvE*z93*-w: Off
_4(2)_ Explosive Safety Certi_3_*qqcrz4lfLQGlvE*z93*-w: Off
_4(3)_ Electromagnetic Radiat_0_Iuy0gJdEnPiO20hASvzo9g: Off
_4(3)_ Electromagnetic Radiat_1_Iuy0gJdEnPiO20hASvzo9g: Off
_4(3)_ Electromagnetic Radiat_2_Iuy0gJdEnPiO20hASvzo9g: Off
_4(3)_ Electromagnetic Radiat_3_Iuy0gJdEnPiO20hASvzo9g: Off
_4(4)_ Electromagnetic Radiat_3amZHa2uGj67ax1peL871g: Off
_4(5)_ Small Arms Range Safet_s21forf8gy9rryAB9Fg6DQ: Off
_4(6)_ Radiological_73CslwFgaYuyM2ea9aPh4Q: Off
_5(1)_ Duration/Begin Date_ (_JFntR3HRyNp2XDHo7EphqA: 02/01/2023
_5(2)_ Duration/End Date_ (En_iwzlgVetwHAo09TsbyV8NQ: 12/31/2024
_6_ If SAR is being recommend_YvWmzH7xGhs1D2hOa6EQng: Category A (non-explosive) site approval request recommended for approval without conditions. Project is consistent with Installation Development Plan.
_7_ Recommendation by Public _uZgmerUuoElLWZGp5Xr6kQ: Recommend approval.

Peter Daddona/Asset Management Branch Head/peter.c.daddona.civ@us.navy.mil

_8_ Date:_d5aHbBXsCmseFwLbipulQw: 11/10/2022
singleselectfield_hrUzwDsCemDgP2im-xpIFA: Approved
Comments_QzWkkKxeHxUSJbHYVvLfGg:
_12_ Date_NB*sMLtygyGTJ0HVXLZMuQ:
fc-int01-generateAppearances:
2022-12-05T12:02:26-0500
CURTIN.KENNETH.M.1025344517

File details come from the government source that posted it. Updated .