Amendment 0003 - J.2 MRDW Statement of Work.pdf
PDF 1 MB Posted
- Attached to
- Monongahela National Forest Electrical Improvements Project Federal contract opportunity
- Solicitation number
- 12445523Q0014
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Project Marlinton Warehouse Electrical Improvements
General Information
1.0 Scope of Work
The project will consist of the following:
• The project will consist of adding additional outlets to the existing warehouse for the Marlinton Ranger District of the Monongahela National Forest.
• The attached drawings provide general locations of outlets, exact locations to be coordinated with the COR.
• The contractor shall provide and install 10 single gang duplex outlets and two 2 gang duplex outlets.
• All conduits shall be Electric Metallic Tube (EMT), and surface mounted unless otherwise indicated on the drawings or in this Statement of Work.
• Aluminum or Steel Metal Clad Cable (MCC) may be used if it will be fully concealed by a wall.
• NFPA 70 and NEC shall supersede any contract documents provided.
• The contractor shall supply all materials and labor to install the outlets and complete any incidental work.
• Installation of conduit, wire, and any other work to electrify the outlets shall be incidental to the installation of the electrical outlets.
• All work shall comply with the NEC.
• Outlets shall be tested in the presence of the COR. See sections 260010 Part 3 and 260519 Part 3 of the specifications. Other tests listed in the specifications may be applicable.
2.0 Background
The Marlinton Ranger District of the Monongahela National Forest is in need of additional power outlets in its warehouse to accommodate for convenience, as well as additional capacity for field equipment chargers. The warehouse is located at the Marlinton Ranger District’s Warehouse located at the Ranger Station in Marlinton, WV.
Contractor Requirements
3.0 Technical Requirements / Tasks
Contractor shall be a licensed electrician in the state of West Virginia and maintain liability insurance. NFPA 70 shall supersede any other documentation provided.
4.0 Government Furnished
Government shall furnish access to the facility during regular business hours (M-F 8:00 AM – 4:30 PM), as well as restroom facilities onsite. No work shall be permitted on weekends or on federal holidays without the written permission of the CO. Any government provided property shall be returned prior to payment of the final invoice.
5.0 Deliverables / Schedule
Key Deliverables
Item No. Deliverable Objective Due 0001 Mobilization Mobilize to the Site -
0002 Provide and Install Outlets (Includes Addtl. Circuits, Conduit, Breakers, etc.)
Provide and Install Outlets (Includes Addtl.
Circuits, Conduit, Breakers, etc.)
Period of Performance End Date
Attachment See Photos.
Figure 1: Location of existing service panel
Figure 2: Close-up of Panel Box
Figure 3: Left most Garage Bay
Figure 4: Right Garage Bay
| Project |
| General Information |
| Contractor Requirements |
File details come from the government source that posted it. Updated .