J.10 Schedule of Items and Prices.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- Oscar Dyson FSV Midlife Extension Program Federal contract opportunity
- Solicitation number
- 1305M224R0081
About this file
The provided document appears to be a Schedule of Items and Prices for the Oscar Dyson FSV Midlife Extension Program, which is a federal contract opportunity with Solicitation Number 1305M224R0081. The document details a wide range of base work items and optional work items for vessel hull, auxiliaries, propulsion, electrical, mission, and other systems. It includes a breakdown of labor, subcontract, and material costs for each work item. The document also includes sections for Additional Item Requests (AIRs) and Growth Work, as well as supplementary schedule rates. The total estimated value for the base, optional, and growth work is provided. The contract is being managed by the Department of Commerce's National Oceanic and Atmospheric Administration.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| BASE WORK ITEMS | OPTIONAL WORK ITEMS | ||||||||||||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | LABOR | SUBCONTRACT | MATERIAL | EXTENDED PRICE | CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | LABOR | SUBCONTRACT | MATERIAL | EXTENDED PRICE |
| Hull | Hull | ||||||||||||||||
| 10000 | 20101 | Install Diesel Exhaust Fluid (Urea) Tank & Delivery System | 1 | JB | $0.00 | 3000 | 60101 | Miscellaneous Steel Repair | 1 | JB | $0.00 | ||||||
| 10000 | 20102 | Structural Repairs to Hull and House | 1 | JB | $0.00 | 3000 | 60102 | Trawl and Oceo Winch Room Flush Hatch Repair | 1 | JB | $0.00 | ||||||
| 10000 | 20103 | Relocate Net Sonde Winch | 1 | JB | $0.00 | 3000 | 60103 | Service Forward Mast | 1 | JB | $0.00 | ||||||
| 10000 | 20104 | Replace Trawl Gallows | 1 | JB | $0.00 | 3000 | 60104 | Fabricate and Install Wood Deck for the Trawl Way | 1 | JB | $0.00 | ||||||
| 10000 | 20105 | Replace Mast | 1 | JB | $0.00 | Total Hull | $0.00 | ||||||||||
| 10000 | 20106 | Remove SM200 Sonar and Dome | 1 | JB | $0.00 | Auxillaries | |||||||||||
| 10000 | 20107 | Inspect and Service Sliding Water Tight Doors | 1 | JB | $0.00 | 3000 | 60501 | Miscellaneous Steel Repair | 1 | JB | $0.00 | ||||||
| Total Hull | $0.00 | 3000 | 60502 | Replace Tank Level Indicators (TLI) | 1 | JB | $0.00 | ||||||||||
| Propulsion Work Items | 3000 | 60503 | Miscellaneous Insulation and Lagging Repairs | 1 | JB | $0.00 | |||||||||||
| 10000 | 20201 | Vessel Repowering | 1 | JB | $0.00 | 3000 | 60504 | Replace Air Circulation Units (ACU) | 1 | JB | $0.00 | ||||||
| 10000 | 20202 | Tail Shaft Removal & Inspections | 1 | JB | $0.00 | 3000 | 60505 | Replace Water Heaters | 1 | JB | $0.00 | ||||||
| 10000 | 20203 | Inspect & Service Thrust Line Shaft Bearings | 1 | JB | $0.00 | 3000 | 60506 | Replace Cranes | 1 | JB | $0.00 | ||||||
| 10000 | 20204 | Replace Propeller Blades & Hub | 1 | JB | $0.00 | 3000 | 60507 | Replace Hydro Winches | 1 | JB | $0.00 | ||||||
| 10000 | 20205 | Bow Thruster Inpections & Overhaul | 1 | JB | $0.00 | Total Auxillaries | $0.00 | ||||||||||
| Total Propulsion | $0.00 | Outfitting/ Preservation/ Furnishing | |||||||||||||||
| Electrical Work Items | 3000 | 60601 | General Repairs to Railings | 1 | JB | $0.00 | |||||||||||
| 10000 | 20301 | Remove Unused Cabling | 1 | JB | $0.00 | 3000 | 60602 | Interior Bulkhead Painting | 1 | JB | $0.00 | ||||||
| 10000 | 20302 | Service ROXTEC Cable Transits | 1 | JB | $0.00 | 3000 | 60603 | Interior Joiner Door Painting | 1 | JB | $0.00 | ||||||
| 10000 | 20303 | Overhaul Emergency Generator | 1 | JB | $0.00 | 3000 | 60604 | Void Preservation | 1 | JB | $0.00 | ||||||
| 10000 | 20304 | Service & Inspect Transformers | 1 | JB | $0.00 | 3000 | 60605 | Bilge Preservation | 1 | JB | $0.00 | ||||||
| 10000 | 20305 | Control Center Inspections & Maintenance | 1 | JB | $0.00 | 3000 | 60606 | Deck Covering Replacement | 1 | JB | $0.00 | ||||||
| 10000 | 20306 | Inspections & Maintenance Emergency Switchboard | 1 | JB | $0.00 | 3000 | 60607 | Install Sheathing | 1 | JB | $0.00 | ||||||
| 10000 | 20307 | Convert Auxillary Electric Motors to 480V | 1 | JB | $0.00 | 3000 | 60608 | Sound Proof Stateroom Overheads | 1 | JB | $0.00 | ||||||
| Total Electrical | $0.00 | Total Outfitting/ Preservation/ Furnishing | $0.00 | ||||||||||||||
| Mission | TOTAL OPTIONAL WORK ITEMS | $0.00 | |||||||||||||||
| 10000 | 20401 | Replace VHF & HF Antennas | 1 | JB | $0.00 | ||||||||||||
| 10000 | 20402 | Replace Navigation Lights with LED Lights | 1 | JB | $0.00 | ||||||||||||
| 10000 | 20403 | Replace Dynamic Positioning System | 1 | JB | $0.00 | ||||||||||||
| 10000 | 20404 | Replace Fire & Alarm Detection System (FAD) | 1 | JB | $0.00 | ADDITIONAL ITEMS - GROWTH | |||||||||||
| 10000 | 20405 | Replace RAPP Pentagon System | 1 | JB | $0.00 | ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||||||||
| 10000 | 20406 | Replace Furuno S Band Radar | 1 | JB | $0.00 | CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | Unit Price | Extended Price | |||||
| 10000 | 20407 | Replace Furuno X Band Radar | 1 | JB | $0.00 | 2000 | 4000 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 65,000 Unit of Issue: Hour; Extended Price: $____________
| HRS | EST. 65,000 | |||||
| Total Mission | $0.00 | 2000 | 4000 | ORF - AIRs/Growth Material Markup/Handling Fee |
Unit Price: $500,000.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$500,000.00 X percentage quoted]: $______________
| % | 1 | EST. $500,000.00 | |||||||||||
| Auxillaries | Total Growth | $0.00 | |||||||||||
| 10000 | 20501 | Replace Ship Service Pumps | 1 | JB | $0.00 | ||||||||
| 10000 | 20502 | Replace Through Hull Piping Penetrations | 1 | JB | $0.00 | ADDITIONAL SCHEDULE RATES | |||||||
| 10000 | 20503 | Replace Flexible Couplings & Hoses | 1 | JB | $0.00 | CLIN | SPEC WORK ITEM | Product Description | QTY | UNIT | UNIT PRICE | EXTENDED PRICE | |
| 10000 | 20504 | Replace Tank & Void Vents | 1 | JB | $0.00 | N/A | N/A | Additional Temporary Services (See CAR 1352.271-89) | 1 | Day | $ | $ | |
| 10000 | 20505 | Replace Ventilation Ducting | 1 | JB | $0.00 | N/A | N/A | Lay Day (See CAR 1352.271- 86) | 1 | Day | $ | $ | |
| 10000 | 20506 | Replace Ventilation Fans | 1 | JB | $0.00 | ||||||||
| 10000 | 20507 | Replace Air Conditioning (AC) Plants | 1 | JB | $0.00 | BASE | $0.00 | ||||||
| 10000 | 20508 | Replace Refrigeration Plants | 1 | JB | $0.00 | BASE + OPTIONS | $0.00 | ||||||
| 10000 | 20509 | Fire Main Systems Repairs | 1 | JB | $0.00 | BASE + OPTIONS +GROWTH | $0.00 | ||||||
| 10000 | 20510 | Renew Seawater Piping Systems Valves | 1 | JB | $0.00 | ||||||||
| 10000 | 20511 | Drain Piping Repairs | 1 | JB | $0.00 | ||||||||
| 10000 | 20512 | Install Reverse Osmosis (RO) Water Makers | 1 | JB | $0.00 | ||||||||
| 10000 | 20513 | Rebuild Fuel Oil Purifiers | 1 | JB | $0.00 | ||||||||
| 10000 | 20514 | Service Oily Water Separator (OWS) | 1 | JB | $0.00 | ||||||||
| 10000 | 20515 | Service Air Compressors & Replace Storage Cylinders | 1 | JB | $0.00 | ||||||||
| 10000 | 20516 | Inspect Fixed & Portable Fire Fighting Equipment | 1 | JB | $0.00 | ||||||||
| 10000 | 20517 | Inspect & Service RAPP Hydraulic Power Unit (HPU) | 1 | JB | $0.00 | ||||||||
| 10000 | 20518 | Inspect & Service Appleton Hydraulic Power Unit (HPU) | 1 | JB | $0.00 | ||||||||
| 10000 | 20519 | Inspect & Service Davit Hydraulic Power Units (HPU) | 1 | JB | $0.00 | ||||||||
| 10000 | 20520 | Replace Hydraulic Hoses | 1 | JB | $0.00 | ||||||||
| 10000 | 20521 | Inspect & Service Centerboard Hydraulic Power Unit (HPU) | 1 | JB | $0.00 | ||||||||
| 10000 | 20522 | Rudder Service & Inspections | 1 | JB | $0.00 | ||||||||
| 10000 | 20523 | Replace Bow Crane | 1 | JB | $0.00 | ||||||||
| 10000 | 20524 | Replace Starboard A-Frame | 1 | JB | $0.00 | ||||||||
| 10000 | 20525 | Upgrade Anchoring System | 1 | JB | $0.00 | ||||||||
| 10000 | 20526 | Overhaul Work Boat Davit | 1 | JB | $0.00 | ||||||||
| 10000 | 20527 | Annual Life Raft Inspections | 1 | JB | $0.00 | ||||||||
| 10000 | 20528 | Trawl System Equipment Servicing | 1 | JB | $0.00 | ||||||||
| 10000 | 20529 | Service Trawl Blocks | 1 | JB | $0.00 | ||||||||
| 10000 | 20530 | Overaul MSD System | 1 | JB | $0.00 | ||||||||
| 10000 | 20531 | Reconfigure 01 Deck Fan Room | 1 | JB | $0.00 | ||||||||
| 10000 | 20532 | Flush and Test Auxillary and Main Salt Water Piping | 1 | JB | $0.00 | ||||||||
| 10000 | 20533 | Reconfigure After Steering Station | 1 | JB | $0.00 | ||||||||
| 10000 | 20534 | Overhaul Rescue Boat Davit | 1 | JB | $0.00 | ||||||||
| 10000 | 20535 | Replace Main Seawater Overboard Discharge Piping | 1 | JB | $0.00 | ||||||||
| Total Auxillaries | $0.00 | ||||||||||||
| Outfitting/ Preservation/ Furnishing | |||||||||||||
| 10000 | 20601 | Modifiy Hull Marking Designations | 1 | JB | $0.00 | ||||||||
| 10000 | 20602 | Portlight and Window Maintenance | 1 | JB | $0.00 | ||||||||
| 10000 | 20603 | Preservation Underwater Hull | 1 | JB | $0.00 | ||||||||
| 10000 | 20604 | Preservation Exterior Decks | 1 | JB | $0.00 | ||||||||
| 10000 | 20605 | Preservation Freeboard | 1 | JB | $0.00 | ||||||||
| 10000 | 20606 | Preservation of Deck House, Stack, & Mast | 1 | JB | $0.00 | ||||||||
| 10000 | 20607 | Preservation Deck Machinery | 1 | JB | $0.00 | ||||||||
| 10000 | 20608 | Preservation Chain Locker | 1 | JB | $0.00 | ||||||||
| 10000 | 20609 | Preservation Ballast Tanks | 1 | JB | $0.00 | ||||||||
| 10000 | 20610 | Preservation Miscellaneous Tanks | 1 | JB | $0.00 | ||||||||
| 10000 | 20611 | Service and Inspect Cathelco Anti-Fouling and Impress Current System | 1 | JB | $0.00 | ||||||||
| 10000 | 20612 | Hull Anode Replacement | 1 | JB | $0.00 | ||||||||
| 10000 | 20613 | Refresh Wet Lab | 1 | JB | $0.00 | ||||||||
| 10000 | 20614 | Modify Berthing 2nd Deck | 1 | JB | $0.00 | ||||||||
| 10000 | 20615 | Refresh Mess Deck | 1 | JB | $0.00 | ||||||||
| 10000 | 20616 | Replace Galley Appliances | 1 | JB | $0.00 | ||||||||
| Total Outfitting/ Preservation/ Furnishing | $0.00 | ||||||||||||
| Engineering/ Integration | |||||||||||||
| 10000 | 20801 | Drawing Updates | 1 | JB | $0.00 | ||||||||
| 10000 | 20802 | Vessel Inclining | 1 | JB | $0.00 | ||||||||
| 10000 | 20803 | Spare Parts | 1 | JB | $0.00 | ||||||||
| 10000 | 20804 | Technical Documents | 1 | JB | $0.00 | ||||||||
| 10000 | 20805 | Weight Control | 1 | JB | $0.00 | ||||||||
| 10000 | 20806 | Crew Training | 1 | JB | $0.00 | ||||||||
| Total Engineering/ Integration | $0.00 | ||||||||||||
| Support/ Services | |||||||||||||
| 10000 | 20901 | Dock Trials | 1 | JB | $0.00 | ||||||||
| 10000 | 20902 | Sea Trials | 1 | JB | $0.00 | ||||||||
| 10000 | 20903 | Conduct ABS and USCG 5 Year Special Surveys | 1 | JB | $0.00 | ||||||||
| 10000 | 20904 | Weight Testing of Cranes, A-Frames and Davits | 1 | JB | $0.00 | ||||||||
| 10000 | 20905 | Utilities and Services | 1 | JB | $0.00 | ||||||||
| 10000 | 20906 | Cleaning and Protective Coverings | 1 | JB | $0.00 | ||||||||
| 10000 | 20907 | Extended Drydocking | 1 | JB | $0.00 | ||||||||
| 10000 | 20908 | Underwater Body Inspections and Repairs | 1 | JB | $0.00 | ||||||||
| Total Support/ Services | $0.00 | ||||||||||||
| TOTAL BASE WORK ITEMS | $0.00 |
Attachment IV TORFP 0000001305M223QNMAN000501+000 Price Schedule
Sheet1
| 10101 | Inspect/Service SSDG Circuit Breakers & Switchboard Cleaning D2 |
| 10102 | Inspect/Service Propulsion Motor Center Bearing |
| 10103 | Inspect/Service Propulsion Motors |
| 10104 | Service Rapp System Components |
| 10105 | Sound Proof Staterooms |
| 10106 | Replace Flexible Hoses on HPU |
| 10107 | Purchase & Install Sliding Jettison Racks for the Life Rafts |
| 10108 | Test and Calibrate Electrical Gauges |
| 10109 | Install WTD Control Panel in Engine Operation Station |
| 10110 | Replace Roller Chocks on Bow |
| 10111 | Install Ladder Centerboard Trunk |
| 10112 | Hard Wire Forward Mast Crab Lights |
| 10113 | Install Engineer Monitoring Equipment in Staterooms |
| 10114 | Dock Trials |
| 10115 | Protective Coverings |
| 10116 | Weight Control |
| SUBTOTAL $602 K | |
| Option | al – Class 30000 Items |
Item Title
30000 Additional Government Requirements ...................................................................... $250 K
SUBTOTAL $150 K
Option al – Class 50000 Items
Item Title
| 50501 | Modify EDG Exhaust |
| 50502 | Modify Oily Water Separator Piping |
| 50503 | Inspect & Service Sliding Water Tight Door (WTD) Gaskets & Seals |
| 50504 | Inspect/Test 01 Deck Exterior Bulkhead |
| 50505 | Main Engine Room Bilge Cleaning |
| 50506 | Install Washer/Dryer 02 Deck |
| 50507 | Miscellaneous Pipe Repairs |
| 50508 | Miscellaneous Welding and Fabrication |
| 50509 | Miscellaneous Insulation & Lagging Repairs |
SUBTOTAL $219 K
GRAND TOTAL $1.071 M