AMD_4_-_ATTACHMENT_1_-_REVISED_RFP_QUESTIONS_AND_ANSWERS_8-23-19.pdf

PDF 79 KB Posted

Attached to
FORT GORDON LANDFILL CLOSURES
Solicitation number
ISO0171-19
Issued by

About this file

AMD 4 - ATTACHMENT 1

View the file

Other files

File Type Posted
AMD_4_-_ISO0171-19.pdf PDF
AMD_3_-_ISO0171-19.doc DOC document
AMD_3_-_ATTACHMENT_1_-_RFP_QUESTIONS_AND_ANSWERS.xlsx XLSX spreadsheet
AMD_2_-_ATTACHEMENT_17_-_17TH_ST,_STORMWATER_CONTROL,_LOCATION_AND_VINCINITY_MAP.pdf PDF
AMD_2_-_ATTACHMENT_3_-_PG_4_OF_ISO0171-17_REPLACED.pdf PDF
AMD_2_-_ATTACHMENT_11_-_Gibson_Road_Landfill.pdf PDF
AMD_2_-_ATTACHEMENT_16_-_17TH_ST,_STORMWATER_CONTROL,_GRADING_AND_DRAINAGE_PLAN.pdf PDF
AMD_2_-_ATTACHMENT_18_-_17TH_ST,_STORMWATER_CONTROL,_SECTIONS,_DETAILS,_AND_SEDIMENT_NOTES.pdf PDF
AMD_2_-_ATTACHMENT_14_-_17TH_ST,_STORMWATER_CONTROL,_EROSION_CONTROL_NOTES.pdf PDF
AMD_2_-_ATTACHMENT_10_-_833-12-01_GRLF.pdf PDF
AMD_2_-_ATTACHMENT_5_-_RFP_QUESTIONS_AND_ANSWERS_8-21-19.xlsx XLSX spreadsheet
AMD_2_-_ATTACHMENT_13_-_17TH_ST,_STORMWATER_CONTROL,_DRAINAGE_CONDITIONS.pdf PDF
AMD_2__-_ATTACHMENT_6_-_DIVISION_O1_-_SECTION_01_50_00_REV_1.1.pdf PDF
AMD_2_-_ATTACHMENT_7_-_Additional_Contract_Requirements.pdf PDF
AMD_2_-_ISO0171-19.doc DOC document
AMD_2_-_ATTACHMENT_15_-_17TH_ST,_STORMWATER_CONTROL,_EXISTING_CONDITIONS.pdf PDF
AMD_2_-_ATTACHMENT_19_-_17TH_ST,_COMBINE_SET.pdf PDF
AMD_2_-_ATTACHMENT_4_-_PG_5_OF_ISO0171-17_REPLACED.pdf PDF
AMD_2_-_ATTACHMENT_12_-_GRLF_Misc.pdf PDF
AMD_2_-_ATTACHMENT_2_-_PG_2_OF_ISO0171-17_REPLACED.pdf PDF
AMD_2_-_ATTACHMENT_8_-_DESIGN_REPAIR_17TH_STREET_LANDFILL.pdf PDF
AMD_2_-_ATTACHMENT_9_-_DE-01515-0P_C-1_Remaining_Capacity_Plan.pdf PDF
AMD_2_-_ATTACHMENT_1_-_PG_1_OF_ISO0171-17_REPLACED.pdf PDF
ISO0171-19_-_Site_Visit_Sign-in_Sheet.pdf PDF
AMD_1_-_ISO0171-19.pdf PDF
ATTACHMENT_8_-_Past_Performance_Questionnaire.docx DOCX document
ISO0171-19_-_RFP.pdf PDF
ATTACHMENT_7_Experience_Overview.pdf PDF
ATTACHMENT_2_-_Wage_Determiniation_GA-78.pdf PDF
ATTACHMENT_5_-_DRAWINGS.pdf PDF
ATTACHMENT_3_-__DIVISION_1_REQUIREMENTS.pdf PDF
ISO0171-19_COVER_LETTER.pdf PDF
ATTACHMENT_4_PERMITTING_REQUIRMENTS.pdf PDF
Criminal_and_Drivers_History_Consent_Form_190-6.pdf PDF
ATTACHMENT_1_-_Landfill_Closures_Section_B_-_pricing_pages.pdf PDF
ATTACHMENT_6_Experience_Information.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMD 4 ‐ ATTACHMENT 1 ‐ QUESTIONS/ANSWERS ‐ REVISED ANSWERS TO AMD 3 ‐ ATTACHMENT 1

RFP QUESTION: GOVERNMENT RESPONSE

26. ISO0171‐19‐RFP, Section 5.10.: Do current landfill management requirements include capture/management/testing of storm waters?

Discharges from the landfill are covered under our NPDES Industrial Storm Water General Permit

GAR050000

32. ISO0171‐19‐RFP, Section 5.10.: Are there any current Georgia Water Quality Control Act (GWCA) or Georgia Erosion and Sedimentation Control Act (GESCA) permits for the landfills? Please provide copies.

There are not any active LDA or NPDES Construction Storm Water Permits for the Gibson Rd landfill. NPDES Construction Storm Water permits are required for the construction of the landfill and/or landfill cells. The LDA/NPDES Construction Storm Water permit is terminated once landfilling activities commence. All storm water management/testing is conducted under the Industrial Storm Water General permit after landfilling activities begin.

18. During the site visit is was indicated the adjacent retention pond could be use for sediment control. Please confirm. Additionally, because the contractor is required to meet sediment control requirements of the Georgia Erosion and Sediment Control Act, please confirm the Gibson Road landfill is currently in compliance during storm events.

What will be the measurement of the effectiveness of the temporary erosion control structures?

See PWS 5.10.2.1.1. A retention pond can be retrofitted and utilized for sediment control; however, the closure of the Gibson Rd. landfill is covered under the approved D&O plan and will not require NPDES Construction Storm Water permit coverage.

6. Will air permitting be part of this scope? (17th Street Landfill) See PWS 5.10.2.2

11. Could the adjacent retention ponds be use for sediment control? Additionally, because the contractor is required to meet sediment control requirements of the Georgia Erosion and Sediment Control Act, please confirm the Carter Road landfill is currently in compliance during storm events. What will be the measurement of the effectiveness of the temporary erosion control structures?

Storm Water monitoring is currently conducted per the Industrial Storm Water General permit.