Amendment 0001 J.5 MRDW Project Specifications Updated 2.14.23.pdf

PDF 103 KB Posted

Attached to
Monongahela National Forest Electrical Improvements Project Federal contract opportunity
Solicitation number
12445523Q0014
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Monongahela National Forest Electrical Improvements Project, newest first.
File Type Posted
Amendment 0003 - J.12 GRDO Statement of Work.pdf PDF
Amendment 0003 - J.15 GRDO Specifications.pdf PDF
Amendment 0003 - J.14 GRDO Project Plans.pdf PDF
Amendment 0003 - J.2 MRDW Statement of Work.pdf PDF
Amendment 0003 - J.9 GRDW Project Plans.pdf PDF
Amendment 0003 - J.5 MRDW Project Specifications.pdf PDF
Amendment 0003 - Additional Questions and Answers Document.pdf PDF
Amendment 0003 - J.10 GRDW Specifications.pdf PDF
Amendment 0003 - RFQ_12445523Q0014 Revised.pdf PDF
Amendment 0003 - J.7 GRDW Statement of Work.pdf PDF
Amendment 0003 - J.4 MRDW Project Plans.pdf PDF
Amendment 0003 - SF30 - Please sign and return with quote package.pdf PDF
Amendment 0002 SF30 - Sign and return.pdf PDF
Amendment 0001 SF30 - Sign and return.pdf PDF
Amendment 0001 J.12 GRDO Statement of Work Updated 2.14.23.pdf PDF
Amendment 0001 J.2 MRDW Statement of Work Updated 2.14.23.pdf PDF
Amendment 0001 J.4 MRDW Project Plans Updated 2.14.23.pdf PDF
Amendment 0001 J.7 GRDW Statement of Work Updated 2.14.23.pdf PDF
Amendment 0001 J.9 GRDW Project Plans Updated 2.14.23.pdf PDF
Amendment 0001 J.10 GRDW Project Specifications Updated 2.14.23.pdf PDF
Amendment 0001 J.15 GRDO Project Specifications Updated 2.14.23.pdf PDF
Amendment 0001 Monongahela NF Electrical Improvements Project -Q and A Document.pdf PDF
J.11 DBA WD WV0021 - Nicholas County.pdf PDF
J.14 GRDO Project Plans.pdf PDF
J.2 MRDW Statement of Work.pdf PDF
J.4 MRDW Project Plans.pdf PDF
J.13 GRDO Project Maps.pdf PDF
J.12 GRDO Statement of Work.pdf PDF
J.10 GRDW Project Specifications.pdf PDF
J.7 GRDW Statement of Work.pdf PDF
J.9 GRDW Project Plans.pdf PDF
J.15 GRDO Project Specifications.pdf PDF
RFQ_12445523Q0014.pdf PDF
J.8 GRDW Project Maps.pdf PDF
J.6 DBA WD-WV0022 Pocahontas County.pdf PDF
J.3 MRDW Project Maps.pdf PDF
J.1 DBA WD WV0022 - Poncahontas County.pdf PDF
J.5 MRDW Project Specifications.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

011000 - SUMMARY

011000 PAGE 1 OF 4

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Contractor's use of site and premises.

4. Coordination with occupants.

5. Work restrictions.

6. Specification and Drawing conventions.

1.2

PROJECT INFORMATION

A. Project Identification: Marlinton Warehouse Electrical Upgrades.

1. Project Location: 1627 Cemetery Road Marlinton, WV 24954.

B. Owner: USDA Forest Service, Monongahela National Forest.

1. Contracting Officer’s Representative: Jacob Hise – Jacob.Hise@usda.gov

1.3

WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following:

The project will consist of adding additional outlets to the existing warehouse for the Marlinton Ranger District of the Monongahela National Forest. The attached sketch shall provide general locations of out-lets, exact locations to be coordinated with the COR. There shall be approximately 10 single gang duplex outlets and two 2 gang duplex outlets. The conduit to be utilized shall be Electric Metallic Tube (EMT), and surface mounted. Metal Clad Cable (MCC) may be used if it will be totally concealed by a wall. NFPA 70 and NEC shall supersede any contract documents provided. The contractor shall supply all materials and labor to install the outlets and complete any incidental work. Installation of conduit, wire, and any other work to electrify the outlets shall be incidental to the installation of the electrical outlets. All work shall comply with the NEC. Outlets shall be tested in the presence of the COR.

B. Type of Contract:

1. Project will be constructed under a single prime contract.

1.4

CONTRACTOR'S USE OF SITE AND PREMISES

A. Restricted Use of Site: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.

mailto:Jacob.Hise@usda.gov mailto:acob.Hise@usda.gov

011000 - SUMMARY

011000 PAGE 2 OF 4

B. Limits on Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits on Use of Site: Confine construction operations to the warehouse at the rear of the property where the electrical upgrades shall take place.

2. Driveways, Walkways, and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.

D. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.

1.5 COORDINATION WITH OCCUPANTS

A. Full Owner Occupancy: Owner will occupy site and existing building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.

1.6 WORK RESTRICTIONS

A. Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Limit work in the existing building to normal business working hours of

8:00 a.m. to 4:30 p.m., Monday through Friday (except Federal holidays), unless otherwise indicated.

A. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify COR prior to proceeding with interruptions. At least one day of prior notice is required.

2. Obtain COR’s verbal or written permission before proceeding with utility interruptions.

011000 PAGE 3 OF 4

Electrical Circuits and Outlets

3. Utility interruptions as required by the work should be limited as much as feasible without exceeding a period of up to one workday 8:00 a.m. - 4:30 p.m.

B. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.

1. Notify COR in advance of proposed disruptive operations. At least one day of advance notice is required.

2. Obtain COR’s written or verbal permission before proceeding with disruptive operations.

1.7 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Text Color: Text used in the Specifications, including units of measure, manufacturer and product names, and other text may appear in multiple colors or underlined as part of a hyperlink; no emphasis is implied by text with these characteristics.

3. Hypertext: Text used in the Specifications may contain hyperlinks. Hyperlinks may allow for access to linked information that is not residing in the Specifications. Unless otherwise indicated, linked information is not part of the Contract Documents.

4. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

011000 PAGE 4 OF 4

Electrical Circuits and Outlets

A. Outlet Requirements

a. All outlets shall be 20-amp outlets meeting NEC requirements for the space in which they are installed.

B. Circuit Requirements

a. There shall be no more than 5 outlets on a 20-amp circuit.

b. A single gang outlet shall constitute an outlet for the purposes of determining the number of outlets on a circuit.

c. Outlets may be added to existing circuits if the final number of outlets does not exceed the maximum number given above.

d. Outlets shall not be added to lighting circuits unless otherwise approved by the COR in writing.

e. Contractor shall install appropriately sized circuit breakers as necessary in the existing panel box. These circuit breakers are incidental to the installation and electrification of the outlets installed by the contractor.

SECTION 011000 - SUMMARY PART 1 - GENERAL
1.5 COORDINATION WITH OCCUPANTS
1.6 WORK RESTRICTIONS
1.7 SPECIFICATION AND DRAWING CONVENTIONS