This document is a Utilities System Manual that defines the points of demarcation between facility systems and the NAVFAC Utilities and Energy Management (UEM) utility system. It provides specific guidance on the demarcation points for electric, water, sanitary sewer, steam, condensate, and natural gas systems. The manual includes definitions, diagrams, and details on ownership and maintenance responsibilities at the service point, which is the transition between NAVFAC UEM and the customer's funding for sustainment, restoration, and modernization. The manual does not apply to sites with negotiated agreements such as Public Private Venture housing or municipal/mutual service agreements. The Points of Demarcation set forth in this manual must be considered when developing new agreements.

The related federal contract opportunity is for Base Operations Support (BOS) Services at Naval Support Activity (NSA) Mid-South in Millington, Tennessee and outlying areas. This is a competitive 8(a) set-aside solicitation for a single-award Facilities Support Indefinite-Quantity Contract with recurring firm-fixed price work and non-recurring indefinite delivery/indefinite quantity work. The contract term is anticipated to be a base period of one year plus four one-year option periods. The primary NAICS code is 561210 with an annual small business size standard of $47.0M. The solicitation requires offerors to submit technical, past performance, and price proposals for evaluation.

View the file

Other files

File Type Posted
N6945024R0037-0003.pdf PDF
J-1700000 BSVE Inventory_0002.xlsx XLSX spreadsheet
N6945024R0037_SectionJ_0002.pdf PDF
J-1502000-29_FRCS Inventory_0002.xlsx XLSX spreadsheet
J1601000-14_Sample of Historical Utility Service Orders_0002.xlsx XLSX spreadsheet
J-1502000-27 Backflow Prevention Devices_0002.xlsx XLSX spreadsheet
J-1601000-05 NSA Mid-South Instruction 11011.3_0002.pdf PDF
J-1601000-08 09 10 Utility Asset Inventory_0002.xlsx XLSX spreadsheet
J-0200000-09 - SERVICE PROVIDER INFORMATION_0002.xlsx XLSX spreadsheet
N6945024R0037_SectionF_0002.pdf PDF
J-1601000-12 Utility Specification Attributes_0002.xlsx XLSX spreadsheet
J-1502000-23 HVAC Equipment under IMP_0002.xlsx XLSX spreadsheet
J-0200000-18_ELINS_0002.xlsx XLSX spreadsheet
N6945024R0037_TN20240200(Bldg)_0002.pdf PDF
JL-8_N6945024R0037_GPI_Responses_0002.pdf PDF
N6945024R0037_SectionC_0002.pdf PDF
N6945024D0037-0002.pdf PDF
JL-7_N6945024R0037_Site_Visit_Sign-In-Sheets_0001.pdf PDF
JL-6_N6945024R0037_Site_Visit_Brief_0001.pdf PDF
N6945024R0037-0001.pdf PDF
J-1601000-04 GIS Maps Utilities v2.pdf PDF
J-1503050-09 Historical Grounds Maintenance Service Orders.xlsx XLSX spreadsheet
J-1503010-09 Historical Custodial Service Orders.xlsx XLSX spreadsheet
JL-4_N6945024R0037_SECNAV5512.pdf PDF
J-1503060-03_Site_Map - Pavement Clearance.pdf PDF
J-1503050-02 Grounds Maintenance Map.pdf PDF
J-1502000-23 HVAC Equipment under IMP.xlsx XLSX spreadsheet
J-0200000-18_ELINS.xlsx XLSX spreadsheet
J-1502000-05 Historical Emergency Urgent and Routine Work.pdf PDF
J-1503010-07 FloorPlans.pdf PDF
J-1700000 BSVE Inventory 4-19-2024.xlsx XLSX spreadsheet
J-1502000-13 HVAC System Inventory under PM.xlsx XLSX spreadsheet
J-1601000-12_Specification Attributes.xlsx XLSX spreadsheet
J-1606000-06_Plant_Log.pdf PDF
J-0200000-15_CNRSEINST 41011.pdf PDF
N6945024R0037_WD15-4673(Rev.26).pdf PDF
N6945024R0037_SectionJ.pdf PDF
J-1700000-07-01 BSVE WO Historical Data.xlsx XLSX spreadsheet
JL-3_N6945024R0037_Site_Visit_Itinerary.pdf PDF
J-1502000-29_FRCS Inventory.xlsx XLSX spreadsheet
J-1503010-08 Custodial Inventory.xlsx XLSX spreadsheet
J-1502000-27 Backflow Prevention Devices.xlsx XLSX spreadsheet
J-1502000-30_FRCS Cybersecurity Program.pdf PDF
J-1606000-04-01 SOP Emergency Response Plan COVID-19.pdf PDF
J-1700000-08 Shuttle Bus Calendar and Schedule.pdf PDF
J-1601000-07 Meter Inventory and Schedule.xlsx XLSX spreadsheet
J-1502000-09 Compressed Air and Certification Inventory.xlsx XLSX spreadsheet
N6945024R0037.pdf PDF
JM-2_N6945024R0037_PPQ.doc DOC document
J-1502000-11 Lighting Inventory.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

i

UTILITIES SYSTEM MANUAL - POINTS OF DEMARCATION

TABLE OF CONTENTS

Page No.

INTRODUCTION 1

ELECTRIC SYSTEM 2

Section E1 Definitions Section E2 Points of Demarcation (Service Points)

WATER SYSTEM 4

Section W1 Definitions Section W2 Points of Demarcation (Service Points)

SANITARY SEWER SYSTEM 6

Section SAN1 Definitions Section SAN2 Points of Demarcation (Service Points)

STEAM AND CONDENSATE SYSTEM 9

Section ST1 Definitions Section ST2 Points of Demarcation (Service Points)

NATURAL GAS SYSTEM 11

Section G1 Definitions Section G2 Points of Demarcation (Service Points)

APPENDICES

APPENDIX A ELECTRICAL SYSTEM DRAWINGS 12

APPENDIX B WATER SYSTEM DRAWINGS 22

APPENDIX C SANITARY SEWERAGE SYSTEM DRAWINGS 25

APPENDIX D STEAM AND CONDENSATE SYSTEM DRAWINGS 28

APPENDIX E GAS SYSTEM DRAWING 33

INTRODUCTION

An area of great confusion for many NAVFAC Utilities and Energy Management (UEM) customers is the point of demarcation between facility systems and the NAVFAC UEM utility system. This service point (Demarcation) is the point of connection between the serving utility and the facility and is where ownership changes. This is the transition between NAVFAC UEM and customer funding for Sustainment, Restoration, and Modernization.

The NAVFAC Real Property Inventory Procedures Manual (P-78) defines a Utility System as ‘A system which generates and/or distributes a commodity and makes that commodity available to more than one facility’. It further defines Facility property by a building, structure, or linear structure out to an imaginary line surrounding a facility at a distance of five feet from the foundation that, barring specific direction to the contrary such as a utility privatization agreement, denotes what is included in the basic record for the facility (e.g., landscaping, sidewalks, and utility connections). This imaginary line is what is commonly referred to as the ‘five-foot line.’

The intent of this document is to supply specific direction that clearly defines the demarcation point between utility and facility systems, and replace the ‘five foot line’ rule with more practical, standard guidance.

Clear demarcation is in the best interest of the Installation, Supported Commands, and NAVFAC UEM because it allows proper alignment of Sustainment, Restoration, and Modernization funding with the appropriate Maintenance Responsible UIC. Clear demarcation also helps communicate what services are included in the Navy Working Capital Fund (NWCF) utility rates and what is the responsibility of the facility owner.

The Points of Demarcation and ownership set forth in this document does not apply to sites where a negotiated agreement exists, such as Public Private Venture (PPV) housing, Municipal/Mutual Service Agreements [MSA], Letters of Agreement [LOA], and Memorandum of Understanding [MOU]. However, the Points of Demarcation and ownership set forth in this document must be considered when developing new agreements.

The Points of Demarcation and ownership set forth in this document does not apply to sites where Utility Service is supplied and distributed to facilities by an outside service provider.

Everything beyond the outside service provider’s point of demarcation, typically the provider owned meter, is owned by the facility.

NAVFAC UEM

24 MAY 2012

ELECTRIC SYSTEM

Section E1 - DEFINITIONS

1. Service - The conductors and equipment for delivering electric energy from the serving utility to the wiring system of the facility served.

2. Service Drop -The overhead conductors from the last pole or other aerial support to and including the splices, if any, to the Service Entrance Conductors or Service Lateral.

3. Service Lateral - The underground conductors between the Service Drop, including any risers at a pole or other structure, and the Service Entrance Conductors or from a pad mounted transformer to the Service Entrance Conductors.

4. Unit Substation - A substation consisting of a primary switch, transformer, secondary transition section, and a secondary switchgear section.

5. Service Entrance Conductors - The conductors between the Service Equipment and the point of connection to the Service Drop, typically at the weatherhead or Service Lateral, typically at the junction box.

6. Service Equipment - The main control and cutoff equipment, usually consisting of a circuit breaker(s) or switch(es) and fuse(s), and their accessories, connected to the load end of conductors to a building or other structure.

7. Service Point - The service point is the point of connection between the serving utility and the facility and is also the ’Point of Demarcation’ where ownership changes. This is the transition between NAVFAC UEM and customer funding for Sustainment, Restoration, and Modernization. Refer to Appendix A, Drawings E-1 through E-9.

Section E2 – POINTS OF DEMARCATION (SERVICE POINTS)

1. Service Drop Demarcation - The point of demarcation (Service Point) is at the load end of the service drop where spliced to the service entrance conductors, typically at the weatherhead.

2. Service Lateral Demarcation - The point of demarcation (Service Point) is at the connection to the secondary lugs of the transformer or at the connection to the service drop.

3. Unit Substation Demarcation - The point of demarcation (Service Point) for a unit substation with the secondary switchgear physically attached to the secondary transition section is at the connection to the secondary switchgear circuit breaker load stabs. The point of demarcation (Service Point) when the secondary switchgear is physically separated from the secondary transition section is at the connection to the secondary lugs of the transformer.

4. Electric Service Meter - Regardless of service point, all KWH meters used for revenue are owned by NAVFAC UEM except when a negotiated agreement exists, such as Public Private Venture (PPV) housing where the consumer owns the meter.

5. Piers & Dry Docks - The point of demarcation (service point) is at the shore to ship power receptacle.

6. Drawings for Electrical System Service Points - Drawings depicting examples of Service Points for the Electrical System can be found under Appendix A for the following:

UNIT SUBSTATIONS Drawings E-1, E-2, E-6 and E-9 PAD TRANSFORMERS Drawing E-3 THREE/SINGLE PHASE TRANSFORMERS Drawing E-4 SERVICE LATERAL Drawings E-5 OVERHEAD SERVICE CONDUCTORS Drawings E-7 and E-8

WATER SYSTEM

Section W1 - DEFINITIONS

1. Cut Off Valve - The first exterior valve off the main line which will disconnect service to the entire building or structure being served without disrupting other water services.

2. Post Indicator Valve (PIV) - A valve which is operated by a permanent above ground mechanism which also indicates whether the valve is in the open or closed position.

3. Back Flow Preventer- A device which is installed between fixtures, equipment, appliances, or buildings and the potable water supply that allows flow only in one direction. The back flow prevention device is intended to prevent contamination or pollution of the potable water supply caused by back pressure or back siphoning of non-potable waters into the potable water.

4. Service Point - The service point is the point of connection between the serving utility and the facility and is also the ’Point of Demarcation’ where ownership changes. This is the transition between NAVFAC UEM and customer funding for Sustainment, Restoration, and Modernization. Refer to Appendix B, Drawings W-1 and W-2.

5. Drinking Water Treatment Plant – The central facility for the production of potable water, containing all treatment processes and appurtenances exclusive of the distribution system.

Section W2 - POINTS OF DEMARCATION (SERVICE POINTS)

1. Water Distribution System - The Point of Demarcation is the downstream side of first cutoff valve (exterior to the facility) off the main. If there is no exterior cut-off valve or the cut-off valve cannot be located, the Point of Demarcation is at the connection to the main.

2. Water Meters - Regardless of the service point, all water meter assemblies (including any bypass piping, meter box, meter, and valves) used for revenue are owned by NAVFAC UEM except when a negotiated agreement exists, such as Public Private Venture (PPV) housing where the consumer owns the meter. .

3. Fire Protection Systems - The Point of Demarcation is the downstream side of the Cut Off Valve (typically a PIV). If there is no Cut Off Valve, the Point of Demarcation is at the connection to the main.

4. Fire Hydrants – UEM owns Fire Hydrants served by UEM owned mains. Fire Hydrants on a facility owned fire loop are owned by the facility.

5. Piers & Dry Docks - The Point of Demarcation is at the pier riser at the hose connection point.

6. Backflow Preventers – NAVFAC UEM owns and maintains backflow preventers where the downstream piping is also owned by UEM. All other backflow preventers are the responsibility of the customer or the facility being served.

7. Drinking Water Treatment Plants – Drinking Water Treatment Plants that produce water for a distribution system serving multiple facilities are part of the utility owned system. Drinking Water Treatment Plants that serve a single facility are not part of the utility owned system.

8. Drawings for Water & Fire Protection System Service Points - Drawings depicting examples of Service Points can be found under Appendix B for the following:

WATER DISTRIBUTION SYSTEM Drawings W-1 and W-2

SANITARY SEWER SYSTEM

Section SAN1 - DEFINITIONS

1. Building Activity - The command/activity having financial responsibility for a building or facility.

2. Lateral - The line that extends from the building to either the main sewer line, a manhole located on the main sewer line, or a pump station. Cleanouts are considered a component of the Lateral.

3. Main Sewer Line - Sewer lines from the point of connection to a commercial sanitary sewer system or UEM wastewater treatment facility, to the furthest upstream manhole.

4. Manhole - A structure, which is all or partially underground, and is accessible to entry. The structure is designed to collect sewage from underground piping by means of gravity flow or pumping, and discharge by means of gravity.

5. Oil-Water Separator - A structure/tank, which is underground, partially underground, or above ground and is accessible to entry. The structure is designed to collect, separate and/or hold oil from an oil-water mixture waste stream.

6. Pump Station - A structure designed to receive, hold, and discharge sewage. Discharge of sewage is accomplished by pumping through underground piping (force main) to a manhole where gravity flow occurs.

7. Wash Rack - A structure designed for the washing and rinsing of vehicles, aircraft and equipment.

8. Diversion Valve - A valve intended to divert effluent between a sanitary sewer system and storm drainage system.

9. Service Point - The service point is the point of connection between the serving utility and the facility and is also the ’Point of Demarcation’ where ownership changes. This is the transition between NAVFAC UEM and customer funding for Sustainment, Restoration, and Modernization. Refer to Appendix C, Drawings SAN-1 and SAN-2.

10. Wastewater Treatment Plant – A facility where wastewater is treated with chemical or biological processes to produce clean water that can be returned to rivers and waterways.

Section SAN2 - POINTS OF DEMARCATION (SERVICE POINTS)

1. Gravity Lines, Manholes, and Force Mains - The Point of Demarcation is the downstream connection point to the Main Sewer Line which is usually at a manhole. If there is not a manhole, the Point of Demarcation is at the connection to the main.

2. Storm Drainage Systems - Combined sanitary sewer and storm drainage systems are not allowed. Separation of connections between sanitary sewer and storm drainage systems are the responsibility of the offending system’s owner.

3. Cesspools, Holding Tanks, and Septic Tanks - Cesspools, Holding Tanks, and Septic tanks with or without leaching fields, are the responsibility of the facility and cannot be connected to the main sewer line directly or via laterals except where a leaching field is connected to a permitted treatment process.

4. Cleanouts – Installation and maintenance of cleanouts are the responsibility of the property/facility owner. For each connection to the Main Sewer Line, a sewer cleanout is required. .

5. Sanitary Sewer Pump Stations - NAVFAC-UEM is responsible for pump stations that meet all of the following: (a) serve more than one facility, (b) are located on the Main Sewer Line, and

(c) are constructed to NAVFAC UEM standards. All other pump stations are the responsibility of the property/facility owner.

6. Piers & Dry Docks - The Point of Demarcation is at the pier riser at the hose connection point.

7. Wash Racks - Wash racks are the responsibility of the property/facility owner.

8. Oil-Water Separators - Oil-water separators (OWS) are the responsibility of the facility that the OWS serves. Any lines or manhole upstream of an OWS are considered part of the facility.

9. Grease Interceptors – Grease Interceptors (GI), also called Grease Traps, are the responsibility of the facility that the GI serves. Any lines or manhole upstream of the GI are considered part of the facility.

10. Diversion valve - The diversion valve or any structure upstream of this valve are the responsibility of the facility.

11. Wastewater Treatment Plants - Wastewater Treatment Plants that receive wastewater from a collection system serving multiple facilities are part of the utility owned system. Wastewater Treatment Plants that serve a single facility are not part of the utility owned system.

12. Drawings for Sanitary Sewer System Service Points - Drawings depicting examples of Service Points can be found under Appendix C for the following:

SANITARY SEWER SYSTEM Drawings SAN-1 and SAN-2

STEAM AND CONDENSATE SYSTEM

Section ST1 - DEFINITIONS

1. Industrial Purposes- Steam which is used for any purpose other than water or building heating.

2. Isolation Valve- The first valve off the main line that will isolate service to the facility without disrupting other steam services.

3. Pressure Reducing Station - Reduces steam from the higher pressure to the lower pressure. A Pressure Reducing Station typically includes a pressure reducing valve, upstream and downstream isolation valve, and bypass valve.

4. Utilization Pressure - Any pressure that the facility uses steam to support industrial or domestic needs.

5. Steam Distribution System - Network of piping, valves, fittings and other appurtenances that delivers steam from a central plant to multiple points of service.

6. Central Steam Plant - A facility that contains boilers and feeds a Steam Distribution System.

Centralized steam plants may be small and part of a nodal strategy but will always primarily function to distribute steam to multiple facilities. Satellite boilers are not considered Central steam plants.

7. Boiler - An electrical/mechanical device containing a heat transfer fluid under pressure designed to convert chemical (or electrical) energy to thermal energy. The thermal energy may then be used for a variety of purposes such as space heating or the production of electricity.

Steam generators and hot water generators are considered boilers, while steam and hot water converters are not.

8. Satellite Boiler - Small boiler(s) designed and constructed to primarily feed the load at the facility where it is located but may also feed an adjacent facility.

9. Service Point - The service point is the point of connection between the serving utility and the facility and is also the ’Point of Demarcation’ where ownership changes. This is the transition

Modernization. Refer to Appendix D, Drawings ST-1 through ST-4.

Section ST2 - SERVICE POINTS (DEMARCATION)

1. Steam Distribution Pipeline - The service point is at the downstream valve on the first Pressure Reducing Station that delivers utilization pressure. In the absence of a PR station, utilities ownership ends at the Isolation Valve at the main.

2. Satellite Boilers – No Point of Demarcation is necessary for these facilities because they are not utility systems.

3. Pier Steam Distribution - The Point of Demarcation is at the pier riser at the hose connection point.

4. Steam Service Meter - Regardless of service point, all steam service meters used for revenue are owned by NAVFAC UEM except when a negotiated agreement exists, such as Public Private Venture (PPV) housing where the consumer owns the meter. Steam Service Meters may be located on the steam supply line or the condensate return line.

5. Condensate Return System – When the condensate pumping station is located inside the facility the service point is at the connection to the condensate receiver. When the consate pumping station is located outside the facility, the service point is on the condensate line where it exits the facility.

6. Non-Returning Condensate System - The customer owns and maintains the entire condensate line and system components when the condensate is not returned to the steam distribution plant.

7. Drawings for Steam and Condensate System Service Points - Drawings depicting examples of Service Points can be found under Appendix D for the following:

STEAM AND CONDENSATE SYSTEM Drawings ST-1 through ST4

NATURAL GAS

Section G1 - DEFINITIONS

1. Pressure Regulator – Natural gas pressure regulators are designed to maintain outlet pressure at a constant level independently of fluctuations in inlet pressure or gas flow. Under zero-flow conditions, regulators close tightly.

2. Service Point - The service point is the point of connection between the serving utility and the facility and is also the ’Point of Demarcation’ where ownership changes. This is the transition

Modernization. Refer to Appendix E, Drawings G-1 and G-2.

Section G2 - SERVICE POINTS (DEMARCATION)

1. Natural Gas System - The service point is the last of either the discharge side of the Pressure Regulator or downstream side of the Gas Service Meter for the building or structure being served. Where natural gas is supplied and distributed to facilities by an outside service provider, everything beyond the outside service provider’s point of demarcation (typically the provider owned meter) is owned by the facility. Any components owned by an outside service provider shall be maintained by the service provider.

2. Gas Service Meter - All meters used for revenue are owned by NAVFAC UEM except when a negotiated agreement exists, such as Public Private Venture (PPV) housing where the consumer owns the meter and outside provider owned meters.

3. Drawings for Natural Gas System Service Points - Drawings depicting examples of Service Points can be found under Appendix E for the following:

NATURAL GAS DISTRIBUTION SYSTEM Drawings G-1 and G-2

APPENDIX A

ELECTRICAL SYSTEM DRAWINGS - UTILITES POINTS OF DEMARCATION

E-1 Unit Substations

E-2 Unit Substations

E-3 Pad Transformer

E-4 Three/Single Phase Transformers

E-5 Service Lateral

E-6 Service Lateral

E-7 Overhead Service Conductors

E-8 Overhead Service Conductors

E-9 Unit Substation in Joint Use Room

APPENDIX B

WATER SYSTEM DRAWINGS - UTILITES POINTS OF DEMARCATION

W-1 Water Distribution System

W-2 Water Distribution System

APPENDIX C

SANITARY SEWER SYSTEM DRAWINGS - UTILITES POINTS OF DEMARCATION

SAN-1 Sanitary Sewer

SAN-2 Sanitary Sewer

APPENDIX D

STEAM SYSTEM DRAWINGS - UTILITES POINTS OF DEMARCATION

ST-1 Steam and Condensate System

ST-2 Steam and Condensate System

ST-3 Steam and Condensate System

ST-4 Steam and Condensate System

APPENDIX E

NATURAL GAS SYSTEM DRAWINGS - UTILITES POINTS OF DEMARCATION

G-1 Natural Gas Distribution System

G-2 Natural Gas Distribution System

LANT-PAC UEM Points of Demarcation rev4
E-1 Demarc
E-2 Demarc
E-3 Demarc
E-4 Demarc
E-5 Demarc
E-6 Demarc
E-7 Demarc
E-8 Demarc
E-9 Demarc
podPPENDIX B
W-1 Demarc
W-2 Demarc
APPENDIX C
San-1 Demarc
San-2 Demarc
APPENDIX D
ST-1 Demarc
ST-2 Demarc
ST-3 Demarc
ST-4 Demarc
APPENDIX E
G-1 Demarc
G-2 Demarc