J03 Self Performed Calculation Sheet.pdf

PDF 153 KB Posted

Attached to
PIMC Mechanical Projects: HVAC and Central Plant & Isolation Rooms in Phoenix, AZ, Maricopa, County
Solicitation number
75H701-25-R-00001
Issued by

About this file

This is a Self-Performed Calculation Sheet template (Attachment J03) for solicitation 75H701-25-R-00001 that contractors must complete to demonstrate compliance with FAR limitations on subcontracting requirements.

The worksheet requires contractors to calculate their percentage of work performed by similarly situated entities by documenting the total proposed price, subtracting profit/fees, materials costs, and costs for non-similar situated entities. For general construction contracts, no more than 85% of the amount paid by the government can go to firms that are not similarly situated (75% for special trade contractors). The form must be completed both at proposal submission and contract completion, requiring contractor signature and date at both stages. It includes a table to list all proposed prime contractors and subcontractors, their socioeconomic status (e.g. 8(a), SDVOSB, HUBZone), work activities, and dollar values. The document provides detailed definitions and examples of similarly situated entities and how to properly calculate compliance with subcontracting limitations.

View the file

Other files

File Type Posted
B05 Amendment A00007 (75H70125R00001).pdf PDF
B05 Amendment A00006 (75H70125R00001).pdf PDF
B05 Amendment A00005 (75H70125R00001).pdf PDF
B05 Amendment A00004 (75H70125R00001).pdf PDF
Site Visit Sign-in (75H70125R00001).pdf PDF
J04 2025 Exemption Letter for a Qualifying Hospital.pdf PDF
B05 Amendment A00003 (75H70125R00001).pdf PDF
J02 WD AZ20250039 2025.01.03.pdf PDF
B05 Amendment A00002 (75H70125R00001).pdf PDF
B05 Amendment A00001 (75H70125R00001).pdf PDF
J01a Specifications - PIMC HVAC.pdf PDF
J01f PIMC Asbestos Survey - Bldg 233 Hospital (Feb 2003).pdf PDF
J01c Specifications - PIMC CP and IR.pdf PDF
B01 RFP 75H701-25-R-00001 PIMC HVAC CP and IR.pdf PDF
J01e Location Map.pdf PDF
J02 WD AZ20240039 Mod 6 2024.09.06.pdf PDF
J01d Drawings - PIMC CP and IR.pdf PDF
J08 OF 306 Declaration for Federal Employment.pdf PDF
J04 2024 Exemption Letter for a Qualifying Hospital.pdf PDF
J09 Addendum to OF-306 (Childcare Form).pdf PDF
J05 Company Specialized Experience Form Construction.pdf PDF
J04a FORMS_TPT_5000HC_11228.pdf PDF
J01b Drawings - PIMC HVAC.pdf PDF
J06 PPQ.pdf PDF
J01h Above Ceiling Work Permit.pdf PDF
J07 IHS IEE Representation Form.pdf PDF
J01g Infection Control Risk Assessment Permit.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J03 - Self-Performed Calculation Sheet Solicitation Number: 75H701-25-R-00001

SELF-PERFORMED CALCULATION SHEET

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (FAR 52.219-14 (Oct 2022) and/or FAR 52.219-17)

Offeror’s are to identify self-performance IAW CFR Title 13: Business Credit and Assistance, Chapter I, PART 125— GOVERNMENT CONTRACTING PROGRAMS § 125.6 Prime contractor performance requirements (limitations on subcontracting). https://www.ecfr.gov/current/title-13/chapter-I/part-125/section-125.6

SELF PERFORMED CALCULATIONS for Construction Firms, it will not pay more than 85% (75% for special trade contractors) of the amount paid by the government to it to firms that are not similarly situated. Any work that a similarly situated subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded.

Cost of materials are excluded and not considered to be subcontracted. (See Page 3 for clarifications on “similar situated” entities).

OFFEROR’S SELF PERFORMANCE WORKSHEET:

Offeror’s are required to complete this Worksheet for this Proposal.

a) Offeror’s total proposed price (base + option(s)) $___________

b) Subtract profit or fees $___________

c) Subtract cost of materials $___________

d) Subtract Offeror’s total estimated cost of contract performance incurred for NON similar situated entities $___________

e) Offeror’s total estimated cost of contract performance for similar situated entities (a-b-c-d=e)

f) Offeror’s percentage of “similar situated” entities work (e/a x 100% = %) ________%

List of Proposed Prime Contractor and Subcontractors, their work activities and value:

Prime Contractor/Subcontractor Concern Status

(i.e., SB, 8(a), SDB, SDVOSB, HUBZone, etc.)

Work Activities $ Value

(Can add additional sheet if necessary) https://www.ecfr.gov/current/title-13/chapter-I/part-125/section-125.6

At completion of this Contract/Task Order, the awardee shall complete and submit the following calculations to the Contracting Officer for the actual results achieved.

a) Offeror’s total proposed price (base + option(s)) $___________

b) Subtract profit or fees $___________

c) Subtract cost of materials $___________

d) Subtract Offeror’s total estimated cost of contract performance incurred for NON similar situated entities $___________

e) Offeror’s total estimated cost of contract performance for similar situated entities (a-b-c-d=e)

f) Offeror’s percentage of “similar situated” entities work (e/a x 100% = %) ________%

Signed at submission of Proposal:

Name: ___________________________________ Title: ______________________________________

Signature: _________________________________ Date: ______________________________________

Signed at completion of Contract:

Name: ___________________________________ Title: ______________________________________

Signature: _________________________________ Date: ______________________________________

Definitions: “Concern Status” means the SBA determined status of the firm, the small business program status as that which qualified the prime contractor for the award, and that is considered small for the NAICS code the prime contractor assigned to the subcontract the subcontractor will perform. These include Small Business, 8(a) participants, Small Disadvantaged Businesses (SDB), HUBZone Small Business concerns, Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns, and Economically Disadvantaged Women-Owned Small Business (EDWOSB) concerns and Women- Owned Small Business (WOSB) concerns eligible under the WOSB Program. If none of these apply, the concern would be a Large Business.

(FAR 52.219-14 Limitations on Subcontracting (Oct 2022)— “Similarly situated entity” means a first-tier subcontractor, including an independent contractor, has the same small business program status as that which qualified the prime contractor for the award, and that is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract. An example of a similarly situated entity is a first-tier subcontractor that is a HUBZone small business concern for a HUBZone setaside or sole source award under the HUBZone Program.]

(13 CFR 125.6) § 125.6 What are the prime contractor's limitations on subcontracting?

(a) General. In order to be awarded a full or partial small business set-aside contract with a value greater than the simplified acquisition threshold (as defined in the FAR at 48 CFR 2.101)” in paragraph (a) introductory text; and an 8(a) contract, an SDVOSB contract, a VOSB contract, a HUBZone contract, or a WOSB or EDWOSB contract pursuant to part 127 of this chapter, a small business concern must agree that:

(3) In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not similarly situated. Any work that a similarly situated subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(4) In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime may be paid to firms that are not similarly situated. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(c) Subcontracts to similarly situated entities. A small business concern prime contractor that receives a contract listed in paragraph (a) of this section and spends contract amounts on a subcontractor that is a similarly situated entity shall not consider those subcontracted amounts as subcontracted for purposes of determining whether the small business concern prime contractor has violated paragraph (a) of this section, to the extent the subcontractor performs the work with its own employees. Any work that the similarly situated subcontractor does not perform with its own employees shall be considered subcontracted SBA will also exclude a subcontract to a similarly situated entity from consideration under the ostensible subcontractor rule (§ 121.103(h)(4)). A prime contractor may no longer count a similarly situated entity towards compliance with the limitations on subcontracting where the subcontractor ceases to qualify as small or under the relevant socioeconomic status.

Example 1 to paragraph (c):

An SDVO SBC sole source contract is awarded in the total amount of $500,000 for hammers. The prime contractor is a manufacturer and subcontracts 51% of the total amount received, less the cost of materials ($100,000) or $204,000, to an SDVO SBC subcontractor that manufactures the hammers in the U.S. The prime contractor does not violate the limitation on subcontracting requirement because the amount subcontracted to a similarly situated entity (less the cost of materials) is excluded from the limitation on subcontracting calculation.

Example 2 to paragraph (c):

A competitive 8(a) BD contract is awarded in the total amount of $10,000,000 for janitorial services. The prime contractor subcontracts $8,000,000 of the janitorial services to another 8(a) BD certified firm. The prime contractor does not violate the limitation on subcontracting for services because the amount subcontracted to a similarly situated entity is excluded from the limitation on subcontracting.

https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=d254fd6f55dec6a6ba3d0fb8c22b9aa4&term_occur=999&term_src=Title:13:Chapter:I:Part:125:125.6 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=28ecffbfcc51433405558dc74cf1be8f&term_occur=999&term_src=Title:13:Chapter:I:Part:125:125.6 https://www.law.cornell.edu/cfr/text/48/2.101 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=28ecffbfcc51433405558dc74cf1be8f&term_occur=999&term_src=Title:13:Chapter:I:Part:125:125.6 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=28ecffbfcc51433405558dc74cf1be8f&term_occur=999&term_src=Title:13:Chapter:I:Part:125:125.6 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=28ecffbfcc51433405558dc74cf1be8f&term_occur=999&term_src=Title:13:Chapter:I:Part:125:125.6 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=28ecffbfcc51433405558dc74cf1be8f&term_occur=999&term_src=Title:13:Chapter:I:Part:125:125.6 https://www.law.cornell.edu/cfr/text/13/part-127 https://www.law.cornell.edu/cfr/text/13/part-127 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=25f1b362914d0022585ec32bf708ede2&term_occur=999&term_src=Title:13:Chapter:I:Part:125:125.6

Example 3 to paragraph (c):

A WOSB set-aside contract is awarded in the total amount of $1,000,000 for landscaping services. The prime contractor subcontracts $500,001 to an SDVO SBC subcontractor that is not also a WOSB under the WOSB program. The prime contractor is in violation of the limitation on subcontracting requirement because it has subcontracted more than 50% of the contract amount to an SDVO SBC subcontractor, which is not considered similarly situated to a WOSB prime contractor.

SELF-PERFORMED CALCULATION SHEET
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (FAR 52.219-14 (Oct 2022) and/or FAR 52.219-17)

File details come from the government source that posted it. Updated .