_INSTRUCTIONS TO PMs.pdf
PDF 46 KB Posted
- Solicitation number
- WWYK200323-P
About this file
This document appears to be instructions for Project Managers (PMs) regarding the handling and application of technical specifications for federal contract projects at Tinker Air Force Base. For '35%' or IDIQ projects, PMs are instructed to copy applicable "Tinker Technical/Guide Specs" and list them in the project's Statement of Work (SOW). For 100% design projects, PMs are to copy designer-generated specifications to the appropriate section. For Concept/Design-Build projects, no technical specifications will be included, as they will be provided by the contractor/designer of record.
The related federal contract opportunity is for a repair project at Tinker AFB, solicitation number WWYK200323, to repair HVAC diffuser and ductwork in building B3001. This is a Tinker AFB MAC BOA (Multiple Award Contract - Basic Ordering Agreement) set-aside, with an estimated price range between $1,000,000 and $5,000,000. Mandatory site visit attendance by MAC BOA Prime Contractors is required, and an Entry Authorization List must be provided by a specific deadline. No travel plans should be made until the firm initial site visit date and time is provided.
View the file
Other files
Show 40 more
Latest 50 of 183 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For any '35%' or IDIQ project, copy applicable "Tinker Technical/Guide Specs" to this section.
‐TOC for the guide specs is located at the shortcut provided.
‐Design team should review the TOC and select specs that are applicable to the project.
‐PM will list the specs in the appropriate 'appendix' section of the project SOW (along with the general specifications).
‐Copy the applicable .pdf specification files to this directory from the shortcut provided.
For 100% desgin, copy designer generated specifications to this section.
‐PM will list the specification sections in the appropriate 'appendix' section of the 'construction only' SOW.
For Concept/DB projects, no technical specifications will be included, these will be provided by the contractor/desginer of record.
WHEN COPYING FILES, PLEASE MAKE SURE YOU ARE COPYING AND NOT MOVING FILES!!!!!
WHEN COMPLETE, DELETE THIS 'README' FILE AND THE SHORTCUT.
File details come from the government source that posted it. Updated .