AMD_2_-_ISO0171-19.doc
ISO Standard Amendment 2 DOC document 76 KB Posted
- Attached to
- FORT GORDON LANDFILL CLOSURES
- Solicitation number
- ISO0171-19
About this file
AMENDMENT 2 - ISO0171-19 - 3 PAGES
View the file
Other versions and copies of ISO 0171-19
| File | Revision | Posted | Attached to |
|---|---|---|---|
| AMD_4_-_ISO0171-19.pdf | Amendment 4 | FORT GORDON LANDFILL CLOSURES | |
| AMD_3_-_ISO0171-19.doc | Amendment 3 | FORT GORDON LANDFILL CLOSURES | |
| AMD_1_-_ISO0171-19.pdf | Amendment 1 | FORT GORDON LANDFILL CLOSURES | |
| ISO0171-19_-_Site_Visit_Sign-in_Sheet.pdf | Revision not stated | FORT GORDON LANDFILL CLOSURES | |
| ISO0171-19_-_RFP.pdf | Revision not stated | FORT GORDON LANDFILL CLOSURES | |
| ISO0171-19_COVER_LETTER.pdf | Revision not stated | FORT GORDON LANDFILL CLOSURES |
Who attaches ISO 0171-19
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT
| tc \l1 "AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 3 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| AMENDMENT #2 |
| 08/21/2019 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
UNICOR, Federal Prison Industry
Central Office 400 First St. NW Washington, DC 20534 See Block 6
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, State and Zip Code) |
| (x) |
| 9A. AMENDMENT OF SOLICITATION NO. |
| X |
| ISO0171-19 |
9B. DATED (SEE ITEM 11)
07/23/2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and the date specified for receipt of Offers XX is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE
DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. |
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, Appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :
BY MUTUAL AGREEMENT
D. OTHER (Specify type of modification and authority)
E. IMPORTANT : Contractor is not, XX is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AMEND SOLICITATION #ISO0171-19 AS FOLLOWS:
The closing date has been extended from 8/26/2019 to 09/06/2019.
12a. change to Yes.
12b. change to 10
13a. remove 2 – no copies are required, as offers should be submitted electronically.
Continued on Page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
KIMBERLY SCHWINN, CONTRACTING OFFICER
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| BY |
| //s// |
| 08/21/2019 |
(Signature of the person authorized to sign)
(Signature of contracting officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR(48 CFR) 53.243
AMD 2 – ISO0171-19
August 21, 2019 13b. change from “is not” to “is”
Part 5 of PWS (page 9 of 39), change 5.4 to “Project is not currently funded” Part 5 of PWS,5.10.2.2, (Page 12 of 39) add the following: The contractor is required to provide adequate road access to the 17th Street Landfill to be maintained during construction and used by the Government after construction. Provide adequate grading and natural drainage as appropriate for use, and provide gravel as necessary.
Section L, (c) TAB C: Subfactor 3 - Design-Build: At a minimum, offerors shall: (2)(a)1. Remove and replace three (3) years with six (6) years.
Section L – bottom of 34 and top of 35 remove
Document Title
I Project Execution and Project Schedule II Experience
III Past Performance
IV Price As the sections were already named.
Section L(2) Document II – Experience: (page 34 of 39) Experience Overview Sheet should be listed as Attachment 7; and the Experience Information Sheet should be listed as Attachment 6.
REPLACE THE FOLLOWING PAGES IN THE ORIGINAL RFP WITH THE ATTACHED
PAGE 1 – AMD 2 - ATTACHMENT 1
PAGE 2 – AMD 2 - ATTACHMENT 2
PAGE 4 – AMD 2 - ATTACHMENT 3
PAGE 5 – AMD 2 - ATTACHMENT 4
All questions/answers are included on AMD 2 - ATTACHMENT 5 (8 PAGES). THERE ARE 5 QUESTIONS THAT WILL BE ANSWERED BY FRIDAY, AUGUST 23, 2019.
In Attachment 3 of the RFP, DIVISION 01, GENERAL REQUIREMENTS SPECIFICATIONS; Spec Section 01 50 00 remove all pages (12) for this section and replace them with AMD 2 - Attachment 6 (9 PAGES).
AMD 2 – ATTACHMENT 7 (12 PAGES), ADDITIONAL CONTRACT REQUIREMENTS IS BEING INCLUDED TO PROVIDE ADDITIONAL INFORMATION REGARDING THIS RFP.
THE FOLLOWING LIST OF ATTACHMENTS ARE ADDITIONAL DRAWINGS:
AMD 2 - ATTACHMENT 8 - DESIGN REPAIR 17TH STREET LANDFILL (7 PAGES)
AMD 2 - ATTACHMENT 9 - DE-01515-0P C-1 Remaining Capacity Plan (1 PAGE)
AMD 2 - ATTACHMENT 10 - 833-12-01 GRLF (25 PAGES)
AMD 2 - ATTACHMENT 11 - Gibson Road Landfill (12 PAGES) AMD 2 - ATTACHMENT 12 - GRLF Misc (3 PAGES)
AMD 2 – ISO0171-19
August 21, 2019 AMD 2 - ATTACHMENT 13 - 17TH ST, STORMWATER CONTROL, DRAINAGE CONDITIONS (1 PAGE) AMD 2 - ATTACHMENT 14 - 17TH ST, STORMWATER CONTROL, EROSION CONTROL NOTES (1 PAGE) AMD 2 - ATTACHMENT 15 - 17TH ST, STORMWATER CONTROL, EXISTING CONDITIONS (1 PAGE) AMD 2 - ATTACHEMENT 16 - 17TH ST, STORMWATER CONTROL, GRADING AND DRAINAGE PLAN (1 PAGE) AMD 2 - ATTACHEMENT 17 - 17TH ST, STORMWATER CONTROL, LOCATION AND VINCINITY MAP (1 PAGE) AMD 2 - ATTACHMENT 18 - 17TH ST, STORMWATER CONTROL, SECTIONS, DETAILS, AND SEDIMENT NOTES (1 PAGE)
AMD 2 - ATTACHMENT 19 - 17TH ST, COMBINE SET (26 PAGES)
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
File details come from the government source that posted it.