J10 WD 20250002 aiken allendale barnwell.pdf

PDF 2 MB Posted

Attached to
Savanah River IDIQ for road & fence maintenance and repairs
Solicitation number
12445225R0027
Issued by

About this file

This document is a Wage Determination (WD) for construction projects in Aiken, Allendale, and Barnwell Counties in South Carolina, specifically for the Savannah River Site. The wage determination, effective 01/03/2025, establishes prevailing wage rates for various construction job classifications including building construction, heavy construction, and highway construction projects.

The document provides detailed hourly wage rates for numerous trades and occupations, ranging from asbestos abatement workers ($15.25/hour) to elevator constructors ($48.92/hour). It includes provisions for different wage rates based on contract dates, referencing Executive Orders 14026 and 13658, which mandate minimum wage requirements for federal contractors. The wage determination also includes fringe benefits for each classification and notes that workers may be eligible for higher minimum wages under certain conditions, with specific guidelines for contracts entered into at different time periods between 2015 and 2022.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .