J25_Trial Proposal Drawing Set.pdf

PDF 4 MB Posted

Attached to
Competitive 8(a) SATOC JOC 2025
Solicitation number
Not on record
Issued by

About this file

This document is a Request for Proposal (RFP) for a Job Order Contract (JOC) to provide new construction, alterations, maintenance, repair, sustainment, restoration, and modernization services for the U.S. Army Garrison and tenant organizations located at Redstone Arsenal (RSA). The North American Industry Classification System (NAICS) code is 236210 (Industrial Building Construction) with a $45 Million business size standard. The product/service code is C1QA (Architect and Engineering - Construction: Restoration of Real Property). The projected period of performance is 20 June 2025 through 19 June 2030 with a 6-month priced option extension. The contract is a 100% 8(a) small business set-aside acquisition to support the U.S. Army Garrison-Redstone's mission to maintain oversight of construction activities at RSA, including administrative facilities, base support and maintenance shops, childcare centers, fitness centers, vehicle maintenance, food service, public safety, airfield structures, roads, utilities, and research/testing facilities. The work may also include incidental design, testing, studies, and abatement for lead-based paint and asbestos.

View the file

Other files

File Type Posted
Amendment 04 11 October 24.pdf PDF
2021112-4 RESERVE CTR MnO V1 VICINITY MAP BnW.pdf PDF
2021112-4 RESERVE CTR MnO V1 VICINITY MAP Color.pdf PDF
W9124P-24-R-0004 Amendment 03 11Sept24.pdf PDF
J24_Price Template - Amended Pricing 30Aug24.xlsx XLSX spreadsheet
(r)QA Government Response W9124P-24-R-0004 1 Sept 2024.xlsx XLSX spreadsheet
W9124P-24-R-0004 AMENDMENT 02 20 AUG 24.pdf PDF
W9124P-24-R-0004 AMENDMENT 01 16 AUG 24.pdf PDF
J13_JOC SP Order Form.pdf PDF
APPENDIX A - Streamlined Projects.pdf PDF
J20_Equipment Demo Form.pdf PDF
J15_NOI NPDES Permit.pdf PDF
J14_Septic Permit Application.pdf PDF
J2_RSA Policy 200-6.pdf PDF
J8_Quality Control Report.pdf PDF
J22_CDRLS_JOC_27Jun24.pdf PDF
J30 Highway Construction General Wage Decision No. AL20230163.pdf PDF
J7_SWDA Incinerator.pdf PDF
J11_Equipment Warranty List.pdf PDF
J10_Progress Chart.xlsx XLSX spreadsheet
FY25 JOC PWS_Final 7 AUG 24.pdf PDF
W9124P-24-R-0004 Final Sol 7 Aug 24.pdf PDF
Attachment B_Army Contract Writing Stsyem Transition Information for Offerors.pdf PDF
Attachment A_Army Contract Writing Stsyem Transition Information for Offerors.pdf PDF
J26_Seed Project-2024112-4.pdf PDF
J17_NPDES NOT.pdf PDF
J21_Time Extension Request.pdf PDF
J5_RSA Landfill Delivery Ticket.pdf PDF
J28 Building Construction General Wage Decision No. AL20240091.pdf PDF
J29 Heavy Construction General Wage Decision No. AL20230120.pdf PDF
J12_JOC Close-out Form.pdf PDF
J24_Price Template.xlsx XLSX spreadsheet
Attachment C_Army Contract Writing Stsyem Transition Information for Offerors.pdf PDF
J13_JOC SP Order Form.pdf PDF
J4_Equipment Data Sheet.pdf PDF
J19_Refrigeration Installation Form.pdf PDF
J9_Site Visit Memo.pdf PDF
J1_DD Form 1348-1.pdf PDF
J23 Past Performance Survey.pdf PDF
J18_Spill Response Plan.pdf PDF
J16_NPDES Inspection Form.pdf PDF
J3_EnvLaw.pdf PDF
J27 JOC QASP_30July2024.pdf PDF
J6_COH Landfill.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WALLS

NUMBER NAME FINISH BASE MATERIAL FINISH HEIGHT SILL CASING COVERING

100 CORRIDOR VCT-1 WB-1 P-1 ACT-1 - 8'-9" - - - 100

101 MECHANICAL ROOM CONCRETE/CS-1 WB-1 P-3 - - - - - - NOTE #1 101

101A ELECTRICAL ROOM CONCRETE/CS-1 WB-1 P-3 - - - - - - NOTE #1 101A

102 EAST HIGH BAY RAF-1 / CPT-1 WB-1 P-1 ACT-1 - 10'-0" - - - 102

103 LAUNDRY VCT-1 WB-1 P-1 ACT-1 - 8'-9" - - - 103

104 BREAK AREA / WORK SHOP CONCRETE/CS-1 WB-1 P-1 ACT-1 - 14'-0" - - - 104

105 WOMEN'S RESTROOM CT-1 CT-2 CT-3/CT-4 ACT-2 - 8'-6" - - - 105

105A WOMEN'S SHOWER CT-1 CT-2 CT-3/CT-4 GYP.BOARD P-2 8'-6" - - - 105A

106 WEST HIGH BAY RAF-1 / CPT-1 WB-1 P-1 ACT-1 - 10'-0" - - - 106

107 JANITOR'S CLOSET VCT-1 WB-1 P-1 - - - - - - 107

108 STORAGE CONCRETE/CS-1 WB-1 P-1 ACT-1 - 14'-0" - - - 108

109 MEN'S RESTROOM CT-1 CT-2 CT-3/CT-4 ACT-2 - 8'-6" - - - 109

109A MEN'S SHOWER CT-1 CT-2 CT-3/CT-4 GYP.BOARD P-2 8'-6" - - - 109A

110 COMMUNICATION ROOM SDT-1 WB-1 P-3 - - - - - - 110

111 OFFICE VCT-1 WB-1 P-1 ACT-1 - 8'-9" SSM-1 - WC-1 111

112 SAPP ROOM SDT-1 WB-1 P-1 ACT-1 - 8'-9" - - - 112

113 OFFICE VCT-1 WB-1 P-1 ACT-1 - 8'-9" SSM-1 - WC-1 113

114 BREAK ROOM VCT-1 WB-1 P-1 ACT-1 - 8'-9" - - - 114

115 OFFICE / STORAGE VCT-1 WB-1 P-1 ACT-1 - 8'-9" - - - 115

NOTES:

1. PRIME COAT ONLY (MECHANICAL & ELECTRICAL ROOMS).

2.

ROOM FINISH SCHEDULE

ROOM FLOOR CEILING

REMARKS NUMBER

WINDOWS

MATERIAL AND FINISH SCHEDULE:

A. ALL PRODUCT NAMES AND MODEL NUMBERS ARE GIVEN FOR ESTIMATING PURPOSES. PRODUCTS EQUAL

TO THOSE SPECIFIED MAY BE USED IF APPROVED BY THE DPW-PM.

B. SUBMIT SAMPLES OF ALL PRODUCTS LISTED IN THE ‘MATERIAL AND FINISH SCHEDULE’ TO THE DPW-PM

FOR APPROVAL. THE SAMPLES SHALL INCLUDE TEXTURE AND COLOR CHARTS FOR SELECTION OF ALL

ITEMS.

CARPET:

CPT-1: J+J FLOORING, JOURNEY 7621, COLOR: "PACE 3347", SIZE: 18"x36", INSTALLED w/ INTERFACE TACTILES AT

CORNERS.

INSTALLATION METHOD: ASHLAR

NOTES:

A. ALL CARPET TILES SHALL HAVE PRE-APPLIED ADHESIVE, UNLESS OTHERWISE NOTED.

B. PROVIDE AND INSTALL VINYL TRANSITION STRIPS AS NECESSARY BETWEEN CARPET AND OTHER

FLOORING MATERIALS, UNLESS OTHERWISE NOTED.

C. ALL CARPET TILES SHALL BE INSTALLED OVER TANDUS, CLOSED-CELL CUSHION, FLEX-AIRE CUSHION D. CARPET ORDERED SHALL INCLUDE AN ADDITIONAL QUANTITY OF 2% FOR GOVERNMENT STORAGE.

VINYL COMPOSITE TILE:

VCT-1: TARKETT, 12"x12", ITEM: PCVT 10516, STYLE: LVT CORTINA GRANDE, COLOR: "GRILLE GREY"

STATIC DISSIPATIVE TILE:

SDT-1: VPI ESD STATIC CONTROL TILE, STATMATE, 24"x24", COLOR: 16_CLOUD, VPI-165 ADHESIVE, 24" GROUNDING

STRIP PER 1000SF REQUIRED

NOTES:

A. SUBSTITUTIONS MUST BE PRE-APPROVED EQUALS.

B. STRICTLY FOLLOW MANUFACTURERS SURFACE PREPARATION AND INSTALLATION RECOMMENDATIONS.

FOLLOWING COMPONENTS MUST BE USED TOGETHER TO OBTAIN THE STATIC DISSIPATIVE PERFORMANCE

REQUIREMENTS:

1. TILE w/ INTEGRAL STATIC DISSIPATIVE ELEMENTS

2. S-202 STATIC DISSIPATIVE ADHESIVE

3. COPPER GROUNDING STRIPS

4. 2-392 STATIC DISSIPATIVE POLISH

WALL BASE:

WB-1: JOHNSONITE, "PERCEPTIONS" RECESS PROFILES, RWDC 20 1/4 X120, 4 1/4"x1/8", CHARCOAL-20, CERAMIC TILE:

CT-1: AMERICAN OLEAN COLORBODY, UNGLAZED PORCELEAN MOSAIC, 2"x2", COLOR: #A06 "STORM GRAY SPECKLED", STRAIGHT JOINT

GROUT: COLOR: STERLING SILVER, 78 GROUT, APPLY SEALER

CT-2: AMERICAN OLEAN COLOR STORY, GLAZED CERAMIC WALL TILE, 4"x4", COLOR: #0025 "BALANCE", FLAT TOP COVE BASE(+ CORNERS) A3401/SCR3401/SCL3401

GROUT: COLOR: BRIGHT WHITE, 22 GROUT, APPLY SEALER, 1/16" GROUT LINE PER MFG

CT-3: AMERICAN OLEAN COLOR STORY, GLAZED CERAMIC WALL TILE , 4"x12", (FIELD)

COLOR: #0034 "MATT BALANCE (MATTE)", BRICK PATTERN, 1/16" GROUT LINE PER MFG

GROUT: COLOR: BRIGHT WHITE, 22 GROUT, APPLY SEALER

CT-4: AMERICAN OLEAN COLOR STORY, GLAZED CERAMIC WALL TILE, 4"x12",(ACCENT- 2 ROWS AT 42" AFF)

COLOR: #0025 "ICE WHITE", BRICK PATTERN, 1/16" GROUT LINE PER MFG

GROUT: COLOR: BRIGHT WHITE, 22 GROUT, APPLY SEALER

NOTES:

A. COMPLETELY CLEAN EXISTING SLAB FROM ANY WAXY OR OILY FILMS AND ANY OTHER DEBRIS OR

OBSTRUCTIONS.

B. GROUT SHALL BE LATICRETE SPECTRALOCK, URETHANE GROUT

C. INSTALL 1/2" WATER RESISTANT PURPLE GYPSUM BOARD IN RESTROOMS, JANITOR CLOSETS, AND CABINET

AREAS IN BREAKROOMS.

D. INSTALL 1/4" CEMENTITIOUS FIBER BOARD ONLY AT SHOWER WALL LOCATIONS WITH CERAMIC OR

PORCELAIN TILE INSTALLED.

E. INSTALL TILE ON WALL BEHIND MIRRORS UNLESS OTHERWISE NOTED.

CONCRETE SEALER:

CS-1: SEALER, CLEAR, NON-GLOSSING, MASONRY AND CONCRETE SEALER, STONE TECHNOLOGIES CONCRETE

SEALER X-2.

NOTES:

i. APPLY TO NEW CONCRETE AFTER CURED TO 80% DESIGN STRENGTH, MINIMUM OF 4 DAYS OF CURING.

ii. NEW CONCRETE THAT CURING COMPOUND WAS APPLIED WHEN PLACED WILL REQUIRE TO BE PRESSURE

WASHED CLEAN PRIOR TO SEALING AS A MINIMUM. ADDITIONAL PREPARATION MAY BE NECESSARY

DEPENDING ON TYPE OF CURING AGENT USED.

iii. EXISTING CONCRETE TO RECEIVE VCT OR CARPET SHALL BE ETCHED OR BEAD BLASTED PRIOR TO

iv. FOLLOW MANUFACTURER'S INSTRUCTIONS FOR APPLICABLE TYPE APPLICATION.

PAINT:

P-1: SHERWIN-WILLIAMS, SATIN FINISH, "SW 7064 PASSIVE"

P-2: SHERWIN-WILLIAMS, SEMI-GLOSS, "SW7067 CITYSCAPE"

P-3: SHERWIN WILLIAMS, SW 7005, PURE WHITE, SEMI-GLOSS (MECH, ELEC, COMM, RISER ROOMS)

STAIN:

S-1: RUST OLEUM , WOOD FINISH, EBONY, 271131, POLYURETHANE FINISH . CONTRACTOR TO SUBMIT SAMPLE

BEFORE STAINING.

ACOUSTICAL CEILING TILE AND GRID:

ACT-1: CERTAIN TEED, BAROQUE, BET-157, 24"x24"x5/8", TRIM EDGE, WHITE, 15/16" GRID ACT-2: CERTAIN TEED, VINYL SHIELD, 24"x24"x5/8", TRIM EDGE, WHITE, 15/16" GRID

NOTES:

A. CEILING GRID SHALL ACCOMMODATE LIGHT FIXTURE LAYOUT. LIGHT FIXTURES SHALL BE CENTERED IN

ROOM, UNLESS OTHERWISE NOTED.

B. CONTRACTORS SHALL INSTALL INITIAL HANGING WIRE FOR CEILING GRID MAINS NO MORE THAN 24” FROM

WALL AT BOTH ENDS THEN INSTALL REMAINING HANGING WIRES PER MANUFACTURER SPECS (TYPICALLY

EVERY 48”).

C. CONTRACTORS SHALL INSTALL CEILING GRID MAINS, IN HALLWAYS AND CORRIDORS, PERPENDICULAR TO THE LENGTH OF THE SPACE. CEILING GRID MAINS SHALL NOT BE INSTALLED RUNNING PARALLEL WITH

THE LONGER AXIS.

SOLID SURFACE MATERIAL:

SSM-1: CORIAN, VENARO WHITE, FOR ALL COUNTERTOPS (BREAKROOM AND RESTROOM COUNTERTOPS, WINDOW

SILLS)

RESTROOM LAVATORIES: CORIAN, DESIGNER WHITE

INTERIOR WALL PANEL:

FRP-1: MARLITE, STANDARD FIBER-REINFORCED PLASTIC WALL PANEL, PEBBLED, P151, LIGHT GRAY

RAISED ACCESS FLOORING:

RAF-1: 24"x24"x12"H. RAISED PANEL SYSTEM, CONCORE 1500 BY TATE OR EQUIVALENT

NOTES:

A. CONTRACTOR SHALL FIELD VERIFY HEIGHT TO MATCH EXISTING FLOOR HEIGHT.

B. ALL SUBSTITUTIONS MUST BE APPROVED PRIOR TO BID OPENING.

WINDOW TREATMENT:

WC-1: LEVOLOR OR EQUAL, 1" ALUM MINI-BLINDS, COLOR: ALABASTER, #112

7 AR3
PROJECT PDF SET
PROJECT PDF SET.pdf
1 T1
2 C1
3 C2
4 C3
5 AR1
6 AR2
8 AR4
9 AR5
10 AR6
11 AR7
12 AC1
13 AC2
14 AC3
15 AC4
16 AC5
17 PL1
17 PL2
18 EL1
19 EL2
20 EL3
22 FP1
23 FP2
24 FP3

21 EL4

File details come from the government source that posted it. Updated .