J0901 SOI Road Const Maint Repair IDIQ.xlsx

XLSX spreadsheet 292 KB Posted

Attached to
Savanah River IDIQ for road & fence maintenance and repairs
Solicitation number
12445225R0027
Issued by

About this file

This is a Schedule of Items spreadsheet for a Savannah River Site (SRS) Road Construction, Maintenance, & Repair Indefinite Delivery/Indefinite Quantity (IDIQ) contract covering five contract years from October 1, 2025 to September 30, 2030. The comprehensive pricing schedule includes detailed line items for road and infrastructure maintenance services, with estimated quantities for tasks such as emergency mobilization, construction surveying, soil erosion control, clearing and grubbing, embankment construction, culvert installation and repair, equipment rental, labor, seeding, and various other road and environmental maintenance activities.

The contract covers approximately 309.26 square miles and allows for flexible pricing based on fuel price ranges (less than $3 to $5.99 per gallon), with unit prices and total prices to be negotiated for each task order. Key equipment and labor categories include backhoe loaders, bulldozers, motor graders, excavators, water trucks, general and specialized labor, and various construction and maintenance vehicles. The document provides a standardized framework for road maintenance and repair services, with specific technical specifications for each line item and an emphasis on environmental considerations such as erosion control, seeding, and site restoration.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

YEARFuel < $3
Total PriceFuel $3 - 3.99
Total PriceFuel $4 - $4.99
Total PriceFuel $5 - $5.99

Total Price

BASE YEAR$ - 0$ - 0$ - 0$ - 0
OPTION YEAR 1$ - 0$ - 0$ - 0$ - 0
OPTION YEAR 2$ - 0$ - 0$ - 0$ - 0
OPTION YEAR 3$ - 0$ - 0$ - 0$ - 0
OPTION YEAR 4$ - 0$ - 0$ - 0$ - 0

SRS ROAD CONSTRUCTION, MAINTENANCE, & REPAIR IDIQ - SCHEDULE OF ITEMS

BASE YEAR: OCTOBER 1, 2025 ~ SEPTEMBER 30, 2026

**All mobilization costs shall be incidental to each pay item. This work consists of moving personnel, equipment, supplies, material, and incidentals to the project and performing work necessary within each pay item shown in Schedule of Items. The SRS is approx. 309.26 square miles in area.
Item No.DescriptionEstimated QuantityPay UnitMethod of MeasurementFuel < $3
Unit PriceFuel < $3
Total PriceFuel $3 - $3.99
Unit PriceFuel $3 - $3.99
Total PriceFuel $4 - $4.99
Unit PriceFuel $4 - $4.99
Total PriceFuel $5 - $5.99
Unit PriceFuel $5 - $5.99

Total Price

15101-0000Emergency Mobilization Inlcludes special emergency mobilization of equipment within 24 - 48 hours.Negotiated Per Task OrderLump Sum (LPSM)Actual Quantity
15201-0000Construction Survey and Staking Tolerances per FS-24 Table 152-1Negotiated Per Task OrderLump Sum (LPSM)Actual Quantity
15704-1100Soil Erosion Control, Brush Blanket 100% Biodegradable Erosion Control Blanket for Ditches or Slopes. Includes: furnishing and placement of ADS Geosynthetics, Curlex, Nilex or equiavalent. Submittal required)1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
15705-0100Soil Erosion Control, Silt Fence Inlcudes furnishing, placement, and installation & removal after final acceptance1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
15705-0500Soil Erosion Control, Temporary Culvert Pipe Installation and removal, 12" - 24" dia. HDPE non-perforated pipe with coorugated exterior and smooth interior. Includes: furnishing, excavation, placement, all elbows, bands, backfilling, and removal of pipe. Pipe shall meet AASHTO HS-25 loads.1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
15705-1400Soil Erosion Control, Fiber Roll Bales Compressed weed free straw bale. Includes furnishing and placement and removal of an indivudual 30-40 lbs straw bale in 4" excavated trench with min. of 2 stakes per bale in low flow drainage ditch only or toe of slope. Straw bale shall be certified noxious weed free.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
15706-0300Soil Erosion Control, Sandbag Includes furnishing and placement and removal of pre-filled sandbag which shall be clean and silt free material.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
20101-0000Clearing and Grubbing Disposal method: scattering.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0
20201-0000Selective Clearing Disposal method: scattering.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0
20202-0000Selective Clearing Disposal method: scattering.1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20203-0000Selective Clearing Disposal method: scattering.1MILEActual Quantity$ - 0$ - 0$ - 0$ - 0
20205-0000Selective Clearing and Grubbing Disposal method: scattering.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0
20206-0000Selective Clearing and Grubbing Disposal method: scattering.1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20207-0000Selective Clearing and Grubbing Disposal method: scattering.1MILEActual Quantity$ - 0$ - 0$ - 0$ - 0
20210-0000Special Clearing and Grubbing Disposal method: scattering.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0
20211-0000Special Clearing and Grubbing Disposal method: scattering.1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20212-0000Special Clearing Disposal method: scattering.1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20213-0000Roadsde Cleanup500MILEActual Quantity$ - 0$ - 0$ - 0$ - 0
20214-0000Roadsde CleanupNegotiated Per Task OrderLump Sum (LPSM)Actual Quantity
20215-0000Roadsde Cleanup1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0
20216-0000Tree Pruning1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
20217-0000Tree Root Pruning1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
20220-1000Removal, Individual Tree2EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
20220-2000Removal, Individual Stump1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
20302-2100Removal of Pipe Culvert lncudes excavating and removing existing culvert and disposal at designated SRS landfill by C.O.1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20420-0000Embankment Construction Includes subgrade grading and roadway compaction placement method per FP-24 Section 204.11, Table 204-1. Includes: a minimum of 100 linear feet or 1+00.00 of new roadway construction, 14-ft wide roadway, includes up to 4-ft of embankment excavation or embankment fill construction, 1-ft nominal depth of new ditch construction on both sides of roadway, 1V:3H embankment backslopes/cutslopes or embankment fill slope construction, subgrade grading, and subgrade compaction in NTE compaction layers lifts of 12-inches loose depth.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20425-1000Ditch, Excavation Inlcudes excavating and constructing a new 2-ft. wide flat-bottom shaped ditch at 1-ft nominal depth w/ 1V:2H or flatter backslopes/cutslopes. Disposal method: scattering.1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20435-1000Backfill, Select Granular Includes furnishing and placement, backfilling, and compaction.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20436-2000Backfill, Granular Includes subgrade grading and roadway compaction placement method per FP-24 Section 204.11, Table 204-1. Includes approx. 871 SQYD cul-de-sac embankment construction for 100-feet diameter embankment, 218 SQYD for 50-feet diameter embankment, 1-ft nominal depth of new ditch construction on both sides of intersection if applicable, 1V:3H embankment backslopes/cutslopes or embankment fill slope construction, subgrade grading, and subgrade compaction in NTE compaction layers lifts is 6" per loose depth layer for all aggregate material.1TONActual Quantity$ - 0$ - 0$ - 0$ - 0
20441-0000Waste Load and haul off material. Inlcudes loading, hauling, and disposing of material at designated SRS landfill as appointed by the C.O. The SRS is approx. 309.26 square miles in area. Inlcudes loading, hauling, and dumping govt. furnished material at specific project location.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20701-1000Separation Geotextile, Woven30Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20701-2000Separation Geotextile, Non-Woven1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20702-0000Stabilization Geotextile, Non-Woven1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20703-1100Geotextile Filter, Class 1, Woven Type C1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20803-0000Structural backfill Inlcudes furnishing, placement, and compacting. Maximum particle size is 3-in with 15% max passing No. 200 seive.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
25102-0200Placed Riprap, Class 2 Inlcudes furnishing and machine placement. Conform to FP-24 Table 251-1.17TONActual Quantity$ - 0$ - 0$ - 0$ - 0
25102-0300Placed Riprap, Class 3 Inlcudes furnishing and machine placement. Conform to FP-24 Table 251-1.17TONActual Quantity$ - 0$ - 0$ - 0$ - 0
25102-0400Placed Riprap, Class 4 Inlcudes furnishing and machine placement. Conform to FP-24 Table 251-1.17TONActual Quantity$ - 0$ - 0$ - 0$ - 0
25111-0000Grouted riprap Inlcudes furnishing and placing 6-inch depth of grout onto riprap filling the voids.1TONActual Quantity$ - 0$ - 0$ - 0$ - 0
30301-5000Aggregate Surface Reconditioning Repair soft and unstable areas to the full aggregate surface depth and according to Subsection 204.07. Scarify to the depth of aggregate surfacing shown in the plans. If no depth is indicated in the plans, scarify to a 6-inch depth. Remove irregularities and shape to a uniform surface. Compact and finish the surface according to Subsections 301.05 and 301.06.1MILEActual Quantity$ - 0$ - 0$ - 0$ - 0
30301-6000Roadway Reconditioning Includes dispose of waste, ditch reconditioning, shoulder reconditioning, roadbed reconditioning, aggregate surface reconditioning. Maintain existing cross slope and crown or shape and grade as shown in the plans.500MILEActual Quantity$ - 0$ - 0$ - 0$ - 0
30303-1000Roadbed Reconditioning Compact-in-place borrow delivered from a Government supplied on-site source.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
30303-2000Aggregate Surface Reconditioning Compact-in-place borrow delivered from a Government supplied on-site source.50Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
30303-3000Roadway Reconditioning Compact-in-place borrow delivered from a Government supplied on-site source.10Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
30303-4000Shoulder Reconditioning Compact-in-place borrow delivered from a Government supplied on-site source.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
30401-1000Full Depth Reclamation, Method 1 Includes furnishing, placement, and spreading with grader.1MILEActual Quantity$ - 0$ - 0$ - 0$ - 0
30402-1000Full Depth Reclamation, Method 1 Includes furnishing, placement, and spreading with grader.1TONActual Quantity$ - 0$ - 0$ - 0$ - 0
31201-0000Dust Palliative5MILEActual Quantity$ - 0$ - 0$ - 0$ - 0
31211-0000Lignosulfonate1TONActual Quantity$ - 0$ - 0$ - 0$ - 0
31212-0000Calcium Chloride1TONActual Quantity$ - 0$ - 0$ - 0$ - 0
31213-0000Magnesium Chloride1TONActual Quantity$ - 0$ - 0$ - 0$ - 0
31302-0400Aggregate-Topsoil Course, 4-inch Depth1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
55201-0100Structural Concrete, Class A Inlcudes furnishing, placing, finishing, and curing concrete in bridges, culverts, and other structures w/ 4,500 psi 28-day compressive strength. Mix design submittal required)1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
60101-0000Concrete Inlcudes furnishing, placing, finishing, and curing concrete w/ 3,000 psi 28-day compressive strength. Mix design per FP-24 Table 601-11Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
60103-0100Concrete, Headwall for 18-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-0120Concrete, Headwall for 21-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-0140Concrete, Headwall for 24-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-0160Concrete, Headwall for 30-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-0180Concrete, Headwall for 36-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-0200Concrete, Headwall for 42-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-0220Concrete, Headwall for 48-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-0240Concrete, Headwall for 54-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-0260Concrete, Headwall for 60-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-0280Concrete, Headwall for 66-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-0300Concrete, Headwall for 72-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-3000Concrete, Sloped and Flared Box Inlet/Outlet for 24-inch Pipe Culvert Includes furnishing and installation of flared end section1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
60103-3020Concrete, Sloped and Flared Box Inlet/Outlet for 30-inch Pipe Culvert Includes furnishing and installation of flared end section1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60103-3040Concrete, Sloped and Flared Box Inlet/Outlet for 36-inch Pipe Culvert Includes furnishing and installation of flared end section1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60201-060018-inch Pipe Culvert1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
60201-080024-inch Pipe Culvert1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
60201-100036-inch Pipe Culvert1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
60201-120048-inch Pipe Culvert1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
60201-140060-inch Pipe Culvert1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
60501-0000Standard Underdrain System with Geotextile Conform to FP-24 Section 605. Includes furnishing and installation of new collector pipe with perforations, geotextile, couplings, fittings, excavation up to 10-ft depth, backfilling, and compaction.1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
60703-0000Cleaning Culvert In Place1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60705-0000Repairing Drainage Structure1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-0200Lining 15-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-0300Lining 18-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-0400Lining 21-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-0500Lining 24-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-0600Lining 30-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-0700Lining 36-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-0800Lining 42-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-0900Lining 48-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-1000Lining 54-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-1100Lining 60-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-1200Lining 66-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
60707-1300Lining 72-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0
61401-0000Flowable Backfill Lean concrete backfill, conform to FP-24 Section 614. Includes furnishing and placement of lean concrete in designated area. Contractor shall submit a lean concrete backfill mix design for approval.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
61701-0050Guardrail system G1, type 1, class A, steel posts Includes installing a new guardrail systems with posts (drilled w/ backfilling & compaction or drive only), rails, terminal sections, anchorage assembly, all hardware, and assembling. Contractor shall submit P.E. stamped W-beam guardrail with end treatment to C.O. for approval.)1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
61708-1000Remove and Reset Guardrail Includes modifying, removing and resetting an existing treated posts or steel posts guardrail system including the steel end treatments and removing and ressetting posts, and raising an existing guardrail systems.1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
62201-0000Equipment1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-0025Dump Truck 10 C.Y. with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-0350Backhoe Loader Cat 416E, JD 310G, or equivalent, 4-wheel drive, w/ extendable stick; with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-0725Wheel Loader John Deere 544, Cat 950, or equivalent, with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-1125Bulldozer Cat D-4, Case 550, or equivalent, w/ tilt blade; with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-2100Compactor Cat CS44B or equivalent, with a minimum centrifugal force of 15,652 lbs vibratory smooth-drum roller compactor or equalivalent, with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-2300Brush Mower, with 1800 mm Diameter Rotary Mower, 50 HP with Operator1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-2750Motor Grader Cat 140, JD770D, or equivalent; with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-3000Hydraulic Excavator Track Mounted, Cat 315, Case 9030, or equiv., with thumb attachment; with operator1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-3450Track Loader Skid steer, Bobcat S220 or equivalent; with operator1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-3750Chainsaw with Operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-3850Water Truck 4,000 gallon minimum and pressurized; with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62201-4300Pump, water, trash, 6-inch Centrifugal Sump pump w/ screening and minimum 100-ft length hose. Includes furnishing gas powered or electrical self-priming centrifugal pump w/ up to 105’ max head. Must be on project site and running. Fuel and electrical for power and all connections, hardware, and parts is incidental at hourly rate.1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62301-0000General Labor1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62302-0000Special Labor Skilled chain saw operator1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62302-0000Special Labor Welder certified in AWS1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0
62510-1000Seeding, Dry Method Includes: preparation, seeding, and fertiliznig.0.5ACREActual Quantity$ - 0$ - 0$ - 0$ - 0
62510-2000Seeding, Hydraulic Method Includes using hydraulic-type equipment capable of providing a uniform application using water slurry as the carrying agent, tracer material grass cellulose fiber mulch.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0
62515-1000Mulching, Dry Method0.5ACREActual Quantity$ - 0$ - 0$ - 0$ - 0
62515-2000Mulching, Hydraulic Method Includes using hydraulic-type equipment applying wood fiber or grass straw cellulose mulch, and applying bonded fiber matrix hydraulic mulch. Conform to FP-24 625.08.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0
62521-0000Fertilizer Furnish and place, dry method0.5TONActual Quantity$ - 0$ - 0$ - 0$ - 0
62701-0000Sod Furnish, place, & install. Bermuda/ Centipede/ Zoysia/St. Augustine/ Fescue/ Carpet/ Ryegrass or as specified in Task Order.150Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0
62902-0000Rolled Erosion Control Product 6-inch depth, Geocell confinement system, Geoweb confinement system or equivalent. Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Keys Connection Devices, Rebar #3 J-Hooks 18-inches etc. Granular infill aggregate not included.50Square Feet (SQFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
62902-0000Rolled Erosion Control Product 8-inch depth, Geocell confinement system, Geoweb confinement system or equivalent. Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Keys Connection Devices, Rebar #3 J-Hooks 18-inches etc. Granular infill aggregate not included.1Square Feet (SQFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0
66701-0000Negotiated Pau ItemNegotiated Per Task OrderLump Sum (LPSM)Actual Quantity

$ - 0 $ - 0 $ - 0 $ - 0

Option Year 1

SRS ROAD CONSTRUCTION, MAINTENANCE, & REPAIR IDIQ - SCHEDULE OF ITEMS

OPTION YEAR 1: OCTOBER 1, 2026 ~ SEPTEMBER 30, 2027

**All mobilization costs shall be incidental to each pay item. This work consists of moving personnel, equipment, supplies, material, and incidentals to the project and performing work necessary within each pay item shown in Schedule of Items. The SRS is approx. 309.26 square miles in area.
Item No.DescriptionEstimated QuantityPay UnitMethod of MeasurementFuel < $3
Unit PriceFuel < $3
Total PriceFuel $3 - $3.99
Unit PriceFuel $3 - $3.99
Total PriceFuel $4 - $4.99
Unit PriceFuel $4 - $4.99
Total PriceFuel $5 - $5.99
Unit PriceFuel $5 - $5.99

Total Price

15101-0000Emergency Mobilization Inlcludes special emergency mobilization of equipment within 24 - 48 hours.Negotiated Per Task OrderLump Sum (LPSM)Actual Quantity
15201-0000Construction Survey and Staking Tolerances per FS-24 Table 152-1Negotiated Per Task OrderLump Sum (LPSM)Actual Quantity
15704-1100Soil Erosion Control, Brush Blanket 100% Biodegradable Erosion Control Blanket for Ditches or Slopes. Includes: furnishing and placement of ADS Geosynthetics, Curlex, Nilex or equiavalent. Submittal required)1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15705-0100Soil Erosion Control, Silt Fence Inlcudes furnishing, placement, and installation & removal after final acceptance1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15705-0500Soil Erosion Control, Temporary Culvert Pipe Installation and removal, 12" - 24" dia. HDPE non-perforated pipe with coorugated exterior and smooth interior. Includes: furnishing, excavation, placement, all elbows, bands, backfilling, and removal of pipe. Pipe shall meet AASHTO HS-25 loads.1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15705-1400Soil Erosion Control, Fiber Roll Bales Compressed weed free straw bale. Includes furnishing and placement and removal of an indivudual 30-40 lbs straw bale in 4" excavated trench with min. of 2 stakes per bale in low flow drainage ditch only or toe of slope. Straw bale shall be certified noxious weed free.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15706-0300Soil Erosion Control, Sandbag Includes furnishing and placement and removal of pre-filled sandbag which shall be clean and silt free material.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20101-0000Clearing and Grubbing Disposal method: scattering.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20201-0000Selective Clearing Disposal method: scattering.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20202-0000Selective Clearing Disposal method: scattering.1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20203-0000Selective Clearing Disposal method: scattering.1MILEActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20205-0000Selective Clearing and Grubbing Disposal method: scattering.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20206-0000Selective Clearing and Grubbing Disposal method: scattering.1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20207-0000Selective Clearing and Grubbing Disposal method: scattering.1MILEActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20210-0000Special Clearing and Grubbing Disposal method: scattering.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20211-0000Special Clearing and Grubbing Disposal method: scattering.1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20212-0000Special Clearing Disposal method: scattering.1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20213-0000Roadsde Cleanup500MILEActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20214-0000Roadsde CleanupNegotiated Per Task OrderLump Sum (LPSM)Actual Quantity$ - 0$ - 0$ - 0$ - 0
20215-0000Roadsde Cleanup1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20216-0000Tree Pruning1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20217-0000Tree Root Pruning1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20220-1000Removal, Individual Tree2EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20220-2000Removal, Individual Stump1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20302-2100Removal of Pipe Culvert lncudes excavating and removing existing culvert and disposal at designated SRS landfill by C.O.1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20420-0000Embankment Construction Includes subgrade grading and roadway compaction placement method per FP-24 Section 204.11, Table 204-1. Includes: a minimum of 100 linear feet or 1+00.00 of new roadway construction, 14-ft wide roadway, includes up to 4-ft of embankment excavation or embankment fill construction, 1-ft nominal depth of new ditch construction on both sides of roadway, 1V:3H embankment backslopes/cutslopes or embankment fill slope construction, subgrade grading, and subgrade compaction in NTE compaction layers lifts of 12-inches loose depth.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20425-1000Ditch, Excavation Inlcudes excavating and constructing a new 2-ft. wide flat-bottom shaped ditch at 1-ft nominal depth w/ 1V:2H or flatter backslopes/cutslopes. Disposal method: scattering.1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20435-1000Backfill, Select Granular Includes furnishing and placement, backfilling, and compaction.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20436-2000Backfill, Granular Includes subgrade grading and roadway compaction placement method per FP-24 Section 204.11, Table 204-1. Includes approx. 871 SQYD cul-de-sac embankment construction for 100-feet diameter embankment, 218 SQYD for 50-feet diameter embankment, 1-ft nominal depth of new ditch construction on both sides of intersection if applicable, 1V:3H embankment backslopes/cutslopes or embankment fill slope construction, subgrade grading, and subgrade compaction in NTE compaction layers lifts is 6" per loose depth layer for all aggregate material.1TONActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20441-0000Waste Load and haul off material. Inlcudes loading, hauling, and disposing of material at designated SRS landfill as appointed by the C.O. The SRS is approx. 309.26 square miles in area. Inlcudes loading, hauling, and dumping govt. furnished material at specific project location.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20701-1000Separation Geotextile, Woven30Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20701-2000Separation Geotextile, Non-Woven1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20702-0000Stabilization Geotextile, Non-Woven1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20703-1100Geotextile Filter, Class 1, Woven Type C1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20803-0000Structural backfill Inlcudes furnishing, placement, and compacting. Maximum particle size is 3-in with 15% max passing No. 200 seive.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
25102-0200Placed Riprap, Class 2 Inlcudes furnishing and machine placement. Conform to FP-24 Table 251-1.17TONActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
25102-0300Placed Riprap, Class 3 Inlcudes furnishing and machine placement. Conform to FP-24 Table 251-1.17TONActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
25102-0400Placed Riprap, Class 4 Inlcudes furnishing and machine placement. Conform to FP-24 Table 251-1.17TONActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
25111-0000Grouted riprap Inlcudes furnishing and placing 6-inch depth of grout onto riprap filling the voids.1TONActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30301-5000Aggregate Surface Reconditioning Repair soft and unstable areas to the full aggregate surface depth and according to Subsection 204.07. Scarify to the depth of aggregate surfacing shown in the plans. If no depth is indicated in the plans, scarify to a 6-inch depth. Remove irregularities and shape to a uniform surface. Compact and finish the surface according to Subsections 301.05 and 301.06.1MILEActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30301-6000Roadway Reconditioning Includes dispose of waste, ditch reconditioning, shoulder reconditioning, roadbed reconditioning, aggregate surface reconditioning. Maintain existing cross slope and crown or shape and grade as shown in the plans.500MILEActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30303-1000Roadbed Reconditioning Compact-in-place borrow delivered from a Government supplied on-site source.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30303-2000Aggregate Surface Reconditioning Compact-in-place borrow delivered from a Government supplied on-site source.50Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30303-3000Roadway Reconditioning Compact-in-place borrow delivered from a Government supplied on-site source.10Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30303-4000Shoulder Reconditioning Compact-in-place borrow delivered from a Government supplied on-site source.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30401-1000Full Depth Reclamation, Method 1 Includes furnishing, placement, and spreading with grader.1MILEActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30402-1000Full Depth Reclamation, Method 1 Includes furnishing, placement, and spreading with grader.1TONActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
31201-0000Dust Palliative5MILEActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
31211-0000Lignosulfonate1TONActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
31212-0000Calcium Chloride1TONActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
31213-0000Magnesium Chloride1TONActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
31302-0400Aggregate-Topsoil Course, 4-inch Depth1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
55201-0100Structural Concrete, Class A Inlcudes furnishing, placing, finishing, and curing concrete in bridges, culverts, and other structures w/ 4,500 psi 28-day compressive strength. Mix design submittal required)1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60101-0000Concrete Inlcudes furnishing, placing, finishing, and curing concrete w/ 3,000 psi 28-day compressive strength. Mix design per FP-24 Table 601-11Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-0100Concrete, Headwall for 18-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-0120Concrete, Headwall for 21-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-0140Concrete, Headwall for 24-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-0160Concrete, Headwall for 30-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-0180Concrete, Headwall for 36-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-0200Concrete, Headwall for 42-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-0220Concrete, Headwall for 48-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-0240Concrete, Headwall for 54-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-0260Concrete, Headwall for 60-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-0280Concrete, Headwall for 66-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-0300Concrete, Headwall for 72-inch Pipe Culvert Inlcudes furnishing of concrete, forming, reinforcement placement, placing, finishing, curing concrete and removal of forming once concrete has cured for concrete headwall.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-3000Concrete, Sloped and Flared Box Inlet/Outlet for 24-inch Pipe Culvert Includes furnishing and installation of flared end section1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-3020Concrete, Sloped and Flared Box Inlet/Outlet for 30-inch Pipe Culvert Includes furnishing and installation of flared end section1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60103-3040Concrete, Sloped and Flared Box Inlet/Outlet for 36-inch Pipe Culvert Includes furnishing and installation of flared end section1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60201-060018-inch Pipe Culvert1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60201-080024-inch Pipe Culvert1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60201-100036-inch Pipe Culvert1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60201-120048-inch Pipe Culvert1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60201-140060-inch Pipe Culvert1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60501-0000Standard Underdrain System with Geotextile Conform to FP-24 Section 605. Includes furnishing and installation of new collector pipe with perforations, geotextile, couplings, fittings, excavation up to 10-ft depth, backfilling, and compaction.1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60703-0000Cleaning Culvert In Place1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60705-0000Repairing Drainage Structure1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-0200Lining 15-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-0300Lining 18-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-0400Lining 21-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-0500Lining 24-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-0600Lining 30-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-0700Lining 36-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-0800Lining 42-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-0900Lining 48-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-1000Lining 54-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-1100Lining 60-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-1200Lining 66-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60707-1300Lining 72-inch Pipe Culvert1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
61401-0000Flowable Backfill Lean concrete backfill, conform to FP-24 Section 614. Includes furnishing and placement of lean concrete in designated area. Contractor shall submit a lean concrete backfill mix design for approval.1Cubic Yard (CUYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
61701-0050Guardrail system G1, type 1, class A, steel posts Includes installing a new guardrail systems with posts (drilled w/ backfilling & compaction or drive only), rails, terminal sections, anchorage assembly, all hardware, and assembling. Contractor shall submit P.E. stamped W-beam guardrail with end treatment to C.O. for approval.)1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
61708-1000Remove and Reset Guardrail Includes modifying, removing and resetting an existing treated posts or steel posts guardrail system including the steel end treatments and removing and ressetting posts, and raising an existing guardrail systems.1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-0000Equipment1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-0025Dump Truck 10 C.Y. with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-0350Backhoe Loader Cat 416E, JD 310G, or equivalent, 4-wheel drive, w/ extendable stick; with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-0725Wheel Loader John Deere 544, Cat 950, or equivalent, with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-1125Bulldozer Cat D-4, Case 550, or equivalent, w/ tilt blade; with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-2100Compactor Cat CS44B or equivalent, with a minimum centrifugal force of 15,652 lbs vibratory smooth-drum roller compactor or equalivalent, with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-2300Brush Mower, with 1800 mm Diameter Rotary Mower, 50 HP with Operator1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-2750Motor Grader Cat 140, JD770D, or equivalent; with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-3000Hydraulic Excavator Track Mounted, Cat 315, Case 9030, or equiv., with thumb attachment; with operator1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-3450Track Loader Skid steer, Bobcat S220 or equivalent; with operator1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-3750Chainsaw with Operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-3850Water Truck 4,000 gallon minimum and pressurized; with operator8HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62201-4300Pump, water, trash, 6-inch Centrifugal Sump pump w/ screening and minimum 100-ft length hose. Includes furnishing gas powered or electrical self-priming centrifugal pump w/ up to 105’ max head. Must be on project site and running. Fuel and electrical for power and all connections, hardware, and parts is incidental at hourly rate.1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62301-0000General Labor1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62302-0000Special Labor Skilled chain saw operator1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62302-0000Special Labor Welder certified in AWS1HOURActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62510-1000Seeding, Dry Method Includes: preparation, seeding, and fertiliznig.0.5ACREActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62510-2000Seeding, Hydraulic Method Includes using hydraulic-type equipment capable of providing a uniform application using water slurry as the carrying agent, tracer material grass cellulose fiber mulch.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62515-1000Mulching, Dry Method0.5ACREActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62515-2000Mulching, Hydraulic Method Includes using hydraulic-type equipment applying wood fiber or grass straw cellulose mulch, and applying bonded fiber matrix hydraulic mulch. Conform to FP-24 625.08.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62521-0000Fertilizer Furnish and place, dry method0.5TONActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62701-0000Sod Furnish, place, & install. Bermuda/ Centipede/ Zoysia/St. Augustine/ Fescue/ Carpet/ Ryegrass or as specified in Task Order.150Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62902-0000Rolled Erosion Control Product 6-inch depth, Geocell confinement system, Geoweb confinement system or equivalent. Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Keys Connection Devices, Rebar #3 J-Hooks 18-inches etc. Granular infill aggregate not included.50Square Feet (SQFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62902-0000Rolled Erosion Control Product 8-inch depth, Geocell confinement system, Geoweb confinement system or equivalent. Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Keys Connection Devices, Rebar #3 J-Hooks 18-inches etc. Granular infill aggregate not included.1Square Feet (SQFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
66701-0000Negotiated Pau ItemNegotiated Per Task OrderLump Sum (LPSM)Actual Quantity

$ - 0 $ - 0 $ - 0 $ - 0

Option Year 2

SRS ROAD CONSTRUCTION, MAINTENANCE, & REPAIR IDIQ - SCHEDULE OF ITEMS

OPTION YEAR 2: OCTOBER 1, 2027 ~ SEPTEMBER 30, 2028

**All mobilization costs shall be incidental to each pay item. This work consists of moving personnel, equipment, supplies, material, and incidentals to the project and performing work necessary within each pay item shown in Schedule of Items. The SRS is approx. 309.26 square miles in area.
Item No.DescriptionEstimated QuantityPay UnitMethod of MeasurementFuel < $3
Unit PriceFuel < $3
Total PriceFuel $3 - $3.99
Unit PriceFuel $3 - $3.99
Total PriceFuel $4 - $4.99
Unit PriceFuel $4 - $4.99
Total PriceFuel $5 - $5.99
Unit PriceFuel $5 - $5.99

Total Price

15101-0000Emergency Mobilization Inlcludes special emergency mobilization of equipment within 24 - 48 hours.Negotiated Per Task OrderLump Sum (LPSM)Actual Quantity
15201-0000Construction Survey and Staking Tolerances per FS-24 Table 152-1Negotiated Per Task OrderLump Sum (LPSM)Actual Quantity
15704-1100Soil Erosion Control, Brush Blanket 100% Biodegradable Erosion Control Blanket for Ditches or Slopes. Includes: furnishing and placement of ADS Geosynthetics, Curlex, Nilex or equiavalent. Submittal required)1Square Yard (SQYD)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15705-0100Soil Erosion Control, Silt Fence Inlcudes furnishing, placement, and installation & removal after final acceptance1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15705-0500Soil Erosion Control, Temporary Culvert Pipe Installation and removal, 12" - 24" dia. HDPE non-perforated pipe with coorugated exterior and smooth interior. Includes: furnishing, excavation, placement, all elbows, bands, backfilling, and removal of pipe. Pipe shall meet AASHTO HS-25 loads.1Linear Foot (LNFT)Actual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15705-1400Soil Erosion Control, Fiber Roll Bales Compressed weed free straw bale. Includes furnishing and placement and removal of an indivudual 30-40 lbs straw bale in 4" excavated trench with min. of 2 stakes per bale in low flow drainage ditch only or toe of slope. Straw bale shall be certified noxious weed free.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15706-0300Soil Erosion Control, Sandbag Includes furnishing and placement and removal of pre-filled sandbag which shall be clean and silt free material.1EACHActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20101-0000Clearing and Grubbing Disposal method: scattering.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20201-0000Selective Clearing Disposal method: scattering.1ACREActual Quantity$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.