Amendment 0001 J.12 GRDO Statement of Work Updated 2.14.23.pdf
PDF 1 MB Posted
- Attached to
- Monongahela National Forest Electrical Improvements Project Federal contract opportunity
- Solicitation number
- 12445523Q0014
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Project Gauley Ranger Station Electrical Improvements
General Information
1.0 Scope of Work
The work shall consist of base and optional bid items. The base bid work shall consist of installing new duplex power outlets (including adding circuits as necessary) and replacing a GFCI Circuit Breaker. The optional bid items include adding a 30amp circuit with a L5-30R outlet and adding CAT6 Data ports/Wireless Access Point Hookups. Wireless Access Point Hookups shall consist of a CAT6 Single Data Port mounted to the ceiling with Power Over Ethernet (POE) capability. Locations shall be approved by the COR. All materials and labor required to provide CAT6 connection to the data port are incidental to the optional item. All CAT6 Data Ports and Hookups Shall be “568B” configuration. The contractor shall supply all labor and materials necessary to complete the work, including any work incidental to the contract requirements. This includes but may not be limited to installation of conduit, wiring, circuit breakers, and any other work or materials incidental to the electrifying and installation of the power outlets. All work shall meet the requirements of the National Electrical Code. NFPA 70, NEC, and IBS shall supersede any of the contract documents provided. Electrical systems shall be tested in the presence of the COR.
2.0 Background
The Gauley Ranger District Office on the Monongahela National Forest is located in Richwood, WV. The building was built in 1991 and is in need of additional power outlets to meet present staffing demands, as well as hookups for future wireless access points. A faulty GFCI circuit breaker also needs replaced. One 30Amp circuit with L5-30R, and the data hookups shall be bid as an option.
Contractor Requirements
3.0 Technical Requirements / Tasks
Contractor shall be a licensed electrician in the state of West Virginia and shall be insured. Contractor shall have experience with electrical renovation projects, installing electrical system/components in reduced working environments such as crawl spaces.
4.0 Government Furnished
Government shall furnish access to the facility during normal working hours. 8:00AM – 4:30 PM Monday through Friday (unless otherwise approved by COR), excluding Federal Holidays.
5.0 Deliverables / Schedule
Key Deliverables
Item No. Deliverable Objective Due 1 Power outlets (and circuits as necessary) Install and test power outlets as outlined in the electrical concept plan. Replace GFCI Breaker.
Period of Performance End Date
2 Option A – 30A Circuit/Outlet
Add 30 Amp circuit to existing sub-panel, with L5- 30R wall outlet as shown on plans.
Period of Performance End Date
2 Option B – CAT6 Upgrades
Add additional CAT6 wall ports and CAT6 wireless access point hookups, as shown on the plans.
Period of Performance End Date
Attachment See Attached Photos.
Figure 1: Conduit feeds from panel, view from crawl space
Figure 2: View of Crawl Space
Figure 3: Existing Sub-Panel B
Figure 4: Breaker Panel A
Figure 5: Crawl Space Access Door (All 3 access points are similar)
Figure 6: Warehouse Breaker Panel, Replace 20A GFCI Breaker #15
Figure 7: Warehouse Breaker Panel Diagram