Amendment No. 2 to Solicitation No. 459868 provides clarifying details for a Department of Energy Office of Science contract to furnish and deliver two 10,000-gallon above ground fuel storage tanks at Brookhaven National Laboratory. The amendment addresses six key contractor questions, including electrical service requirements, site access limitations, dispenser and piping specifications, initial fuel delivery, fuel management system installation, and catwalk configuration.

Specific clarifications include: electrical services will be provided by the owner/separate contractor, there are no overhead restrictions for tank delivery, the new dispenser and remote fill piping will be located at the front end of the tanks, initial fuel delivery will be handled by the owner, the fuel master dispenser will be supplied and installed by Brookhaven National Laboratory, and the catwalks will be full-length with crossover platforms between tanks. The facility is a limited access, gate-controlled federal government site with specific operational hours.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

Procurement and Property Management Building 902B P.O. Box 5000

Upton, NY 11973-5000

Date: 2/19/25

AMENDMENT NO. 2

to

Solicitation No. 459868 for

TWO (2) 10,000 GALLON ABOVE GROUND FUEL STORAGE TANKS

GENERAL: This Amendment No. 2 is issued to answer the following questions:

Question 1: Electrical Requirements:

• Will the installation contractor be responsible for providing electrical service for the pumps, fuel management system, and monitoring system?

• If yes, where is the nearest electrical service point in relation to the new storage tank location?

• Would any trenching, backfill, or site restoration be required to connect the electrical service?

Answer 1: Electrical Requirements

a. All electrical service for the pumps, fuel management system, and monitoring system will be by Owner/separate contractor.

Question 2: Are there any overhead restrictions or site access limitations that could impact the offloading and setting of the new storage tanks using a crane, truck, or trailer?

Answer 2: None *Note – Brookhaven National Laboratory is a limited access (gate controlled with specific days/hours of operation) federal government facility.

3/6/25 jfamiglie Cross-Out

2 | P a g e

Question 3: What are the specifications and requirements for the new dispenser and remote fill piping?

Answer 3: New dispenser and remote fill are to be at the front end of the tank.

Question 4: Who is responsible for the initial fuel delivery to the new tanks?

Answer 4: Initial Fuel Delivery is by Owner

Question 5: Is the contractor responsible for supplying and installing the Fuel Master fuel management system, or will this be provided and installed by the owner?

Answer 5: The fuel master dispenser will be supplied and installed by Brookhaven National Laboratory.

Question 6: Are the catwalks to be provided with each tank expected to be full length of the tanks with crossover platforms from one to tank to the other?

Answer 6: Yes.

End of Amendment No. 2