ATTACHMENT 1 - SECTION B - PRICING PAGES

View the file

Other files

File Type Posted
AMD_4_-_ISO0171-19.pdf PDF
AMD_4_-_ATTACHMENT_1_-_REVISED_RFP_QUESTIONS_AND_ANSWERS_8-23-19.pdf PDF
AMD_3_-_ISO0171-19.doc DOC document
AMD_3_-_ATTACHMENT_1_-_RFP_QUESTIONS_AND_ANSWERS.xlsx XLSX spreadsheet
AMD_2_-_ATTACHEMENT_17_-_17TH_ST,_STORMWATER_CONTROL,_LOCATION_AND_VINCINITY_MAP.pdf PDF
AMD_2_-_ATTACHMENT_3_-_PG_4_OF_ISO0171-17_REPLACED.pdf PDF
AMD_2_-_ATTACHMENT_11_-_Gibson_Road_Landfill.pdf PDF
AMD_2_-_ATTACHEMENT_16_-_17TH_ST,_STORMWATER_CONTROL,_GRADING_AND_DRAINAGE_PLAN.pdf PDF
AMD_2_-_ATTACHMENT_18_-_17TH_ST,_STORMWATER_CONTROL,_SECTIONS,_DETAILS,_AND_SEDIMENT_NOTES.pdf PDF
AMD_2_-_ATTACHMENT_14_-_17TH_ST,_STORMWATER_CONTROL,_EROSION_CONTROL_NOTES.pdf PDF
AMD_2_-_ATTACHMENT_10_-_833-12-01_GRLF.pdf PDF
AMD_2_-_ATTACHMENT_5_-_RFP_QUESTIONS_AND_ANSWERS_8-21-19.xlsx XLSX spreadsheet
AMD_2_-_ATTACHMENT_13_-_17TH_ST,_STORMWATER_CONTROL,_DRAINAGE_CONDITIONS.pdf PDF
AMD_2__-_ATTACHMENT_6_-_DIVISION_O1_-_SECTION_01_50_00_REV_1.1.pdf PDF
AMD_2_-_ATTACHMENT_7_-_Additional_Contract_Requirements.pdf PDF
AMD_2_-_ISO0171-19.doc DOC document
AMD_2_-_ATTACHMENT_15_-_17TH_ST,_STORMWATER_CONTROL,_EXISTING_CONDITIONS.pdf PDF
AMD_2_-_ATTACHMENT_19_-_17TH_ST,_COMBINE_SET.pdf PDF
AMD_2_-_ATTACHMENT_4_-_PG_5_OF_ISO0171-17_REPLACED.pdf PDF
AMD_2_-_ATTACHMENT_12_-_GRLF_Misc.pdf PDF
AMD_2_-_ATTACHMENT_2_-_PG_2_OF_ISO0171-17_REPLACED.pdf PDF
AMD_2_-_ATTACHMENT_8_-_DESIGN_REPAIR_17TH_STREET_LANDFILL.pdf PDF
AMD_2_-_ATTACHMENT_9_-_DE-01515-0P_C-1_Remaining_Capacity_Plan.pdf PDF
AMD_2_-_ATTACHMENT_1_-_PG_1_OF_ISO0171-17_REPLACED.pdf PDF
ISO0171-19_-_Site_Visit_Sign-in_Sheet.pdf PDF
AMD_1_-_ISO0171-19.pdf PDF
ATTACHMENT_8_-_Past_Performance_Questionnaire.docx DOCX document
ISO0171-19_-_RFP.pdf PDF
ATTACHMENT_7_Experience_Overview.pdf PDF
ATTACHMENT_2_-_Wage_Determiniation_GA-78.pdf PDF
ATTACHMENT_5_-_DRAWINGS.pdf PDF
ATTACHMENT_3_-__DIVISION_1_REQUIREMENTS.pdf PDF
ISO0171-19_COVER_LETTER.pdf PDF
ATTACHMENT_4_PERMITTING_REQUIRMENTS.pdf PDF
Criminal_and_Drivers_History_Consent_Form_190-6.pdf PDF
ATTACHMENT_6_Experience_Information.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION COST ESTIMATE BREAKDOWN – ISO0171-19 – Base Bid

Project Description: Gibson Road Landfill Closure Work Location: Fort Gordon

Line # Master Format Division Material Costs Equipment Costs Labor Costs Total Costs

01 – General Conditions 02 – Existing Conditions 07 – Thermal Moisture Protection 31 – Earthwork 32 – Exterior Improvements

Subtotal:

Sales Tax Subcontractor Mark Up Overhead – Field and Office Bond Profit Other

Total Cost (CLIN 001 and CLIN 002 - Base Bid - Close Gibson Road Landfill)

CLIN 2 - A

CLIN 2 - B

CLIN 2 - C

CLIN 2 - D

CLIN 2 - E

CLIN 1 DESIGN

CONSTRUCTION COST ESTIMATE BREAKDOWN – ISO0171-19 – OPTION 1

Project Description: 17th Street Landfill Passive Methane Ventilation System

Work Location: Fort Gordon

Line # Master Format Division Material Costs Equipment Costs Labor Costs Total Costs

01 – General Conditions 02 – Existing Conditions 31 – Earthwork 32 – Exterior Improvements 33 – Utilities

Subtotal:

Sales Tax Subcontractor Mark Up Overhead – Field and Office Bond Profit Other

Total Cost (CLIN 003 and CLIN 004 Option 1- 17th Street Landfill - Install Passive Methane Ventilation System)

CLIN 4 -A

CLIN 4 -B

CLIN 4 - C

CLIN 4 - D

CLIN 4 - E

CLIN 3 DESIGN

CONSTRUCTION COST ESTIMATE BREAKDOWN – ISOO171-19 – OPTION 2

Project Description: Carter Road Landfill Closure Work Location: Fort Gordon

Line # Master Format Division Material Costs Equipment Costs Labor Costs Total Costs

01 – General Conditions 02 – Existing Conditions 31 – Earthwork 32 – Exterior Improvements

Subtotal:

Sales Tax Subcontractor Mark Up Overhead – Field and Office Bond Profit Other

Total Cost (CLIN 005 and CLIN 006 Option 2 Close Carter Road Landfill)

CLIN 6 - A

CLIN 6 - B

CLIN 6 - C

CLIN 6 - D

CLIN 5 DESIGN

Table of Contents
DE 04230-6P Landfill Closures_RFP.pdf
Attachment 1 Division 01 General Requirements Specifications
DE 04230-6P Landfill Closures_RFP
d - DE04230-6P Wage Determination Rates
DE 04230-6P Landfill Closures_RFP
Attachment 1 Cover
Attachment 2 Cover
Attachment 2 LIA_LDA Permitting Requirements
Attachment 3 Cover
Attachment 3 Reference Design Drawings
Landfills Closure Binder
Gibson Road Landfill Cover Minor Modification GA EPD
Gibson Minor Mod-CLOSURE PLAN-3
Gibson Minor Mod-PROFILE-02
Gibson Road Landfill Existing Gas Control System
042501COVR
042501DETL-3
042501DETLS1
042501DETLS2
042501DO_NARRATIVE
042501EXCOND
042501PROPOSED020606
Landfills Closure Binder 46
Landfills Closure Binder
Gibson Road Landfill Existing Gas Control System
042501SPECS_1
042501SPECS_2
042501SPECS_3
17th Street Closure and Post-Closure Plan_April 2016_REV9
Carter Road closeout_opt
20190205132515780 3
Carter Road Surface Water Control Plans Combined
CR_CE-101
CR_CE-102
CR_CE-103
CR_CE-104
CR_CE-105
CR_CE-106
CR_CE-201
CR_CE-202
CR_CE-203
CR_CE-301
CR_CG-101
CR_CG-102
CR_Cover