N6945024R0037_SectionF_0002.pdf
PDF 539 KB Posted
- Solicitation number
- N6945024R0037
About this file
This document is a section of the solicitation for Base Operations Support (BOS) Services at Naval Support Activity (NSA) Mid-South, Millington, Tennessee and outlying areas. The solicitation is a competitive 8(a) set-aside with a single award Facilities Support Indefinite-Quantity contract, including recurring work (firm-fixed price) and non-recurring work (indefinite delivery, indefinite quantity) Contract Line Item Numbers (CLINS). The contract term is anticipated to be a one-year base period plus four one-year option periods. The BOS services required include Facility Management, Facility Investment, Custodial, Pest Control, Integrated Solid Waste Management, Grounds Maintenance & Landscaping, Pavement Clearance, Utilities Management, Electrical, Wastewater, Water, Base Support Vehicles and Equipment, and Environmental. The solicitation details numerous required deliverables such as work schedules, reports, certifications, permits, and plans. Specific response dates and frequency for deliverables are provided. The source selection will be based on technical proposal, past performance, and price proposal evaluations to determine best value to the Government.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F
0200000 - Management and Administration
N69450-24-R-0037
Amendment 0002
DELIVERABLES OR PERFORMACE
Annex/
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
0200000/
2.2.1.2
N/A Request to Work
Outside
Government’s
Regular Working
Hours
At least seven calendar days prior to requested day.
KO and
COR
As required
0200000/
2.3.1
N/A Sign-in Sheets and
Minutes for
Review and
Comments
Within two working days
KO, COR
and all attendees
As Required
0200000/
2.3.1
N/A Sign-in Sheets and
Minutes Final
Revision
Within two working days
KO, COR
and all attendees
As Required
0200000/
2.3.4
N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
As specified
0200000/
2.3.5
N/A Certificate of
Insurance
Within 15 calendar days after award.
KO and
COR
As specified
0200000/
2.3.5
N/A Written Notice of cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
As required
2.3.10 N/A Phase-In Plan Within 5 days of
award
KO and
COR
As required
2.3.10 N/A Phase-out Plan 120 days prior to
contract completion date
KO and
COR
As required
0200000/
2.6.1
N/A Plans of Action and Milestones
(POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Command
Security
Manager
As required
0200000/
2.6.1
N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by
0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command
Security
Manager
As required
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
0200000/
2.6.4
N/A Scheduling and
Work Status
Updates
Weekly, within
30 minutes of the inquiry during regular working hours, and by
08:00 the following work day for inquiries after regular working hours
KO and
COR
As Specified
0200000/
2.6.4
N/A Work Schedules Within 15 calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR Monthly
0200000/
2.6.5
N/A Notification of any
Difficulty in
Scheduling Work
By the end of each workday
KO and
COR
As required
0200000/
2.6.6
N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by
0800 the following work day for inquiries after regular working hours
KO and
COR
As required
0200000/
2.6.7
N/A Service
Interruptions
30 days in advance for planned outages;
as soon as possible for unplanned
KO and
COR
As required
0200000/
2.6.8.2
J-0200000-09 Sample Pipe
Delimited Flat-File
Within 30 calendar days prior to contract start.
KO or a representa tive designate d by the
KO
As required to demonstrate the ability to properly format the flat-file
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
0200000/
2.6.8.3
N/A List of personnel requiring access to
Government’s
Maximo
Within 30 calendar days prior to contract start.
KO and
COR
As specified
0200000/
2.6.9.1
N/A Quality
Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
As required
0200000/
2.6.9.1
N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
As specified
0200000/
2.6.9.2
N/A QC Inspection File Within five calendar days of completion/ termination of the contract.
KO and
COR
As specified
0200000/
2.6.9.3
N/A Contractor Quality
Inspection and
Surveillance
Report
First work day of each month.
KO and
COR
Monthly
0200000/
2.6.10
N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
As specified
0200000/
2.7.1
N/A List of Key
Personnel and
Qualifications
Within 15 calendar days after award.
KO and
COR
As specified
0200000/
2.7.1
N/A Organizational
Chart
Within 15 calendar days after award.
KO and
COR
As specified
0200000/
2.7.2.6
N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
As specified
0200000/
2.8.1
N/A Employee List Within 15 calendar days prior to contract start and within seven calendar days of changes and upon request.
KO and
COR
As required
0200000/
2.8.8
N/A OF-306
Declaration for
Federal
Employment and
Digital
Fingerprints
Prior to commencement of work.
KO, COR,
and
Security
Manager
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
0200000/
2.8.9
N/A List of personnel requiring access to and the justification for their access to
Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security
Manager
As required
0200000/
2.9.2
N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/
2.9.3
N/A Activity Hazard
Analysis
Together with the
Accident
Prevention Plan and within seven calendar days of any changes.
KO and
COR
As specified
0200000/
2.9.4
N/A Compliance Plans, Programs, and
Procedures to include LOTO
Together with the
Accident
Prevention Plan and within seven calendar days of any changes.
KO and
COR
As specified
0200000/
2.9.4.7
N/A Report of periodic inspections of the energy control procedures
Together with the
Accident
Prevention Plan and within seven calendar days of any changes.
KO and
COR
As specified
0200000/
2.9.6
J-0200000-04 NAVFAC
Contractor Incident
Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
As required
0200000/
2.9.6
J-0200000-04 Weight Handling
Equipment
Accident Report
Within 15 working days of accident.
KO and
COR
As required
0200000/
2.9.6
J-0200000-04 Crane and Rigging
Gear Near Miss
Report
Within 15 working days of accident.
KO and
COR
As required
0200000/
2.9.8
N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
Monthly
0200000/
2.9.9
N/A OSHA Citations and Violations
Corrective Action
Report
Within 48 hours after receiving a citation.
KO and
COR
As required
0200000/
2.9.10
N/A Safety Inspection and Monitoring
Report
First work day of each month.
KO and
COR
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
0200000/
2.9.11
N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications expire.
KO and
COR
As specified
0200000/
2.10
N/A EMS Goals and
Policy
Measurement
Information
Upon request. KO and
COR
As required
0200000/
2.10.1.1
N/A Water
Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
As specified
0200000/
2.10.2
N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/
2.10.2.21
N/A Air Quality
Reports for
Contractor’s
Controlled
Equipment
Within 15 calendar days after the end of each month and at termination of the contract.
KO and
COR
Monthly
0200000/
2.10.2.21
J-0200000-04 Solvent Use Log Within the first 10 working days of each month.
KO/COR/
Environ mental
Division
Monthly
0200000/
2.10.2.21
J-0200000-04 Gasoline Loading Within the first 10 working days of
KO/COR/
Environ mental
Division
Monthly
0200000/
2.10.2.6
N/A Sampling Plan Prior to Sampling KO and
COR
As required
0200000/
2.10.2.6
N/A Laboratory
Analysis
Upon Request KO and
COR
As specified
0200000/
2.10.2.8
J-0200000-04 Ozone Depleting
Annual Report
15 January KO/COR/
Environ mental
Division
Annually
0200000/
2.10.2.8
N/A Class I and II ODS
Report
Within 24 hours following delivery of refrigerant to
DLA and by the
10th of each month
KO/COR/
Environ mental
Division
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
2.10.2.8
J-0200000-04 ODS
Release/Recovery
Report
Within 24 hours following of ODS release
KO, COR
and
Environ mental
Division
As required
0200000/
2.10.2.9
J-1800000-08 Used Oil Disposal and Recycling
Sampling Plan
Within 15 calendar days prior to contract start.
KO, COR
and
Environ mental
Division
As specified
0200000/
2.10.2.9
J-1800000-08 Used Oil Disposal and Recycling
Summary Report
Form
By October 10th KO, COR and
Environ mental
Division
Annually
0200000/
2.10.2.9
J-1800000-12 Spill Prevention
Control and
Countermeasure
Plan inspection form for Oil-containing drums
Within 10 working days of each quarter
KO, COR
and
Environ mental
Division
Quarterly
0200000/
2.10.2.10/
2.10.2.11
J-0200000-04 Solid Waste
Management and
Recycling Reports
First work day of each month.
KO and
COR
Monthly
0200000/
2.10.2.10
J-0200000-04 Summary Solid
Waste
Management and
Recycling Report
By October 10th KO and
COR
Annually
0200000/
2.10.2.13
N/A Waste Stream
Determination
Report
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
As required.
0200000/
2.10.2.15
N/A Fuel and hazardous substance spill notification
Verbal notification within 15 minutes of discovery
Regional
Dispatch
Center
As required
0200000/
2.10.2.15
N/A Fuel and hazardous substance spill notification
As soon as possible but not more than 2 hours after spill
KO and
COR
As required
0200000/
2.10.2.15
N/A Fuel and hazardous substance spill report
Within 48 hours of discovery
KO and
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
0200000/
2.10.2.16
N/A Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
As specified
2.10.2.16
J-0200000-04 Contractor
Hazardous
Material Inventory
Log
Within 15 calendar days after the end of each month and at termination of the contract.
KO, COR
and
Environ mental
Division
Monthly
0200000/
2.10.2.20
N/A Asbestos
Containing
Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written
Notification within 24 hours
KO and
COR
As specified
0200000/
2.10.2.21
N/A Hazardous Air
Pollutants Semi-annual Reports
At intervals of
160 to 200 calendar days
KO, COR,
Installatio n
Environm ental
Division, City, State, and
EPA
Semi-annually
0200000/
2.10.2.21
N/A Hazardous Air
Pollutants Monthly
Data
First workday of each month.
KO, COR,
Installatio n
Environm ental
Division
Monthly
0200000/
2.10.2.24
N/A Identification of
Lead Based
Building Materials
One hour verbal notification and follow-up with written with in 24 hours.
KO, COR
Installatio n
Environm ental
Division
As required
0200000/
2.10.2.25
N/A Dewatering Plan In advance of work performance
KO, COR
Installatio n
Environm ental
Division
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
0200000/
2.10.2.26
N/A Recycling of
Ethylene Glycol
Report
Within 15 calendar days after the end of each quarter and at termination of the contract.
KO/COR/
Environ mental
Division
Quarterly
0200000/
2.10.3
N/A Sustainable
Procurement and
Practices Plan
Within 15 calendar days prior to contract start and within
15 calendar days after exercised option periods.
KO and
COR
Annually
0200000/
2.10.3
N/A Sustainable
Delivery of
Services Report
Within five calendar days after each contract period.
KO and
COR
Annually
0200000/
2.10.3.2
N/A Recovered
Material
Certification
When a product containing recovered materials is equal to or better than the original and could be used.
KO and
COR
As Required
0200000/
2.11
N/A Mission Essential
Contractor
Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As Required
0200000/
2.11
N/A Mission
Critical/Essential
Personnel List
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/
2.12
N/A Technical Library
Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes.
KO and
COR
As specified
0200000/
2.14.1
Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
0200000/
2.14.2
N/A Notification to the
Government for
Work Above the
Recurring Work
Limitations and
ROM Estimate
Within two hours of identification.
KO and
COR
As required
0200000/
2.15.1.1
N/A Non-Recurring
Work Quantities
Ordered via
FedMall
By the fifth day of the following month
KO and
COR
Monthly
0200000/
2.15.2.1
N/A Non-Recurring
Work Proposals
Within two working days following receipt of request.
KO As required
Deliverables Form Preparation Instructions
Deliverable Title: Request to Work Outside Government’s Regular Working Hours
Form Attachment No.: N/A
Government Approval Required: ___ Yes X No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s comments and resubmit the request via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.
Deliverable Title: GFE Inventory
Form Attachment No.: N/A
Government Approval Required: ___ Yes X No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Inventory shall include no less than the following information;
a. Description
b. Quantity
c. Manufacturer
d. Acquisition Cost
e. Model Number
f. Location
g. Serial Number
h. GFE Number
Submit a copy via email to recipients on the distribution list for Government review and comment.
Deliverable Title: Emergency Planning and Community Right-To-Know Act (EPCRA) Report
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
2. Include the following:
a. EPCRA Plans and Procedures:
1) Hazardous Materials Planned for Use: Include an inventory of hazardous materials planned for use, including estimated quantities, and a copy of the corresponding material safety data sheets (MSDS) for hazardous materials expected to be used for this contract during each calendar year. The inventory shall include all information required to complete the Contractor Hazardous
Material Inventory Log shown in the Form Attachment. This report shall be submitted to the KO and Environmental Compliance Office via the KO.
2) Plan for protecting personnel and property during the transport, storage, and use of the materials.
3) Emergency procedures for spill response and disposal, including a site map with approximate quantities on site at any given time. The site map, showing where the hazardous substances are stored, shall be attached to the inventory.
4) Approved labeling system to identify contents of all containers on-site.
b. Hazardous Materials Actually Used: Include an inventory of the actual hazardous materials used, including include quantities, to the KO and Environmental Compliance
Office via the KO. The inventory shall include all information required to complete the
Contractor Hazardous Material Inventory Log shown in the Form Attachment.
3. Submit additional information to the Government as requested to support EPCRA reporting requirements.
Deliverable Title: Solvent Use Log
Form Attachment No.: J-0200000-04
Government Approval Required: X Yes ___ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
2. Include the following:
a. This report will be used to comply with the base Air permit.
b. Report will contain solvent usage for parts washers
c. Follow the instructions on the form J-0200000-04 Solvent Use Log.
3. Submit to the Government electronically to KO, COR, and Environmental Division (PRA4) within the first 10 working days of each month.
Deliverable Title: Gasoline Loading
Form Attachment No.: J-0200000-04
Government Approval Required: X Yes ___ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
2. Include the following:
a. This report will be used to comply with the base Air permit.
b. Report will contain fuel loading data for tanks.
c. Follow the instructions on the form J-0200000-04 Gasoline Loading.
within the first 10 working days of each month.
Deliverable Title: Ozone Depleting Annual Report
Form Attachment No.: J-0200000-04
Government Approval Required: X Yes ___ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
2. Include the following:
a. The annual report shall contain type of ODS/refrigerant and quantities (pounds)
b. The report must display the information by type of ODS.
3. Submit to the Government electronically to KO, COR, and Environmental Division (PRA4) by
15 January annually.
Deliverable Title: ODS Release/Recovery Report
Form Attachment No.: J-0200000-04
Government Approval Required: X Yes ___ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
2. Include the following:
a. This report will be used to comply with base air permit and ODS regulatory requirements.
b. Complete form in accordance with instructions provided on the form.
within 24 hours of an ODS release.
Deliverable Title: Spill Prevention Control and Countermeasure Plan inspection form for Oil-containing drums
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
2. Include the following:
a. Report will contain inspection check-list for Oil-containing Drums that contain 55 gallons or larger, to comply with the Base SPCC.
b. This report will be used to comply with the base Spill Prevention, Control, and
Countermeasure (SPCC) Plan and 40 CFR-112.
c. Follow the instructions on the form.
3. Submit to the Government electronically to KO, COR, and Environmental Division (PRA4) the first 10 working days of each quarter.
Deliverable Title: Report of Hazardous Materials Inventory
Form Attachment No.: J-0200000-04
Government Approval Required: X Yes ___ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
4. The report shall be prepared using Microsoft Office software.
5. Include the following:
a. Identifies hazardous materials issued to each activity supported.
b. Fill out figure J-0200000-04 Report of Hazardous Materials Inventory in accordance with NAVSUPPACTMIDSOUTHINST 5100.6.
6. Submit to the Government electronically to KO, COR, and Environmental Division (PRA4) annually by 10 April.
1501000 - Facility Management
DELIVERABLES OR PERFORMANCE
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1501000/
3.1.1
N/A MAXIMO Asset
Changes Report
By COB the third workday of each month
COR, KO
& FMD
Monthly
1501000/
3.3
N/A MAXIMO Flat File When direct entry is not used
COR,
RCC and
FMD
Daily
1502000 - Facility Investment
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To
Frequency
1502000/
2.2.1
N/A
Certification and
Licenses
Within 15 days after award or as requested by the
KO
KO and
COR
Once for initial submittal, then as requested
1502000/
3.1
J-1502000-35 Service Order
Summary Report
First work day of each month
KO and
COR
Monthly
1502000/
3.1
N/A Roofing Repair
Report
Fifth work day of each month
COR and
Requirem ents
Branch
Hd.
Monthly
1502000/
3.2
Preventive
Maintenance
Program Plan
30 calendar days after contract award
KO and
COR
Annually
1502000/
3.2
N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
COR and
Requirem ents
Branch
Head
Monthly
1502000/
3.2.8
N/A HVAC Oil Sample
Analysis Report
5 working days after test results received
COR,
Requirem ents and
Env.
Branch
Hd.
Annually
1502000/
3.2.1
J-1502000-35 Generator Service
Log
Within the first
10 working days of each month.
COR,
Requirem ents and
Env.
Branch
Hd.
Monthly
1502000/
3.2.3
N/A Monthly Cathodic
Protection
Inspection/Test
Schedule
Within 30 days following award
COR and
Require ments
Branch
Head
Annually and as changes occur
1502000/
3.2.3
N/A Annual Cathodic
Protection
Calibration
Schedule
Within 30 days following award
COR and
Require ments
Branch
Head
Annually
1502000/
3.2.3
N/A Cathodic Protection
Test Results
Within five working days of the test
COR and
Require ments
Branch
Head
Monthly
Form
Attachment
Number Deliverable Title
3.2.3
N/A Cathodic Protection
System Report
Upon completion of annual calibration
COR and
Require ments
Branch
Head
Annually
1502000/
3.2.5
J-1502000-10 Elevated Water
Tank PM Report
31July KO and
COR
Annually
1502000/
3.2.6
N/A Exterior Lighting
Systems Program
30 calendar days after contract award
KO and
COR
As specified
1502000/
3.2.9
J-1502000-35 Grounding System
Visual Inspection
Results
Five work days following inspection
KO, COR
and ESO
Every Six
Months
1502000/
3.2.9, 3.4.3
J-1502000-35 Grounding System
Test and Inspection
Results
Five work days following testing
KO, COR
and ESO
Annually, Monthly for new equipment
1502000/
3.2.11
N/A PTAC Summary
Replacement Report
Fifth work day of each month
COR and
Requirem ents
Branch
Head.
Monthly
1502000/
3.3
Integrated
Maintenance
Program Plan
30 calendar days after contract award
KO and
COR
Annually
1502000/
3.3
N/A Monthly IMP
Schedule and IMP
Maintenance and
Repair Status
Five work days prior to the beginning of each month
KO and
COR
Monthly
1502000/
3.4
Inspection, Testing, and Certification
Program Summary
Report
First work day of each month
KO and
COR
Monthly
1502000/
3.4
Inspection, Testing and Certification
Schedule and
Equipment
Certifications
First work day of each month
KO and
COR
Monthly
1502000/
3.4.1
J-1502000-38 Backflow Device
Test Report
Five working days after test
COR/
Requirem ents
Branch
Head.
As required
1502000/
3.4.3
Ground Point
Inspection and
Testing Results
First working day of each month
KO and
COR
Monthly
1502000/
3.4.5
Inspection and Test
Report for Vertical
Transportation
Equipment
By the fifth work day of each month
COR and
Requirem ents
Branch
Head.
Form
Attachment
Number Deliverable Title
3.5
Other Recurring
Services Program
Summary Report
First work day of each month
COR and
Requirem ents
Branch
Head.
Monthly
1502000/
3.5.1
N/A Boiler Water
Treatment Test
Results
Within 5 days following test
KO and
COR
As specified
1502000/
3.5.3.1
N/A FRCS Maintenance
Schedule
30 calendar days after contract award
KO and
COR
As specified
1502000/
3.5.3.2
N/A Report of FRCS in bypass mode
Within four hours of identification
KO, COR
and CIO
As specified
1502000/
3.5.3.2
N/A FRCS Network
Intrusion
Within four hours of identification
KO, COR
and CIO
As specified
1502000/
3.5.5
J-1502000-35 HVAC Water
Chemical Analysis
Report
Within five days after tests completed
COR and
Requirem ents
Branch
Head.
As specified
1502000/
3.5.6
N/A HVAC Condenser
Tube Inspection
Findings
Within five days after tests completed
COR and
Requirem ents
Branch
Head.
As specified
1502000/
3.5.7
N/A Oil/Water Separator
Service Log
After award, no later than
October 5th of each calendar year.
COR and
Environm ental
Branch
Hd.
Annually
1502000/
3.5.9
N/A Traffic Control
Device Program
30 calendar days after contract award
KO and
COR
As specified
1502000/4 N/A Non-recurring Work
Status Report
Fifth work day of each month
KO and
As specified
Deliverable Title: Service Order Summary Report
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
The Service Order Summary Report shall be a compilation of the previous months service order reports with the following information:
a. Detailed description of work actually completed, problems encountered and recommended follow-up actions required.
b. Brief description of material and parts used, including quantities and cost.
c. Date and time work began.
d. Date and time work was completed.
e. Total hours of labor (by craft) expended, including travel time.
f. Name of person accepting the work and any comments written on the service order ticket.
g. Last name and first initial of the Contractor employee(s) performing the work.
Submit a copy of the summary report via email to KO and COR for Government review and comment.
Deliverable Title: Service Order Status Report
Form Attachment No.: N/A
Government Approval Required: Yes X No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
At a minimum, the report shall include the following by service call (sort report by date completed then by Service Call Number):
Completed Open
a. Service call number. Y Y
b. Job order number. Y N
c. Date/time call received. Y Y
d. Name of Maintenance Representative and phone number
Y Y
e. Short description of required work. Y Y
f. Classification/ Priority Assigned. Y Y
g. Location of work. Y Y
h. Description of work performed Y N
i. Date/time completed Y N
j. For Emergency Service Calls: Date/Time work began.
Y N
Submit a copy of the status report via email to the COR and Customer Maintenance Reps (as needed) for
Government review.
Deliverable Title: Roofing Repair Report
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
The Roofing Repair Report summarizes temporary and permanent roof repairs Format is optional. At a minimum, the report shall contain the following information:
a. Service call number
b. Building number
c. Description of temporary/permanent repair
d. Date of temporary repair
e. Date of permanent repair or date permanent repair is scheduled
Submit a copy of the summary report via email to COR for Government review.
Deliverable Title: Preventive Maintenance Program Plan
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
The Service Order Summary Report shall be a compilation of the previous months service order reports with the following information:
a. Name of inspector/mechanic
b. Date
c. Checks made
d. Services performed
e. Corrective action performed
f. Materials used
g. Material cost
Submit a copy of the plan via email to KO and COR for Government review.
Deliverable Title: Monthly PM Work Schedule
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
The schedule shall be sent electronically and shall list all PM's to be performed by the week. PM's shall be listed by craft, i.e. HVAC, plumbing, etc., and building number. The schedule shall also show the day and week of performance and the PM Guide number.
Submit a copy of the report via email to the COR for Government review.
Deliverable Title: HVAC Oil Sample Analysis Report
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
An approved laboratory test report format shall be used annually for oil samples on all HVAC systems 70 tons or greater.
Submit a copy of the report via email to the COR, Environmental and Requirements Branch Heads for
Government review within five working days after tests results are received.
Deliverable Title: Backflow Device Test Report
Form Attachment No.: J-1502000-33
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Complete Backflow Device Test Report Form attached which is self-explanatory, or a similar contractor developed form (approved by ACO) each time a backflow device is tested.
Submit a copy of the report via email to the COR for Government review within five working days after test.
Deliverable Title: Inspection and Test Report for Vertical Transportation Equipment
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Provides a log/tabular list of all inspections, tests, maintenance and repair performed on each elevator and dumbwaiter, broken down by elevator/dumbwaiter. Exact format shall be developed by the contractor but as a minimum this record shall indicate the items shown on figure 3-2A and the following:
a. Elevator/Dumbwaiter identification
b. Date and time notified (if other than routine service)
c. Date and time service/repair
d. Name of mechanic
e. Nature of problem (if other than routine service)
f. Description of service performed
g. Item of equipment/component involved
h. What parts were replaced
Submit a copy of the report via email to the COR and for Government review by the fifth working day of each month
Deliverable Title: Report of Elevator/Dumbwaiter Inspections and Tests
Form Attachment No.: J-1502000-33
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Upon completion of inspections and/or tests the form (J-1502000-33 Report of Periodic Inspections and
Tests), or similar approved contractor developed form, shall be prepared by filling in the appropriate blanks. Inspection checklists as shown in ANSI 17.1 shall also be filled out and attached.
Submit a copy of the report via email to the COR for Government review within 5 working days of inspection/test completion.
Deliverable Title: Other Recurring Services Program Summary Report
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Format is optional and records may be kept in logs, record cards, or other format, and maintained either at the equipment or in a central location. Equipment that has no logbook shall have a record card. As a minimum the records shall indicate the following:
a. Name of inspector/mechanic
b. Checks Made
c. Date
d. Services performed
e. Corrective action performed
f. Materials used
g. Material cost
Deliverable Title: Water Chemical Analysis Report
Form Attachment No.: J-1502000-33
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Report format similar to J-1502000-33 Water Chemical Analysis Report or an equivalent approved laboratory report format shall be used to report results of monthly HVAC cooling water quality.
Deliverable Title: Non-recurring Work Status Report
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Excel software.
Format is optional and Serves as a comprehensive listing of all non-recurring work requested by the
Government and provides a ready reference of the status of all indefinite quantity work from inception to completion. Report format is to be electronic spreadsheet; report will include the following information:
a. Work Request Number
b. Date Received
c. Job Title/Description
d. Priority
e. Whether Maint. Services or Davis-Bacon Work
f. Price
g. Delivery Order Number
h. Job Order Number
i. Estimated/Actual Start Date
j. Estimated/Actual Completion Date
Include with each report a listing of delivery orders completed the previous month.
Submit a copy of the report via email to the COR.
Deliverable Title: Generator Service Log
Form Attachment No.: J-1502000-33
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Report will contain data for all generators.to include O&M run times and the emergency run times and cause. This report will be used to comply with the base Air permit. Follow the instructions on the form J-
1502000-33 Generator Service Log.
Submit a copy of the report via email to the COR for Government review within the first 10 working days of each month..
Deliverable Title: Cathodic Protection - Quarterly Structure-to-Electrode Potential Report
Form Attachment No.: N/A
Government Approval Required: Yes _X_ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Test in accordance with UFC 570-06 and forward results to ACO.
Submit a copy of the summary report via email quarterly to COR for Government review and comment five working days after tests completed.
Deliverable Title: Cathodic Protection - Monthly Rectifier Report
Form Attachment No.: N/A
Government Approval Required: Yes _X_ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Test in accordance with UFC 570-06 and forward results to ACO.
Submit a copy of the summary report via email monthly to COR for Government review and comment five working days after tests completed.
1503010 - Custodial
Spec Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission To Frequency
1503010/
2.2.1
N/A Pathogen
Training
Certificates
Upon request KO and
COR
Upon request
1503010/
2.3.1
N/A Pathogen
Exposure
Control Plan
Within 15 calendar days prior to contract start and annually thereafter
KO and
COR
As specified
1503010/
3.1
N/A Annual Work
Schedule
Within 15 calendar days prior to contract start
KO and
COR
Annually and five calendar days prior to implementing any changes to the schedule
1503010/
3.1
N/A Monthly Work
Plan
First work day of each month and five calendar days prior to implementing any changes to the schedule
KO and
COR
Monthly
1503010/
3.2
N/A Custodial
Service Order
Report
First work day of each month
KO and
1503020 - Pest Control
Annex/Spec
Item
Form
Attachment
Number
Deliverable Title
Date(s) of
1503020/2.2.1 N/A Copy of State
Certification for
Contractor Personnel
15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO,
COR,
and
PMC
As required
1503020/2.3.1 N/A Copy of Local/State
Business License
Prior to contract start.
Copies of renewed licenses shall also be submitted.
KO and
COR
1 per state
1503020/2.3.2 N/A Permits 5 days prior to the start of work requiring permits.
KO and
COR
As required
1503020/2.3.4 N/A Ultra-Low Volume
(ULV) Equipment
Calibration and
Droplet Analysis
Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO,
COR,
and
PMC
As required
1503020/2.3.5 N/A Planned Pesticide Use
Sheets including
Pesticide Labels and
Material Safety Data
Sheets (MSDS)
15 days prior to the start of work.
Note: Any proposed changes in pesticide usage shall be submitted for
KO approval at least 5 business days in advance of pesticide use.
KO and
COR
1 for each pesticide per pest as required
1503020/3 N/A Contractor's Work
Plan
Prior to start of work.
KO and
Item
Form
1503020/3.3 J-1503020-14 Report of Pest
Management
Operations
Electronically once per month by the
15th of the following month
(Example:
July data must be submitted by August
15).
KO,
COR,
and
PMC
Monthly
1503020/3 N/A Report of Conditions
Conducive to Pest
Infestation
1 working day after citing conditions.
KO and
COR
As required
1503020/3, 3.3 N/A Monthly Summary of completed Pest
Control Service
Orders
Once per month by the
15th of the following month.
KO,
COR,
and
PMC
Monthly
1503020/3.1.3, N/A Five-year Termite
Treatment Warranties
10 days following the treatment.
KO and
COR
As required
1503020/3.1.3, J-1503020-18 Termite and Wood
Decay Inspection (DD
Form 1070) (per the appropriate Pest
Group Sheet)
10 working days after inspection completed.
COR/
Require ments
Branch
Head
As required
1503020/3, 4 J-1503020-18 Adult Mosquito Catch
(per the appropriate
Pest Group Sheet)
The same day as collected in a labeled, re-sealable plastic bag.
KO and
COR
As required
1503020/3.1.2, N/A Larval Mosquito
Survey Report (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO and
COR
As required
1503020/3.1.2, N/A Stored Product Pest
Survey (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO and
COR
As required
1503020/3.1.2, N/A Pharaoh Ant
Treatment: Floor Plan
Diagram (per the appropriate Pest
Group Sheet)
2 calendar days prior to beginning the treatment.
KO and
COR
As required
1503020/3.1.2, N/A Tick Survey Report
(per the appropriate
Pest Group Sheet)
Within 1 day of the survey.
KO and
Item
Form
1503020/3.1.4, N/A Mole Cricket Survey
Report (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO and
COR
As required
1503020/3.1.2, N/A Aerial Spray
Operations - FAA
Approval (per the appropriate Pest
Group Sheet)
24 hours prior to performing aerial operations.
KO and
Instructions for Contractor's Work Plan
The CWP shall adhere to applicable publications and directives contained in J-1503020-02 (Applicable Publications and Directives). The CWP will require approval by the Contracting Officer (KO). The CWP shall establish the strategy and methods for conducting a safe, effective, and environmentally sound pest management program in compliance with these specifications. Prospective contractors may review the installation’s historical records of pest activity and abatement actions, survey facilities and grounds, and consult with the Installation PMC in development of a plan. The CWP shall address continuous monitoring, pest response and removal procedures, record keeping, warranties, education and communication to installation personnel to prevent pests and disease vectors, bird control on applicable airfields and in hangars, etc. The IPM approach should use targeted (i.e., effective, environmentally sound) methods including habitat/facility modification, biological/genetic/cultural control, mechanical/physical control, and where necessary, the judicious use of least hazardous pesticides. The CWP shall include labels, MSDS sheets, and planned pesticide use sheets and comply with all applicable local, state, and Federal regulations, and the
IPMP.
Termite and Wood Decay Inspection (DD Form 1070) (per the appropriate Pest Group Sheet)
DESCRIPTION/PURPOSE: To report results of structural pest inspection.
APPLICATION/INTERRELATIONSHIP: Used to monitor condition of structures and effectiveness of structural pest control program.
PREPARATION INSTRUCTIONS: Computer generated format similar to the form in J-1503020-18 1) Report of Structural Pest Inspection
FREQUENCY: Every other year for each structure/facility except family housing units.
DUE DATE: Within 10 working days of inspection. Inspection reports for individual structures/facilities may be accumulated and submitted monthly. Conditions of critical or urgent nature shall be reported immediately.
DISTRIBUTION: Electronically to the COR..
Adult Mosquito Catch (per the appropriate Pest Group Sheet)
DESCRIPTION/PURPOSE: Provides a tally of female mosquitoes caught for each light trap.
APPLICATION/INTERRELATIONSHIP: Used to determine the need for mosquito control.
PREPARATION INSTRUCTIONS: Fill out Light Trap Survey form found in J-1503020-18 2) Mosquito Light
Trap Report
FREQUENCY: Four consecutive days per week 15 April through 30 September.
DUE DATE: The first work day of the following week.
DISTRIBUTION: Submit the collected mosquitoes and one copy of Light Trap Survey form to NAVHOSP
Preventive Medicine. Retain original on file for Navy inspections.
1503030 - Integrated Solid Waste Management (ISWM)
Spec Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission To Frequency
1503030/
2.3.1, 3.2.2
N/A Recycling
Revenue
Receipts
Report
With invoice/Monthly
KO and
COR
As specified
1503030/
2.3.2
N/A Weight
Tickets
With invoice/Monthly
KO and
COR
As specified
1503030/
2.3.3
N/A Disposal
Permits
Within 15 calendar days after Contract award
KO and
COR
As required
1503030/
3.1
N/A Solid Waste
Collection
Schedule
15 days after award/Annually
KO and
As specified
1503040 - Other (Splash Park)
DELIVERABLES OR PERFORMAMCE
Spec
Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission To Frequency
1503040/
2.1.1
N/A Certifications and Training
Within 15 days after award or as requested by the KO
KO and COR Once for initial submittal, then as requested
1503040/
3.5
N/A Water Analysis
Report
First work day of each month
KO and COR Monthly
1503040 - Other (Splash Park)
Deliverable Title: Water Analysis Report
Form Attachment No.: N/A
Government Approval Required: ___ Yes X No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s comments and resubmit the request via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.
1503050 - Grounds Maintenance and Landscaping
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission To Frequency
1503050/
2.2.1
N/A Certification, Training, and
Licensing
Within 15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO and COR Annually and as required by Section
H – Special Contract
Requirements, FAC
5252.237-9301
Substitutions of Key
Personnel (JUN
1994)
1503050/
2.3.1.1
N/A Business
Licensing
Within 15 calendar days prior to contract start.
Copies of renewed licenses shall also be submitted.
KO and COR As required
1503050/
2.3.1.4
N/A Planned
Pesticide/
Herbicide Use
Sheets including
Pesticide/
Herbicide
Labels and
Safety Data
Sheets (SDS)
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO, COR,
PMC
Annually for each pesticide/herbicide, as required.
1503050/
2.3.1.5
N/A Pest
Management
Operations
Report
Electronically by the 15th of the following month
(Example:
July data must be submitted by
August 15) on the format approved by
PMC.
KO, COR and
PMC
Monthly
1503050/
2.3.2
N/A Permits Within 15 calendar days prior to start of work.
KO and COR As required
1503050/ 3 N/A Weight Tickets With Invoice KO and COR As Specified
1503050/ 3 J-1503050-07 Recycling
Reporting
Form
As specified KO and COR With each invoice
1503050 - Grounds Maintenance and Landscaping
1503050/
3, 3.2.5
N/A SDS sheets and catalog cut sheets or samples for fertilizer, mulch, and herbicides
Prior to bringing on-board installation and prior to use
KO and COR As required
1503050/ 3 N/A Contractor
Work
Schedules
Within 15 calendar days prior to contract start
KO and COR Annually and five calendar days prior to implementing any changes to the schedule
1503050/
3.1.1.3
N/A Soil Analysis test results and proposed fertilizer
Within 15 days after receipt of the test results by the
Contractor
KO and COR As required
1503050/
3.1.1.3
N/A Top Dressing and Over
Seeding Seed
Type
Within 15 calendar days prior to contract start
KO and COR Annually and five calendar days prior to implementing changes to the schedule
1503050/
3.1.7
N/A Artificial Turf
Maintenance
Plan
Within 15 calendar days prior to contract start
KO and COR Annually and five calendar days prior to implementing any changes to the plan
1503050/
3.6
N/A Grounds
Maintenance
Service Order
Summary of
Completion
Report
By the fifth day of each month
KO and COR Monthly
1503060 - Pavement Clearance
Spec Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission To Frequency
1503060/
3.1
N/A Pavement
Sweeping
Schedule
15 working days after award and
15 working days after the start of each option year
KO and COR Annually
1503060/
3.2.2
N/A Snow Removal
Plan
15 working days after award and
15 working days after the start of each option year
KO and COR Annually
1601000 - Utility Management
Annex
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1601000/
3.1.1
Contingency Plan 15 working days after award and
15 working days after the start of each option year
KO and
COR
Annually
1601000/
3.1.2
N/A Utility Outage
Request
Within 30 calendar days of request
COR/
UEM
Branch
Head
As
Required
1602000/
3.1.2
N/A Unscheduled
Outage
Within 24 hours of outage
COR/
UEM
Branch
Head
As
Required
1601000/
3.1.3
N/A Monthly Meter
Reading Report
By the 25th day of each month
Utilities
Branch
Head/KO
Monthly
1601000/
3.1.3
N/A Re-read Meter Within 1 day of request
COR/
UEM
Branch
Head
As
Required
1601000/
3.1.4, 3.1.6
N/A Excavation Permit
Utility Markings
Upon issuance Utilities
Branch
Head/COR and KO
As required
1601000/
3.2
N/A Utility
Infrastructure
Condition
Assessment
First work day of the each month in
Maximo
KO/COR Monthly
1601000/
3.2.1
N/A Notification of utility assets not included in the listing
As Specified KO/COR As
Required
1601000/
3.2.1
N/A Asset description change report
As Required KO/COR As
Required
1601000/
3.2.1
N/A Summary of
MAXIMO Asset
Changes Report
By COB the third workday of each month
COR/KO
& FMD
Monthly
1601000/
3.3
N/A Report of FRCS in bypass mode
Within four hours of identification
KO, COR
and CIO
As specified
1601000/
3.4
N/A MAXIMO Flat
File
As specified COR/RCC
/FMD
Deliverable Title: Meter Readings
Form Attachment No.: N/A
Government Approval Required: ___ Yes X No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Excel software.
Read all meters on specified dates each month. Record required meter readings for gas, electricity, sewage, and water in an Excel spreadsheet and return completed spreadsheet.
Submit the completed spreadsheet via email to the COR and UEM Branch Head by the first work day of
Deliverable Title: Utility Outage Request
Form Attachment No.: N/A
Government Approval Required: _X__ Yes No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Public Works approval must be obtained for planned outages. Public Works will obtain clearances from system users. Whenever possible, routine maintenance requiring shutdown of equipment shall be performed when winter heating or summer air conditioning is not required.
Submit a request via email to the COR and UEM Branch Head at least10 days prior to requested outage date.
Report Preparation Instruction
Report Title: MAXIMO Asset Changes Report
Form Attachment No.: J-1601000-11
Government Approval Required: __ Yes __ No
Media:
__ Hard Copy __ Electronic __ Direct System Input
Preparation Instructions:
The report shall be prepared using Microsoft Office Excel software.
The MAXIMO Asset Changes Report shall be a compilation of the previous months inventory changes with the following information:
a. Detailed description of why there is a change.
b. Brief description of asset, including quantities and cost.
c. Date and time asset changed.
d. Name of person that identified the change to the asset.
Submit a copy of the summary report via email to KO for Government review and comment.
1602000 - Electrical
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1602000/
2.2.1
N/A Certification and
Training
Thirty calendar days before making splices or terminations
KO/COR As required
1602000/
N/A Critical Spare Parts
Inventory
15 days after award
KO and
COR
Once.
Update if the requiremen ts change.
1602000 /
3.1
N/A Standard Operation
Procedures
Within 30 days after contract start and within five days of any changes
KO Once.
Update if the requiremen ts change.
1602000/
3.3
N/A Service Order
Status Report
1st working day each week
COR and
UEM
Weekly
1602000/
3.3
N/A Service Order
Summary Report
1st working day each month
COR and
UEM
Monthly
1602000/
3.1
N/A Condition Report 1st working day each week
KO and
COR
Weekly
1602000/
3.1
N/A Unscheduled
Electrical Outage
Within 24 hours of outage
COR/
UEM
Branch
Head
As
Required
1602000/
3.1
N/A Outage Report Within 3 days after the end of the month
KO and
COR
Monthly
1602000/
3.2
N/A Generator Run
Time Report
1st working day each month
COR/
Environ mental
Branch
Head
Monthly
1602000 /
3.2, 3.4
N/A Electrical Power
Generators Testing
Schedule
30 days after award
KO Annually and any time a change is made to the schedule
1602000 /
3.4
N/A Preventive
Maintenance Plan and Preventive
Maintenance
Schedule
By the 25th day of each month
KO and
COR
Annually and any time a change is made to the schedule
1602000 /
3.4
N/A Monthly PM schedule
By the 25th day of each month
KO and
COR
Monthly
1602000 /
3.4
N/A Unaccomplished
Maintenance
Report
3 days after following the end of the month
KO and
COR
As
Required
1602000 - Electrical
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1602000 /
3.4
N/A Repair Status
Report
By the 25th day of each month
KO/COR As
Deliverable Title: Unscheduled Electrical Outage
Form Attachment No.: N/A
Government Approval Required: ___ Yes X No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Provide information similar equivalent to NASMFS Form 11310/1 to document electrical outages.
Submit form via email to the COR and UEM Branch Head within 24 hours of the unscheduled outage.
1604000 - Wastewater
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1604000/
N/A Road Closure
Request
Ten working days prior to service commencing
KO and
COR
As required
1604000/
N/A Critical Spare Parts
Inventory
15 days after award
KO and
COR
Update if the requiremen ts change.
1604000/
3.1.1
N/A Schedule of
Operator
Attendance
7 prior to the start of work Within 2 days of Request
KO and
COR
As required
1604000/
3.1.1
N/A Wastewater
Treatment
Operating Records, Logs, Reports
3 days after the end of the month during which work is performed.
KO and
COR
Monthly
1604000/
3.1.1
N/A Condition Report Weekly KO and
COR
Weekly
1604000/
3.1.1
N/A Monthly Outage
Report
By the First working day of each month
KO and
COR
Monthly
1604000/
3.2
N/A Service Order
Summary Report
First work day of each month
KO and
COR
Monthly
1604000/
3.2
N/A Service Order
Status Report
First work day of each week
COR and
UEM
Weekly
1604000/
3.3
N/A Preventive
Maintenance (PM)
Program
Within 30 days following contract award
KO and
COR
As specified
1604000/
3.3
N/A Monthly PM schedule
By the 25th day of each month
KO and
COR
Monthly
1604000/
3.5.1
N/A Pipeline Cleaning
Schedule
15 days after award
KO Annually and any time a change is made.
1604000/
3.5.2
N/A Schedule of Wet
Well Services
15 days after award
KO Annually and any time a change is made.
1604000/
3.5.2.1
N/A Wet Well Volume
Report
10 days after the end of each fiscal year.
KO Annually
1604000/
3.4.2
N/A Wet Well Cleaning
Report
30 days after contract award
KO and
COR
1606000 - Water
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission To Frequency
1606000/
2.2.1
N/A Proof of all
Certification, Training, and
Lic…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .