J.7 GRDW Statement of Work.pdf

PDF 6 MB Posted

Attached to
Monongahela National Forest Electrical Improvements Project Federal contract opportunity
Solicitation number
12445523Q0014
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Monongahela National Forest Electrical Improvements Project, newest first.
File Type Posted
Amendment 0003 - J.7 GRDW Statement of Work.pdf PDF
Amendment 0003 - J.4 MRDW Project Plans.pdf PDF
Amendment 0003 - SF30 - Please sign and return with quote package.pdf PDF
Amendment 0003 - J.12 GRDO Statement of Work.pdf PDF
Amendment 0003 - J.15 GRDO Specifications.pdf PDF
Amendment 0003 - J.14 GRDO Project Plans.pdf PDF
Amendment 0003 - J.2 MRDW Statement of Work.pdf PDF
Amendment 0003 - J.9 GRDW Project Plans.pdf PDF
Amendment 0003 - J.5 MRDW Project Specifications.pdf PDF
Amendment 0003 - Additional Questions and Answers Document.pdf PDF
Amendment 0003 - J.10 GRDW Specifications.pdf PDF
Amendment 0003 - RFQ_12445523Q0014 Revised.pdf PDF
Amendment 0002 SF30 - Sign and return.pdf PDF
Amendment 0001 Monongahela NF Electrical Improvements Project -Q and A Document.pdf PDF
Amendment 0001 SF30 - Sign and return.pdf PDF
Amendment 0001 J.12 GRDO Statement of Work Updated 2.14.23.pdf PDF
Amendment 0001 J.2 MRDW Statement of Work Updated 2.14.23.pdf PDF
Amendment 0001 J.4 MRDW Project Plans Updated 2.14.23.pdf PDF
Amendment 0001 J.5 MRDW Project Specifications Updated 2.14.23.pdf PDF
Amendment 0001 J.7 GRDW Statement of Work Updated 2.14.23.pdf PDF
Amendment 0001 J.9 GRDW Project Plans Updated 2.14.23.pdf PDF
Amendment 0001 J.10 GRDW Project Specifications Updated 2.14.23.pdf PDF
Amendment 0001 J.15 GRDO Project Specifications Updated 2.14.23.pdf PDF
J.8 GRDW Project Maps.pdf PDF
J.6 DBA WD-WV0022 Pocahontas County.pdf PDF
J.3 MRDW Project Maps.pdf PDF
J.1 DBA WD WV0022 - Poncahontas County.pdf PDF
J.5 MRDW Project Specifications.pdf PDF
J.11 DBA WD WV0021 - Nicholas County.pdf PDF
J.14 GRDO Project Plans.pdf PDF
J.2 MRDW Statement of Work.pdf PDF
J.4 MRDW Project Plans.pdf PDF
J.13 GRDO Project Maps.pdf PDF
J.12 GRDO Statement of Work.pdf PDF
J.10 GRDW Project Specifications.pdf PDF
J.9 GRDW Project Plans.pdf PDF
J.15 GRDO Project Specifications.pdf PDF
RFQ_12445523Q0014.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

Attachment

Project Greenbrier Ranger District Warehouse Lighting Upgrades

General Information

1.0 Scope of Work

The project requirements follow below:

Replacement of an outdated fuse panel with an appropriately sized breaker subpanel. Replacement of the panel box supply wires is incidental to the panel replacement. In addition, the circuit for the upstairs lighting, and light fixtures shall be replaced. Approximately 250 feet of metal clad wire (contractor is responsible to field verify the actual length), 1 switch, 6 light fixtures, and associated appurtenances shall be incidental to the contract. Proposed wire, panel, fixtures, etc. shall follow existing counterparts’ locations and routes. In addition to the work at the warehouse, contractor shall install wire from existing Analog Telephone Adapter (ATA) to 66 block in the main office (approximately 10’ run), intended to connect to the existing analog phone line run to warehouse. Contractor shall be responsible for testing line from warehouse to office 66 block to determine connection location. The contractor shall supply all materials and labor to complete the requirements described herein and any incidental work. All work shall comply with the NEC. Phone line and proposed lighting circuit shall be tested in the presence of the COR.

2.0 Background

The upstairs lighting circuit at the Greenbrier Ranger Station is served by an old fuse box. The fuse box and outdated wiring need replaced, along with the upstairs lighting circuit including lighting fixtures, wire, and switch. The wiring for the fuse box from the service/main breaker box is routed through walls sheathed by plywood. The upstairs wiring circuit feeds from the proposed sub-panel location up the inside of the wall and then routed along the exposed trusses/wall framing. Contractor to verify necessary wire gauge, and utilize metal-clad wiring at a minimum, where allowed by code.

Contractor Requirements

3.0 Technical Requirements / Tasks

Contractor shall be a licensed electrician in the state of West Virginia and maintain liability insurance. NFPA 70, NEC, IBC shall supersede any other documentation provided.

4.0 Government Furnished

Government shall furnish access to the facility during regular business hours (M-F 8:00 AM – 4:30 PM), as well as restroom facilities onsite. No work shall be permitted on weekends or on federal holidays without the written permission of the CO. Any government provided property shall be returned prior to payment of the final invoice.

5.0 Deliverables / Schedule

Key Deliverables

Item No. Deliverable Objective Due 1 Upgraded Electrical

Components Replace circuits, sub-panel, lighting fixtures and appurtenances as described in the project documents.

Period of Performance End Date

2 Add Phone Cable Add cable from existing Analog Telephone Adapter (ATA) to existing 66 block.

Period of Performance End Date

Attachment See Photos.

Figure 1: Location of existing fuse box to be replaced

Figure 2: Existing Lighting Circuit to be replaced Figure 3: Fuse Box to be replaced with sub-panel

Figure 4: Existing main service panel, to remain. Shown for reference