ATTACHMENT 5:
REFERENCE DESIGN
DRAWINGS
DECEMBER 2010 REVISED AUGUST 2012
CLOSURE AND POST CLOSURE CARE PLAN
FORT GORDON
SOLID WASTE PERMIT NUMBER: 121-010D(SL)
17TH STREET LANDFILL AND C&D ANNEX
RICHMOND COUNTY, GEORGIA
(REVISED JUNE 2013)
(REVISED APRIL 2016)
Channel
Pipe Outlet to Well-defined
9"
Section AA
A
Plan
A
No Well-defined Channel
Pipe Outlet to Flat Area-
A
13 ft
Plan
A
Section AA
9"
13 FT
Figure 6-24.3 - RIPRAP Outlet Protection (Modified From VA SWCC)
Filter non-woven geotextile
(Mirafi 180N or equal)
Filter non-woven geotextile
(Mirafi 180N or equal)
NOTES:
1. FULL FLOW CHARACTERISTICS:
FLOW RATE (Q) = 11.61 CFS
VELOCITY (V) = 11.97 FPS
TAILWATER (Tw) = <0.5 DIA.
2. APRON DIMENSIONS:
LENGTH (La) = 11 FT
HEADWALL WIDTH (W1) = 6 FT
DOWNSTREAM WIDTH (W2) = 13 FT
AVERAGE STONE DIA. (d50) = 6 INCHES
STONE DEPTH (D) = 9 INCHES
Channel
Pipe Outlet to Well-defined
9"
Section AA
A
Plan
A
No Well-defined Channel
Pipe Outlet to Flat Area-
A
13 ft
Plan
A
Section AA
9"
13 ft
Filter non-woven geotextile
(Mirafi 180N or equal)
Filter non-woven geotextile
(Mirafi 180N or equal)
NOTES:
1. FULL FLOW CHARACTERISTICS:
FLOW RATE (Q) = 3.99 CFS
VELOCITY (V) = 8.39 FPS
TAILWATER (Tw) = >0.5 DIA.
2. APRON DIMENSIONS:
LENGTH (La) = 11 FT
HEADWALL WIDTH (W1) = 6 FT
DOWNSTREAM WIDTH (W2) = 13 FT
AVERAGE STONE DIA. (d50) = 6 INCHES
STONE DEPTH (D) = 9 INCHES
Diversion diversion pipe outlet corrugated
Stabilized stakes dike
3:1
Diversion
Hold-down
Level section
4' min
Plastic
Min. 10' spacing
Top of
Inlet Detail
Outlet Pipe
1.5' min
3:1
0.5' min fill (island) hand-compacted
Top of
4' min
1' min channel ground
Natural
Channel
Pipe Outlet to Well-defined
9"
Section AA
A
Plan
A
No Well-defined Channel
Pipe Outlet to Flat Area-
A
13 ft
Plan
A
24"
6 ft
Section AA
9"
13 ft
Filter non-woven geotextile
(Mirafi 180N or equal)
Filter non-woven geotextile
(Mirafi 180N or equal)
NOTES:
1. FULL FLOW CHARACTERISTICS:
FLOW RATE (Q) = 13.34 CFS
VELOCITY (V) = 10.7 FPS
TAILWATER (Tw) = >0.5 DIA.
2. APRON DIMENSIONS:
LENGTH (La) = 11 FT
HEADWALL WIDTH (W1) = 6 FT
DOWNSTREAM WIDTH (W2) = 13 FT
AVERAGE STONE DIA. (d50) =6 INCHES
STONE DEPTH (D) = 9 INCHES
24"
6 ft
24"
6 ft
TABLE #1
NOTES:
- AREAS WITHOUT FINAL COVER THAT WILL BE EXPOSED FOR MORE THAN 3 MONTHS WILL BE PLANTED WITH
TEMPORARY GRASS
- SEEDING RATES ARE BASED ON 100% PURE LIVE SEED SCHEDULES FROM THE MANUAL FOR EROSION AND
SEDIMENT CONTROL IN GEORGIA
- A TEMPORARY COVER SHOULD BE USED WHEN PLANTING UNHULLED BERMUDA GRASS AND PENSACOLA
BAHIAGRASS
ANNUAL RYEGRASS
TEMPORARY SEEDING
FESCUE
BERMUDA GRASS-UNHULLED
BERMUDA GRASS-HULLED
PERMANENT SEEDING
PLANTINGCOVER (INCHES)PER ACRESEEDING
PENSACOLA BAHIAGRASS
BROWNTOP MILLET
VEGETATION PLAN
DATE OFDEPTH OFPOUNDS
0.25 - 0.5
0.25 - 0.5
0.25 - 0.5
0.25 - 0.5
0.25 - 0.5
0.25 - 0.5
YEAR ROUND
3/1 - 7/1
10/1 - 3/1
8/15 - 11/1
4/1 - 7/15
8/1 - 4/15
FERTILIZER REQUIREMENTS
SPECIES
BERMUDA GRASS-HULLED
SECOND
MAINTENANCE
NOTES:
A SPLIT THE APPLICATION WHEN HIGH RATES ARE USED
B APPLY WHEN PLANT GROW TO HEIGHT OF 2 TO 4 INCHES
C APPLY IN THE SPRING AFTER SEEDING
N-P-K = NITROGEN-PHOSPHORUS-POTASH
TABLE #2
RATERATEN-P-KYEAR
TOP-DRESSINGEQUIVALENT
NITROGEN ANALYSIS OR
10-10-10
6-12-12
FIRST
6-12-12
50-100
1.500 50-100
A
MAINTENANCE
SECOND
BERMUDA GRASS-UNHULLED FIRST
6-12-12
10-10-10
6-12-12
400 30
50-100
1.500 50-100
A,C
MAINTENANCE
SECOND
PENSACOLA BAHIAGRASS FIRST
6-12-12
10-10-10
6-12-12
400 30
50-100
1.500 50-100
B
MAINTENANCE
SECOND
FESCUE FIRST
6-12-12
10-10-10
6-12-12
400 30
50-100
1.500 50-100
A
CLOSURE/POST CLOSURE PLAN
ANNUAL POST-CLOSURE CARE COST ESTIMATE
(PRE-ESTABLISHED VEGETATION)
1.
2.
3.
4.
NOTES:
MOBILIZATION LS 1 $36,000 $36,000
EARTHWORK CY 60,000 $8 $480,000
TOPSOIL CY 16,000 $16 $256,000
MATTING AND SEEDING SF 525,000 $0.26 $136,500
NOTES:
CLOSURE COST ESTIMATE
ASSUME TWO (2) FOOT MATERIAL WILL BE OBTAINED WITHIN A FIVE MILE RADIUS
ALL UNIT PRICES INCLUDE INSURANCE COSTS
ALL COSTS ARE IN 2016 DOLLARS
CLOSURE COSTS WILL BE ADJUSTED FOR INFLATION EVERY YEAR.
1.
2.
3.
ASSUMES THE DISTURBANCE OF A CUMULATIVE AREA OF 0.25 ACRES/YEAR.
ASSUMES A MOBILIZATION FEE OF $250.
ASSUMES SEMI-ANNUAL SAMPLING OF SIX SURFACE MONITORING LOCATIONS AND 16
GROUNDWATER MONITORING WELLS.
ASSUMES QUARTERLY METHANE MONITORING AT NINETEEN LOCATIONS.
ROUTINE INSPECTIONS/REPAIRS: ASSUME THE REPLACEMENT OF 0.25 ACRES OF TOPSOIL AND
CLAY MATERIAL ONCE A YEAR.
CUTTING VEGETATION AT LEAST 2 TIMES PER YEAR.
ALL COSTS ARE IN 2016 DOLLARS.
4.
6.
BMPs LS 1 $80,000
$80,000
METHANE MONITORING PROBES EA 17 $34,000
METHANE VENTS LVF 630
$120
$75,600
ENGINEERING AND CLOSURE CERT (10%) LS 1
$113,930
$113,930
SUB-TOTAL $1,255,230
SUB-TOTAL X 15% CONTINGENCY = TOTAL $188,285
TOTAL $1,443,515
7.
$2,000
GROUNDWATER MONITORING WELLS EA 9
$4,800
$43,200
ITEM UNITS QUANTITY UNIT PRICE TOTAL
REPAIR 5 ACRES OF SOIL COVER YEARLY YR 5 $20,000 $100,000
ROUTINE EROSION CONTROL YR $5,000 $150,000
MOWING 2 TIMES / YEAR YR $2,000 $60,000
SURFACE WATER MONITORING $25,000 $75,000
WATER QUALITY REPORTS
$5,000
$150,000
METHANE MONITORING $240,000
TOTAL $2,085,000
AVERAGE YEARLY COST $69,500
$8,000
ITEM UNITS QUANTITY UNIT PRICE TOTAL
MAINTENANCE
FINAL COVER REPAIR YRS 1-5
REPAIR 1 ACRE OF SOIL COVER YEARLY YR 25 $5,000 $125,000
FINAL COVER REPAIR YRS 6-30
SED POND CLEANOUT EVERY YEAR LS 30 $4,500 $135,000
SURFACE WATER MANAGEMENT
GROUNDWATER MONITORING $35,000 $1,050,000
MONITORING
YR
YR
YR
YR
5.
NSA FACILITY
5'-0"
MIN. 3'-0"
Plan Included
Page # Y/N
CE203 Y 1. The applicable Erosion, Sedimentation and Pollution Control Plan Checklist established by the Commission as of January 1 of the year in which the land-disturbing activity was permitted.
(The completed Checklist must be submitted with the ES&PC Plan or the Plan will not be reviewed)
ALL Y 2. Level II certification number issued by the Commission, signature and seal of the certified design professional.
(Signature, seal and Level I I number must be on each sheet pertaining to ES&PC plan or the
Plan will not be reviewed)
ALL Y 3. The name and phone number of the 24-hour local contact responsible for erosion, sedimentation and pollution controls.
CE201 Y 4. Provide the name, address and phone number of primary permittee.
CE201 Y 5. Note total and disturbed acreage of the project or phase under construction.
N/A N 6. Provide land lot and district numbers for site location. Describe critical areas and any additional measures that will be utilized for these areas. (Army Installation does not apply)
C001 Y 7. Provide vicinity map showing site’s relation to surrounding areas. Include designation of specific phase, if necessary.
ALL Y 8. Graphic scale and north arrow.
CS101 OR CG101 Y 9. Existing and proposed contour lines with contour lines drawn at an interval in accordance with the following:
N/A N 10. Boundary line survey.
CE202 Y 11. Delineation and acreage of contributing drainage basins on the project site.
N/A N 12. Delineation of on-site wetlands and all state waters located on and within 200 feet of the project site. (NONE)
N/A N 13. Delineation of the applicable 25-foot or 50-foot undisturbed buffers adjacent to state waters and any additional buffers required by the Local Issuing Authority . Clearly note and delineate all areas of impact.
CE202 Y 14. Delineate all sampling locations, perennial and intermittent streams and other water bodies into which storm water is discharged.
N/A N 15. Storm-drain pipe and weir velocities with appropriate outlet protection to accommodate discharges without erosion.
Identify/Delineate all storm water discharge points.
CE100's Y 16. Soil series for the project site and their delineation.
CE201 Y 17. Identify the project receiving waters and describe all adjacent areas including streams, lakes, residential areas, wetlands, etc. which may be affected.
N/A N 18. Any construction activity which discharges storm water into an Impaired Stream Segment, or within 1 linear mile upstream of and within the same watershed as, any portion of an Biota Impaired Stream Segment must comply with Part III. C. of the
Permit. Include the completed Appendix 1 listing all the BMPs that will be used for those areas of the site which discharge to the Impaired Stream Segment.
N/A N 19. If a TMDL Implementation Plan for sediment has been finalized for the Impaired Stream Segment (identified in item 18 above) at least six months prior to submittal of NOI, the ES&PC Plan must address any site-specific conditions or requirements included in the TMDL Implementation Plan.
REPORT Y 20. Provide hydrology study and maps of drainage basins for both the pre- and post-developed conditions.
ALL Y 21. Initial date of the Plan and the dates of any revisions made to the Plan including the entity who requested the revisions.
CS101 Y 22. The limits of disturbance for each phase of construction.
N/A N 23. Limit of disturbance shall be no greater than 50 acres at any one time without prior written authorization from the EPD
District Office. If EPD approves the request to disturb 50 acres or more at any one time, the plan must include at least 4 of the BMPs listed in Appendix 1 of this checklist.
(A copy of the written approval by EPD must be attached to the plan for the plan to be reviewed.)
CE300's Y 24. Provide a minimum of 67 cubic yards of sediment storage per acre drained using a temporary sediment basin, retrofitted detention pond, and/or excavated inlet sediment traps for each common drainage location. Sediment storage volume must be in place prior to and during all land disturbance activities until final stabilization of the site has been achieved. A written rationale explaining the decision to use equivalent controls when a sediment basin is not attainable must be included in the plan for each common drainage location in which a sediment basin is not provided. Worksheets from the Manual must be included for structural BMPs and all calculations used by the design professional to obtain the required sediment storage when using equivalent controls.
N/A N 25. Use of alternative BMPs whose performance has been documented to be equivalent to or superior to conventional BMPs as certified by a Design Professional (unless disapproved by EPD or the Georgia Soil and Water Conservation
Commission). Please refer to the Alternative BMP Guidance Document found at www.gaswcc.org.
CE301 N 26. Best Management Practices to minimize off-site vehicle tracking of sediments and the generation of dust.
N/A N 27. BMPs for concrete washdown of tools, concrete mixer chutes, hoppers and the rear of the vehicles. Washout of the drum at the construction site is prohibited.
CE202 Y 28. Provide BMPs for the remediation of all petroleum spills and leaks.
CE100's Y 29. Location of Best Management Practices that are consistent with and no less stringent than the Manual for Erosion and
Sediment Control in Georgia. Use uniform coding symbols from the Manual, Chapter 6, with legend.
CE201 Y 30. Description of the nature of construction activ ity .
CE100's Y 31. A description of appropriate controls and measures that will be implemented at the construction site including: (1) initial sediment storage requirements and perimeter control BMPs, (2) intermediate grading and drainage BMPs, and (3) final
BMPs.
CE203 Y 32. Description and chart or timeline of the intended sequence of major activ ities which disturb soils for the major portions of the site (i.e., initial perimeter and sediment storage BMPs, clearing and grubbing activ ities, excavation activities, utility activities, temporary and final stabilization).
REPORT Y 33. Description of the practices that will be used to reduce the pollutants in storm water discharges.
N/A N 34. Description of the measures that will be installed during the construction process to control pollutants in storm water that will occur after construction operations have been completed.
CE201 Y 35. Design professional's certification statement and signature that the site was visited prior to development of the ES&PC
Plan as stated on page 14 of the permit.
CE201 Y 36. Design professional's certification statement and signature that the permittee’s ES&PC Plan provides for an appropriate and comprehensive system of BMPs and sampling to meet permit requirements as stated on page 14 of the permit.
CE201 Y 37. Certification statement and signature of the permittee or the duly authorized representative as stated in section V.G.2.d. of the state general permit.
CE201 Y 38. An estimate of the runoff coefficient or peak discharge flow of the site prior to and after construction activities are completed.
CE202 Y 39. Indication that non-exempt activ ities shall not be conducted within the 25 or 50-foot undisturbed stream buffers as measured from the point of wrested vegetation without first acquiring the necessary variances and permits.
CE201 Y 40. Indication that the design professional who prepared the ES&PC Plan is to inspect the installation of the initial sediment storage requirements and perimeter control BMPs within 7 days after installation.
CE202 Y 41. Indication that amendments/rev isions to the ES&PC Plan which have a significant effect on BMPs with a hydraulic component must be certified by the design professional.
CE202 Y 42. Indication that waste materials shall not be discharged to waters of the State, except as authorized by a Section 404 permit.
CE202 Y 43. Documentation that the ES&PC Plan is in compliance with waste disposal, sanitary sewer, or septic tank regulations during and after construction activ ities have been completed.
CE203 Y 44. Provide complete requirements of inspections and record keeping by the primary permittee.
CE202 Y 45. Provide complete requirements of sampling frequency and reporting of sampling results.
CE203 Y 46. Provide complete details for retention of records as per Part IV.F. of the permit.
CE202 Y 47. Description of analy tical methods to be used to collect and analyze the samples from each location.
CE201 Y 48. Appendix B rationale for outfall sampling points where applicable.
CE201 Y 49. Cleary note statement in bold letters- "The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures and practices prior to, or concurrent with, land disturbing activities."
CE201 Y 50. Cleary note maintenance statement in bold letters - "Erosion control measures will be maintained at all times. I f full implementation of the approved plan does not provide for effective erosion control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source."
CE201 Y 51. Clearly note the statement in bold letters - "Any disturbed area left exposed for a period greater than 14 days shall be stabilized with mulch or temporary seeding."
CE300's Y 52. Provide detailed drawings for all structural practices. Specifications must, at a minimum, meet the guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.
CE301 Y 53. Provide vegetative plan, noting all temporary and permanent vegetative practices. Include species, planting dates and seeding, fertilizer, lime and mulching rates. Vegetative plan shall be site specific for appropriate time of year that seeding will take place and for the appropriate geographic region of Georgia.
Effective October 1, 2010
Map Scale Ground Slope Contour Intervals, ft.
1 inch = 100ft or larger scale
Flat 0 - 2% 0.5 or 1
Rolling 2 - 8% 1 or 2
Steep 8% + 2,5 or 10
City/County:Augusta/ Richmond Date on Plans:March 1, 2011
TO BE SHOWN ON ES&PC PLAN
EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN CHECKLIST
STAND ALONE CONSTRUCTION PROJECTS
SWCD:_________________________________________________________
Project Name:Fort Gordon Landfills Address:Fort Gordon, GA 30905
| Table of Contents |
| DE 04230-6P Landfill Closures_RFP.pdf |
| Attachment 1 Division 01 General Requirements Specifications |
| DE 04230-6P Landfill Closures_RFP |
| d - DE04230-6P Wage Determination Rates |
| DE 04230-6P Landfill Closures_RFP |
| Attachment 1 Cover |
| Attachment 2 Cover |
| Attachment 2 LIA_LDA Permitting Requirements |
| Attachment 3 Cover |
| Attachment 3 Reference Design Drawings |
| Landfills Closure Binder |
| Gibson Road Landfill Cover Minor Modification GA EPD |
| Gibson Minor Mod-CLOSURE PLAN-3 |
| Gibson Minor Mod-PROFILE-02 |
| Gibson Road Landfill Existing Gas Control System |
| 042501COVR |
| 042501DETL-3 |
| 042501DETLS1 |
| 042501DETLS2 |
| 042501DO_NARRATIVE |
| 042501EXCOND |
| 042501PROPOSED020606 |
| Landfills Closure Binder 46 |
| Landfills Closure Binder |
| Gibson Road Landfill Existing Gas Control System |
| 042501SPECS_1 |
| 042501SPECS_2 |
| 042501SPECS_3 |
| 17th Street Closure and Post-Closure Plan_April 2016_REV9 |
| Carter Road closeout_opt |
| 20190205132515780 3 |
| Carter Road Surface Water Control Plans Combined |
| CR_CE-101 |
| CR_CE-102 |
| CR_CE-103 |
| CR_CE-104 |
| CR_CE-105 |
| CR_CE-106 |
| CR_CE-201 |
| CR_CE-202 |
| CR_CE-203 |
| CR_CE-301 |
| CR_CG-101 |
| CR_CG-102 |
| CR_Cover |
| CR_CS-101 |
File details come from the government source that posted it.