This document appears to be an equipment standards list for a federal contract opportunity at U.S. Naval Support Activity (NSA) Souda Bay, Crete, Greece. The equipment standards list covers a wide range of facilities and systems including foundations, floors, roofing, walls, stairs, plumbing, HVAC, electrical, conveying systems, and site infrastructure. For each equipment type, the list provides the UNIFORMAT II classification code, equipment description, and notes on maintenance requirements. The related federal contract opportunity is for Base Operations Support (BOS) Services at NSA Souda Bay, with solicitation number N6247024R0001 issued by the Department of the Navy Naval Facilities Engineering Command. The summary does not include specific details on the required products or services, response dates, award information, pricing terms, set asides, or other contractual details, as this appears to be an equipment standards reference document rather than the full solicitation.
View the file
Other files for this federal contract opportunity
Show all 50
Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Equipment Standards v14
| Equipment Standard Code | Equipment Description | Master System | System | Sub Systems | Notes | ADDITIONAL NOTES |
| FNDT | FOUNDATION | A10 - FOUNDATIONS | A1010 - STANDARD FOUNDATIONS | A1010110 - STRIP FOOTINGS |
A1010210 - SPREAD FOOTINGS
A1010250 - PILE CAPS
| A1010999 - OTHER | FOS responsibility | ||||
| FNDT | FOUNDATION | A10 - FOUNDATIONS | A1020 - SPECIAL FOUNDATIONS | A102005 - RAFT FOUNDATIONS |
A1020110 - CIP CONCRETE PILES
A1020120 - PRECAST CONCRETE PILES
A1020130 - STEEL PIPE PILES
A1020140 - STEEL H PILES
A1020160 - TREATED WOOD PILES
A1020210 - GRADE BEAMS
| A1020999 - OTHER | FOS responsibility | |||||
| FNDT | FOUNDATION | A10 - FOUNDATIONS | A1030 - SLAB ON GRADE | A1030120 - PLAIN/REINFORCED | ||
| A1030999 - OTHER | FOS responsibility | |||||
| FNDT | FOUNDATION | A20 - FOUNDATIONS | A2010 - BASEMENT EXCAVATION | A2010999 - OTHER BASEMENT EXCAVATION | ||
| FNDT | FOUNDATION | A20 - FOUNDATIONS | A2010 - BASEMENT EXCAVATION | A2010999 - OTHER BASEMENT EXCAVATION | FOS responsibility | |
| FNDT | FOUNDATION | A20 - FOUNDATIONS | A2020 - BASEMENT WALLS | A2020110 - CIP CONCRETE |
A2020140 - CONCRETE BLOCK
A2020150 - WOOD
| A2020999 - OTHER | FOS responsibility | ||||
| FLRC | FLOOR CONSTRUCTION | B10 - SUPERSTRUCTURE | B1010 - FLOOR CONSTRUCTION | B1010220 - CIP CONCRETE BEAM AND SLAB |
B1010238 - PRECAST CONCRETE BEAM AND PLANK
B1010244 - LIGHT GAUGE STEEL FLOOR SYSTEM
B1010250 - COMPOSITE DECK, STEEL BAR JOISTS
B1010254 - COMP DECK, STRUCTURAL STEEL BEAM
B1010264 - WOOD BEAM, JOIST, AND DECK
B1010998 - EXTERIOR STAIRS
| B1010999 - OTHER | FOS responsibility | ||||
| ROOF | ROOF CONSTRUCTION | B10 - SUPERSTRUCTURE | B1020 - ROOF CONSTRUCTION | B1020102 - WOOD DECK AND RAFTER |
B1020108 - STEEL DECK, BEAMS AND BAR JOIST
B1020122 - CIP CONCRETE ROOF CONSTRUCTION
B1020137 - AWNING/CANOPY
B1020901 - CIP CONCRETE BEAM AND SLAB
B1020902 - PRECAST CONCRETE BEAM AND PLANK
| B1020999 - OTHER | FOS responsibility | |||||
| ROOF | ROOF | B10 - SUPERSTRUCTURE | B1030 - ROOF CONSTRUCTION | B103001 - METAL STRUCTURAL FRAME | FOS responsibility | |
| WALL | WALLS | B20 - EXTERIOR ENCLOSURE | B2010 - EXTERIOR WALLS | B2010101 - CIP CONCRETE |
B2010104 - PRECAST CONCRETE PANEL (RIBBED)
B2010106 - PRECAST CONCRETE PANEL (TILT UP)
B2010109 - CONCRETE BLOCK
B2010125 - SOLID BRICK - SINGLE WYTHE
B2010126 - SOLID BRICK - DOUBLE WYTHE
B2010128 - STONE VENEER W/STUD BACKUP
B2010130 - BRICK VENEER W/STUD BACKUP
B2010132 - MASONRY COMPOSITE
B2010134 - MASONRY CAVITY
B2010140 - GLASS BLOCK
B2010146 - METAL SIDING PANEL
B2010148 - WOOD CLADDING W/STUD BACKUP
B2010151 - STUCCO WALL
B2010152 - E.I.F.S.
| B2010999 - OTHER | FOS responsibility | |||||
| FNC | EXTERIOR SECURITY FENCING | B20 - EXTERIOR ENCLOSURE | B2010 - EXTERIOR WALLS | B2010999-OTHER | NEW CODES | |
| RLG | SAFETY RAILING / PARAPETS | |||||
| WNDW | OPENINGS | B20 - EXTERIOR ENCLOSURE | B2020 - EXTERIOR GLAZED OPENINGS | B2020102 - WOOD WINDOWS |
B2020104 - STEEL WINDOWS
B2020106 - ALUMINUM WINDOWS
B2020210 - TUBULAR ALUMINUM FRAMING
B2020220 - CURTAIN WALL PANELS
| B2020999 - OTHER | FOS responsibility | |||||
| ADO | AUTOMATIC DOOR | B20 - EXTERIOR ENCLOSURE | B2030 - EXTERIOR DOORS | B2030999 - OTHER | ||
| RLD | ROLL UP DOOR | B20 - EXTERIOR ENCLOSURE | B2030 - EXTERIOR DOORS | B2030999 - OTHER | ||
| B2030410 - OVERHEAD DOORS | Note UNIFOMAT II code for level 4 was Identified as B2034. This code is for Overhead doors - not Roll Up Doors. This may be just be a simple naming convention conflict. | |||||
| SLD | SLIDING DOOR | B20 - EXTERIOR ENCLOSURE | B2030 - EXTERIOR DOORS | B2030999 - OTHER | Note UNIFORMAT II code for level 4 was Identified as B2039, however this code is for Other Doors and Entrances. This is not a problem because Sliding doors are not otherwise identified. | |
| DOOR | EXTERIOR DOORS | B20 - EXTERIOR ENCLOSURE | B2030 - EXTERIOR DOORS | B2030110 - GLAZED DOORS |
B2030210 - WOOD DOORS
B2030220 - STEEL DOORS
B2030230 - ALUMINUM DOORS
B2030410 - OVERHEAD DOORS
B2030901 - HANGAR DOORS
B2030902 - BLAST RESISTANT DOORS
| B2030999 - OTHER | FOS responsibility | |||||
| GTR | GUTTER/ROOF | B30 - ROOFING | B3010 - ROOF COVERING | B3010610 - GUTTERS | FOS responsibility | |
| ROOF | ROOF COVERING | B30 - ROOFING | B3010 - ROOF COVERING | B3010105 - BUILT-UP |
B3010120 - SINGLE PLY MEMBRANE
B3010130 - PREFORMED METAL
B3010135 - FORMED METAL
B3010140 - SHINGLE TILE
B3010320 - ROOF DECK INSULATION
B3010620 - DOWNSPOUTS
| B3010999 - OTHER | FOS responsibility | ||||
| ROOF | ROOF OPENING | B30 - ROOFING | B3020 - ROOF OPENING | B3020110 - SKYLIGHTS |
B3020210 - HATCHES
| B3020999 - OTHER | FOS responsibility | ||||
| PRTN | PARTITIONS | C10 - INTERIOR CONSTRUCTION | C1010 - PARTITIONS | C1010102 - CONCRETE BLOCK |
C1010120 - TILE
C1010126 - DRYWALL W/STUD FRAMING
C1010140 - PLASTER W/STUD FRAMING
C1010710 - INTERIOR WINDOWS
| C1010999 - OTHER | FOS responsibility | ||||
| DOOR | INTERIOR DOORS | C10 - INTERIOR CONSTRUCTION | C1020 - INTERIOR DOORS | C1020102 - SPECIAL DOORS |
C1020111 - FIRE DOOR, SWINGING
C1020112 - FIRE DOOR, SLIDING
C1020113 - FIRE DOOR, ROLLING SERVICE/ROLL-UP
C1020114 - METAL DOOR
C1020120 - WOOD DOOR/WOOD FRAME
C1020122 - WOOD DOOR/METAL FRAME
C1020124 - WOOD FIRE DOORS/METAL FRAMES
C1020301 - BLAST RESISTANT DOOR
| C1020999 - OTHER | FOS responsibility | ||||
| PRTN | FITTINGS | C10 - INTERIOR CONSTRUCTION | C1030 - FITTINGS | C1030110 - TOILET PARTITIONS |
C1030310 - LOCKERS
C1030830 - CABINETS
C1030831 - COUNTERTOP
| C1030999 - OTHER | FOS responsibility | ||||||
| STRS | STAIR CONSTRUCTION | C20 - STAIRS | C2010 - STAIR CONSTRUCTION | C2010110 - STAIRS | FOS responsibility | ||
| RLG | STAIWAY-BALCONIES RAILING | C2010999-OTHER | METER GROUP NOT INCLUDED IN PREVIOUS VERSIONS | ||||
| STRS | STAIR FINISHES | C20 - STAIRS | C2020 - STAIR FINISHES | C2020999 - OTHER STAIR FINISHES | FOS responsibility | METER GROUP DOES NOT EXIST | |
| PRTN | WALL FINISHES | C30 - INTERIOR FINISHES | C3010 - WALL FINISHES | C3010230 - WALL COVERING |
C3010380 - WALL TILE
| C3010999 - OTHER | FOS responsibility | ||||
| FLRG | FLOORING | C30 - INTERIOR FINISHES | C3020 - FLOORING | C3020901 - CARPET |
C3020902 - CARPET TILE
C3020903 - COMPOSITION SHEET
C3020904 - CONCRETE TOPPING
C3020905 - WOOD
C3020906 - TERRAZZO
C3020907 - VINYL TILE
C3020908 - CORK TILE
C3020909 - RUBBER SHEET
C3020910 - PORCELAIN TILE
C3020911 - QUARRY TILE
C3020912 - PAINT
C3020913 - MARBLE TILE
C3020914 - CERAMIC TILE
C3020915 - ACCESS FLOORING
| C3020999 - OTHER | FOS responsibility | ||||
| CEIL | CEILING FINISHES | C30 - INTERIOR FINISHES | C3030 - CEILING FINISHES | C3030105 - PLASTER |
C3030110 - DRYWALL
C3030210 - ACOUSTICAL
| C3030999 - OTHER | FOS responsibility | |||||
| CEIL | CEILING FINISHES | C30 - INTERIOR FINISHES | C3040 - INTERIOR FINISH ASSEMBLIES | C3040999 - OTHER INTERIOR FINISH ASSEMBLIES | FOS responsibility | |
| LFT | LIFTS | D10 - CONVEYING | D1010 - ELEVATORS AND LIFTS | D1010901 - LIFTS | Specialized Program - identify PM requirements with VTE program coordinator - program monitored by region. Anyway the Eq. Info has to be stored | |
| HCR | HOISTS & CRANES | D10 - CONVEYING | D1090 - OTHER CONVEYING SYSTEMS | D1090902 - CRANES AND HOISTS | Specialized Program - identify PM requirements with VTE program coordinator - program monitored by region. Anyway the Eq. Info has to be stored | |
| DRF | DRINKING FOUNTAINS AND COOLERS | D20 - PLUMBING | D2010 - PLUMBING FIXTURES | D2010810 - DRINKING FOUNTAIN | PM is not cost effective. | |
| PLMB | PLUMBING FIXTURES | D20 - PLUMBING | D2010 - PLUMBING FIXTURES | D2010110 - TOILET |
D2010210 - URINAL
D2010310 - LAVATORY
D2010410 - SINK
D2010430 - LABORATORY SINK
D2010510 - BATHTUB
D2010610 - GROUP WASH FOUNTAIN
D2010710 - SHOWER
D2010820 - WATER COOLER
D2010901 - EMERGENCY SHOWER
D2010902 - EMERGENCY EYE WASH
D2010903 - BIDET
D2020905 - PIPING/FITTINGS
| D2010999 - OTHER | FOS responsibility | |||||
| BFP | BACKFLOW PREVENTER | D20 - PLUMBING | D2020 - DOMESTIC WATER DISTRIBUTION | D2020903 - BACKFLOW PREVENTER | In order to better store BFP info we should identify if each BFP is installed on: Domestic Water Distribution (D202003.07), or on Irrigation System (G205007.03), or on Sprinklers (D401002.01) | |
| TNK | WATER TANK | D20 - PLUMBING | D2020 - DOMESTIC WATER DISTRIBUTION | D2020902 - STORAGE TANK | No PM required - inspection need annually or greater | |
| WMT | WATER METER | D20 - PLUMBING | D2020 - DOMESTIC WATER DISTRIBUTION | D2020999 - OTHER | Create a Recurring - Recurring PM package for UEM meter reading under NWCF GL account | |
| PMP | PUMP, generic WATER | D20 - PLUMBING | D2020 - DOMESTIC WATER DISTRIBUTION | D2020906 - CIRCULATING PUMP | perform cost/benefit analysis to determine size threshold - To be done based on MDI and system criticality | |
| FLT | FILTER, generic WATER | D20 - PLUMBING | D2020 - DOMESTIC WATER DISTRIBUTION | D2020999-OTHER | Depends on system - case by case determination | |
| WHT | WATER HEATER | D20 - PLUMBING | D2020 - DOMESTIC WATER DISTRIBUTION | D2020210 - WATER HEATERS, RESIDENTIAL, ELEC |
D2020220 - WATER HEATERS, RESIDENTIAL, GAS
D2020230 - WATER HEATERS, RESIDENTIAL, OIL
D2020240 - WATER HEATERS, COMMERCIAL, ELEC
D2020250 - WATER HEATERS, COMMERCIAL, GAS
D2020260 - WATER HEATERS, COMMERCIAL, OIL
| D2020904 - HEAT TRANSFER PACKAGE | Only commercial water heaters are included in PM program. | |||||
| Domestic water heaters can be PMed on if reimbursable customer makes the request | In order to assign a correct SUBSYSTEM, it shall be identified each type of boiler by defining the following information: TYPE (hot water o steam), MATERIAL , TYPE OF ENERGY SUPPLY (electric/Gas/Oil etc..). Capacity, etc… | |||||
| FHY | FIRE HYDRANT | D20 - PLUMBING | ||||
| K3020 - Distribution | D2020 - DOMESTIC WATER DISTRIBUTION | |||||
| K3020 - Distribution | D2020905 - PIPING / FITTINGS | |||||
| K3020100 - Service Areas | Fire hydrant PM is paid by UEM if the fire protection line is on the potable water distribution line; otherwise is under FM&S responsibility | |||||
| PLMB | PLUMBING SYSTEMS | D20 | D2020-DOMESTIC WATER DISTRIBUTION | D2020905 - PIPING / FITTINGS | ||
| HDRC | HYDRONIC SYSTEMS | |||||
| WSF | Water Softener | D20 - PLUMBING | D2020-DOMESTIC WATER DISTRIBUTION | D2020999 - OTHER | ||
| SPP | SUMP PUMP | D20 - PLUMBING | D2030 - SANITARY WASTE | D2030905 - SUMP PUMP | perform cost/benefit analysis to determine size threshold - To be done based on MDI and system criticality | |
| PLMB | PLUMBING FIXTURES | D20 - PLUMBING | D2030 - SANITARY WASTE | D2030901 - SANITARY WASTE SEPARATOR |
D2030902 - WASTE/VENT PIPING
| D2030999 - OTHER | FOS responsibility | |||||
| PLMB | PLUMBING FIXTURES | D20 - PLUMBING | D2040 - RAIN WATER DRAINAGE | D2040210 - ROOF DRAINS | ||
| D2040999 - OTHER | FOS responsibility | |||||
| GSM | GAS METER | D20 - PLUMBING | D2090 - OTHER PLUMBING SYSTEMS | D2090999 - OTHER | Create a Recurring - Recurring PM package for UEM meter reading under NWCF GL account | |
| PLMB | PLUMBING FIXTURES | D20 - PLUMBING | D2090 - OTHER PLUMBING SYSTEMS | D2090999 - OTHER | FOS responsibility | |
| BOI | BOILER | D30 - HVAC | D3020 - HEAT GENERATING SYSTEMS | D3020126 - BOILER, ELECTRIC, HOT WATER |
D3020128 - BOILER, ELECTRIC, STEAM
D3020130 - BOILER CAST IRON HOT WATER GAS
D3020134 - BOILER, CAST IRON, STEAM, GAS
D3020136 - BOILER, CAST IRON HT WTR GAS/OIL
D3020138 - BOILER, CAST IRON, STEAM GAS/OIL
D3020311 - BOILER FUEL OIL PUMP
D3020901 - BOILER, CAST IRON, HT WTR, OIL
D3020902 - BOILER, CAST IRON, STEAM, OIL
D3020903 - BOILER, SOLID FUEL
D3020904 - BOILER FEEDWATER TANK
D3020905 - FURNACE
| D3020999 - OTHER | In order to assign a correct SUBSYSTEM, it shall be identified each type of boiler by defining the following information: TYPE (hot water o steam), MATERIAL , TYPE OF ENERGY SUPPLY (electric/Gas/Oil etc..). Capacity, etc… | |||||
| EXT | EXPANSION TANK | D30 - HVAC | D3020 - HEAT GENERATING SYSTEMS | D3020906 - EXPANSION TANK | ||
| FOT | FUEL OIL TANK | D30 - HVAC | D3020 - HEAT GENERATING SYSTEMS | D3020999 - OTHER | Supply for bulk storage/none for < or = 1000 gals | |
| CHL | CHILLER | D30 - HVAC | D3030 - COOLING GENERATING SYSTEMS | D3030120 - CHILLER, SCROLL, AIR COOLED |
D3030125 - CHILLER, SCROLL, WATER COOLED
D3030130 - CHILLER, RECIP, WATER COOLED
D3030135 - CHILLER, RECIP, AIR COOLED
D3030140 - CHILLER, CENTRIFUGAL, WTR COOLED
D3030145 - CHILLER, GAS ABSO, WTR COOLED
D3030150 - CHILLER, STEAM ABSO, WTR COOLED
D3030160 - CHILLER, SCREW, AIR COOLED
| D3030165 - CHILLER, SCREW, WATER COOLED | It has to be identified if the item is a Absortion Water Chiller (D303001.01) or a Compression Chill (D303001.02) | In order to assign a correct SUBSYSTEM, we should identify for each EQUIPMENT the following data: TYPE (Scroll, Reciprocating, Centrifugal, Gas Absorption etc ), AIR or WATER COOLED | ||
| CLT | COOLING TOWER | D30 - HVAC | D3030 - COOLING GENERATING SYSTEMS |
D3030310 - COOLING TOWER, GALVANIZED
D3030320 - COOLING TOWER, FIBERGLASS
D3030330 - COOLING TOWER, STAINLESS STEEL
| ACC | AIR COOLED CONDENSER | D30 - HVAC | D3030 - COOLING GENERATING SYSTEMS | D3030901 - CONDENSER, DX, AIR COOLED | |
| DRX | DIRECT EXPANSION | D30 - HVAC | D3030 - COOLING GENERATING SYSTEMS | D3030903 - PACKAGED DX REFRIGERANT SYSTEM | It has to be identified if the item uses R22 or any other not good for ozone refrigerant gas. In that case include the equipment in list for replacement |
| PMP | PUMP, generic HVAC | D30 - HVAC | D3040 - DISTRIBUTION SYSTEMS | D3040330 - CIRCULATING PUMP, END SUCTION | perform cost/benefit analysis to determine size threshold - To be done based on MDI and system criticality |
| FLT | FILTER, generic HVAC | D30 - HVAC | D3040 - DISTRIBUTION SYSTEMS | D3040999-OTHER | Depends on system - case by case determination |
| HEX | HEAT EXCHANGER | D30 - HVAC | D3040 - DISTRIBUTION SYSTEMS | D3040610 - HEAT EXCHANGER, PLATE TYPE | No PM required |
| HEX | HEAT EXCHANGER | D30 - HVAC | D3040 - DISTRIBUTION SYSTEMS | D3040620 - HEAT EXCHANGER, SHELL TUBE | No PM required |
| AHU | AIR HANDLING UNIT | D30 - HVAC | D3040 - DISTRIBUTION SYSTEMS |
D3040106 - AIR HANDLING UNIT, FIELD FAB
D3040110 - AIR HANDLING UNIT, CENTRAL STA
D3040114 - AIR HANDLING UNIT, ROOFTOP
| FAN | SUPPLY FAN | D30 - HVAC | D3040 - DISTRIBUTION SYSTEMS | D3040220 - FAN SYSTEM, CENTRIFUGAL IN-LINE | To be done based on MDI & system criticality - perform cost/benefit analysis to determine size threshold - It has to be identified what type of FAN (D304007.xx) |
| EXF | EXHAUST FAN | D30 - HVAC | D3040 - DISTRIBUTION SYSTEMS | D3040240 - FAN SYSTEM, ROOF EXHAUST | Perform cost/benefit analysis to determine size threshold - To be done based on MDI and system criticality - It has to be identified what type of FAN (D305001.xx) |
| FCU | FAN COIL UNIT | D30 - HVAC | D3040 - DISTRIBUTION SYSTEMS |
D3040118 - FAN COIL A/C, CAB MNT, TWO PIPE
D3040122 - FAN COIL A/C, CAB MNT, FOUR PIPE
D3040124 - FAN COIL A/C, DUCT MOUNT, 2 PIPE
D3040128 - FAN COIL A/C, DUCT MOUNT, 4 PIPE
| It has to be identified what type of FAN COIL (D305003 Chilled Water, or D305006.03 Direct Expansion) | In order to assign a correct SUBSYSTEM, we should identify for each EQUIPMENT the Type: CABINET/DUCT MOUNTED; 2/4 PIPES | ||||
| HOD | KITCHEN HOOD | D30 - HVAC | D3040 - DISTRIBUTION SYSTEMS | D3040260 - KITCHEN EXHAUST/MAKE-UP AIR | |
| HMD | HUMIDIFIER | D30 - HVAC | D3040 - DISTRIBUTION SYSTEMS | D3040902 - HUMIDIFIER | PW responsibility - perform Cost/Benefit analyses to determine size threshold |
| PKU | PACKAGE UNIT | D30 - HVAC | D3050 - TERMINAL & PACKAGE UNITS | D30502-- - PKG A/C |
ONE-NET: ONE-NET:
In order to assign a correct SUBSYSTEM, we should identify for each EQUIPMENT the Type: AIR/WATER COOLED; HOT WATER/ELEC HEAT
| CRU | COMPUTER ROOM UNIT | D30 - HVAC | D3050 - TERMINAL & PACKAGE UNITS | D3050185 - COMPUTER ROOM COOLING UNITS | |
| A/C | A/C SPLIT UNIT | D30 - HVAC | D3050 - TERMINAL & PACKAGE UNITS | D3050170 - SPLIT SYSTEMS AIR COOLED CONDENSE UNIT | Preventive maintenance program for A/C split unit shall include external condenser maitenance and internal unit for air filter replacing or cleaning |
| HET | heating system | D30 - HVAC | D3050 - TERMINAL & PACKAGE UNITS |
D3050120 - UNIT HEATERS, GAS
D3050130 - UNIT HEATERS, HYDRONIC
D3050901 - UNIT HEATERS, ELECTRIC
D3050902 - UNIT HEATER, INFRARED
| In order to assign a correct SUBSYSTEM, we should identify for each EQUIPMENT the Type: ELECTIRC, GAS, HYDRONIC | ||||||
| VFD | VARIABLE FREQUENCY DRIVE | D30 - HVAC | D3060 - CONTROLS & INSTRUMENTATION | D3060901 - HVAC CONTROLS, ELECTRIC, DIGITAL | The UNIFORMAT II code for this identifies it as a "Control Device." When conrol devices fail they are replaced. There is no PM function for this type of equipment. | |
| DCP | DIGITAL CONTROL PANEL | D30 - HVAC | D3060 - CONTROLS & INSTRUMENTATION | D3060901 - HVAC CONTROLS, ELECTRIC, DIGITAL | HVAC digital control panel and/or LAN interface panel board for remote monitoring | |
| VAV | VARIABLE AIR VOLUME | D30 - HVAC | D3090 - OTHER HVAC SYSTEMS & EQUIPMENT | D3040132 - VAV TERMINAL | The UNIFORMAT II code for this identifies it as a "Terminal Device." VAV boxes generally are controlled by DDC or the room temperature controllers. If on DDC any problems will be identified through the control telemetry. Checking all thermostat controlled VAV boxes would not be cost effective in our opinion. Replacement costs are low should the fail. | |
| ACT | AIR CURTAIN | D30 - HVAC | D3090 - OTHER HVAC SYSTEMS & EQUIPMENT | D3090903 - AIR CURTAIN | TBD - Perform Cost/Benefit analyses to determine if RCM approach | |
| LVR | LOUVER | D30 - HVAC | D3090 - OTHER HVAC SYSTEMS & EQUIPMENT | D3090999-OTHER | HVAC Air intake/ exhaust louver | |
| DFR | AIR DIFFUSER | D30 - HVAC | D3090 - OTHER HVAC SYSTEMS & EQUIPMENT | D3090999-OTHER | HVAC air Supply diffuser /return register | |
| DMP | AIR DAMPER | D30 - HVAC | D3090 - OTHER HVAC SYSTEMS & EQUIPMENT | D3090999-OTHER | HVAC damper-motorized or manual, fire/smoke damper | |
| WRF | Walk in Refregerator/Freezer | D30 - HVAC | D3090 - OTHER HVAC SYSTEMS & EQUIPMENT | D3030903 - PACKAGED DX REFRIGERANT SYSTEM | User owned equipment - Reimbursible PM if requested by customer | |
| ACP | AIR COMPRESSOR | D30 - HVAC | D3060 - CONTROLS & INSTRUMENTATION | D3060903 - AIR COMPRESSOR | < or = to 30 gal operator reponsibility > 30 gal PW responsibility - perforform cost/benefit analysis, but often we don't have this info. Note: The regional Boiler/UPV program coordinator has inventories for all bases in the region for air compressors. Once certified the cert is good for three years; Air compressor are included in PM if reimbursable customer requests for it | |
| WSK | SPRINKLER WATER SUPPLY | D40 - FIRE PROTECTION | D4010 - SPRINKLERS | D4010410 - WET PIPE SYSTEMS | No PM required on sprinkler piping and sprinkler heads | |
| PSK | SPRINKLER PUMPING EQUIPMENT | D40 - FIRE PROTECTION | D4010 - SPRINKLERS | D4010350 - PREACTION SYSTEMS | Booster pumps, valves etc… shall be included in PM program; instead sprinkler pipes and heads are not included | |
| DSK | DRY SPRINKLER SYSTEM | D40 - FIRE PROTECTION | D4010 - SPRINKLERS | D4010310 - DRY PIPE SYSTEMS | No PM required | |
| FEX | FIRE EXTINGUISHERS | D40 - FIRE PROTECTION | D4030 - FIRE PROTECTION SPECIALTIES | D4020999 - OTHER | Fire Dept. /facility user responsibility | |
| FMG | FOAM GENERATING EQUIPMENT | D40 - FIRE PROTECTION | D4030 - FIRE PROTECTION SPECIALTIES | D4020999 - OTHER | ||
| FLS | FIRE ALARM SYSTEM | D40 - FIRE PROTECTION | D4030 - FIRE PROTECTION SPECIALTIES | D4030999 - OTHER | ||
| BFP | BACKFLOW PREVENTER | D40 - FIRE PROTECTION | D4090 - OTHER FIRE PROTECTION SYSTEMS | D4090903 - BACKFLOW PREVENTER | In order to better store BFP info we should identify if each BFP is installed on: Domestic Water Distribution (D202003.07), or on Irrigation System (G205007.03), or on Sprinklers (D401002.01) | |
| TRF | TRANSFORMER | D50 - ELECTRICAL | D5010 - ELECTRICAL SERVICE & DISTRIBUTION | D5010902 - TRANSFORMER | perform cost/benefit analysis to determine size threshold - To be done based on MDI & system criticality | |
| EPN | Electric Panels | D50 - ELECTRICAL | D5010 - ELECTRICAL SERVICE & DISTRIBUTION | D5010906 - PANELBOARDS | Frequencies may vary in other countries, but this will only impact the frequencies. (by italian law each 3 years) | |
| MSS | MOTOR START SYSTEM | D50 - ELECTRICAL | D5010 - ELECTRICAL SERVICE & DISTRIBUTION | D5010903 - MOTOR CONTROL CENTER | Annual PM for elect motors is fine if the motor has sealed bearings. Electrical checks on 3 phase motors should be performed at least annually. | |
| ELCT | ELECTRICAL | D50 - ELECTRICAL | D5010 - ELECTRICAL SERVICE & DISTRIBUTION | D5010120 - ELECTRICAL SERVICE 10,000 S.F. 1000 amps 3 Ph 4 Wire |
D5010901 - TRANSFER SWITCH 1000 Amps - Automactic D5010903 - MOTOR CONTROL CENTER 600 Amps - Circuit Breakers
D5010905 - CAPACITOR BANK
| D5010999 - OTHER | FOS responsibility | |||||
| PSW | PAD SWITCH | D50 - ELECTRICAL | D5010 - ELECTRICAL SERVICE AND DISTRIBUTION | D5010240 - SWITCHGEAR | Annual PM - PW responsibility | |
| SWP | SEWAGE PANEL | D50 - ELECTRICAL | D5010 - ELECTRICAL SERVICE AND DISTRIBUTION | D5010906 - PANELBOARDS | No PM required - See EPN | |
| EHV | HIGH TENSION SERVICE & DISTRIBUTION | D50 - ELECTRICAL | D5020 - LIGHTING & BRANCH WIRING | D5020120 - ELECTRICAL DISTRIBUTION | 5 year cycle, flag as PM but sent to contracting | |
| LEX | EXIT LIGHTING | D50 - ELECTRICAL | D5020 - LIGHTING & BRANCH WIRING | D5020901 - EXIT LIGHTING | PM only on exist lights for testing purposes; if deficiencies are identified create a follow up service request. Exit lights are not included in PM | |
| LTW | LIGHTING TOWER | D50 - ELECTRICAL | D5020 - LIGHTING & BRANCH WIRING | D5020999 - OTHER | Lighting Tower any type and dimension | |
| AOL | AIRCRAFT OBSTRUCTION LIGHTS | D50 - ELECTRICAL | D5020 - LIGHTING & BRANCH WIRING | D5020999 - OTHER | PW responsibility - may be reimbursible | |
| ELCT | ELECTRICAL | D50 - ELECTRICAL | D5020 - LIGHTING & BRANCH WIRING | D5020120 - ELECTRICAL DISTRIBUTION |
D5020248 - INTERIOR LIGHTING, FLUORECENT Fluorecent/1 watt per S.F. - 5 Fixtures per 1000 S.F.
D5020250 - INTERIOR LIGHTING, INCANDESCENT 1 watt per S.F. - 6 fixtures per 1000 S.F.
D5020252 - INTERIOR LIGHTING, HIGH INT 1 watt/S.F. - 1 fixture per 1000/16'
D5020902 - EXPLOSION PROOF LIGHTING
D5020903 - EXTERIOR LIGHTING
| D5020999 - OTHER | FOS responsibility | |||||
| STL | STREET LIGHTS | D50 - ELECTRICAL | D5020 - LIGHTING AND BRANCH WIRING | D5020999 - OTHER | ||
| SSA | Site Security & Alarm Systems | D50 - ELECTRICAL | D5030 - COMMUNICATION AND SECURITY | D5030910 - COMMUNICATION/ALARM SYSTEMS | We need to avoid general catergories and concentrate on specific equipment. | |
| COMM | ELECTRICAL | D50 - ELECTRICAL | D5030 - COMMUNICATION AND SECURITY | D5030910 - COMMUNICATION/ALARM SYSTEMS | ||
| D5030999 - OTHER | FOS responsibility | |||||
| EPG | ELECTRICAL | D50 - ELECTRICAL | D5090 - OTHER ELECTRICAL SYSTEMS | D5090210 - GENERATORS | PW or UEM or Reimbursible PM | |
| LEX | ELECTRICAL | D50 - ELECTRICAL | D5090 - OTHER ELECTRICAL SYSTEMS | D5090901 - EMERGENCY LIGHTING | PW Responsibility | |
| LPS | LIGHTNING PROTECTION SYSTEM | D50 - ELECTRICAL | D5090 - OTHER ELECTRICAL SYSTEMS | D5090902 - LIGHTNING PROTECTION (ARRESTERS) | FOS responsibility | |
| GRD | GROUNDS | D50 - ELECTRICAL | D5090 - OTHER ELECTRICAL SYSTEMS | D5090903 - GROUNDING SYSTEM | Shops doing grounds maintenance is not the norm in the current maintenance climate. In any case, I'm not sure grounds maintenance is consider PM. We'll have to discuss this. | |
| UPS | UNITERRUPTED POWER SUPPLY | D50 - ELECTRICAL | D5090 - OTHER ELECTRICAL SYSTEMS | D5090904 - UNINTERUPTIBLE POWER SUPPLY | ||
| CNV | Converter, electrical | D50 - ELECTRICAL | D5090 - OTHER ELECTRICAL SYSTEMS | D5090999 - OTHER | ||
| ACP | Air compressor for vehicles | E10 - EQUIPMENT | E1030 - VEHICULAR EQUIPMENT | E1030999 - OTHER | User owned equipment - Reimbursible PM if requested by customer | |
| ADV | AUDIO-VISUAL EQUIPMENT | E10 - EQUIPMENT | E1090 - OTHER EQUIPMENT | E1090999 - OTHER EQUIPMENT | ||
| WSH | INDUSTRIAL WASHER | E10 - EQUIPMENT | E1090 - OTHER EQUIPMENT | E1090999 - OTHER EQUIPMENT | Depends on system - case by case determination | |
| SPT | SHOP TOOL | E10 - EQUIPMENT | E1090 - OTHER EQUIPMENT | E1090999 - OTHER EQUIPMENT | PW responsibility only for shop tools requiring PM - ie breaks, lathes etc. | |
| FDS | Food Service Equipment | E10 - EQUIPMENT | E1090 - OTHER EQUIPMENT | E1090999 - OTHER EQUIPMENT | User owned equipment - Reimbursible PM if requested by customer | |
| PLM | POOL MAINTENANCE | F10 - SPECIAL CONSTRUCTION | F1040 - SPECIAL FACILITIES | F104001 - INTERIOR SWIMMING POOLS | Equipment that is unique to the pool will need a special Job Plan. Other equipment at the pools will use a standardized Job Plan. | |
| AVS | ANTI-VEHICLE SYSTEM | G20 - SITE IMPROVEMENTS | G2010 - PAVEMENTS | G201005 - GUARDRAILS AND BARRIERS | Operator responsibility for testing - service call for repairs - PM only if required - Actually there is a specific PM program for this sort of Eq. | |
| TRS | TURNSTILE | G20 - SITE IMPROVEMENTS | G2040 - SITE IMPROVEMENTS & AM | G204099.08 - TURNSTILES | To be done upon MDI - PW responsibility | |
| SLG | Sliding Gate | G20 - SITE IMPROVEMENTS | G2040 - SITE IMPROVEMENTS & AMMENITIES | G204001.01 - FENCES AND GATES | ||
| TRT | TREE REMOVAL & TRIMMING | G20 - SITE IMPROVEMENTS | G2050 - LANDSCAPING | G205099 - LANDSCAPING | This is not routine periodic maintenance. It should not be included in the PM program. | |
| IRS | IRRIGATION SYSTEM | G20 - SITE IMPROVEMENTS | G2050 - LANDSCAPING | G205007.03 - IRRIGATION CONTROLS | No PM required - Service Call response only | |
| EPG | EMERGENCY POWER GENERATOR | J10 - Electric Utilities | J1010 - Production | J1010160 - Generators | ||
| EMH | ELECTRICAL MANHOLES | J10 - Electric Utilities | J1020 - Transmission | J1020110 - UG Structures | Service Call as needed | |
| SUB | ELETRICAL SUBSTATION | J10 - Electric Utilities | J1030 - Distribution | J1030140 - Sub Stations | UEM is responsible for funding | |
| CFS | CHEMICAL FEED SYSTEM | K10 - Potable Water Utilities | K1010 - Production | K1010200 - Chemical Treatment | Routine operator PM tasking - can this be categorized as WTP? | |
| WTP | WATER TREATMENT PLANT | K10 - Potable Water Utilities | K1010 - Production | K1010130- Pump Stations | UEM is responsible for funding | |
| VLV | VALVE | K10 - Potable Water Utilities | K1020 - Distribution | K1020100 - Service Areas | No PM required below certain size - Clarify - Distributions System PM - The only Valves we have in the system are the ones that has to be Pmed | |
| PWS | POTABLE WATER DISTRIBUTION AND STOREAGE SYSTEM | K10 - Potable Water Utilities | K1020 - Distribution | K1020100 - Service Areas | UEM is responsible for funding | |
| EST | ELEVATED STORAGE TANK | K10 - Potable Water Utilities | K1020 - Distribution | K1020120 - Storage | Inspections, painting, cleaning, cathodic protection etc | |
| PMS | PUMP STATION | K10 - Potable Water Utilities | K1020 - Distribution | K1020110 - Pump Stations | Check the size of the pumps to evaluate if PM is cost effective | |
| RWS | RAW WATER DISTRIBUTION AND STOREAGE SYSTEM | K20 - Non-Potable Water Utilities | K2010 - Production | K2010140 - Storage | Only equipment that is unique to the raw water distribution and storage system will need a special Job Plan. Other equipment in the system will use a standardized Job Plan. For example, a centrifugal pump at a for a boiler will use the same JP as a centrifugal pump in the water distribution system except the frequencies may be different. | |
| WLL | WELL | K20 - Non-Potable Water Utilities | K2020 - Distribution | K2020100 - Service Areas | ||
| STM | STEAM DISTRIBUTION SYSTEM | L10 - Steam Utilities | L1020 - Distribution | L1020100 - Service Area | ||
| WWT | Waste Water Treatment Plant | M10 - Sanitary Sewer Utilities | M1010 - Production | M1010130 - Primary Clarification | UEM is responsible for funding | |
| SMH | SEWAGE MANHOLES | M10 - Sanitary Sewer Utilities | M1020 - Distribution | M1020100 - Service Area | UEM is responsible for funding | |
| LST | LIFT STATION | M10 - Sanitary Sewer Utilities | M1020 - Distribution | M1020120 - Pump Stations | ||
| STK | SEPTIC TANK | M10 - Sanitary Sewer Utilities | M1020 - Distribution | M1020110 - Storage | ||
| OWS | OIL WATER SEPARATOR | M30 - Oily Wastewater Utilities | M3010 - Production | M3010200 - Sludge Dewatering | Most of the time Transportation is responsible for funding | |
| SDR | STORM DRAINS | M40 - Storm Water Utilities | M4020 - Distribution | M4020100 - Service Area | PW responsibility - once per year prior to rainy season | |
| FFE | FUEL FARM EQUIPMENT | R23 - GROUND BASED VEHICLE AND EQUIPMENT FUEL FACILITIES | R2310 - FILLING STATION | R231099 - FILLING STATION COMPONENT | ||
| CTD | Cathodic Protection | W10 - CATHODIC PROTECTION SYSTEM | W1010 - IMPRESSED CURRENT CP | W101010 - RECTIFIERS | PW responsibility |
&P of &N EQUIPMENT UNIFIRMAT STANDARDS V14
Header
| Header | |
| ARCHIBUS/FM Data Transfer | |
| Version | AllowTableAdditions |