J8_Quality Control Report.pdf
PDF 709 KB Posted
- Attached to
- Competitive 8(a) SATOC JOC 2025
- Solicitation number
- Not on record
About this file
This document is a Contractor's Quality Control Report (QCR) for a federal construction contract. The QCR provides details on the work performed, weather conditions, equipment usage, testing, and safety incidents during a single reporting period. It includes a certification that the work was performed in compliance with the contract.
The related federal contract opportunity is for a Competitive 8(a) Small Business Set-Aside Job Order Contract (JOC) to provide new construction, alterations, maintenance, repair, and modernization services for the U.S. Army Garrison at Redstone Arsenal. The contract has a 5-year period of performance, including a 6-month option. The North American Industry Classification System (NAICS) code is 236210 Industrial Building Construction, with a $45 million size standard. The contracting agency is the Department of the Army Materiel Command Contracting Command Redstone Arsenal.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR'S QUALITY CONTROL REPORT (QCR) DATE: REPORT NO:
CONTRACT NUMBER AND NAME OF CONTRACTOR: DESCRIPTION AND LOCATION OF THE WORK:
WEATHER CLASSIFICATION: CLASSIFICATION:
CLASS A No interruptions of any kind from weather conditions occurring on this or previous shifts.
CLASS B Weather occurred during this shift that caused a complete stoppage of all work. CLASS _______________
CLASS C Weather occurred during this shift that caused a partial stoppage of work. TEMPERATURE:
CLASS D Weather overhead excellent or suitable during shift. Work completely stopped due to results of previous adverse weather.
CLASS E Weather overhead excellent or suitable during shift but work partially stopped MAX ______ MIN ______ due to previous adverse manner. PRECIPITATION:
OTHER Explain
INCHES _____________
CONTRACTOR/SUBCONTRACTORS AND AREA OF RESPONSIBILITY FOR WORK PERFORMED TODAY: (Attach list of items of equipment either idle or working as appropriate.)
a.
b.
c.
d.
e.
f.
g.
1. WORK PERFORMED TODAY: (Indicate location and description of work performed. Refer to work performed by prime and/or subcontractors by letter in Table above. Indicate any delays in work.)
2. TYPE AND RESULTS OF INSPECTION: (Indicate whether: P - Preparatory, I - Initial, or F - Follow-up and include satisfactory work completed or deficiencies with action to be taken.)
3. TESTS REQUIRED BY PLANS AND/OR SPECIFICATIONS PERFORMED AND RESULTS OF TESTS:
Attachment J8 Daily QCR 1 May 2023
ATTACHMENT J8
4. VERBAL INSTRUCTIONS RECEIVED: (List any instructions given by Government personnel on construction deficiencies retesting required, etc., with action to be taken. List the names of the Government personnel who gave verbal instruction)
5. REMARKS: (Cover any conflicts in plans, specifications or instructions: acceptability of incoming materials; offsite surveillance activities; progress of work, delays, causes and extent thereof; days of no work with reasons for same.)
Include any telephone conversations/instructions with the Contracting Officer, COR or other representative.
Indication of delays to be in accordance with para 2 of Part B of FAR 52.249-10.
6. SAFETY: (Include any infractions of approved safety plan, safety manual or instructions from Government personnel.
Specify corrective action taken.)
INSPECTOR
CONTRACTOR'S CERTIFICATION: I certify that the above report is complete and correct and that all material and equipment used, work performed and tests conducted during this reporting period were in strict compliance with the contract plans and specifications except as noted above.
CONTRACTOR'S APPROVED AUTHORIZED REPRESENTATIVE
SAM FORM 696, 1 SEP 79
Attachment J8 Daily QCR 1 May 2023
| QCR (1) |
| QCR (2) |
| CONTRACTORS QUALITY CONTROL REPORT QCR: |
| REPORT NO: |
| CONTRACT NUMBER AND NAME OF CONTRACTOR: |
| DESCRIPTION AND LOCATION OF THE WORK: |
| CLASSIFICATION CLASS: |
| CLASS: |
| TEMPERATURE MAX MIN: |
| MAX: |
| MIN: |
| PRECIPITATION INCHES: |
| INCHES: |
| b: |
| c: |
| d: |
| e: |
| f: |
| g: |
| 1 WORK PERFORMED TODAY Indicate location and description of work performed Refer to work performed by prime andor subcontractors by letter in Table above Indicate any delays in work: |
| 2 TYPE AND RESULTS OF INSPECTION Indicate whether P Preparatory I Initial or F Followup and include satisfactory work completed or deficiencies with action to be taken: |
| 3 TESTS REQUIRED BY PLANS ANDOR SPECIFICATIONS PERFORMED AND RESULTS OF TESTS: |
| 4 VERBAL INSTRUCTIONS RECEIVED List any instructions given by Government personnel on construction deficiencies retesting required etc with action to be taken List the names of the Government personnel who gave verbal instruction: |
| INSPECTOR: |
| Date2_af_date: |
| 5 REMARKS Cover any conflicts in plans specifications or instructions acceptability of incoming materials offsite surveillance activities progress of work delays causes and extent thereof days of no work with reasons for same Include any telephone conversationsinstructions with the Contracting Officer COR or other representative Indication of delays to be in accordance with para 2 of Part B of FAR 5224910: |
| 6 SAFETY Include any infractions of approved safety plan, safety manual, or instructions from Government personnel: |
| Specify corrective action taken: |
File details come from the government source that posted it. Updated .