- Solicitation number
- JF459868
- Issued by
-
Department of Energy Office of Science
About this file
This is Amendment No. 1 to Solicitation No. 459868 issued by Brookhaven National Laboratory's Procurement and Property Management office, addressing questions and answers regarding two 10,000-gallon above-ground fuel storage tanks.
The amendment clarifies that tank installation is included in the scope of work, with delivery, unloading, and installation required at Brookhaven National Laboratory (98 Rochester St., Upton, NY 11973). The tanks will store unleaded gasoline and E-85 fuel for on-site vehicles, using a Fuelmaster FMU 2500 Master Unit with FMLIVE module dispenser system. Key requirements include: tanks must be exactly 10,000 gallons (no smaller alternatives accepted), rectangular tanks are acceptable, UL 142 certification is mandatory (European EN 12285-2 certification not accepted), and lead time extensions will not be granted. The delivery site is a Department of Energy National Laboratory with restricted access, requiring entry through a guard booth during designated hours. The specific on-site delivery location is yet to be determined.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Procurement and Property Management Building 902B P.O. Box 5000
Upton, NY 11973-5000
Date: 2/14/25
AMENDMENT NO. 1
to
Solicitation No. 459868 for
TWO (2) 10,000 GALLON ABOVE GROUND FUEL STORAGE TANKS
GENERAL: This Amendment No. 1 is issued to answer the following questions:
Question 1: Is tank installation included in the statement of work?
Answer 1: Yes, the awardee would need to deliver, unload and install the tank to
Brookhaven National Laboratory.
Question 2: Which fuel type will be stored in the tank?
Answer 2: Fuel types are unleaded gasoline and E-85. (Dispenser System is a
Fuelmaster FMU 2500 Master Unit with FMLIVE module.)
Question 3: How will the customer be using the tank (i.e. filling equipment) If so, what size? Busses, on site vehicles, heavy equipment?
Answer 3: Tanks will be used for fueling of on-site vehicles.
Question 4: What is the address for the delivery? Is the site Commercial, Residential or
Construction Site or Military Location? Is there limited access at location / gated entry?
2 | P a g e
Answer 4: The site address is shown below. The specific delivery location on site has not yet been determined.
Brookhaven National Lab 98 Rochester St.
Upton, NY 11973
The site is a Department of Energy National Laboratory (multi-discipline science research) and has limited access entry (guard booth and designated hours for entry).
Question 5: Is an alternative tank with a capacity of less than 10,000 gallons acceptable?
Answer 5: The tank size needs to be 10,000-gallons. (Alternate solutions less than
10,000 gallons will not be accepted.)
Question 6: Will rectangular tanks be accepted?
Answer 6: Yes.
Question 7: Can the lead time be extended?
Answer 7: No.
Question 8: I wanted to confirm whether the European certification EN 12285-2 (for above-ground tanks) would be an acceptable equivalent to UL 142? Please let me know if this certification meets the project requirements or if strict adherence to UL 142 is necessary?
Answer 8: Certification to UL 142 standard is required.
Question 9: Are you looking for somebody to install these tanks as well??
Answer 9: Yes.
Material, work, and workmanship, except where specified otherwise in this Addendum, shall conform to all requirements of Contract Documents, and become a part thereof.
End of Amendment No. 1