J-0200000-09 - SERVICE PROVIDER INFORMATION_0002.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Base Operations Support (BOS) Services, Naval Support Activity (NSA) Mid-South, Millington, Tennessee and Outlying Areas
Solicitation number
N6945024R0037
Issued by

About this file

This document is a Service Provider Information attachment for a federal contract opportunity. The attachment provides a detailed field list and instructions for submitting a service provider file for the Base Operations Support (BOS) Services contract at Naval Support Activity (NSA) Mid-South, Millington, Tennessee and outlying areas.

The key details of the related federal contract opportunity are: It is a competitive 8(a) set-aside solicitation for a single-award Facilities Support Indefinite-Quantity contract with recurring and non-recurring work CLINs. The contract term is a one-year base period plus four one-year option periods. The primary NAICS code is 561210 with a $47.0M annual small business size standard. The solicitation is being advertised by the Department of the Navy's Naval Facilities Engineering Command, with a point of contact of Courtney Peterson, Contract Specialist. The contract will include facility management, custodial, grounds maintenance, utilities, and other services at the NSA Mid-South location. Award will be made to the offeror whose total price and technical proposal offers the best value to the Government.

View the file

Other files

File Type Posted
N6945024R0037-0003.pdf PDF
J-1700000 BSVE Inventory_0002.xlsx XLSX spreadsheet
N6945024R0037_SectionJ_0002.pdf PDF
J-1502000-29_FRCS Inventory_0002.xlsx XLSX spreadsheet
J1601000-14_Sample of Historical Utility Service Orders_0002.xlsx XLSX spreadsheet
J-1502000-27 Backflow Prevention Devices_0002.xlsx XLSX spreadsheet
J-1601000-05 NSA Mid-South Instruction 11011.3_0002.pdf PDF
J-1601000-08 09 10 Utility Asset Inventory_0002.xlsx XLSX spreadsheet
N6945024R0037_SectionF_0002.pdf PDF
J-1601000-12 Utility Specification Attributes_0002.xlsx XLSX spreadsheet
J-1502000-23 HVAC Equipment under IMP_0002.xlsx XLSX spreadsheet
J-0200000-18_ELINS_0002.xlsx XLSX spreadsheet
N6945024R0037_TN20240200(Bldg)_0002.pdf PDF
JL-8_N6945024R0037_GPI_Responses_0002.pdf PDF
N6945024R0037_SectionC_0002.pdf PDF
N6945024D0037-0002.pdf PDF
JL-7_N6945024R0037_Site_Visit_Sign-In-Sheets_0001.pdf PDF
JL-6_N6945024R0037_Site_Visit_Brief_0001.pdf PDF
N6945024R0037-0001.pdf PDF
J-1601000-04 GIS Maps Utilities v2.pdf PDF
J-1503050-09 Historical Grounds Maintenance Service Orders.xlsx XLSX spreadsheet
J-1503010-09 Historical Custodial Service Orders.xlsx XLSX spreadsheet
JL-4_N6945024R0037_SECNAV5512.pdf PDF
J-1503060-03_Site_Map - Pavement Clearance.pdf PDF
J-1503050-02 Grounds Maintenance Map.pdf PDF
J-1502000-23 HVAC Equipment under IMP.xlsx XLSX spreadsheet
J-0200000-18_ELINS.xlsx XLSX spreadsheet
J-1502000-05 Historical Emergency Urgent and Routine Work.pdf PDF
J-1503010-07 FloorPlans.pdf PDF
J-1700000 BSVE Inventory 4-19-2024.xlsx XLSX spreadsheet
J-1502000-13 HVAC System Inventory under PM.xlsx XLSX spreadsheet
J-1601000-12_Specification Attributes.xlsx XLSX spreadsheet
J-1606000-06_Plant_Log.pdf PDF
J-0200000-15_CNRSEINST 41011.pdf PDF
N6945024R0037_WD15-4673(Rev.26).pdf PDF
N6945024R0037_SectionJ.pdf PDF
J-1700000-07-01 BSVE WO Historical Data.xlsx XLSX spreadsheet
JL-3_N6945024R0037_Site_Visit_Itinerary.pdf PDF
J-1502000-29_FRCS Inventory.xlsx XLSX spreadsheet
J-1503010-08 Custodial Inventory.xlsx XLSX spreadsheet
J-1502000-27 Backflow Prevention Devices.xlsx XLSX spreadsheet
J-1502000-30_FRCS Cybersecurity Program.pdf PDF
J-1606000-04-01 SOP Emergency Response Plan COVID-19.pdf PDF
J-1700000-08 Shuttle Bus Calendar and Schedule.pdf PDF
J-1601000-07 Meter Inventory and Schedule.xlsx XLSX spreadsheet
J-1502000-09 Compressed Air and Certification Inventory.xlsx XLSX spreadsheet
N6945024R0037.pdf PDF
JM-2_N6945024R0037_PPQ.doc DOC document
J-1502000-11 Lighting Inventory.xlsx XLSX spreadsheet
N6945024R0037_SectionF.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-Service Provider Info

ATTACHMENT J-0200000-09

SERVICE PROVIDER INFORMATION

Interface: Service Provider
VERSION #:v3
Current as of:3 December 2015
Version History
v1 - Updated to reflect current interface in MAXIMO
v2 - Update to reflect addition of Utility Outage Reporting information & Support GL Account Import
v3 - Update to reflect addition of additional remarks field.[In sync with NITC R2 Interface Document]
TABS
1-Service Provider InfoThis Sheet
2-Service Provider Field ListService Provider Template Data Format Information
3-Service Provider - TemplateSample Excel Format

2-Service Provider Field List

ATTACHMENT J-0200000-09

SERVICE PROVIDER INFORMATION

Interface: Service Provider
VERSION #: v3
Current as of: 3 December 2015
Service Provider (BOSC1) is a pipe delimited file.
PositionNameLength
LimitData Format NoteField DefinitionContent Notes <<<NOTE TO SPEC WRITER: UPDATE THE CONTENT NOTES WITH INFORMATION SPECIFIC TO THE CONTRACT AND LOCATION. >>>
NAVFAC

MAXIMO_FIELD

(WORKORDER.)

1Approved Date10MM/DD/YYYY hh:mm:ssThe Date on which the Work Order was last approved. If the file contains an Approved Date, then this date will be pulled over to the record.
If the Approved Date in the file is null, then the Reported Date plus one minute will be displayed in the record.will default when upload if left blankAPPROVEDDATE
2Work Type15

Must match Value List in Maximo.

(Cross-walked field.). Must match CrosswalkIdentifies the work order's type.
Example types are: preventive maintenance, corrective maintenance, emergency maintenance, capital project, and event report.PM is used for all scheduled work
PROJECT for IMP repairsWORKTYPE
3Service Provider Reference Code10Contractors internal work order tracking number. Will update Record if Value is found in Maximo otherwise new record (Work order) will be created.* will delete if left blank when a work order is updated or completed.SERVPRVREFCODE
4Description150Describes the work order.
If the Description is null, in the inbound file, then this field is defaulted to CROSSWALK value.will create a default entry if left blank on update:

"Entered by SP FlatFile BOSC interface. No description provided."

Include contractor job plan number in the descriptionInclude PM job plan and frequency.

ie QUARTERLY PM JOB PLAN 1234. Or describe work performed ie Replace AHU fan motor and belt.DESCRIPTION
5Location30Must match Value List in MaximoIdentifies the work order's location. This is not necessarily the asset's location, however, if an asset is entered, its location will default here.
- If the Location is null, in the inbound file, then this field is defaulted to the site's base location.* Location is not required if the record has an asset #. Most records originating from the contractor system would be for maintenance on an asset # so this field can be left blank. If populated, the location must exist in NAVFAC MAXIMO or the record will be rejected.LOCATION
6Reported By62Must match Value List in MaximoIdentifies the person reporting the work order.Leave blank on flat file; auto-populates by direct entry.REPORTEDBY
7Master SystemN/ANot usedWill pull from asset number.N/A
8Status16(Cross-walked field.)
Must match CrosswalkStatus of the work order, for example, in progress, waiting on material, waiting for approval, completed, or closed.Value list in REFERENCE SPREADSHEETSTATUS
9Status Date10MM/DD/YYYY hh:mm:ssLeave blank on flat file; auto-populates by direct entry.STATUSDATE
10Priority12(Cross-walked field.)
Must match CrosswalkIdentifies the importance of the work order, from 0-999, where 0 is the lowest priority and 999 is the highest. If the Priority is null, in the inbound file, then this field is defaulted.Leave blank on flat file unless local direction is providedWOPRIORITY
11Actual Start10MM/DD/YYYY hh:mm:ssFormat is importantACTSTART
12Actual Finish10MM/DD/YYYY hh:mm:ssFormat is importantACTFINISH
13Supervisor30Must match Value List in MaximoLeave blank; if used, must match a MAXIMO userSUPERVISOR
14Labor Hours(Actual)8Number (2 decimal places)required to change status to COMPACTLABHRS

15 Labor Cost(Actual) 10 Number (2 decimal places) required to change status to COMP ACTLABCOST

16 Material Cost(Actual) 10 Number (2 decimal places) required to change status to COMP ACTMATCOST

17Duration8Number (2 decimal places)Estimated remaining number of hours needed to complete the work.May be left blankESTDUR
18Asset25Must match an existing ASSETNUM in MaximoThe asset number used must exist in NAVFAC MAXIMO prior to submission, or the record will be rejected.The asset number used must exist in NAVFAC MAXIMO prior to submission, or the record will be rejected.ASSETNUM
19Target Finish10MM/DD/YYYY hh:mm:ssFor contractor scheduled work Target Finish is calculated using the Frequency of Service in J-0200000-01.

For IMP system breakdowns the Target Finish is 2 days from the date the work was reported to the Contractor

For E/U/R the Target Finish date is calculated from the date the work was reported to the Contractor.Required to create the work orderTARGCOMPDATE
20Target Start10MM/DD/YYYY hh:mm:ssFor contractor scheduled work Target Start is calculated using the Frequency of Service in J-0200000-01.

For IMP system breakdowns the Target Start is the date the work was reported to the Contractor

For E/U/R the Target Start date is calculated from the date the work was reported to the Contractor.Required to create the work order.TARGSTARTDATE
21Reported Date10MM/DD/YYYY hh:mm:ssLeave blank on flat file; auto-populates by direct entry.REPORTDATE
22Lead30Must match Value List in MaximoLead person responsible for the work.Leave blank; if used, must match a MAXIMO userLEAD
23Scheduled Start10MM/DD/YYYY hh:mm:ssScheduled start should be between the target start and target completion dateRequired if status change to inprogress or approvedSCHEDSTART
24Scheduled Finish10MM/DD/YYYY hh:mm:ssScheduled finish should be between the target start and target completion dateRequired if status change to inprogress or approvedSCHEDFINISH
25Modified Date10LEAVE BLANKLeave blank/Do Not UseLeave blank/Do Not UseCHANGEDATE
26Modified By30LEAVE BLANKLeave blank/Do Not UseLeave blank/Do Not UseCHANGEBY
27N/A4MM/DD/YYYY hh:mm:ssN a should be between the target start and target completion datePlaceholder for WORKORDER.PMNEXTDUEDATE. Value is not presently imported.PMNEXTDUEDATE
28N/A1Yes or NoUse "N" or leave blankISTASK
29N/A10Length Limit: 250Must exist in NAVFAC MAXIMO prior to submission or the record will be rejected.Must exist in NAVFAC MAXIMO prior to submission or the record will be rejected.PARENT
30Work Order10Must match Value List in MaximoUsed in updating record status on existing records.Not required if the record has a Service Provider Reference Code, otherwise must match the MAXIMO work orderWONUM
31Detail Location250Detail location should be between the target start and target completion dateleave blank; will pull from asset numberDETAILLOC
32CLIN30Contract Line Item NumberValue list in ELINs TabCLIN
33Customer Ref Code8Must match Value List in MaximoLeave blank unless Requirements provides reference list.May be blank; if used, must match a code in MAXIMOCUSTOMERCODE
34Sub Work Type15(Cross-walked field).
Must match CrosswalkDefaulted field based on the value of worktypeFACILITIES for scheduled work in Annex 1502000

UTILITIES for scheduled work in any Annex 16 sub-annex

FPCT for IMP repairs under the limit of liabilitySUBWORKTYPE
35Work Center8Must match Value List in MaximoWork center should be between the target start and target completion dateFor this contract use MIL_CTR1
Do not leave blank or will assign to CHR_CTR.PERSONGROUP
36GL Account27Must be a complete GL account or will imported as NULLOnly full GL Account, including delimiters, values can be imported.Use "S.2024STP2.XX.N25GSW000001" for all work orders. changes every FYGLACCOUNTThis will need the new fiscal year GL account number
37Outage Type50ALNType of utility outageMay be blank. The “Outage Type” value must be a valid value available in the “OUTTYPE” domain.OUTAGETYPE
38Outage Cause50ALNCause of utility outageMay be blank. The “Outage Cause” value must be a valid value available in the “OUTCAUSE” domain.OUTAGEREASON
39Num of Bldgs Affected12IntegerNumber of Building affected (whole number)May be blankNUMBLDSAFFECTED
40Outage Start Date10MM/DD/YYYY hh:mm:ssOutage Start (Date/Time)May be blank. The “Outage Start Date” value must be m valid value available in the “OUTDATE” domain.OUTAGESTARTDATE
41Outage End Date10MM/DD/YYYY hh:mm:ssOutage End (Date/Time)May be blank. The “Outage End Date” value must be m valid value available in the “OUTDATE” domain.OUTAGEENDDATE
42Remarks1000ALNAdditional remarks. At each submission the remarks are appended to the END of previous remarks. /// Use and Style is a CONTRACT SPECIFIC USE ///Each remark submission is restricted to 1000 characters, and the DATE will be appended in Maximo prior saving. This can be used (local/contract specific guidance) to provide a chronology to the work order. Resulting format would be: DATE1 - Remark1; DATE2 - Remark2; etc.

The total field length is restricted to <2000 characters - or a maximum of 11-12 remarks on a single Work Order.

The following information shall be provided if it is relevant:

1. Name and phone number of all Government personnel with whom the work was coordinated or provided clarificaiton to the technician, and date KO was notified of any problems scheduling the work or accessing the location.

2. A narrative of work performed and technicians observations.

3. The estimated cost and date notification of work exceeding LOL was submitted to the KO. LONGDESCRIPTION

3-Service Provider-Template

ATTACHMENT J-0200000-09
SERVICE PROVIDER INFORMATIONATTACHMENT J-0200000-XX

SERVICE PROVIDER INFORMATION

Interface: Service Provider
VERSION #: v3
Current as of: 3 December 2015
Position123456789101112131415161718192021222324252627282930313233343536373839404142
NameApproved DateWork TypeService Provider Reference CodeDescriptionLocationReported ByMaster SystemStatusStatus DatePriorityActual StartActual FinishSupervisorLabor Hours
(Actual)Labor Cost
(Actual)Material Cost
(Actual)DurationAssetTarget FinishTarget StartReported DateLeadScheduled StartScheduled FinishModified DateModified ByPMNEXTDUEDATEIs Task?Parent WOWork OrderDetail LocationCLINCustomer Ref CodeSub Work TypeWork CenterGL AccountOutage TypeOutage CauseNum of Bldgs AffectedOutage Start DateOutage End DateRemarks
Validation toolYYYYY
REQUIRED TO CREATE WONY*YYY*NNYNNNNNNNNNYYYNNNNNNNNNNNYNY*YYNNNNNN*
REQUIRED TO UPDATE WONY*Y*YNNNNNNNNNNNNNYNNNNY*Y*NNNNNNNNNY*YYNNNNNN*
REQUIRED TO COMP WONY*Y*YNNNYNNYYNY*Y*Y*NYNNNNNNNNNNNNNNNY*YYNNNNNY*

NOTES:

• File naming convention: boscextract_MIL1_YYYYMMDD.txt

• ONLY POSITION/COLUMN 1-42, and rows containing data should be be included in the FLAT-FILE SUBMISSION;

• Pipe Delimited (.txt) - | (Pipe is at the end of the column. Must have 41 PIPEs per row resulting in 42 columns.)

• Actual Completion dates – Both Actual Start and Actual Finish completion dates are required when changing status to COMP workorder
• Asset number is required for work type PM and PROJECT. Asset number is not required for work type EMERGENCY, URGENT, ROUTINE
• Target dates – When one is provided, both Target Start and Target Finish must be entered.

File details come from the government source that posted it. Updated .