000 TABLE OF CONTENTS.pdf

PDF 70 KB Posted

Attached to
TINKER AFB MAC BOA WWYK200323 REPAIR HVAC DIFFUSER AND DUCTWORK B3001
Solicitation number
WWYK200323-P
Issued by

About this file

This document is a Table of Contents for the Tinker Air Force Base (AFB) General Requirements for Construction, which outlines the divisions and sections covering the general requirements for construction projects at Tinker AFB.

The related federal contract opportunity is for the repair of HVAC diffuser and ductwork at Building 3001, Post P51-R59 at Tinker AFB. This is a pre-solicitation notice for a task order under the Tinker AFB Multiple Award Contract (MAC) Blanket Purchase Agreement (BOA). The estimated price range is between $1,000,000 and $5,000,000, and the contract is set aside for Tinker AFB MAC BOA holders only. A mandatory site visit is required for all MAC BOA Prime Contractors, and an Entry Authorization List (EAL) must be submitted by a specific deadline. The contract will be awarded in accordance with the FAR 36.204(e) guidelines.

View the file

Other files

File Type Posted
Attachment 1 EAL List - BLANK to Contractor_WWYK200323 .xlsx XLSX spreadsheet
32 13 11.pdf PDF
23 82 01.pdf PDF
07 72 20.pdf PDF
08 11 13.pdf PDF
23 08 01.00 20.pdf PDF
08 33 23.pdf PDF
23 05 48.00 40.pdf PDF
10 44 16.pdf PDF
26 05 48.00 10.pdf PDF
01 33 16.00 10.pdf PDF
06 61 16.pdf PDF
23 25 00.pdf PDF
Tinker General Req Specs Nov22ChLog.pdf PDF
23 64 26.pdf PDF
07 41 13.pdf PDF
03 30 00.pdf PDF
26 28 01.00 10.pdf PDF
40 17 26.00 20.pdf PDF
06 20 00.pdf PDF
07 31 13.pdf PDF
23 05 15.pdf PDF
09 29 00.pdf PDF
21 13 13.pdf PDF
07 52 00.pdf PDF
07 62 13.pdf PDF
200323_Submittal Register.pdf PDF
23 82 43.00 40.pdf PDF
00 70 00.pdf PDF
32 01 17.pdf PDF
03 11 13.00 10.pdf PDF
03 20 00.00 10.pdf PDF
31 23 06.pdf PDF
09 72 00.pdf PDF
13 48 00.pdf PDF
04 20 00.pdf PDF
23 31 13.00 40.pdf PDF
08 52 00.pdf PDF
08 51 13.pdf PDF
32 92 23.pdf PDF
26 08 00.pdf PDF
10 28 13.pdf PDF
23 81 23.pdf PDF
32 11 23.pdf PDF
01 45 00.00 10.pdf PDF
05 40 00.pdf PDF
07 53 23.pdf PDF
10 26 00.pdf PDF
23 11 25.pdf PDF
23 57 10.pdf PDF
Show 40 more

Latest 50 of 183 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB Tinker General Requirements

January 2022 Page 1 TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 70 00

00 71 00

00 72 00

00 80 00 00 80 05

GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE

BASE

GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR

FORCE BASE

GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON

TINKER AIR FORCE BASE

SPECIAL PROVISIONS FOR WORKING ON TINKER AFB

SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD ON

TINKER AFB

DIVISION 01 - GENERAL REQUIREMENTS

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 33 16.00 10 DESIGN DATA (DESGIN AFTER AWARD)

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 50 00 CONTRACTOR FACILITIES

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

-- End of Table of Contents –-

File details come from the government source that posted it. Updated .