This document is a Solicitation Notice for Base Operations Support (BOS) Services at Naval Support Activity (NSA) Mid-South, Millington, Tennessee and outlying areas. The procurement includes services such as facility management, custodial, grounds maintenance, pavement clearance, utilities management, environmental, and others. It will be a single award Facilities Support Indefinite-Quantity contract with recurring and non-recurring work, with a base period of one year and four one-year option periods. The procurement is a competitive 8(a) set-aside, with award based on best value to the government. A site visit is scheduled for August 21-22, 2024, and the Government Pre-Award Inquiry cutoff date is 2:00 PM EDT on August 29, 2024. The primary NAICS code is 561210 with an annual small business size standard of $47.0M. The procuring agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-1503050-09 FX Service Orders
| J-1503050-09 Historical Grounds Maintenance Service Orders | ||
| Year | DESCRIPTION | DATE SUBMITTED |
| FY21 | Remove tree that is falling down in the field east of S203 on Kittyhawk. Remove stump and install straw for erosion control. Safety issue, the tree is leaning | 24-Nov-20 |
| FY21 | Remove small tree stump- approx 2' high on Tarawa Ave east of 456. level area and Install straw at completion. | 01-Dec-20 |
| FY21 | Pavement Clearance- clear the NGIS parking lot of snow for the selection board members. | 16-Feb-21 |
| FY21 | Snow removal/Pavement Clearance- clear Joe Dugger Bldg 499 parking lot. Only on the actual gym side of the building (west side only). | 18-Feb-21 |
| FY21 | Snow removal/Pavement Clearance- clear Bldg 752 NEX main entrance parking lot. | 18-Feb-21 |
| FY21 | Pickup and dispose of debris, limb, branches, etc. due to snow and ice. North side | 24-Feb-21 |
| FY21 | Pickup and dispose of debris, limb, branches, etc. due to snow and ice. South side | 24-Feb-21 |
| FY21 | Cut and remove large hanging branch in the RV Park. Darrell Barger knows exact location of safety issue. | 19-Mar-21 |
| FY21 | There are 12 Crepe Myrtle trees along the West side of Hornet Ave. at the AVG gate. The trees all need to be trimmed. These are blocking the camera view from Security. | 13-May-21 |
| FY21 | C-1 tree trimming needed for blocking Security camera view. Mark Stites knows exact location of the issue. Contact him before starting. | 13-May-21 |
| 11 | Cut/dig new swale (approx 50') near CVIS tent and perimeter road to remove water from old range area. | 18-May-21 |
| FY21 | Remove large dead limb at C1 and ensure all dead limbs on tree are removed for safety. | 01-Jun-21 |
| FY21 | Remove tree/limbs that are down behind Bldg 789 near the mech room. | 21-Jun-21 |
| FY21 | BLDG 767. Add government provided fresh mulch to all planter beds north and south side. Blow down/sweep parking lot. | 23-Jun-21 |
| FY21 | Bldg 767. Trim all bushes and trees, especially in the planter beds. Raise the canopy to 7'-8' and remove all new growth. Cut to a prestige level | 23-Jun-21 |
| FY21 | Hornet Ave. north side of base by soccer field, large tree limb has broken and is hanging. Remove and dispose of limb. | 26-Jul-21 |
| FY21 | Trim all the bushes on the north side of 447 and the one bush at the corner across from 499 to a prestige standard. | 26-Jul-21 |
| FY21 | Remove two dead trees on the north east side of Bldg 791. | 29-Jul-21 |
| FY21 | Bldg 780. Cut/trim on bushes and trees at the building to a prestige appearance. Cut the trees to the 10'-12' height. Complete prior to pressure washing the building. | 09-Aug-21 |
| FY21 | Remove and dispose was large hanging limb north of 945. | 23-Aug-21 |
| FY21 | Trim trees above electrical lines her switch station. | 30-Aug-21 |
| FY21 | Remove the fallen tree limbs at two locations in Fairway Cottages. | 08-Sep-21 |
| FY21 | Remove all Crepe Myrtles at the CAC card gate. The bushes are growing too quick and keep blocking the security cameras. Ensure ground is level/clean at completion. Add straw as well to end product. | 16-Sep-21 |
| FY21 | Remove 3 dead trees in the south parking lot of 787 along Wasp. Ensure area is clean, level and straw in place at completion. | 16-Sep-21 |
| FY21 | Remove the 9 dead bushes at the north west corner of Navy Road. Ensure area is clean, level and straw in place at completion. | 16-Sep-21 |
| FY21 | Remove one dead tree between Bldgs 450 and 448.. Ensure area is clean, level and straw in place at completion. | 22-Sep-21 |
| FY22 | Remove down tree limb at the RV park. | |
| FY22 | Remove tree limb and downed tree by BLDG 457, west side to the left of the main entrance. Backfill/level the hole. | 25-Oct-21 |
| FY22 | Trim branches from the trees on the east and west sides of the east switching station DE . | 13-Dec-21 |
| FY22 | Pickup and dispose of debris, limb, branches, etc. due to strong winds over the weekend. South side | 13-Dec-21 |
| FY22 | Bldg 785- Remove large limb hanging from tree in front of building. | 24-Jan-22 |
| FY22 | BLDG 457- remove limbs from sidewalk area - Dave Fulcher knows the location/specific issue. | 08-Feb-22 |
| FY22 | Intrepid, South of 456: limbs partially blocking the road - Dave Fulcher knows the location/specific issue | 08-Feb-22 |
| FY22 | Remove downed tree at parking lot between BLDG 456 and BLDG 950. Tree is touching at least 2 privately owned vehicles. | 22-Feb-22 |
| FY22 | Trim tree 1 of 5 on Tarawa next to BLDG 455, remove down branches, damaged branches in tree. Properly dispose of debris. | 07-Mar-22 |
| FY22 | Trim tree 2 of 5 on Tarawa next to BLDG 455, remove down branches, damaged branches in tree. Properly dispose of debris. | 07-Mar-22 |
| FY22 | Trim tree 3 of 5 on Tarawa next to BLDG 455, remove down branches, damaged branches in tree. Properly dispose of debris. | 07-Mar-22 |
| FY22 | Trim tree 4 of 5 on Tarawa next to BLDG 455, remove down branches, damaged branches in tree. Properly dispose of debris. | 07-Mar-22 |
| FY22 | Trim tree 5 of 5 on Tarawa next to BLDG 455, remove down branches, damaged branches in tree, clear utility lines. Properly dispose of debris. | 07-Mar-22 |
| FY22 | Remove fallen tree from north side of parking lot for BLDG 760, across from BLDG 456. Properly dispose of deris, fill hole, provide sod/seed/straw as needed. | 07-Mar-22 |
| FY22 | Mow, edge, blow down and pick up debris at 767/Pat Thompson in support of VIP visit. Complete before 24 March. | 21-Mar-22 |
| FY22 | Remove tree from in front of the S242 EnvisionExpress loading dock. Dispose of debris, backfill and level hole, seed/sod/straw as required. | 20-Apr-22 |
| FY22 | Remove limb/debris from treeline in vicinity of Teen Center (BLDG 770). Contact COR for specific location if needed. | 20-Apr-22 |
| FY22 | At CDC/943: install an adequate grass swale with the required slope to the detention pond on the northwest access to the parking lot and on the east side of the parking lot. Grass seed should be used and storm water controls must be in place until the grass has stabilized. Clean debris from the fence to allow proper drainage | 26-Apr-22 |
| FY22 | BLDG 599: pick up all limbs and debris. | 13-May-22 |
| FY22 | Corner or Singleton and Intrepid (next to Medical); dig swale to drain; Grass seed should be used and storm water controls must be in place until the grass has stabilized. | 13-May-22 |
| FY22 | Corner or Singleton and Oriskany (at intersection with street light); dig swale to drain; approx. 30'-40'. Grass seed should be used and storm water controls must be in place until the grass has stabilized. Also, fill in hole around base of light pole and install rip rap around base of light pole to keep area from eroding in the future. | 13-May-22 |
| FY22 | Clear limb/debris from tree line between Singleton inbound and perimeter road | 13-May-22 |
| FY22 | Clear limbs/debris on obstacle course/track- north side of base/north of Pat Thompson | 13-May-22 |
| FY22 | Clean up all limbs/debris from the C1 area. Ensure area is clean at completion. | 17-May-22 |
| FY22 | Final Ice Storm Clean up: Clean up all limbs/debris on Corsair Rd. Ensure area is clean at completion. | |
| FY22 | Final Ice Storm Clean up: Clean up all limbs/debris North side between MWR cabins and former MARS Station/N100. Ensure area is clean at completion. | |
| FY22 | Final Ice Storm Clean up: Clean up all limbs/debris Tree line north of 767, east of ball field. Ensure area is clean at completion. | |
| FY22 | Final Ice Storm Clean up: Clean up all limbs/debris Pine trees southeast of North 82. Ensure area is clean at completion. | |
| FY22 | Final Ice Storm Clean up: West side of Indianapolis, on the backside of ball field. Ensure area is clean at completion. | |
| FY22 | Final Ice Storm Clean up: Bethel Road and Navy Road . Ensure area is clean at completion. | |
| FY22 | Final Ice Storm Clean up: Tree/fence line around Auto Hobby Shop. Ensure area is clean at completion. | |
| FY22 | Final Ice Storm Clean up: North side; Casablanca and Indianapolis; larges branches/limbs on track/field. Ensure area is clean at completion. | |
| FY22 | BLDG 777 SW side; remove damaged branch from tree, clean up any debris. | 15-Aug-22 |
| FY23 | Remove vegetation from around and between the concrete barriers stored north of N81 to allow Security to relocate them | 05-Oct-22 |
| FY23 | Spray area in between 769 parking lot and south stream channel with herbicide to kill off the grass. | 05-Oct-22 |
| FY23 | Remove vegatation and sediments off of the concrete next to the fence line. Also grade any high point of past the fence for proper draiage. KJS must provide erosion control on any disturb soil. | 26-Oct-22 |
| FY23 | Bldg. 767 - Work to be completed on 12 Dec, weedeat and blow the entire area around the building to include the steps, removing all pine needles, trash, and debris. Remove all fallen branches from the main entrance. | 01-Dec-22 |
| FY23 | bldg. 457(Lassen Building)- Remove a small down tree in front of the building. Backfill/level the hole. | 01-Dec-22 |
| FY23 | Bldg 791. Remove fallen tree from the entrance of the loading dock. West side of the building. | 01-Feb-23 |
| FY23 | NORSID-E49. remove fallen tree branch from the fence. | 08-Feb-23 |
| FY23 | Remove a fallen tree from off the road . Down tree is located on the perimeter road by the Singleton Gate. | 14-Feb-23 |
| FY23 | trimming tree at building 455. 2nd floor in the CO's office tree limbs is hitting against the window. | 27-Feb-23 |
| FY23 | Remove down tree located at the VCC Bldg. 938. Please remove the whole tree. | 03-Mar-23 |
| FY23 | Remove tree on the south section of parking lot beside Tarawa Avenue going to the Navy Exchange. | 03-Mar-23 |
| FY23 | Motorcycle Cycle Trainning Course. Weed eat and spray weed killer on any grass protruding thru the pavement on the course.Going to need the Zamboni Sweeper to remove any grass and gravel off the course prior to painting. | 27-Mar-23 |
| FY23 | Install adequate grass swale with the required slope in the grass near the southeastern corner of the parking lot at building 1694. Swale location shall connect from the paved area to the storm water channel which runs along the fence line. The swale shall be no less than 2-feet wide. Grass seed should be used and storm water controls must be in place until the grass has stabilized. | 13-Apr-23 |
| FY23 | Please remove fallen tree limb in parking lot of C1 blocking the parking space. | 26-Apr-23 |
| FY23 | Remove fallen tree limb from C1 Exit gate lane | 11-May-23 |
| FY23 | Remove fallen tree limb from 791, near ADM's parking lot. | 18-May-23 |
| FY23 | Remove fallen tree blocking walking path on the Nature Trail. | 18-May-23 |
| FY23 | Remove fallen tree limb at Oriskany and Tennesse. | 30-May-23 |
| FY23 | Repair small inlet into east Bio retention pond. Add larger rock to prevent further erosion of soil. | 12-Jul-23 |
| FY23 | Motorcycle Cycle Trainning Course. Spray for unwanted vegation any grass protruding thru the pavement on the course. Utilize weed trimmers and Pavement Sweeper to remove any grass and gravel off the course prior 25 July 2023. | 19-Jul-23 |
| FY23 | Remove fallen tree limb blocking the perimeter road at the Bonnie gate. (Singleton and Navy Rd.) | 25-Jul-23 |
| FY23 | Spray for weeds and cut the old gas station area near navy federal. | 16-Aug-23 |
| FY23 | Bldg. 791 flower bed area between 791/789 near north A corridor entrance Remove debris and bring it to xeriscape level of service. | 11-Sep-23 |
| FY23 | Fill and repair sink hole between 768 and 777 near northwest entrance. | 11-Sep-23 |
| FY23 | Fill and repair sink hole between north side of Polaris drive located btw enterprise and Midway | 11-Sep-23 |
| FY23 | Please cut the pollinator field at a height of approximatley 12 inches. | 13-Sep-23 |
| FY23 | Please trim the crepe myrtle trees around bldg 455 to an approximate height of 12 feet trees are marked with yellow caution tape. | 14-Sep-23 |
| FY23 | Please trim the crepe myrtle trees around bldg 455 to an approximate height of 12 feet trees are marked with yellow caution tape. | 14-Sep-23 |
| FY23 | Please trim the crepe myrtle trees around bldg 455 to an approximate height of 12 feet trees are marked with yellow caution tape. | 14-Sep-23 |
| FY23 | Please trim the crepe myrtle trees around bldg 456 to an approximate height of 12 feet trees are marked with yellow caution tape. | 14-Sep-23 |
| FY23 | Please trim the crepe myrtle trees around bldg 456 to an approximate height of 12 feet trees are marked with yellow caution tape. | 14-Sep-23 |
| FY23 | Please trim the crepe myrtle trees around bldg 456 to an approximate height of 12 feet trees are marked with yellow caution tape. | 14-Sep-23 |
| FY23 | Motorcycle Cycle Training Course. Spray for unwanted vegation any grass protruding thru the pavement on the course. Utilize weed trimmers and Pavement Sweeper to remove any grass, debris, and gravel off the course. | 21-Sep-23 |
| FY23 | Install adequate grass swale with the required slope in the grass near the Selection boards entrance at building 769. Swale location shall connect from the east side of the sidewalk utilizing the metal inlet under the sidewalk to the storm water drain on the west side of the gazebo. Please ensure proper environmental controls are followed by placing seed and straw in the disturbed areas. | 21-Sep-23 |
| FY23 | Install adequate grass swale with the required slope in the grass near bldg 453 along essex. Swale location shall adequatley ensure water run off of the paved surfaces. Please ensure proper environmental controls are followed by placing seed and straw in the disturbed areas. | 21-Sep-23 |