J-0200000-18_ELINS.xlsx
XLSX spreadsheet 208 KB Posted
- Solicitation number
- N6945024R0037
About this file
This document is a Solicitation Notice for a competitive 8(a) set-aside Base Operations Support (BOS) Services contract at Naval Support Activity (NSA) Mid-South in Millington, Tennessee. The procurement includes labor, operations, and management for facility management, facility investment, custodial, pest control, solid waste management, grounds maintenance, pavement clearance, utilities management, electrical, wastewater, water, vehicle/equipment support, and environmental services. The contract will be a single award Facilities Support Indefinite-Quantity contract with firm-fixed price recurring work and indefinite delivery, indefinite quantity non-recurring work. The contract term is a one-year base period plus four one-year option periods. The Government will evaluate offerors' technical proposals, past performance, and pricing to determine the best value. The site visit is scheduled for August 21-22, 2024, and the proposal cutoff date is August 29, 2024. The primary NAICS code is 561210 with an annual small business size standard of $47.0M.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 - Base Period RW
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers - NSA Mid-South |
| Solicitation/Contract No.: N69450-24-R-0037 |
| Line Item 0001 - Recurring Work - Base Period | |||||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||||||
| ELINs A001 through A016 | |||||||||||
| Customer | Category | Sub-Category | ELIN | Sub-ELIN | Annex/Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total |
| CNRSE NSA | Facility Management | Recurring Work | A001 | A001AA | 1501000 | 3.1 | Infrastructure Condition Assessment Program (ICAP) Services | 12 | MO | ||
| CNRSE NSA | Facility Management | Recurring Work | A001 | A001AB | 1501000 | 3.2 | Technical Support Services | 12 | MO | ||
| CNRSE NSA | Facility Management | Recurring Work | A001 | A001AC | 1501000 | 3.3 | NAVFAC Maximo Data Entry | 12 | MO | ||
| CNRSE NSA | Facility Investment | E/U/R Work | A001 | A001AD | 1502000 | 3.1.1 | Emergency Work | 350 | EA | ||
| CNRSE NSA | Facility Investment | E/U/R Work | A001 | A001AE | 1502000 | 3.1.2 | Urgent Work | 350 | EA | ||
| CNRSE NSA | Facility Investment | E/U/R Work | A001 | A001AF | 1502000 | 3.1.3 | Routine Work | 2,500 | EA | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AG | 1502000 | 3.2.1 | Auxiliary Generators | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AH | 1502000 | 3.2.2 | Boiler and Unfired Pressure Vessel (UPV) Systems and Equipment | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AJ | 1502000 | 3.2.3 | Cathodic Protection Systems | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AK | 1502000 | 3.2.4 | Compressed Air Systems | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AL | 1502000 | 3.2.5 | Elevated Water Tank | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AM | 1502000 | 3.2.6 | Emergency Exit and Exterior Lighting Systems | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AN | 1502000 | 3.2.7 | Force Protection Barricades, Turnstiles, and Gates | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AP | 1502000 | 3.2.8 | HVAC and Refrigeration Systems | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AQ | 1502000 | 3.2.9 | Lightning Arrestors and Grounding Devices | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AR | 1502000 | 3.2.10 | Overhead and Sliding Doors | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AS | 1502000 | 3.2.11 | PTAC Units | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AT | 1502000 | 3.2.12 | Solar-Powered Equipment | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AU | 1502000 | 3.2.13 | Sump Pump Maintenance | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AV | 1502000 | 3.2.14 | Tankless Water Heaters | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AW | 1502000 | 3.2.15 | Truck Scales | 12 | MO | ||
| CNRSE NSA | Facility Investment | Preventive Maintenance | A001 | A001AX | 1502000 | 3.2.16 | Uninterruptible Power Source (UPS) Systems | 12 | MO | ||
| CNRSE NSA | Facility Investment | Integrated Maintenance Program (IMP) | A001 | A001AY | 1502000 | 3.3.1 | Fire Protection Systems | 12 | MO | ||
| CNRSE NSA | Facility Investment | Integrated Maintenance Program (IMP) | A001 | A001AZ | 1502000 | 3.3.2 | HVAC and Refrigeration Systems | 12 | MO | ||
| CNRSE NSA | Facility Investment | Integrated Maintenance Program (IMP) | A001 | A001BA | 1502000 | 3.3.3 | Vertical Transportation Equipment (VTE) | 12 | MO | ||
| CNRSE NSA | Facility Investment | Inspection, Testing, and Certification Program | A001 | A001BB | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO | ||
| CNRSE NSA | Facility Investment | Inspection, Testing, and Certification Program | A001 | A001BC | 1502000 | 3.4.2 | Boilers and UPVs Inspecion, Testing and Certification | 12 | MO | ||
| CNRSE NSA | Facility Investment | Inspection, Testing, and Certification Program | A001 | A001BD | 1502000 | 3.4.3 | Test Grounding Points | 12 | MO | ||
| CNRSE NSA | Facility Investment | Inspection, Testing, and Certification Program | A001 | A001BE | 1502000 | 3.4.4 | Truck Scales | 12 | MO | ||
| CNRSE NSA | Facility Investment | Inspection, Testing, and Certification Program | A001 | A001BF | 1502000 | 3.4.5 | Vertical Transportation Equipment (VTE) | 12 | MO | ||
| CNRSE NSA | Facility Investment | Other Recurring Services | A001 | A001BG | 1502000 | 3.5.1 | Boiler Water Testing and Treatment Services | 12 | MO | ||
| CNRSE NSA | Facility Investment | Other Recurring Services | A001 | A001BH | 1502000 | 3.5.2 | Exhaust Hoods and Ducts | 12 | MO | ||
| CNRSE NSA | Facility Investment | Other Recurring Services | A001 | A001BJ | 1502000 | 3.5.3 | Facility Related Control Systems (FRCS) Mainteannce and Monitoring | 12 | MO | ||
| CNRSE NSA | Facility Investment | Other Recurring Services | A001 | A001BK | 1502000 | 3.5.4 | HVAC Seasonal Start-Up and Shutdown | 12 | MO | ||
| CNRSE NSA | Facility Investment | Other Recurring Services | A001 | A001BL | 1502000 | 3.5.5 | HVAC Water Testing and Treatment Services | 12 | MO | ||
| CNRSE NSA | Facility Investment | Other Recurring Services | A001 | A001BM | 1502000 | 3.5.6 | HVAC Condenser Tube Inspection | 12 | MO | ||
| CNRSE NSA | Facility Investment | Other Recurring Services | A001 | A001BN | 1502000 | 3.5.7 | Oil/Water Separators and Grease Traps | 12 | MO | ||
| CNRSE NSA | Facility Investment | Other Recurring Services | A001 | A001BP | 1502000 | 3.5.8 | Roofing Systems | 12 | MO | ||
| CNRSE NSA | Facility Investment | Other Recurring Services | A001 | A001BQ | 1502000 | 3.5.9 | Traffic Control Devices | 12 | MO | ||
| CNRSE NSA | Facility Investment | Other Recurring Services | A001 | A001BR | 1502000 | 3.5.10 | Winterization/De-winterization | 12 | MO | ||
| CNRSE NSA | Custodial | Recurring Work | A001 | A001BS | 1503010 | 3.1 | Scheduled Services (Standard Service) | 12 | MO | ||
| CNRSE NSA | Custodial | Recurring Work | A001 | A001BT | 1503010 | 3.1 | Scheduled Services (Prestige Service) | 12 | MO | ||
| CNRSE NSA | Custodial | Recurring Work | A001 | A001BU | 1503010 | 3.1 | Scheduled Services (Child Youth Programs) | 12 | MO | ||
| CNRSE NSA | Custodial | Recurring Work | A001 | A001BV | 1503010 | 3.1 | Scheduled Services (Health Care Standard) | 12 | MO | ||
| CNRSE NSA | Custodial | Recurring Work | A001 | A001BW | 1503010 | 3.2 | Custodial Service Orders | 52 | EA | ||
| CNRSE NSA | Pest Control | Recurring Work | A001 | A001BX | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| CNRSE NSA | Pest Control | Recurring Work | A001 | A001BY | 1503020 | 3.2 | Pest Control Service Orders | 200 | EA | ||
| CNRSE NSA | Pest Control | Recurring Work | A001 | A001BZ | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| CNRSE NSA | Integrated Solid Waste Management | Recurring Work | A001 | A001CA | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| CNRSE NSA | Integrated Solid Waste Management | Recurring Work | A001 | A001CB | 1503030 | 3.5 | NSA Compactors and Compactor Containers | 12 | MO | ||
| CNRSE NSA | Integrated Solid Waste Management | Recurring Work | A001 | A001CC | 1503030 | 3.6 | NSA Special Event Solid Waste Services | 12 | MO | ||
| CNRSE NSA | Integrated Solid Waste Management | Recurring Work | A001 | A001CD | 1503030 | 3.7 | NSA Dog Park Waste | 12 | MO | ||
| CNRSE NSA | Integrated Solid Waste Management | Recurring Work | A001 | A001CE | 1503030 | 3.8 | NSA Installation Area Waste | 12 | MO | ||
| CNRSE NSA | Other (Splash Park) | Recurring Work | A001 | A001CF | 1503040 | 3.1-3.4 | Pool Maintenance | 12 | MO | ||
| CNRSE NSA | Other (Splash Park) | Recurring Work | A001 | A001CG | 1503040 | 3.5 | Pool Water Treatment | 12 | MO | ||
| CNRSE NSA | Grounds Maintenance | Recurring Work | A001 | A001CH | 1503050 | 3.1 | Improved Grounds (Standard Service) | 12 | MO | ||
| CNRSE NSA | Grounds Maintenance | Recurring Work | A001 | A001CJ | 1503050 | 3.1 | Improved Grounds (Prestige Service) | 12 | MO | ||
| CNRSE NSA | Grounds Maintenance | Recurring Work | A001 | A001CK | 1503050 | 3.2 | Operational Areas | 12 | MO | ||
| CNRSE NSA | Grounds Maintenance | Recurring Work | A001 | A001CL | 1503050 | 3.3 | Storm Drainage Systems | 12 | MO | ||
| CNRSE NSA | Grounds Maintenance | Recurring Work | A001 | A001CM | 1503050 | 3.4 | Levee Maintenance | 12 | MO | ||
| CNRSE NSA | Grounds Maintenance | Recurring Work | A001 | A001CN | 1503050 | 3.6 | Grounds Maintenance Service Orders | 48 | EA | ||
| CNRSE NSA | Pavement Clearance | Recurring Work | A001 | A001CP | 1503060 | 3.1 | Pavement Sweeping Services - Roads and Other Paved Surfaces | 12 | MO | ||
| CNRSE NSA | Pavement Clearance | Recurring Work | A001 | A001CQ | 1503060 | 3.2 | Snow and Ice Removal Services | 12 | MO | ||
| CNRSE NSA | Utilities Management | Recurring Work | A001 | A001CR | 1601000 | 3.1 | Utility Operations Support | 12 | MO | ||
| CNRSE NSA | Utilities Management | Recurring Work | A001 | A001CS | 1601000 | 3.2 | Utility Infrastructure Condition Assessment Program (UICAP) Support | 12 | MO | ||
| CNRSE NSA | Utilities Management | Recurring Work | A001 | A001CT | 1601000 | 3.3 | Operation and Management of Facility Related Control Systems (FRCS) | 12 | MO | ||
| CNRSE NSA | Utilities Management | Recurring Work | A001 | A001CU | 1601000 | 3.4 | NAVFAC Maximo Data Entry (Utility Systems) | 12 | MO | ||
| CNRSE NSA | Electrical | Electrical | A001 | A001CV | 1602000 | 3.1 | Operate Electrical Power Transmission and Distribution Systems | 12 | MO | ||
| CNRSE NSA | Electrical | Electrical | A001 | A001CW | 1602000 | 3.2 | Test and Operate Auxiliary Electrical Power Generators | 12 | MO | ||
| CNRSE NSA | Electrical | Utility E/U/R Work | A001 | A001CX | 1602000 | 3.3.1 | Emergency Work | 25 | EA | ||
| CNRSE NSA | Electrical | Utility E/U/R Work | A001 | A001CY | 1602000 | 3.3.2 | Urgent Work | 12 | EA | ||
| CNRSE NSA | Electrical | Utility E/U/R Work | A001 | A001CZ | 1602000 | 3.3.3 | Routine Work | 55 | EA | ||
| CNRSE NSA | Electrical | Preventive Maintenance | A001 | A001DA | 1602000 | 3.4 | Electrical Transmission and Distribution System Preventive Maintenance Program | 12 | MO | ||
| CNRSE NSA | Wastewater | Recurring Work | A001 | A001DB | 1604000 | 3.1 | Operation - Minimum Operator Attendance | 12 | MO | ||
| CNRSE NSA | Wastewater | Utility E/U/R Work | A001 | A001DC | 1604000 | 3.2.1 | Emergency Work | 12 | EA | ||
| CNRSE NSA | Wastewater | Utility E/U/R Work | A001 | A001DD | 1604000 | 3.2.2 | Urgent Work | 2 | EA | ||
| CNRSE NSA | Wastewater | Utility E/U/R Work | A001 | A001DE | 1604000 | 3.2.3 | Routine Work | 35 | EA | ||
| CNRSE NSA | Wastewater | Preventive Maintenance | A001 | A001DF | 1604000 | 3.3 | Wastewater Collection System Preventative Maintenance Program | 12 | MO | ||
| CNRSE NSA | Wastewater | Other Recurring Services | A001 | A001DG | 1604000 | 3.4 | Cleaning of Sewer Pipeline and Wet Well Services | 12 | MO | ||
| CNRSE NSA | Water | Recurring Work | A001 | A001DH | 1606000 | 3.1 | Operation | 12 | MO | ||
| CNRSE NSA | Water | Integrated Maintenance Program (IMP) | A001 | A001DJ | 1606000 | 3.2 | Raw Water Supply, Treatment Plant and Distribution System Integrated Maintenance Program | 12 | MO | ||
| CNRSE NSA | Water | Inspection, Testing and Certification | A001 | A001DK | 1606000 | 3.3 | Inspection, Testing and Certification of Backflow Prevention Devices | 12 | MO | ||
| CNRSE NSA | Water | Other Recurring Services | A001 | A001DL | 1606000 | 3.4 | Calibrate Meters | 12 | MO | ||
| CNRSE NSA | BSVE | Operations | A001 | A001DM | 1700000 | 3.1.2 | Fuel Delivery Service and Fuel Program Requirements | 12 | MO | ||
| CNRSE NSA | BSVE | Support Services | A001 | A001DN | 1700000 | 3.2.1 | Dispatching Service | 12 | MO | ||
| CNRSE NSA | BSVE | Support Services | A001 | A001DP | 1700000 | 3.2.2 | Received, Replaced and/or Reassigned GSA Vehicles and Equipment | 12 | MO | ||
| CNRSE NSA | BSVE | Maintenance | A001 | A001DQ | 1700000 | 3.3.1 | New and Reassigned Used Vehicle Service | 12 | MO | ||
| CNRSE NSA | BSVE | Maintenance | A001 | A001DR | 1700000 | 3.3.2 | Inspection, Testing and Certification of MHE | 12 | MO | ||
| CNRSE NSA | BSVE | Preventive Maintenance | A001 | A001DS | 1700000 | 3.3.3 | Preventive Maintenance Inspections | 12 | MO | ||
| CNRSE NSA | BSVE | Maintenance | A001 | A001DT | 1700000 | 3.3.4 | BSVE Repair | 12 | MO | ||
| CNRSE NSA | BSVE | Maintenance | A001 | A001DU | 1700000 | 3.3.5 | BSVE Trouble Calls | 42 | EA | ||
| CNRSE NSA | Environmental | Recurring Work | A001 | A001DV | 1800000 | 3.1 | Sampling, Field Testing and Laboratory Services | 12 | MO | ||
| CNRSE NSA | Environmental | Recurring Work | A001 | A001DW | 1800000 | 3.2 | Used Oil Management Services | 12 | MO | ||
| CNRSE NSA | Environmental | Recurring Work | A001 | A001DX | 1800000 | 3.3 | Discarded Hazardous Material/Hazardous Waste/Other Regulated Waste (HM/HW/ORW) Management | 12 | MO | ||
| CNRSE NSA | Environmental | Recurring Work | A001 | A001DY | 1800000 | 3.4 | Oil and Hazardous Substance Spill Response and Cleanup Ashore | 12 | MO | ||
| CNRSE NSA | Environmental | Recurring Work | A001 | A001DZ | 1800000 | 3.5 | Storm Water Monitoring | 12 | MO | ||
| DCAA | Custodial | Recurring Work | A002 | A002AA | 1503010 | 3.1 | Scheduled Services (Standard Service) | 12 | MO | ||
| DCAA | Custodial | Recurring Work | A002 | A002AB | 1503010 | 3.2 | Custodial Service Orders | 1 | EA | ||
| DCAA | Pest Control | Recurring Work | A002 | A002AC | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| DCAA | Pest Control | Recurring Work | A002 | A002AD | 1503020 | 3.2 | Pest Control Service Orders | 1 | EA | ||
| DCAA | Pest Control | Recurring Work | A002 | A002AE | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| DCAA | Integrated Solid Waste Management | Recurring Work | A002 | A002AF | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| AFTAC | Facility Investment | Integrated Maintenance Program (IMP) | A003 | A003AA | 1502000 | 3.3.2 | HVAC and Refrigeration Systems | 12 | MO | ||
| AFTAC | Facility Investment | Integrated Maintenance Program (IMP) | A003 | A003AB | 1502000 | 3.3.3 | Vertical Transportation Equipment (VTE) | 12 | MO | ||
| AFTAC | Facility Investment | Inspection, Testing, and Certification Program | A003 | A003AC | 1502000 | 3.4.5 | Vertical Transportation Equipment (VTE) | 12 | MO | ||
| AFTAC | Custodial | Recurring Work | A003 | A003AD | 1503010 | 3.1 | Scheduled Services (Standard Service) | 12 | MO | ||
| AFTAC | Custodial | Recurring Work | A003 | A003AE | 1503010 | 3.2 | Custodial Service Orders | 2 | EA | ||
| AFTAC | Pest Control | Recurring Work | A003 | A003AF | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| AFTAC | Pest Control | Recurring Work | A003 | A003AG | 1503020 | 3.2 | Pest Control Service Orders | 1 | EA | ||
| AFTAC | Pest Control | Recurring Work | A003 | A003AH | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| AFTAC | Integrated Solid Waste Management | Recurring Work | A003 | A003AJ | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| DECA | Facility Investment | Integrated Maintenance Program (IMP) | A004 | A004AA | 1502000 | 3.3.1 | Fire Protection Systems | 12 | MO | ||
| DECA | Facility Investment | Inspection, Testing, and Certification Program | A004 | A004AB | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO | ||
| DECA | Pest Control | Recurring Work | A004 | A004AC | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| DECA | Pest Control | Recurring Work | A004 | A004AD | 1503020 | 3.2 | Pest Control Service Orders | 1 | EA | ||
| DECA | Pest Control | Recurring Work | A004 | A004AE | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| DECA | Integrated Solid Waste Management | Recurring Work | A004 | A004AF | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| DECA | Grounds Maintenance | Recurring Work | A004 | A004AG | 1503050 | 3.1 | Improved Grounds (Standard Service) | 12 | MO | ||
| LCC | Facility Investment | E/U/R Work | A005 | A005AA | 1502000 | 3.1.1 | Emergency Work | 20 | EA | ||
| LCC | Facility Investment | E/U/R Work | A005 | A005AB | 1502000 | 3.1.2 | Urgent Work | 28 | EA | ||
| LCC | Facility Investment | E/U/R Work | A005 | A005AC | 1502000 | 3.1.3 | Routine Work | 210 | EA | ||
| LCC | Facility Investment | Preventive Maintenance | A005 | A005AD | 1502000 | 3.2.1 | Auxiliary Generators | 12 | MO | ||
| LCC | Facility Investment | Preventive Maintenance | A005 | A005AE | 1502000 | 3.2.4 | Compressed Air Systems | 12 | MO | ||
| LCC | Facility Investment | Preventive Maintenance | A005 | A005AF | 1502000 | 3.2.6 | Emergency Exit and Exterior Lighting Systems | 12 | MO | ||
| LCC | Facility Investment | Preventive Maintenance | A005 | A005AG | 1502000 | 3.2.8 | HVAC and Refrigeration Systems | 12 | MO | ||
| LCC | Facility Investment | Preventive Maintenance | A005 | A005AH | 1502000 | 3.2.10 | Overhead and Sliding Doors | 12 | MO | ||
| LCC | Facility Investment | Preventive Maintenance | A005 | A005AJ | 1502000 | 3.2.16 | Uninterruptible Power Source (UPS) Systems | 12 | MO | ||
| LCC | Facility Investment | Preventive Maintenance | A005 | A005AK | 1502000 | 3.2.17 | Weight Handling Equipment (WHE) | 12 | MO | ||
| LCC | Facility Investment | Integrated Maintenance Program (IMP) | A005 | A005AL | 1502000 | 3.3.1 | Fire Protection Systems | 12 | MO | ||
| LCC | Facility Investment | Integrated Maintenance Program (IMP) | A005 | A005AM | 1502000 | 3.3.2 | HVAC and Refrigeration Systems | 12 | MO | ||
| LCC | Facility Investment | Integrated Maintenance Program (IMP) | A005 | A005AN | 1502000 | 3.3.3 | Vertical Transportation Equipment (VTE) | 12 | MO | ||
| LCC | Facility Investment | Inspection, Testing, and Certification Program | A005 | A005AP | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO | ||
| LCC | Facility Investment | Inspection, Testing, and Certification Program | A005 | A005AQ | 1502000 | 3.4.5 | Vertical Transportation Equipment (VTE) | 12 | MO | ||
| LCC | Facility Investment | Inspection, Testing, and Certification Program | A005 | A005AR | 1502000 | 3.4.6 | Weight Handling Equipment (WHE) | 12 | MO | ||
| LCC | Facility Investment | Other Recurring Services | A005 | A005AS | 1502000 | 3.5.5 | HVAC Water Testing and Treatment Services | 12 | MO | ||
| LCC | Facility Investment | Other Recurring Services | A005 | A005AT | 1502000 | 3.5.7 | Oil/Water Separators and Grease Traps | 12 | MO | ||
| LCC | Custodial | Recurring Work | A005 | A005AU | 1503010 | 3.1 | Scheduled Services (Standard Service) | 12 | MO | ||
| LCC | Custodial | Recurring Work | A005 | A005AV | 1503010 | 3.1 | Scheduled Services (Prestige Service) | 12 | MO | ||
| LCC | Custodial | Recurring Work | A005 | A005AW | 1503010 | 3.2 | Custodial Service Orders | 4 | EA | ||
| LCC | Pest Control | Recurring Work | A005 | A005AX | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| LCC | Pest Control | Recurring Work | A005 | A005AY | 1503020 | 3.2 | Pest Control Service Orders | 1 | EA | ||
| LCC | Pest Control | Recurring Work | A005 | A005AZ | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| LCC | Integrated Solid Waste Management | Recurring Work | A005 | A005BA | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| LCC | Grounds Maintenance | Recurring Work | A005 | A005BB | 1503050 | 3.1 | Improved Grounds (Standard Service) | 12 | MO | ||
| LCC | Grounds Maintenance | Recurring Work | A005 | A005BC | 1503050 | 3.2 | Operational Areas | 12 | MO | ||
| LCC | Utilities Management | Utility Operations Support | A005 | A005BD | 1601000 | 3.1.5 | Utility Escort Services | 12 | MO | ||
| LCC | Utilities Management | Utility Operations Support | A005 | A005BE | 1601000 | 3.1.6 | Utility Locate Services | 12 | MO | ||
| LCC | Utilities Management | Recurring Work | A005 | A005BF | 1601000 | 3.2 | Utility Infrastructure Condition Assessment Program (UICAP) Support | 12 | MO | ||
| LCC | Electrical | Utility E/U/R Work | A005 | A005BG | 1602000 | 3.3.1 | Emergency Work | 13 | EA | ||
| LCC | Electrical | Utility E/U/R Work | A005 | A005BH | 1602000 | 3.3.2 | Urgent Work | 2 | EA | ||
| LCC | Electrical | Utility E/U/R Work | A005 | A005BJ | 1602000 | 3.3.3 | Routine Work | 46 | EA | ||
| LCC | Electrical | Preventive Maintenance | A005 | A005BK | 1602000 | 3.4 | Electrical Transmission and Distribution System Preventive Maintenance Program | 12 | MO | ||
| LCC | BSVE | Maintenance | A005 | A005BL | 1700000 | 3.3.2 | Inspection, Testing and Certification of MHE | 12 | MO | ||
| LCC | BSVE | Maintenance | A005 | A005BM | 1700000 | 3.3.4 | BSVE Repair | 12 | MO | ||
| LCC | BSVE | Maintenance | A005 | A005BN | 1700000 | 3.3.5 | BSVE Trouble Calls | 16 | EA | ||
| MCRC | Facility Investment | E/U/R Work | A006 | A006AA | 1502000 | 3.1.1 | Emergency Work | 12 | EA | ||
| MCRC | Facility Investment | E/U/R Work | A006 | A006AB | 1502000 | 3.1.2 | Urgent Work | 12 | EA | ||
| MCRC | Facility Investment | E/U/R Work | A006 | A006AC | 1502000 | 3.1.3 | Routine Work | 41 | EA | ||
| MCRC | Facility Investment | Preventive Maintenance | A006 | A006AD | 1502000 | 3.2.2 | Boiler and Unfired Pressure Vessel (UPV) Systems and Equipment | 12 | MO | ||
| MCRC | Facility Investment | Preventive Maintenance | A006 | A006AE | 1502000 | 3.2.4 | Compressed Air Systems | 12 | MO | ||
| MCRC | Facility Investment | Preventive Maintenance | A006 | A006AF | 1502000 | 3.2.6 | Emergency Exit and Exterior Lighting Systems | 12 | MO | ||
| MCRC | Facility Investment | Preventive Maintenance | A006 | A006AG | 1502000 | 3.2.8 | HVAC and Refrigeration Systems | 12 | MO | ||
| MCRC | Facility Investment | Preventive Maintenance | A006 | A006AH | 1502000 | 3.2.9 | Lightning Arrestors and Grounding Devices | 12 | MO | ||
| MCRC | Facility Investment | Preventive Maintenance | A006 | A006AJ | 1502000 | 3.2.10 | Overhead and Sliding Doors | 12 | MO | ||
| MCRC | Facility Investment | Preventive Maintenance | A006 | A006AK | 1502000 | 3.2.14 | Tankless Water Heaters | 12 | MO | ||
| MCRC | Facility Investment | Integrated Maintenance Program (IMP) | A006 | A006AL | 1502000 | 3.3.1 | Fire Protection Systems | 12 | MO | ||
| MCRC | Facility Investment | Integrated Maintenance Program (IMP) | A006 | A006AM | 1502000 | 3.3.2 | HVAC and Refrigeration Systems | 12 | MO | ||
| MCRC | Facility Investment | Inspection, Testing, and Certification Program | A006 | A006AN | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO | ||
| MCRC | Facility Investment | Inspection, Testing, and Certification Program | A006 | A006AP | 1502000 | 3.4.2 | Boilers and UPVs Inspecion, Testing and Certification | 12 | MO | ||
| MCRC | Facility Investment | Inspection, Testing, and Certification Program | A006 | A006AQ | 1502000 | 3.4.3 | Test Grounding Points | 12 | MO | ||
| MCRC | Facility Investment | Other Recurring Services | A006 | A006AR | 1502000 | 3.5.3 | Facility Related Control Systems (FRCS) Mainteannce and Monitoring | 12 | MO | ||
| MCRC | Custodial | Recurring Work | A006 | A006AS | 1503010 | 3.1 | Scheduled Services (Standard Service) | 12 | MO | ||
| MCRC | Custodial | Recurring Work | A006 | A006AT | 1503010 | 3.2 | Custodial Service Orders | 4 | EA | ||
| MCRC | Pest Control | Recurring Work | A006 | A006AU | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| MCRC | Pest Control | Recurring Work | A006 | A006AV | 1503020 | 3.2 | Pest Control Service Orders | 1 | EA | ||
| MCRC | Pest Control | Recurring Work | A006 | A006AW | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| MCRC | Integrated Solid Waste Management | Recurring Work | A006 | A006AX | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| MCRC | Grounds Maintenance | Recurring Work | A006 | A006AY | 1503050 | 3.1 | Improved Grounds (Standard Service) | 12 | MO | ||
| MCRC | Grounds Maintenance | Recurring Work | A006 | A006AZ | 1503050 | 3.5 | Bio-Retention Pond Maintenance | 12 | MO | ||
| MWR | BSVE | Operations | A007 | A007AA | 1700000 | 3.1.2 | Fuel Delivery Service and Fuel Program Requirements | 12 | MO | ||
| DHA | Facility Investment | E/U/R Work | A008 | A008AA | 1502000 | 3.1.1 | Emergency Work | 12 | EA | ||
| DHA | Facility Investment | E/U/R Work | A008 | A008AB | 1502000 | 3.1.2 | Urgent Work | 12 | EA | ||
| DHA | Facility Investment | E/U/R Work | A008 | A008AC | 1502000 | 3.1.3 | Routine Work | 79 | EA | ||
| DHA | Facility Investment | Preventive Maintenance | A008 | A008AD | 1502000 | 3.2.1 | Auxiliary Generators | 12 | MO | ||
| DHA | Facility Investment | Preventive Maintenance | A008 | A008AE | 1502000 | 3.2.2 | Boiler and Unfired Pressure Vessel (UPV) Systems and Equipment | 12 | MO | ||
| DHA | Facility Investment | Preventive Maintenance | A008 | A008AF | 1502000 | 3.2.4 | Compressed Air Systems | 12 | MO | ||
| DHA | Facility Investment | Preventive Maintenance | A008 | A008AG | 1502000 | 3.2.6 | Emergency Exit and Exterior Lighting Systems | 12 | MO | ||
| DHA | Facility Investment | Preventive Maintenance | A008 | A008AH | 1502000 | 3.2.8 | HVAC and Refrigeration Systems | 12 | MO | ||
| DHA | Facility Investment | Integrated Maintenance Program (IMP) | A008 | A008AJ | 1502000 | 3.3.1 | Fire Protection Systems | 12 | MO | ||
| DHA | Facility Investment | Integrated Maintenance Program (IMP) | A008 | A008AK | 1502000 | 3.3.2 | HVAC and Refrigeration Systems | 12 | MO | ||
| DHA | Facility Investment | Inspection, Testing, and Certification Program | A008 | A008AL | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO | ||
| DHA | Facility Investment | Inspection, Testing, and Certification Program | A008 | A008AM | 1502000 | 3.4.2 | Boilers and UPVs Inspecion, Testing and Certification | 12 | MO | ||
| DHA | Facility Investment | Other Recurring Services | A008 | A008AN | 1502000 | 3.5.1 | Boiler Water Testing and Treatment Services | 12 | MO | ||
| DHA | Facility Investment | Other Recurring Services | A008 | A008AP | 1502000 | 3.5.3 | Facility Related Control Systems (FRCS) Mainteannce and Monitoring | 12 | MO | ||
| DHA | Facility Investment | Other Recurring Services | A008 | A008AQ | 1502000 | 3.5.5 | HVAC Water Testing and Treatment Services | 12 | MO | ||
| DHA | Facility Investment | Other Recurring Services | A008 | A008AR | 1502000 | 3.5.8 | Roofing Systems | 12 | MO | ||
| DHA | Custodial | Recurring Work | A008 | A008AS | 1503010 | 3.1 | Scheduled Services (Health Care Standard) | 12 | MO | ||
| DHA | Custodial | Recurring Work | A008 | A008AT | 1503010 | 3.2 | Custodial Service Orders | 16 | EA | ||
| DHA | Pest Control | Recurring Work | A008 | A008AU | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| DHA | Pest Control | Recurring Work | A008 | A008AV | 1503020 | 3.2 | Pest Control Service Orders | 20 | EA | ||
| DHA | Pest Control | Recurring Work | A008 | A008AW | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| DHA | Integrated Solid Waste Management | Recurring Work | A008 | A008AX | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| NEXCOM | Pest Control | Recurring Work | A009 | A009AA | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| NEXCOM | Pest Control | Recurring Work | A009 | A009AB | 1503020 | 3.2 | Pest Control Service Orders | 20 | EA | ||
| NEXCOM | Pest Control | Recurring Work | A009 | A009AC | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| NEXCOM | Integrated Solid Waste Management | Recurring Work | A009 | A009AD | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| NPC | BSVE | Operations | A010 | A010AA | 1700000 | 3.1.1 | Scheduled Shuttle BusService | 12 | MO | ||
| USAR 81ST | Facility Investment | E/U/R Work | A011 | A011AA | 1502000 | 3.1.1 | Emergency Work | 12 | EA | ||
| USAR 81ST | Facility Investment | E/U/R Work | A011 | A011AB | 1502000 | 3.1.2 | Urgent Work | 12 | EA | ||
| USAR 81ST | Facility Investment | E/U/R Work | A011 | A011AC | 1502000 | 3.1.3 | Routine Work | 63 | EA | ||
| USAR 81ST | Facility Investment | Preventive Maintenance | A011 | A011AD | 1502000 | 3.2.2 | Boiler and Unfired Pressure Vessel (UPV) Systems and Equipment | 12 | MO | ||
| USAR 81ST | Facility Investment | Preventive Maintenance | A011 | A011AE | 1502000 | 3.2.4 | Compressed Air Systems | 12 | MO | ||
| USAR 81ST | Facility Investment | Preventive Maintenance | A011 | A011AF | 1502000 | 3.2.6 | Emergency Exit and Exterior Lighting Systems | 12 | MO | ||
| USAR 81ST | Facility Investment | Preventive Maintenance | A011 | A011AG | 1502000 | 3.2.8 | HVAC and Refrigeration Systems | 12 | MO | ||
| USAR 81ST | Facility Investment | Integrated Maintenance Program (IMP) | A011 | A011AH | 1502000 | 3.3.1 | Fire Protection Systems | 12 | MO | ||
| USAR 81ST | Facility Investment | Integrated Maintenance Program (IMP) | A011 | A011AJ | 1502000 | 3.3.2 | HVAC and Refrigeration Systems | 12 | MO | ||
| USAR 81ST | Facility Investment | Inspection, Testing, and Certification Program | A011 | A011AK | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO | ||
| USAR 81ST | Facility Investment | Inspection, Testing, and Certification Program | A011 | A011AL | 1502000 | 3.4.2 | Boilers and UPVs Inspecion, Testing and Certification | 12 | MO | ||
| USAR 81ST | Facility Investment | Other Recurring Services | A011 | A011AM | 1502000 | 3.5.1 | Boiler Water Testing and Treatment Services | 12 | MO | ||
| USAR 81ST | Facility Investment | Other Recurring Services | A011 | A011AN | 1502000 | 3.5.3 | Facility Related Control Systems (FRCS) Mainteannce and Monitoring | 12 | MO | ||
| USAR 81ST | Facility Investment | Other Recurring Services | A011 | A011AP | 1502000 | 3.5.4 | HVAC Seasonal Start-Up and Shutdown | 12 | MO | ||
| USAR 81ST | Facility Investment | Other Recurring Services | A011 | A011AQ | 1502000 | 3.5.5 | HVAC Water Testing and Treatment Services | 12 | MO | ||
| USAR 81ST | Facility Investment | Other Recurring Services | A011 | A011AR | 1502000 | 3.5.8 | Roofing Systems | 12 | MO | ||
| USAR 81ST | Pest Control | Recurring Work | A011 | A011AS | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| USAR 81ST | Pest Control | Recurring Work | A011 | A011AT | 1503020 | 3.2 | Pest Control Service Orders | 1 | EA | ||
| USAR 81ST | Pest Control | Recurring Work | A011 | A011AU | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| USAR 81ST | Integrated Solid Waste Management | Recurring Work | A011 | A011AV | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| USAR 81ST | Grounds Maintenance | Recurring Work | A011 | A011AW | 1503050 | 3.1 | Improved Grounds (Standard Service) | 12 | MO | ||
| USACE 787 | Facility Investment | E/U/R Work | A012 | A012AA | 1502000 | 3.1.1 | Emergency Work | 15 | EA | ||
| USACE 787 | Facility Investment | E/U/R Work | A012 | A012AB | 1502000 | 3.1.2 | Urgent Work | 15 | EA | ||
| USACE 787 | Facility Investment | E/U/R Work | A012 | A012AC | 1502000 | 3.1.3 | Routine Work | 75 | EA | ||
| USACE 787 | Facility Investment | Preventive Maintenance | A012 | A012AD | 1502000 | 3.2.2 | Boiler and Unfired Pressure Vessel (UPV) Systems and Equipment | 12 | MO | ||
| USACE 787 | Facility Investment | Preventive Maintenance | A012 | A012AE | 1502000 | 3.2.6 | Emergency Exit and Exterior Lighting Systems | 12 | MO | ||
| USACE 787 | Facility Investment | Preventive Maintenance | A012 | A012AF | 1502000 | 3.2.8 | HVAC and Refrigeration Systems | 12 | MO | ||
| USACE 787 | Facility Investment | Preventive Maintenance | A012 | A012AG | 1502000 | 3.2.10 | Overhead and Sliding Doors | 12 | MO | ||
| USACE 787 | Facility Investment | Integrated Maintenance Program (IMP) | A012 | A012AH | 1502000 | 3.3.1 | Fire Protection Systems | 12 | MO | ||
| USACE 787 | Facility Investment | Integrated Maintenance Program (IMP) | A012 | A012AJ | 1502000 | 3.3.2 | HVAC and Refrigeration Systems | 12 | MO | ||
| USACE 787 | Facility Investment | Inspection, Testing, and Certification Program | A012 | A012AK | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO | ||
| USACE 787 | Facility Investment | Inspection, Testing, and Certification Program | A012 | A012AL | 1502000 | 3.4.2 | Boilers and UPVs Inspecion, Testing and Certification | 12 | MO | ||
| USACE 787 | Facility Investment | Other Recurring Services | A012 | A012AM | 1502000 | 3.5.1 | Boiler Water Testing and Treatment Services | 12 | MO | ||
| USACE 787 | Facility Investment | Other Recurring Services | A012 | A012AN | 1502000 | 3.5.3 | Facility Related Control Systems (FRCS) Mainteannce and Monitoring | 12 | MO | ||
| USACE 787 | Facility Investment | Other Recurring Services | A012 | A012AP | 1502000 | 3.5.5 | HVAC Water Testing and Treatment Services | 12 | MO | ||
| USACE 787 | Facility Investment | Other Recurring Services | A012 | A012AQ | 1502000 | 3.5.8 | Roofing Systems | 12 | MO | ||
| USACE 787 | Custodial | Recurring Work | A012 | A012AR | 1503010 | 3.1 | Scheduled Services (Standard Service) | 12 | MO | ||
| USACE 787 | Custodial | Recurring Work | A012 | A012AS | 1503010 | 3.1 | Scheduled Services (Prestige Service) | 12 | MO | ||
| USACE 787 | Custodial | Recurring Work | A012 | A012AT | 1503010 | 3.2 | Custodial Service Orders | 1 | EA | ||
| USACE 787 | Pest Control | Recurring Work | A012 | A012AU | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| USACE 787 | Pest Control | Recurring Work | A012 | A012AV | 1503020 | 3.2 | Pest Control Service Orders | 1 | EA | ||
| USACE 787 | Pest Control | Recurring Work | A012 | A012AW | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| USACE 787 | Integrated Solid Waste Management | Recurring Work | A012 | A012AX | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| USACE 787 | Grounds Maintenance | Recurring Work | A012 | A012AY | 1503050 | 3.1 | Improved Grounds (Prestige Service) | 12 | MO | ||
| USCG | Custodial | Recurring Work | A013 | A013AA | 1503010 | 3.1 | Scheduled Services (Standard Service) | 12 | MO | ||
| USCG | Custodial | Recurring Work | A013 | A013AB | 1503010 | 3.2 | Custodial Service Orders | 2 | EA | ||
| USCG | Pest Control | Recurring Work | A013 | A013AC | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| USCG | Pest Control | Recurring Work | A013 | A013AD | 1503020 | 3.2 | Pest Control Service Orders | 1 | EA | ||
| USCG | Pest Control | Recurring Work | A013 | A013AE | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| USCG | Integrated Solid Waste Management | Recurring Work | A013 | A013AF | 1503030 | 3.1-3.4 | Recurring Workp | 12 | MO | ||
| USACE MOBILE | Custodial | Recurring Work | A014 | A014AA | 1503010 | 3.1 | Scheduled Services (Standard Service) | 12 | MO | ||
| USACE MOBILE | Custodial | Recurring Work | A014 | A014AB | 1503010 | 3.2 | Custodial Service Orders | 1 | EA | ||
| USACE MOBILE | Pest Control | Recurring Work | A014 | A014AC | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| USACE MOBILE | Pest Control | Recurring Work | A014 | A014AD | 1503020 | 3.2 | Pest Control Service Orders | 1 | EA | ||
| USACE MOBILE | Pest Control | Recurring Work | A014 | A014AE | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| NGIS | Facility Investment | E/U/R Work | A015 | A015AA | 1502000 | 3.1.1 | Emergency Work | 10 | EA | ||
| NGIS | Facility Investment | E/U/R Work | A015 | A015AB | 1502000 | 3.1.2 | Urgent Work | 10 | EA | ||
| NGIS | Facility Investment | E/U/R Work | A015 | A015AC | 1502000 | 3.1.3 | Routine Work | 286 | EA | ||
| NGIS | Facility Investment | Preventive Maintenance | A015 | A015AD | 1502000 | 3.2.2 | Boiler and Unfired Pressure Vessel (UPV) Systems and Equipment | 12 | MO | ||
| NGIS | Facility Investment | Preventive Maintenance | A015 | A015AE | 1502000 | 3.2.6 | Emergency Exit and Exterior Lighting Systems | 12 | MO | ||
| NGIS | Facility Investment | Preventive Maintenance | A015 | A015AF | 1502000 | 3.2.8 | HVAC and Refrigeration Systems | 12 | MO | ||
| NGIS | Facility Investment | Preventive Maintenance | A015 | A015AG | 1502000 | 3.2.11 | PTAC Units | 12 | MO | ||
| NGIS | Facility Investment | Preventive Maintenance | A015 | A015AH | 1502000 | 3.2.14 | Tankless Water Heaters | 12 | MO | ||
| NGIS | Facility Investment | Integrated Maintenance Program (IMP) | A015 | A015AJ | 1502000 | 3.3.1 | Fire Protection Systems | 12 | MO | ||
| NGIS | Facility Investment | Integrated Maintenance Program (IMP) | A015 | A015AK | 1502000 | 3.3.2 | HVAC and Refrigeration Systems | 12 | MO | ||
| NGIS | Facility Investment | Integrated Maintenance Program (IMP) | A015 | A015AL | 1502000 | 3.3.3 | Vertical Transportation Equipment (VTE) | 12 | MO | ||
| NGIS | Facility Investment | Inspection, Testing, and Certification Program | A015 | A015AM | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO | ||
| NGIS | Facility Investment | Inspection, Testing, and Certification Program | A015 | A015AN | 1502000 | 3.4.2 | Boilers and UPVs Inspecion, Testing and Certification | 12 | MO | ||
| NGIS | Facility Investment | Inspection, Testing, and Certification Program | A015 | A015AP | 1502000 | 3.4.5 | Vertical Transportation Equipment (VTE) | 12 | MO | ||
| NGIS | Facility Investment | Other Recurring Services | A015 | A015AQ | 1502000 | 3.5.7 | Oil/Water Separators and Grease Traps | 12 | MO | ||
| NGIS | Facility Investment | Other Recurring Services | A015 | A015AR | 1502000 | 3.5.8 | Roofing Systems | 12 | MO | ||
| NGIS | Pest Control | Recurring Work | A015 | A015AS | 1503020 | 3.1 | Scheduled Pest Control Services | 12 | MO | ||
| NGIS | Pest Control | Recurring Work | A015 | A015AT | 1503020 | 3.2 | Pest Control Service Orders | 20 | EA | ||
| NGIS | Pest Control | Recurring Work | A015 | A015AU | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | ||
| NGIS | Integrated Solid Waste Management | Recurring Work | A015 | A015AV | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| NGIS | Grounds Maintenance | Recurring Work | A015 | A015AW | 1503050 | 3.1 | Improved Grounds (Standard Service) | 12 | MO | ||
| Navy Lodge | Facility Investment | E/U/R Work | A016 | A016AA | 1502000 | 3.1.1 | Emergency Work | 10 | EA | ||
| Navy Lodge | Facility Investment | E/U/R Work | A016 | A016AB | 1502000 | 3.1.2 | Urgent Work | 10 | EA | ||
| Navy Lodge | Facility Investment | E/U/R Work | A016 | A016AC | 1502000 | 3.1.3 | Routine Work | 10 | EA | ||
| Navy Lodge | Facility Investment | Preventive Maintenance | A016 | A016AD | 1502000 | 3.2.2 | Boiler and Unfired Pressure Vessel (UPV) Systems and Equipment | 12 | MO | ||
| Navy Lodge | Facility Investment | Preventive Maintenance | A016 | A016AE | 1502000 | 3.2.6 | Emergency Exit and Exterior Lighting Systems | 12 | MO | ||
| Navy Lodge | Facility Investment | Preventive Maintenance | A016 | A016AF | 1502000 | 3.2.8 | HVAC and Refrigeration Systems | 12 | MO | ||
| Navy Lodge | Facility Investment | Preventive Maintenance | A016 | A016AG | 1502000 | 3.2.11 | PTAC Units | 12 | MO | ||
| Navy Lodge | Facility Investment | Integrated Maintenance Program (IMP) | A016 | A016AH | 1502000 | 3.3.1 | Fire Protection Systems | 12 | MO | ||
| Navy Lodge | Facility Investment | Integrated Maintenance Program (IMP) | A016 | A016AJ | 1502000 | 3.3.2 | HVAC and Refrigeration Systems | 12 | MO | ||
| Navy Lodge | Facility Investment | Inspection, Testing, and Certification Program | A016 | A016AK | 1502000 | 3.4.1 | Backflow Prevention Devices | 12 | MO | ||
| Navy Lodge | Facility Investment | Other Recurring Services | A016 | A016AL | 1502000 | 3.5.2 | Exhaust Hoods and Ducts | 12 | MO | ||
| Navy Lodge | Facility Investment | Other Recurring Services | A016 | A016AM | 1502000 | 3.5.8 | Roofing Systems | 12 | MO | ||
| Navy Lodge | Pest Control | Recurring Work | A016 | A016AN | 1503020 | 3.2 | Pest Control Service Orders | 1 | EA | ||
| Navy Lodge | Integrated Solid Waste Management | Recurring Work | A016 | A016AP | 1503030 | 3.1-3.4 | Recurring Work | 12 | MO | ||
| Navy Lodge | Grounds Maintenance | Recurring Work | A016 | A016AQ | 1503050 | 3.1 | Improved Grounds (Standard Service) | 12 | MO | ||
| Total Recurring Work - Base Period: |
KJS MP Joint Venture, LLC
CLIN 0002 Base Period N-RW
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers - NSA Mid-South |
| Solicitation/Contract No.: N69450-24-R-0037 |
| Line Item 0002 - Non-Recurring Work - Base Period | ||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 4 | ||||||
| ELINs A700 through A786 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
| A700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 10,000 | LH | |
| A701 | BSVE Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 200 | LH | |
| A702 | Material and Equipment - MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor. |
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2.
| The estitmate quantity (in dollars) is provided. A Fixed burdened rate (FBR) shall be entered in the Unit Price column. The FBR shall include factors for ordering, handling, and stockpiling materials and repair parts. Similar to FBR example in J-0200000-01, if a 10% markup is the Contractor's proposed FBR, the Unit Price should be $1.10. When multiplying the proposed Unit Price by the Estimated Quantity, the Extended Price should be During administration, if the vendor's invoice on material is $1,000.00 and the unit price is $1.10, the cost of the material to the government will be $1,050.00. (DO - Dollars) | 1,800,000 | DO | |||
| A703 | Special Event Grass Cutting available on FedMall | Per Acre, Grass shall be mowed and trimmed to a uniform height of 2 inches. All clippings and debris shall be removed. Work to be completed in 3 calendar days. | 30 | EA | |
| A704 | Special Event Edging available on FedMall | Edging to provide a uniform edged cut. All clippings shall be removed. Work to be completed in 3 calendar days. | 1,000 | LF | |
| A705 | Special Event Raking available on FedMall | Per Acre, this work includes the raking and removal of leaves, pine straw and pinecones, limbs, and other debris from the raked area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 30 | EA | |
| A706 | Tree and Stump Removal | ||||
| Large 18.1” DBH and above Tree and Stump Removal available on FedMall | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level. Work shall be completed within 10 calendar days. | 20 | EA | ||
| A707 | Tree and Stump Removal | ||||
| Medium 6.1" DBH up to 18" Tree and Stump Removal available on FedMall | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level. Work shall be completed within 7 calendar days. | 20 | EA | ||
| A708 | Tree and Stump Removal | ||||
| Small up to 6" Tree and Stump Removal available on FedMall | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level. Work shall be completed within 5 calendar days. | 20 | EA | ||
| A709 | Shrub and Stump Removal | ||||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal available on FedMall | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level. Work shall be completed within 5 calendar days. | 20 | EA | ||
| A710 | Shrub and Stump Removal | ||||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal available on FedMall | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level. Work shall be completed within 5 calendar days. | 40 | EA | ||
| A711 | Shrub and Stump Removal | ||||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal available on FedMall | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level. Work shall be completed within 3 calendar days. | 40 | EA | ||
| A712 | Complete Tree Pruning | ||||
| Small - below and including 15' Complete Tree Pruning available on FedMall | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | 20 | EA | |||
| A713 | Complete Tree Pruning Large - above 15' Complete Tree Pruning available on FedMall | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. Work shall be completed within 2 calendar days. | 10 | EA | |
| A714 | Soil Analysis available on DoD FedMall | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | 5 | EA | |
| A715 | Grassing/available on FedMall | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. Seed species will be identified in the task order. | 2 | AC | |
| A716 | Tree Planting available on FedMall | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 5 | EA | |
| A717 | Shrub Planting (1-gallon) available on FedMall | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 10 | EA | |||
| A718 | Shrub Planting (5-gallon) available on FedMall | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 40 | EA | |
| A719 | Bedding/Ornamental Plants (4" pot size) available on FedMall | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 200 | EA | |
| A720 | Sodding available on FedMall | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | 10,000 | SY | |||
| A721 | Sprigging available on FedMall | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. Work shall be completed within 20 calendar days. | 10,000 | SY | |
| A722 | Fertilize available on FedMall | Per Acre, vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | 100 | EA | |
| A723 | Dethatch & Aerate available on FedMall | Per Acre, Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. Work shall be completed within 14 calendar days. | 100 | EA | |
| A724 | Aerate available on FedMall | Per Acre, grass shall be aerated to promote health and growth. Work shall be completed within 10 calendar days. | 100 | EA | |
| A725 | Shrub Pruning (Stand-alone plants) available on FedMall | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. Work shall be completed within 3 calendar days. | 1,000 | EA | |
| A726 | Hedge Pruning (Continuous Hedging) available on FedMall | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. Work shall be completed within 3 calendar days. | 1,000 | EA |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .