J-1501000-06 Equipment Standards List.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece Federal contract opportunity
Solicitation number
N6247024R0001
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document appears to be an equipment standards list for a federal contract opportunity at U.S. Naval Support Activity (NSA) Souda Bay, Crete, Greece. The equipment standards list covers a wide range of facilities and systems including foundations, floors, roofing, walls, stairs, plumbing, HVAC, electrical, conveying systems, and site infrastructure. For each equipment type, the list provides the UNIFORMAT II classification code, equipment description, and notes on maintenance requirements. The related federal contract opportunity is for Base Operations Support (BOS) Services at NSA Souda Bay, with solicitation number N6247024R0001 issued by the Department of the Navy Naval Facilities Engineering Command. The summary does not include specific details on the required products or services, response dates, award information, pricing terms, set asides, or other contractual details, as this appears to be an equipment standards reference document rather than the full solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece, newest first.
File Type Posted
J-0200000-15 ELINS (AMD 0006).xlsx XLSX spreadsheet
N6247024R0001 Amendment 0006.pdf PDF
SECTION F Deliverables (AMD 0006).pdf PDF
N6247024R0001 Amend 0005.pdf PDF
J-1502000-05 PM Services Matrix (AMD 0005).xlsx XLSX spreadsheet
1402000 J Unaccompanied Housing (AMD 0005).pdf PDF
J-1503060-03 Pavement Clearance Site Map (AMD 0005).pdf PDF
Attachment F SECTION F Deliverables (AMD 0005).pdf PDF
J-0200000-15 ELINS (AMD 0003).xlsx XLSX spreadsheet
N6247024R0001 Amendment 0003.pdf PDF
J-1402000-07 Minor Repairs Historical Data (AMD 0002).xlsx XLSX spreadsheet
J-1800000 Environmental (AMD 0002).pdf PDF
J-0200000-15 ELINS (AMD 0002).xlsx XLSX spreadsheet
Attachment F - Section F Deliverables (AMD 0002).pdf PDF
N6247024R0001 Amendment 0002.pdf PDF
J-1502000 Facility Investment (AMD 0002).pdf PDF
J-1502000-23.a Irrigation System Layout (AMD 0002).pdf PDF
J-0600000 Port Operations (AMD 0002).pdf PDF
N6247024R0001 Amendment 0001.pdf PDF
N6247024R0001 RFP.pdf PDF
J-1 NAVFAC Past Performance Questionnaire.pdf PDF
J-0200000-11.a How to purchase PKI to Access Maximo.pdf PDF
J-0200000-11.b How to Request a Maximo Account.pdf PDF
J-0200000-11.c SAAR-N Sample Form for BOSC.pdf PDF
J-0200000-12 Final Governing Standards (FGS) Greece.pdf PDF
J-1002000 Supply Services.pdf PDF
J-1501000 Facility Management.pdf PDF
J-1502000-33.d Arresting Gear Preserved On Site Components.pdf PDF
J-1503010 Custodial.pdf PDF
J-1503020-13 Historical Unscheduled Pest Control Service Orders.xlsx XLSX spreadsheet
J-1503050-11 Running Track Boneyard Grounds Map.pdf PDF
F - Section F Deliverables.pdf PDF
J-2 Corporate Experience Project Data Sheet.pdf PDF
J-7 DBIDS SECNAV FORM 5512_1.pdf PDF
J-0200000 Management and Administration.pdf PDF
J-0200000-07 - NAVFAC Maximo Asset Information.xlsx XLSX spreadsheet
J-1002000-03 Personal Property Customer Service Survey.pdf PDF
1300000 J Galley.pdf PDF
J-1300000-13 Galley Floor Plan.pdf PDF
J-1402000.2 NHG-NAVY INN.pdf PDF
J-1402000.3 Contingency Lodging.pdf PDF
J-1502000-05 Preventative Maintenance (PM) Program Services Matrix.xlsx XLSX spreadsheet
J-1502000-17.a Weatherpak Quick Deploy Guide.pdf PDF
J-1502000-23 Irrigation System Layout.pdf PDF
J-1502000-33.a STW-07 Outdoor Painting Depainting and Corrosion Control.pdf PDF
J-1502000-33.f NAVAIR 17-1-125 CORROSION CONTROL.pdf PDF
J-1503020-15 Integrated Pest Management Plan (IPMP) NSA Souda Bay.pdf PDF
J-1503050-14 Marathi Port Ops Grounds Map.pdf PDF
J-1503050-15 Marathi Security RSM1 Grounds Map.pdf PDF
J-1606001 Water (Overseas).pdf PDF
Show all 50

Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Equipment Standards v14

Equipment Standard CodeEquipment DescriptionMaster SystemSystemSub SystemsNotesADDITIONAL NOTES
FNDTFOUNDATIONA10 - FOUNDATIONSA1010 - STANDARD FOUNDATIONSA1010110 - STRIP FOOTINGS

A1010210 - SPREAD FOOTINGS

A1010250 - PILE CAPS

A1010999 - OTHERFOS responsibility
FNDTFOUNDATIONA10 - FOUNDATIONSA1020 - SPECIAL FOUNDATIONSA102005 - RAFT FOUNDATIONS

A1020110 - CIP CONCRETE PILES

A1020120 - PRECAST CONCRETE PILES

A1020130 - STEEL PIPE PILES

A1020140 - STEEL H PILES

A1020160 - TREATED WOOD PILES

A1020210 - GRADE BEAMS

A1020999 - OTHERFOS responsibility
FNDTFOUNDATIONA10 - FOUNDATIONSA1030 - SLAB ON GRADEA1030120 - PLAIN/REINFORCED
A1030999 - OTHERFOS responsibility
FNDTFOUNDATIONA20 - FOUNDATIONSA2010 - BASEMENT EXCAVATIONA2010999 - OTHER BASEMENT EXCAVATION
FNDTFOUNDATIONA20 - FOUNDATIONSA2010 - BASEMENT EXCAVATIONA2010999 - OTHER BASEMENT EXCAVATIONFOS responsibility
FNDTFOUNDATIONA20 - FOUNDATIONSA2020 - BASEMENT WALLSA2020110 - CIP CONCRETE

A2020140 - CONCRETE BLOCK

A2020150 - WOOD

A2020999 - OTHERFOS responsibility
FLRCFLOOR CONSTRUCTIONB10 - SUPERSTRUCTUREB1010 - FLOOR CONSTRUCTIONB1010220 - CIP CONCRETE BEAM AND SLAB

B1010238 - PRECAST CONCRETE BEAM AND PLANK

B1010244 - LIGHT GAUGE STEEL FLOOR SYSTEM

B1010250 - COMPOSITE DECK, STEEL BAR JOISTS

B1010254 - COMP DECK, STRUCTURAL STEEL BEAM

B1010264 - WOOD BEAM, JOIST, AND DECK

B1010998 - EXTERIOR STAIRS

B1010999 - OTHERFOS responsibility
ROOFROOF CONSTRUCTIONB10 - SUPERSTRUCTUREB1020 - ROOF CONSTRUCTIONB1020102 - WOOD DECK AND RAFTER

B1020108 - STEEL DECK, BEAMS AND BAR JOIST

B1020122 - CIP CONCRETE ROOF CONSTRUCTION

B1020137 - AWNING/CANOPY

B1020901 - CIP CONCRETE BEAM AND SLAB

B1020902 - PRECAST CONCRETE BEAM AND PLANK

B1020999 - OTHERFOS responsibility
ROOFROOFB10 - SUPERSTRUCTUREB1030 - ROOF CONSTRUCTIONB103001 - METAL STRUCTURAL FRAMEFOS responsibility
WALLWALLSB20 - EXTERIOR ENCLOSUREB2010 - EXTERIOR WALLSB2010101 - CIP CONCRETE

B2010104 - PRECAST CONCRETE PANEL (RIBBED)

B2010106 - PRECAST CONCRETE PANEL (TILT UP)

B2010109 - CONCRETE BLOCK

B2010125 - SOLID BRICK - SINGLE WYTHE

B2010126 - SOLID BRICK - DOUBLE WYTHE

B2010128 - STONE VENEER W/STUD BACKUP

B2010130 - BRICK VENEER W/STUD BACKUP

B2010132 - MASONRY COMPOSITE

B2010134 - MASONRY CAVITY

B2010140 - GLASS BLOCK

B2010146 - METAL SIDING PANEL

B2010148 - WOOD CLADDING W/STUD BACKUP

B2010151 - STUCCO WALL

B2010152 - E.I.F.S.

B2010999 - OTHERFOS responsibility
FNCEXTERIOR SECURITY FENCINGB20 - EXTERIOR ENCLOSUREB2010 - EXTERIOR WALLSB2010999-OTHERNEW CODES
RLGSAFETY RAILING / PARAPETS
WNDWOPENINGSB20 - EXTERIOR ENCLOSUREB2020 - EXTERIOR GLAZED OPENINGSB2020102 - WOOD WINDOWS

B2020104 - STEEL WINDOWS

B2020106 - ALUMINUM WINDOWS

B2020210 - TUBULAR ALUMINUM FRAMING

B2020220 - CURTAIN WALL PANELS

B2020999 - OTHERFOS responsibility
ADOAUTOMATIC DOORB20 - EXTERIOR ENCLOSUREB2030 - EXTERIOR DOORSB2030999 - OTHER
RLDROLL UP DOORB20 - EXTERIOR ENCLOSUREB2030 - EXTERIOR DOORSB2030999 - OTHER
B2030410 - OVERHEAD DOORSNote UNIFOMAT II code for level 4 was Identified as B2034. This code is for Overhead doors - not Roll Up Doors. This may be just be a simple naming convention conflict.
SLDSLIDING DOORB20 - EXTERIOR ENCLOSUREB2030 - EXTERIOR DOORSB2030999 - OTHERNote UNIFORMAT II code for level 4 was Identified as B2039, however this code is for Other Doors and Entrances. This is not a problem because Sliding doors are not otherwise identified.
DOOREXTERIOR DOORSB20 - EXTERIOR ENCLOSUREB2030 - EXTERIOR DOORSB2030110 - GLAZED DOORS

B2030210 - WOOD DOORS

B2030220 - STEEL DOORS

B2030230 - ALUMINUM DOORS

B2030410 - OVERHEAD DOORS

B2030901 - HANGAR DOORS

B2030902 - BLAST RESISTANT DOORS

B2030999 - OTHERFOS responsibility
GTRGUTTER/ROOFB30 - ROOFINGB3010 - ROOF COVERINGB3010610 - GUTTERSFOS responsibility
ROOFROOF COVERINGB30 - ROOFINGB3010 - ROOF COVERINGB3010105 - BUILT-UP

B3010120 - SINGLE PLY MEMBRANE

B3010130 - PREFORMED METAL

B3010135 - FORMED METAL

B3010140 - SHINGLE TILE

B3010320 - ROOF DECK INSULATION

B3010620 - DOWNSPOUTS

B3010999 - OTHERFOS responsibility
ROOFROOF OPENINGB30 - ROOFINGB3020 - ROOF OPENINGB3020110 - SKYLIGHTS

B3020210 - HATCHES

B3020999 - OTHERFOS responsibility
PRTNPARTITIONSC10 - INTERIOR CONSTRUCTIONC1010 - PARTITIONSC1010102 - CONCRETE BLOCK

C1010120 - TILE

C1010126 - DRYWALL W/STUD FRAMING

C1010140 - PLASTER W/STUD FRAMING

C1010710 - INTERIOR WINDOWS

C1010999 - OTHERFOS responsibility
DOORINTERIOR DOORSC10 - INTERIOR CONSTRUCTIONC1020 - INTERIOR DOORSC1020102 - SPECIAL DOORS

C1020111 - FIRE DOOR, SWINGING

C1020112 - FIRE DOOR, SLIDING

C1020113 - FIRE DOOR, ROLLING SERVICE/ROLL-UP

C1020114 - METAL DOOR

C1020120 - WOOD DOOR/WOOD FRAME

C1020122 - WOOD DOOR/METAL FRAME

C1020124 - WOOD FIRE DOORS/METAL FRAMES

C1020301 - BLAST RESISTANT DOOR

C1020999 - OTHERFOS responsibility
PRTNFITTINGSC10 - INTERIOR CONSTRUCTIONC1030 - FITTINGSC1030110 - TOILET PARTITIONS

C1030310 - LOCKERS

C1030830 - CABINETS

C1030831 - COUNTERTOP

C1030999 - OTHERFOS responsibility
STRSSTAIR CONSTRUCTIONC20 - STAIRSC2010 - STAIR CONSTRUCTIONC2010110 - STAIRSFOS responsibility
RLGSTAIWAY-BALCONIES RAILINGC2010999-OTHERMETER GROUP NOT INCLUDED IN PREVIOUS VERSIONS
STRSSTAIR FINISHESC20 - STAIRSC2020 - STAIR FINISHESC2020999 - OTHER STAIR FINISHESFOS responsibilityMETER GROUP DOES NOT EXIST
PRTNWALL FINISHESC30 - INTERIOR FINISHESC3010 - WALL FINISHESC3010230 - WALL COVERING

C3010380 - WALL TILE

C3010999 - OTHERFOS responsibility
FLRGFLOORINGC30 - INTERIOR FINISHESC3020 - FLOORINGC3020901 - CARPET

C3020902 - CARPET TILE

C3020903 - COMPOSITION SHEET

C3020904 - CONCRETE TOPPING

C3020905 - WOOD

C3020906 - TERRAZZO

C3020907 - VINYL TILE

C3020908 - CORK TILE

C3020909 - RUBBER SHEET

C3020910 - PORCELAIN TILE

C3020911 - QUARRY TILE

C3020912 - PAINT

C3020913 - MARBLE TILE

C3020914 - CERAMIC TILE

C3020915 - ACCESS FLOORING

C3020999 - OTHERFOS responsibility
CEILCEILING FINISHESC30 - INTERIOR FINISHESC3030 - CEILING FINISHESC3030105 - PLASTER

C3030110 - DRYWALL

C3030210 - ACOUSTICAL

C3030999 - OTHERFOS responsibility
CEILCEILING FINISHESC30 - INTERIOR FINISHESC3040 - INTERIOR FINISH ASSEMBLIESC3040999 - OTHER INTERIOR FINISH ASSEMBLIESFOS responsibility
LFTLIFTSD10 - CONVEYINGD1010 - ELEVATORS AND LIFTSD1010901 - LIFTSSpecialized Program - identify PM requirements with VTE program coordinator - program monitored by region. Anyway the Eq. Info has to be stored
HCRHOISTS & CRANESD10 - CONVEYINGD1090 - OTHER CONVEYING SYSTEMSD1090902 - CRANES AND HOISTSSpecialized Program - identify PM requirements with VTE program coordinator - program monitored by region. Anyway the Eq. Info has to be stored
DRFDRINKING FOUNTAINS AND COOLERSD20 - PLUMBINGD2010 - PLUMBING FIXTURESD2010810 - DRINKING FOUNTAINPM is not cost effective.
PLMBPLUMBING FIXTURESD20 - PLUMBINGD2010 - PLUMBING FIXTURESD2010110 - TOILET

D2010210 - URINAL

D2010310 - LAVATORY

D2010410 - SINK

D2010430 - LABORATORY SINK

D2010510 - BATHTUB

D2010610 - GROUP WASH FOUNTAIN

D2010710 - SHOWER

D2010820 - WATER COOLER

D2010901 - EMERGENCY SHOWER

D2010902 - EMERGENCY EYE WASH

D2010903 - BIDET

D2020905 - PIPING/FITTINGS

D2010999 - OTHERFOS responsibility
BFPBACKFLOW PREVENTERD20 - PLUMBINGD2020 - DOMESTIC WATER DISTRIBUTIOND2020903 - BACKFLOW PREVENTERIn order to better store BFP info we should identify if each BFP is installed on: Domestic Water Distribution (D202003.07), or on Irrigation System (G205007.03), or on Sprinklers (D401002.01)
TNKWATER TANKD20 - PLUMBINGD2020 - DOMESTIC WATER DISTRIBUTIOND2020902 - STORAGE TANKNo PM required - inspection need annually or greater
WMTWATER METERD20 - PLUMBINGD2020 - DOMESTIC WATER DISTRIBUTIOND2020999 - OTHERCreate a Recurring - Recurring PM package for UEM meter reading under NWCF GL account
PMPPUMP, generic WATERD20 - PLUMBINGD2020 - DOMESTIC WATER DISTRIBUTIOND2020906 - CIRCULATING PUMPperform cost/benefit analysis to determine size threshold - To be done based on MDI and system criticality
FLTFILTER, generic WATERD20 - PLUMBINGD2020 - DOMESTIC WATER DISTRIBUTIOND2020999-OTHERDepends on system - case by case determination
WHTWATER HEATERD20 - PLUMBINGD2020 - DOMESTIC WATER DISTRIBUTIOND2020210 - WATER HEATERS, RESIDENTIAL, ELEC

D2020220 - WATER HEATERS, RESIDENTIAL, GAS

D2020230 - WATER HEATERS, RESIDENTIAL, OIL

D2020240 - WATER HEATERS, COMMERCIAL, ELEC

D2020250 - WATER HEATERS, COMMERCIAL, GAS

D2020260 - WATER HEATERS, COMMERCIAL, OIL

D2020904 - HEAT TRANSFER PACKAGEOnly commercial water heaters are included in PM program.
Domestic water heaters can be PMed on if reimbursable customer makes the requestIn order to assign a correct SUBSYSTEM, it shall be identified each type of boiler by defining the following information: TYPE (hot water o steam), MATERIAL , TYPE OF ENERGY SUPPLY (electric/Gas/Oil etc..). Capacity, etc…
FHYFIRE HYDRANTD20 - PLUMBING
K3020 - DistributionD2020 - DOMESTIC WATER DISTRIBUTION
K3020 - DistributionD2020905 - PIPING / FITTINGS
K3020100 - Service AreasFire hydrant PM is paid by UEM if the fire protection line is on the potable water distribution line; otherwise is under FM&S responsibility
PLMBPLUMBING SYSTEMSD20D2020-DOMESTIC WATER DISTRIBUTIOND2020905 - PIPING / FITTINGS
HDRCHYDRONIC SYSTEMS
WSFWater SoftenerD20 - PLUMBINGD2020-DOMESTIC WATER DISTRIBUTIOND2020999 - OTHER
SPPSUMP PUMPD20 - PLUMBINGD2030 - SANITARY WASTED2030905 - SUMP PUMPperform cost/benefit analysis to determine size threshold - To be done based on MDI and system criticality
PLMBPLUMBING FIXTURESD20 - PLUMBINGD2030 - SANITARY WASTED2030901 - SANITARY WASTE SEPARATOR

D2030902 - WASTE/VENT PIPING

D2030999 - OTHERFOS responsibility
PLMBPLUMBING FIXTURESD20 - PLUMBINGD2040 - RAIN WATER DRAINAGED2040210 - ROOF DRAINS
D2040999 - OTHERFOS responsibility
GSMGAS METERD20 - PLUMBINGD2090 - OTHER PLUMBING SYSTEMSD2090999 - OTHERCreate a Recurring - Recurring PM package for UEM meter reading under NWCF GL account
PLMBPLUMBING FIXTURESD20 - PLUMBINGD2090 - OTHER PLUMBING SYSTEMSD2090999 - OTHERFOS responsibility
BOIBOILERD30 - HVACD3020 - HEAT GENERATING SYSTEMSD3020126 - BOILER, ELECTRIC, HOT WATER

D3020128 - BOILER, ELECTRIC, STEAM

D3020130 - BOILER CAST IRON HOT WATER GAS

D3020134 - BOILER, CAST IRON, STEAM, GAS

D3020136 - BOILER, CAST IRON HT WTR GAS/OIL

D3020138 - BOILER, CAST IRON, STEAM GAS/OIL

D3020311 - BOILER FUEL OIL PUMP

D3020901 - BOILER, CAST IRON, HT WTR, OIL

D3020902 - BOILER, CAST IRON, STEAM, OIL

D3020903 - BOILER, SOLID FUEL

D3020904 - BOILER FEEDWATER TANK

D3020905 - FURNACE

D3020999 - OTHERIn order to assign a correct SUBSYSTEM, it shall be identified each type of boiler by defining the following information: TYPE (hot water o steam), MATERIAL , TYPE OF ENERGY SUPPLY (electric/Gas/Oil etc..). Capacity, etc…
EXTEXPANSION TANKD30 - HVACD3020 - HEAT GENERATING SYSTEMSD3020906 - EXPANSION TANK
FOTFUEL OIL TANKD30 - HVACD3020 - HEAT GENERATING SYSTEMSD3020999 - OTHERSupply for bulk storage/none for < or = 1000 gals
CHLCHILLERD30 - HVACD3030 - COOLING GENERATING SYSTEMSD3030120 - CHILLER, SCROLL, AIR COOLED

D3030125 - CHILLER, SCROLL, WATER COOLED

D3030130 - CHILLER, RECIP, WATER COOLED

D3030135 - CHILLER, RECIP, AIR COOLED

D3030140 - CHILLER, CENTRIFUGAL, WTR COOLED

D3030145 - CHILLER, GAS ABSO, WTR COOLED

D3030150 - CHILLER, STEAM ABSO, WTR COOLED

D3030160 - CHILLER, SCREW, AIR COOLED

D3030165 - CHILLER, SCREW, WATER COOLEDIt has to be identified if the item is a Absortion Water Chiller (D303001.01) or a Compression Chill (D303001.02)In order to assign a correct SUBSYSTEM, we should identify for each EQUIPMENT the following data: TYPE (Scroll, Reciprocating, Centrifugal, Gas Absorption etc ), AIR or WATER COOLED
CLTCOOLING TOWERD30 - HVACD3030 - COOLING GENERATING SYSTEMS

D3030310 - COOLING TOWER, GALVANIZED

D3030320 - COOLING TOWER, FIBERGLASS

D3030330 - COOLING TOWER, STAINLESS STEEL

ACCAIR COOLED CONDENSERD30 - HVACD3030 - COOLING GENERATING SYSTEMSD3030901 - CONDENSER, DX, AIR COOLED
DRXDIRECT EXPANSIOND30 - HVACD3030 - COOLING GENERATING SYSTEMSD3030903 - PACKAGED DX REFRIGERANT SYSTEMIt has to be identified if the item uses R22 or any other not good for ozone refrigerant gas. In that case include the equipment in list for replacement
PMPPUMP, generic HVACD30 - HVACD3040 - DISTRIBUTION SYSTEMSD3040330 - CIRCULATING PUMP, END SUCTIONperform cost/benefit analysis to determine size threshold - To be done based on MDI and system criticality
FLTFILTER, generic HVACD30 - HVACD3040 - DISTRIBUTION SYSTEMSD3040999-OTHERDepends on system - case by case determination
HEXHEAT EXCHANGERD30 - HVACD3040 - DISTRIBUTION SYSTEMSD3040610 - HEAT EXCHANGER, PLATE TYPENo PM required
HEXHEAT EXCHANGERD30 - HVACD3040 - DISTRIBUTION SYSTEMSD3040620 - HEAT EXCHANGER, SHELL TUBENo PM required
AHUAIR HANDLING UNITD30 - HVACD3040 - DISTRIBUTION SYSTEMS

D3040106 - AIR HANDLING UNIT, FIELD FAB

D3040110 - AIR HANDLING UNIT, CENTRAL STA

D3040114 - AIR HANDLING UNIT, ROOFTOP

FANSUPPLY FAND30 - HVACD3040 - DISTRIBUTION SYSTEMSD3040220 - FAN SYSTEM, CENTRIFUGAL IN-LINETo be done based on MDI & system criticality - perform cost/benefit analysis to determine size threshold - It has to be identified what type of FAN (D304007.xx)
EXFEXHAUST FAND30 - HVACD3040 - DISTRIBUTION SYSTEMSD3040240 - FAN SYSTEM, ROOF EXHAUSTPerform cost/benefit analysis to determine size threshold - To be done based on MDI and system criticality - It has to be identified what type of FAN (D305001.xx)
FCUFAN COIL UNITD30 - HVACD3040 - DISTRIBUTION SYSTEMS

D3040118 - FAN COIL A/C, CAB MNT, TWO PIPE

D3040122 - FAN COIL A/C, CAB MNT, FOUR PIPE

D3040124 - FAN COIL A/C, DUCT MOUNT, 2 PIPE

D3040128 - FAN COIL A/C, DUCT MOUNT, 4 PIPE

It has to be identified what type of FAN COIL (D305003 Chilled Water, or D305006.03 Direct Expansion)In order to assign a correct SUBSYSTEM, we should identify for each EQUIPMENT the Type: CABINET/DUCT MOUNTED; 2/4 PIPES
HODKITCHEN HOODD30 - HVACD3040 - DISTRIBUTION SYSTEMSD3040260 - KITCHEN EXHAUST/MAKE-UP AIR
HMDHUMIDIFIERD30 - HVACD3040 - DISTRIBUTION SYSTEMSD3040902 - HUMIDIFIERPW responsibility - perform Cost/Benefit analyses to determine size threshold
PKUPACKAGE UNITD30 - HVACD3050 - TERMINAL & PACKAGE UNITSD30502-- - PKG A/C

ONE-NET: ONE-NET:

In order to assign a correct SUBSYSTEM, we should identify for each EQUIPMENT the Type: AIR/WATER COOLED; HOT WATER/ELEC HEAT

CRUCOMPUTER ROOM UNITD30 - HVACD3050 - TERMINAL & PACKAGE UNITSD3050185 - COMPUTER ROOM COOLING UNITS
A/CA/C SPLIT UNITD30 - HVACD3050 - TERMINAL & PACKAGE UNITSD3050170 - SPLIT SYSTEMS AIR COOLED CONDENSE UNITPreventive maintenance program for A/C split unit shall include external condenser maitenance and internal unit for air filter replacing or cleaning
HETheating systemD30 - HVACD3050 - TERMINAL & PACKAGE UNITS

D3050120 - UNIT HEATERS, GAS

D3050130 - UNIT HEATERS, HYDRONIC

D3050901 - UNIT HEATERS, ELECTRIC

D3050902 - UNIT HEATER, INFRARED

In order to assign a correct SUBSYSTEM, we should identify for each EQUIPMENT the Type: ELECTIRC, GAS, HYDRONIC
VFDVARIABLE FREQUENCY DRIVED30 - HVACD3060 - CONTROLS & INSTRUMENTATIOND3060901 - HVAC CONTROLS, ELECTRIC, DIGITALThe UNIFORMAT II code for this identifies it as a "Control Device." When conrol devices fail they are replaced. There is no PM function for this type of equipment.
DCPDIGITAL CONTROL PANELD30 - HVACD3060 - CONTROLS & INSTRUMENTATIOND3060901 - HVAC CONTROLS, ELECTRIC, DIGITALHVAC digital control panel and/or LAN interface panel board for remote monitoring
VAVVARIABLE AIR VOLUMED30 - HVACD3090 - OTHER HVAC SYSTEMS & EQUIPMENTD3040132 - VAV TERMINALThe UNIFORMAT II code for this identifies it as a "Terminal Device." VAV boxes generally are controlled by DDC or the room temperature controllers. If on DDC any problems will be identified through the control telemetry. Checking all thermostat controlled VAV boxes would not be cost effective in our opinion. Replacement costs are low should the fail.
ACTAIR CURTAIND30 - HVACD3090 - OTHER HVAC SYSTEMS & EQUIPMENTD3090903 - AIR CURTAINTBD - Perform Cost/Benefit analyses to determine if RCM approach
LVRLOUVERD30 - HVACD3090 - OTHER HVAC SYSTEMS & EQUIPMENTD3090999-OTHERHVAC Air intake/ exhaust louver
DFRAIR DIFFUSERD30 - HVACD3090 - OTHER HVAC SYSTEMS & EQUIPMENTD3090999-OTHERHVAC air Supply diffuser /return register
DMPAIR DAMPERD30 - HVACD3090 - OTHER HVAC SYSTEMS & EQUIPMENTD3090999-OTHERHVAC damper-motorized or manual, fire/smoke damper
WRFWalk in Refregerator/FreezerD30 - HVACD3090 - OTHER HVAC SYSTEMS & EQUIPMENTD3030903 - PACKAGED DX REFRIGERANT SYSTEMUser owned equipment - Reimbursible PM if requested by customer
ACPAIR COMPRESSORD30 - HVACD3060 - CONTROLS & INSTRUMENTATIOND3060903 - AIR COMPRESSOR< or = to 30 gal operator reponsibility > 30 gal PW responsibility - perforform cost/benefit analysis, but often we don't have this info. Note: The regional Boiler/UPV program coordinator has inventories for all bases in the region for air compressors. Once certified the cert is good for three years; Air compressor are included in PM if reimbursable customer requests for it
WSKSPRINKLER WATER SUPPLYD40 - FIRE PROTECTIOND4010 - SPRINKLERSD4010410 - WET PIPE SYSTEMSNo PM required on sprinkler piping and sprinkler heads
PSKSPRINKLER PUMPING EQUIPMENTD40 - FIRE PROTECTIOND4010 - SPRINKLERSD4010350 - PREACTION SYSTEMSBooster pumps, valves etc… shall be included in PM program; instead sprinkler pipes and heads are not included
DSKDRY SPRINKLER SYSTEMD40 - FIRE PROTECTIOND4010 - SPRINKLERSD4010310 - DRY PIPE SYSTEMSNo PM required
FEXFIRE EXTINGUISHERSD40 - FIRE PROTECTIOND4030 - FIRE PROTECTION SPECIALTIESD4020999 - OTHERFire Dept. /facility user responsibility
FMGFOAM GENERATING EQUIPMENTD40 - FIRE PROTECTIOND4030 - FIRE PROTECTION SPECIALTIESD4020999 - OTHER
FLSFIRE ALARM SYSTEMD40 - FIRE PROTECTIOND4030 - FIRE PROTECTION SPECIALTIESD4030999 - OTHER
BFPBACKFLOW PREVENTERD40 - FIRE PROTECTIOND4090 - OTHER FIRE PROTECTION SYSTEMSD4090903 - BACKFLOW PREVENTERIn order to better store BFP info we should identify if each BFP is installed on: Domestic Water Distribution (D202003.07), or on Irrigation System (G205007.03), or on Sprinklers (D401002.01)
TRFTRANSFORMERD50 - ELECTRICALD5010 - ELECTRICAL SERVICE & DISTRIBUTIOND5010902 - TRANSFORMERperform cost/benefit analysis to determine size threshold - To be done based on MDI & system criticality
EPNElectric PanelsD50 - ELECTRICALD5010 - ELECTRICAL SERVICE & DISTRIBUTIOND5010906 - PANELBOARDSFrequencies may vary in other countries, but this will only impact the frequencies. (by italian law each 3 years)
MSSMOTOR START SYSTEMD50 - ELECTRICALD5010 - ELECTRICAL SERVICE & DISTRIBUTIOND5010903 - MOTOR CONTROL CENTERAnnual PM for elect motors is fine if the motor has sealed bearings. Electrical checks on 3 phase motors should be performed at least annually.
ELCTELECTRICALD50 - ELECTRICALD5010 - ELECTRICAL SERVICE & DISTRIBUTIOND5010120 - ELECTRICAL SERVICE 10,000 S.F. 1000 amps 3 Ph 4 Wire

D5010901 - TRANSFER SWITCH 1000 Amps - Automactic D5010903 - MOTOR CONTROL CENTER 600 Amps - Circuit Breakers

D5010905 - CAPACITOR BANK

D5010999 - OTHERFOS responsibility
PSWPAD SWITCHD50 - ELECTRICALD5010 - ELECTRICAL SERVICE AND DISTRIBUTIOND5010240 - SWITCHGEARAnnual PM - PW responsibility
SWPSEWAGE PANELD50 - ELECTRICALD5010 - ELECTRICAL SERVICE AND DISTRIBUTIOND5010906 - PANELBOARDSNo PM required - See EPN
EHVHIGH TENSION SERVICE & DISTRIBUTIOND50 - ELECTRICALD5020 - LIGHTING & BRANCH WIRINGD5020120 - ELECTRICAL DISTRIBUTION5 year cycle, flag as PM but sent to contracting
LEXEXIT LIGHTINGD50 - ELECTRICALD5020 - LIGHTING & BRANCH WIRINGD5020901 - EXIT LIGHTINGPM only on exist lights for testing purposes; if deficiencies are identified create a follow up service request. Exit lights are not included in PM
LTWLIGHTING TOWERD50 - ELECTRICALD5020 - LIGHTING & BRANCH WIRINGD5020999 - OTHERLighting Tower any type and dimension
AOLAIRCRAFT OBSTRUCTION LIGHTSD50 - ELECTRICALD5020 - LIGHTING & BRANCH WIRINGD5020999 - OTHERPW responsibility - may be reimbursible
ELCTELECTRICALD50 - ELECTRICALD5020 - LIGHTING & BRANCH WIRINGD5020120 - ELECTRICAL DISTRIBUTION

D5020248 - INTERIOR LIGHTING, FLUORECENT Fluorecent/1 watt per S.F. - 5 Fixtures per 1000 S.F.

D5020250 - INTERIOR LIGHTING, INCANDESCENT 1 watt per S.F. - 6 fixtures per 1000 S.F.

D5020252 - INTERIOR LIGHTING, HIGH INT 1 watt/S.F. - 1 fixture per 1000/16'

D5020902 - EXPLOSION PROOF LIGHTING

D5020903 - EXTERIOR LIGHTING

D5020999 - OTHERFOS responsibility
STLSTREET LIGHTSD50 - ELECTRICALD5020 - LIGHTING AND BRANCH WIRINGD5020999 - OTHER
SSASite Security & Alarm SystemsD50 - ELECTRICALD5030 - COMMUNICATION AND SECURITYD5030910 - COMMUNICATION/ALARM SYSTEMSWe need to avoid general catergories and concentrate on specific equipment.
COMMELECTRICALD50 - ELECTRICALD5030 - COMMUNICATION AND SECURITYD5030910 - COMMUNICATION/ALARM SYSTEMS
D5030999 - OTHERFOS responsibility
EPGELECTRICALD50 - ELECTRICALD5090 - OTHER ELECTRICAL SYSTEMSD5090210 - GENERATORSPW or UEM or Reimbursible PM
LEXELECTRICALD50 - ELECTRICALD5090 - OTHER ELECTRICAL SYSTEMSD5090901 - EMERGENCY LIGHTINGPW Responsibility
LPSLIGHTNING PROTECTION SYSTEMD50 - ELECTRICALD5090 - OTHER ELECTRICAL SYSTEMSD5090902 - LIGHTNING PROTECTION (ARRESTERS)FOS responsibility
GRDGROUNDSD50 - ELECTRICALD5090 - OTHER ELECTRICAL SYSTEMSD5090903 - GROUNDING SYSTEMShops doing grounds maintenance is not the norm in the current maintenance climate. In any case, I'm not sure grounds maintenance is consider PM. We'll have to discuss this.
UPSUNITERRUPTED POWER SUPPLYD50 - ELECTRICALD5090 - OTHER ELECTRICAL SYSTEMSD5090904 - UNINTERUPTIBLE POWER SUPPLY
CNVConverter, electricalD50 - ELECTRICALD5090 - OTHER ELECTRICAL SYSTEMSD5090999 - OTHER
ACPAir compressor for vehiclesE10 - EQUIPMENTE1030 - VEHICULAR EQUIPMENTE1030999 - OTHERUser owned equipment - Reimbursible PM if requested by customer
ADVAUDIO-VISUAL EQUIPMENTE10 - EQUIPMENTE1090 - OTHER EQUIPMENTE1090999 - OTHER EQUIPMENT
WSHINDUSTRIAL WASHERE10 - EQUIPMENTE1090 - OTHER EQUIPMENTE1090999 - OTHER EQUIPMENTDepends on system - case by case determination
SPTSHOP TOOLE10 - EQUIPMENTE1090 - OTHER EQUIPMENTE1090999 - OTHER EQUIPMENTPW responsibility only for shop tools requiring PM - ie breaks, lathes etc.
FDSFood Service EquipmentE10 - EQUIPMENTE1090 - OTHER EQUIPMENTE1090999 - OTHER EQUIPMENTUser owned equipment - Reimbursible PM if requested by customer
PLMPOOL MAINTENANCEF10 - SPECIAL CONSTRUCTIONF1040 - SPECIAL FACILITIESF104001 - INTERIOR SWIMMING POOLSEquipment that is unique to the pool will need a special Job Plan. Other equipment at the pools will use a standardized Job Plan.
AVSANTI-VEHICLE SYSTEMG20 - SITE IMPROVEMENTSG2010 - PAVEMENTSG201005 - GUARDRAILS AND BARRIERSOperator responsibility for testing - service call for repairs - PM only if required - Actually there is a specific PM program for this sort of Eq.
TRSTURNSTILEG20 - SITE IMPROVEMENTSG2040 - SITE IMPROVEMENTS & AMG204099.08 - TURNSTILESTo be done upon MDI - PW responsibility
SLGSliding GateG20 - SITE IMPROVEMENTSG2040 - SITE IMPROVEMENTS & AMMENITIESG204001.01 - FENCES AND GATES
TRTTREE REMOVAL & TRIMMINGG20 - SITE IMPROVEMENTSG2050 - LANDSCAPINGG205099 - LANDSCAPINGThis is not routine periodic maintenance. It should not be included in the PM program.
IRSIRRIGATION SYSTEMG20 - SITE IMPROVEMENTSG2050 - LANDSCAPINGG205007.03 - IRRIGATION CONTROLSNo PM required - Service Call response only
EPGEMERGENCY POWER GENERATORJ10 - Electric UtilitiesJ1010 - ProductionJ1010160 - Generators
EMHELECTRICAL MANHOLESJ10 - Electric UtilitiesJ1020 - TransmissionJ1020110 - UG StructuresService Call as needed
SUBELETRICAL SUBSTATIONJ10 - Electric UtilitiesJ1030 - DistributionJ1030140 - Sub StationsUEM is responsible for funding
CFSCHEMICAL FEED SYSTEMK10 - Potable Water UtilitiesK1010 - ProductionK1010200 - Chemical TreatmentRoutine operator PM tasking - can this be categorized as WTP?
WTPWATER TREATMENT PLANTK10 - Potable Water UtilitiesK1010 - ProductionK1010130- Pump StationsUEM is responsible for funding
VLVVALVEK10 - Potable Water UtilitiesK1020 - DistributionK1020100 - Service AreasNo PM required below certain size - Clarify - Distributions System PM - The only Valves we have in the system are the ones that has to be Pmed
PWSPOTABLE WATER DISTRIBUTION AND STOREAGE SYSTEMK10 - Potable Water UtilitiesK1020 - DistributionK1020100 - Service AreasUEM is responsible for funding
ESTELEVATED STORAGE TANKK10 - Potable Water UtilitiesK1020 - DistributionK1020120 - StorageInspections, painting, cleaning, cathodic protection etc
PMSPUMP STATIONK10 - Potable Water UtilitiesK1020 - DistributionK1020110 - Pump StationsCheck the size of the pumps to evaluate if PM is cost effective
RWSRAW WATER DISTRIBUTION AND STOREAGE SYSTEMK20 - Non-Potable Water UtilitiesK2010 - ProductionK2010140 - StorageOnly equipment that is unique to the raw water distribution and storage system will need a special Job Plan. Other equipment in the system will use a standardized Job Plan. For example, a centrifugal pump at a for a boiler will use the same JP as a centrifugal pump in the water distribution system except the frequencies may be different.
WLLWELLK20 - Non-Potable Water UtilitiesK2020 - DistributionK2020100 - Service Areas
STMSTEAM DISTRIBUTION SYSTEML10 - Steam UtilitiesL1020 - DistributionL1020100 - Service Area
WWTWaste Water Treatment PlantM10 - Sanitary Sewer UtilitiesM1010 - ProductionM1010130 - Primary ClarificationUEM is responsible for funding
SMHSEWAGE MANHOLESM10 - Sanitary Sewer UtilitiesM1020 - DistributionM1020100 - Service AreaUEM is responsible for funding
LSTLIFT STATIONM10 - Sanitary Sewer UtilitiesM1020 - DistributionM1020120 - Pump Stations
STKSEPTIC TANKM10 - Sanitary Sewer UtilitiesM1020 - DistributionM1020110 - Storage
OWSOIL WATER SEPARATORM30 - Oily Wastewater UtilitiesM3010 - ProductionM3010200 - Sludge DewateringMost of the time Transportation is responsible for funding
SDRSTORM DRAINSM40 - Storm Water UtilitiesM4020 - DistributionM4020100 - Service AreaPW responsibility - once per year prior to rainy season
FFEFUEL FARM EQUIPMENTR23 - GROUND BASED VEHICLE AND EQUIPMENT FUEL FACILITIESR2310 - FILLING STATIONR231099 - FILLING STATION COMPONENT
CTDCathodic ProtectionW10 - CATHODIC PROTECTION SYSTEMW1010 - IMPRESSED CURRENT CPW101010 - RECTIFIERSPW responsibility

&P of &N EQUIPMENT UNIFIRMAT STANDARDS V14

Header

Header
ARCHIBUS/FM Data Transfer
VersionAllowTableAdditions
11

File details come from the government source that posted it. Updated .