ISO0171-19_COVER_LETTER.pdf

ISO Standard PDF 30 KB Posted

Attached to
FORT GORDON LANDFILL CLOSURES
Solicitation number
ISO0171-19
Issued by

View the file

Other versions and copies of ISO 0171-19

Who attaches ISO 0171-19

Other files

File Type Posted
AMD_4_-_ISO0171-19.pdf PDF
AMD_4_-_ATTACHMENT_1_-_REVISED_RFP_QUESTIONS_AND_ANSWERS_8-23-19.pdf PDF
AMD_3_-_ISO0171-19.doc DOC document
AMD_3_-_ATTACHMENT_1_-_RFP_QUESTIONS_AND_ANSWERS.xlsx XLSX spreadsheet
AMD_2_-_ATTACHEMENT_17_-_17TH_ST,_STORMWATER_CONTROL,_LOCATION_AND_VINCINITY_MAP.pdf PDF
AMD_2_-_ATTACHMENT_3_-_PG_4_OF_ISO0171-17_REPLACED.pdf PDF
AMD_2_-_ATTACHMENT_11_-_Gibson_Road_Landfill.pdf PDF
AMD_2_-_ATTACHEMENT_16_-_17TH_ST,_STORMWATER_CONTROL,_GRADING_AND_DRAINAGE_PLAN.pdf PDF
AMD_2_-_ATTACHMENT_18_-_17TH_ST,_STORMWATER_CONTROL,_SECTIONS,_DETAILS,_AND_SEDIMENT_NOTES.pdf PDF
AMD_2_-_ATTACHMENT_14_-_17TH_ST,_STORMWATER_CONTROL,_EROSION_CONTROL_NOTES.pdf PDF
AMD_2_-_ATTACHMENT_10_-_833-12-01_GRLF.pdf PDF
AMD_2_-_ATTACHMENT_5_-_RFP_QUESTIONS_AND_ANSWERS_8-21-19.xlsx XLSX spreadsheet
AMD_2_-_ATTACHMENT_13_-_17TH_ST,_STORMWATER_CONTROL,_DRAINAGE_CONDITIONS.pdf PDF
AMD_2__-_ATTACHMENT_6_-_DIVISION_O1_-_SECTION_01_50_00_REV_1.1.pdf PDF
AMD_2_-_ATTACHMENT_7_-_Additional_Contract_Requirements.pdf PDF
AMD_2_-_ISO0171-19.doc DOC document
AMD_2_-_ATTACHMENT_15_-_17TH_ST,_STORMWATER_CONTROL,_EXISTING_CONDITIONS.pdf PDF
AMD_2_-_ATTACHMENT_19_-_17TH_ST,_COMBINE_SET.pdf PDF
AMD_2_-_ATTACHMENT_4_-_PG_5_OF_ISO0171-17_REPLACED.pdf PDF
AMD_2_-_ATTACHMENT_12_-_GRLF_Misc.pdf PDF
AMD_2_-_ATTACHMENT_2_-_PG_2_OF_ISO0171-17_REPLACED.pdf PDF
AMD_2_-_ATTACHMENT_8_-_DESIGN_REPAIR_17TH_STREET_LANDFILL.pdf PDF
AMD_2_-_ATTACHMENT_9_-_DE-01515-0P_C-1_Remaining_Capacity_Plan.pdf PDF
AMD_2_-_ATTACHMENT_1_-_PG_1_OF_ISO0171-17_REPLACED.pdf PDF
ISO0171-19_-_Site_Visit_Sign-in_Sheet.pdf PDF
AMD_1_-_ISO0171-19.pdf PDF
ATTACHMENT_8_-_Past_Performance_Questionnaire.docx DOCX document
ISO0171-19_-_RFP.pdf PDF
ATTACHMENT_7_Experience_Overview.pdf PDF
ATTACHMENT_2_-_Wage_Determiniation_GA-78.pdf PDF
ATTACHMENT_5_-_DRAWINGS.pdf PDF
ATTACHMENT_3_-__DIVISION_1_REQUIREMENTS.pdf PDF
ATTACHMENT_4_PERMITTING_REQUIRMENTS.pdf PDF
Criminal_and_Drivers_History_Consent_Form_190-6.pdf PDF
ATTACHMENT_1_-_Landfill_Closures_Section_B_-_pricing_pages.pdf PDF
ATTACHMENT_6_Experience_Information.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Justice

Federal Bureau of Prisons

UNICOR/Federal Prison Industries 400 1st Street, N.W.

Washington, DC 20534

Request for Proposal (RFP) Design-Build Contract Fort Gordon, GA

REQUEST FOR PROPOSAL INFORMATION

Solicitation Number: ISO0171-19

Date of Issue: JULY 23, 2019

Project: LANDFILL CLOSURES

Location of Services: Ft. Gordon, GA

Closing Date/Time: AUGUST 26, 2019/2:00 PM EASTERN

This is a Request for Proposal (RFP) for services to be provided under a Design-Build (design and construction) contract.

Proposal to include price, shall be valid until FEBRUARY 22, 2020. Interested 8a Contractors shall ensure they have reviewed all the documents associated with this RFP and have complied with all the prescribed requirements.

All items within the RFP shall be fully completed and returned by the closing date and time indicated above. Your responses as well as all questions regarding this RFP shall be directed via e-mail to: Clara.Roberts@usdoj.gov.

MADATORY SITE VISIT is scheduled for AUGUST 6, 2019 AT 9:00 AM, meeting location is Bldg 14500 DPW Conference Room (527 15th St, Fort Gordon, GA). Deadline for submittal of participants is AUGUST 2, 2019 no later than 2:00 PM, EASTERN. If you do not participate in the Site Visit, you will not be eligible to submit a proposal for this solicitation.

The Government contemplates award of the following contract type: Firm Fixed Price.

Proposals shall be submitted electronically to clara.roberts@usdoj.gov. Mail delivery will be accepted, however, must be submitted electronically as well.

a. Offerors are responsible for submitting proposals to the Government office designated in the RFP by the time specified in this RFP.

b. Any proposal received after the date/time specified for receipt of offers is "late", and will not be considered.

See RFP for proposal instructions (Section L).

Sincerely, //s// Kimberly Schwinn Contracting Officer Federal Prison Industries/UNICOR

UNICOR/Federal Prison Industries
400 1st Street, N.W.

File details come from the government source that posted it.