The provided document is an Equipment Data Sheet that appears to be a template or form for tracking information related to equipment at a specific location. It includes fields for capturing details such as the equipment's location, manufacturer, model, serial number, size/capacity, manufacturing date, installation date, startup date, and a description. The document is likely used to document the specifications and installation details for various equipment items as part of a renovation, replacement, or new installation project.

The related federal contract opportunity is for a Competitive 8(a) SATOC Job Order Contract (JOC) to provide a full range of new construction, alterations, maintenance, repair, sustainment, restoration, and modernization services for the U.S. Army Garrison at Redstone Arsenal. The contract has a 5-year period of performance, including a 1-year base ordering period and four 1-year optional ordering periods. The contract is a 100% 8(a) small business set-aside, with a NAICS code of 236210 (Industrial Building Construction) and a $45 million business size standard.

View the file

Other files

File Type Posted
Amendment 04 11 October 24.pdf PDF
2021112-4 RESERVE CTR MnO V1 VICINITY MAP Color.pdf PDF
2021112-4 RESERVE CTR MnO V1 VICINITY MAP BnW.pdf PDF
W9124P-24-R-0004 Amendment 03 11Sept24.pdf PDF
J24_Price Template - Amended Pricing 30Aug24.xlsx XLSX spreadsheet
(r)QA Government Response W9124P-24-R-0004 1 Sept 2024.xlsx XLSX spreadsheet
W9124P-24-R-0004 AMENDMENT 02 20 AUG 24.pdf PDF
W9124P-24-R-0004 AMENDMENT 01 16 AUG 24.pdf PDF
J13_JOC SP Order Form.pdf PDF
J15_NOI NPDES Permit.pdf PDF
J14_Septic Permit Application.pdf PDF
J20_Equipment Demo Form.pdf PDF
APPENDIX A - Streamlined Projects.pdf PDF
J2_RSA Policy 200-6.pdf PDF
J8_Quality Control Report.pdf PDF
J22_CDRLS_JOC_27Jun24.pdf PDF
J30 Highway Construction General Wage Decision No. AL20230163.pdf PDF
J7_SWDA Incinerator.pdf PDF
J11_Equipment Warranty List.pdf PDF
J10_Progress Chart.xlsx XLSX spreadsheet
J25_Trial Proposal Drawing Set.pdf PDF
J18_Spill Response Plan.pdf PDF
J16_NPDES Inspection Form.pdf PDF
J3_EnvLaw.pdf PDF
J27 JOC QASP_30July2024.pdf PDF
J6_COH Landfill.pdf PDF
Attachment C_Army Contract Writing Stsyem Transition Information for Offerors.pdf PDF
J13_JOC SP Order Form.pdf PDF
J19_Refrigeration Installation Form.pdf PDF
J9_Site Visit Memo.pdf PDF
J1_DD Form 1348-1.pdf PDF
J23 Past Performance Survey.pdf PDF
FY25 JOC PWS_Final 7 AUG 24.pdf PDF
W9124P-24-R-0004 Final Sol 7 Aug 24.pdf PDF
Attachment B_Army Contract Writing Stsyem Transition Information for Offerors.pdf PDF
Attachment A_Army Contract Writing Stsyem Transition Information for Offerors.pdf PDF
J26_Seed Project-2024112-4.pdf PDF
J17_NPDES NOT.pdf PDF
J21_Time Extension Request.pdf PDF
J5_RSA Landfill Delivery Ticket.pdf PDF
J28 Building Construction General Wage Decision No. AL20240091.pdf PDF
J29 Heavy Construction General Wage Decision No. AL20230120.pdf PDF
J12_JOC Close-out Form.pdf PDF
J24_Price Template.xlsx XLSX spreadsheet
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DO# BLDG # Room #

Is this install going to be:

New: Replacement: Serial # of item replaced:

Location: Wing: Floor: Room:

Manufacturer:

Model Number:

Serial Number:

Size/Capacity:

Manufactured date:

Final Acceptance Date:

Contractor Installation Date:

Contractor Startup Date:

Description:

Is this install going to be:

New: Replacement: Serial # of item replaced:

Location: Wing: Floor: Room:

Manufacturer:

Model Number:

Serial Number:

Size/Capacity:

Manufactured date:

Final Acceptance Date:

Contractor Installation Date:

Contractor Startup Date:

Description:

Is this install going to be:

New: Replacement: serial # of item replaced:

Location: Wing: Floor: Room:

Manufacturer:

Model Number:

Serial Number:

Size/Capacity:

Manufactured date:

Final Acceptance Date:

Contractor Installation Date:

Contractor Startup Date:

Revision Date 17 January 2020

Equipment Check List Form Subcontractor Name and Number:

Tracking #

Is job a complete demolition of

Building,wing,floor and/or room:

DescriptionDescription :

Size

Size Size

Size Size

Size

Wing: Floor: Room:

Wing Floor Room

UOM UOM

UOM UOM

UOM UOM

Other

Attachment J4 Equipment Data Sheet 1 May 2023

Subcontractor Name & Number:
Tracking Number:
DO Number:
BLDG #:
Room #:
Dropdown3: [--]
Wing:
Floor:
Room:
UOM1: [--]
UOM2: [--]
Wing 1:
Floor 1:
Room 1:
Wing 2:
Floor 2:
Room 2:
Unit number 2:
Manufacturer 2:
Model Number 2:
Serial Number 2:
Manufacturer 1:
Model Number 1:
Serial Number 1:
Other:
Description 1:
Unit number 1:
Size 1:
Size 1a:
Manufactured date 1:
Contractors Installation date 1:
Final Acceptance date 1:
Contractors Startup Date 1:
Description 2:
Size 2:
Size 2a:
Manufactured date 2:
Contractors Installation date 2:
Contractors Startup Date 2:
Final Acceptance date 2:
Description 3:
Unit number 3:
Wing 3:
Floor 3:
Room 3:
Manufacturer 3:
Model Number 3:
Serial Number 3:
Size 3:
Size 3a:
Manufactured date 3:
Contractors Installation date 3:
Final Acceptance date 3:
Contractors Startup Date 3:
UOM1a: [--]
UOM2a: [--]
UOM3: [--]
UOM3a: [--]
Dropdown1: [--]
Dropdown1a: [--]
Dropdown2: [--]
Dropdown2a: [--]
Dropdown3a: [--]

File details come from the government source that posted it. Updated .