03 11 13.00 10.pdf

PDF 17 KB Posted

Attached to
TINKER AFB MAC BOA WWYK200323 REPAIR HVAC DIFFUSER AND DUCTWORK B3001
Solicitation number
WWYK200323-P
Issued by

About this file

This document is a technical specification for structural cast-in-place concrete forming for a federal contract opportunity at Tinker Air Force Base. The key details are:

The technical specification covers requirements for the design, engineering, and construction of the formwork, including materials such as fiber voids, polystyrene insulation, and precast concrete units. It specifies tolerances, surface finishes, and inspection requirements. The related federal contract opportunity is for the repair of HVAC diffuser and ductwork at Building 3001, with an estimated value between $1,000,000 and $5,000,000. It is a small business set-aside solicitation under the Tinker AFB Multiple Award Contract (MAC) BOA. The solicitation requires mandatory site visit attendance by MAC BOA prime contractors, and includes specific response deadlines for providing an RSVP and base access information.

View the file

Other files

File Type Posted
Attachment 1 EAL List - BLANK to Contractor_WWYK200323 .xlsx XLSX spreadsheet
32 13 11.pdf PDF
23 82 01.pdf PDF
07 72 20.pdf PDF
08 11 13.pdf PDF
23 08 01.00 20.pdf PDF
08 33 23.pdf PDF
23 05 48.00 40.pdf PDF
10 44 16.pdf PDF
26 05 48.00 10.pdf PDF
01 33 16.00 10.pdf PDF
06 61 16.pdf PDF
23 25 00.pdf PDF
Tinker General Req Specs Nov22ChLog.pdf PDF
23 64 26.pdf PDF
07 41 13.pdf PDF
03 30 00.pdf PDF
26 28 01.00 10.pdf PDF
40 17 26.00 20.pdf PDF
06 20 00.pdf PDF
07 31 13.pdf PDF
23 05 15.pdf PDF
09 29 00.pdf PDF
21 13 13.pdf PDF
07 52 00.pdf PDF
07 62 13.pdf PDF
000 TABLE OF CONTENTS.pdf PDF
200323_Submittal Register.pdf PDF
23 82 43.00 40.pdf PDF
00 70 00.pdf PDF
32 01 17.pdf PDF
03 20 00.00 10.pdf PDF
31 23 06.pdf PDF
09 72 00.pdf PDF
13 48 00.pdf PDF
04 20 00.pdf PDF
23 31 13.00 40.pdf PDF
08 52 00.pdf PDF
08 51 13.pdf PDF
32 92 23.pdf PDF
26 08 00.pdf PDF
10 28 13.pdf PDF
23 81 23.pdf PDF
32 11 23.pdf PDF
01 45 00.00 10.pdf PDF
05 40 00.pdf PDF
07 53 23.pdf PDF
10 26 00.pdf PDF
23 11 25.pdf PDF
23 57 10.pdf PDF
Show 40 more

Latest 50 of 183 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 03 11 13. 00 10

STRUCTURAL CAST- I N- PLACE CONCRETE FORMI NG

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN CONCRETE I NSTI TUTE I NTERNATI ONAL ( ACI )

ACI 117 ( 2010; Er r at a 2011) Speci f i cat i ons f or Tol er ances f or Concr et e Const r uct i on and Mat er i al s and Comment ar y

ACI 301 ( 2010; ERTA 2015) Speci f i cat i ons f or St r uct ur al Concr et e

ACI 347 ( 2004; Er r at a 2008; Er r at a 2012) Gui de t o For mwor k f or Concr et e

ASTM I NTERNATI ONAL ( ASTM)

ASTM C578 ( 2015b) St andar d Speci f i cat i on f or Ri gi d, Cel l ul ar Pol yst yr ene Ther mal I nsul at i on

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 02 Shop Dr awi ngs

For mwor k; G For m Removal Schedul e; G

SD- 03 Pr oduct Dat a

For m Mat er i al s

SD- 04 Sampl es

Fi ber Voi ds; G

SD- 05 Desi gn Dat a

Calculations

SD- 06 Test Repor t s

Apr i l 2019 Page 1 SECTI ON 03 11 13. 00 10

Inspection

SD- 07 Cer t i f i cat es

Fi ber Voi ds

1. 3 DELI VERY, STORAGE, AND HANDLI NG

St or e f i ber voi ds above gr ound l evel i n a dr y l ocat i on. Keep f i ber voi ds dr y unt i l i nst al l ed and over l ai d wi t h concr et e.

PART 2 PRODUCTS

2. 1 SYSTEM DESCRI PTI ON

The desi gn, engi neer i ng, and const r uct i on of t he f or mwor k i s t he r esponsi bi l i t y of t he Cont r act or . Desi gn f or mwor k i n accor dance wi t h met hodol ogy of ACI 347 f or ant i c i pat ed l oads, l at er al pr essur es, and st r esses, and capabl e of wi t hst andi ng t he pr essur es r esul t i ng f r om pl acement and vi br at i on of concr et e. Compl y wi t h t he t ol er ances speci f i ed i n Sect i on 03 30 00 CAST- I N- PLACE CONCRETE, par agr aph TOLERANCES FOR FORM CONSTRUCTI ON. However , f or sur f aces wi t h an ACI Cl ass A sur f ace desi gnat i on, l i mi t t he al l owabl e def l ect i on f or f aci ng mat er i al bet ween st uds, f or st uds bet ween wal er s and wal er s bet ween br aci ng t o 0. 0025 t i mes t he span. Desi gn t he f or mwor k as a compl et e syst em wi t h consi der at i on gi ven t o t he ef f ect s of cement i t i ous mat er i al s and mi xt ur e addi t i ves such as f l y ash, cement t ype, pl ast i c i zer s, accel er at or s, r et ar der s, ai r ent r ai nment , and ot her s. Moni t or t he adequacy of f or mwor k desi gn and const r uct i on pr i or t o and dur i ng concr et e pl acement as par t of t he Cont r act or ' s appr oved Qual i t y Cont r ol Pl an. Submi t desi gn anal ysi s and cal cul at i ons f or f or m desi gn and met hodol ogy used i n t he desi gn. Submi t at l east 10 days ei t her bef or e f abr i cat i on on si t e or bef or e del i ver y of pr ef abr i cat ed f or ms.

2. 2 FORM MATERI ALS

Submi t manuf act ur er ' s dat a, i ncl udi ng l i t er at ur e descr i bi ng f or m mat er i al s, accessor i es, and f or m r el easi ng agent s.

2. 2. 1 Formwork

Compl y wi t h ACI 301 Sect i on 2. Pr ovi de f or sur f aces not exposed t o publ i c v i ew a sur f ace f i ni sh SF- 1. 0. Pr ovi de f or sur f aces exposed t o publ i c v i ew a sur f ace f i ni sh SF- 3. 0. Pat ch hol es and def ect s i n accor dance wi t h ACI 301. Submi t f or m r emoval schedul e i ndi cat i ng el ement and mi ni mum l engt h of t i me f or f or m r emoval .

2. 2. 2 Ret ai n- I n- Pl ace Met al For ms

Use r et ai n- i n- pl ace met al f or ms f or concr et e s l abs and r oof s as speci f i ed i n Sect i on 05 30 00 STEEL DECKS.

2. 2. 3 Pan- For m Uni t s

Use f act or y- f abr i cat ed pan- f or m uni t s of t he appr oxi mat e sect i on i ndi cat ed f or one- way or t wo- way concr et e j oi st and sl ab const r uct i on. Uni t s must consi st of st eel or mol ded f i ber gl ass concr et e f or m pans. Fur ni sh c l osur e uni t s as r equi r ed.

Apr i l 2019 Page 2 SECTI ON 03 11 13. 00 10

2. 2. 4 Fi ber Voi ds

Fi ber voi ds must be t he pr oduct of a r eput abl e manuf act ur er r egul ar l y engaged i n t he commer ci al pr oduct i on of f i ber voi ds. Const r uct t he voi ds of doubl e f aced, cor r ugat ed f i ber boar d. Fabr i cat e t he cor r ugat ed f i ber boar d of wet st r engt h paper l i ner s, i mpr egnat ed wi t h par af f i n, and l ami nat ed wi t h moi st ur e r esi st ant adhesi ve, wi t h a boar d st r engt h of 275 psi . Voi ds whi ch ar e i mpr egnat ed wi t h par af f i n af t er const r uct i on, i n l i eu of bei ng const r uct ed wi t h par af f i n i mpr egnat ed f i ber boar d, ar e accept abl e. Desi gn voi ds t o suppor t not l ess t han 1000 psf . To pr event separ at i on dur i ng concr et e pl acement f i ber voi ds, assembl e wi t h st eel or pl ast i c bandi ng at 4 f eet on cent er maxi mum, or by adequat e st apl i ng or gl ui ng as r ecommended by t he manuf act ur er . Fi ber voi ds pl aced under concr et e s l abs and t hat ar e 8 i nches i n dept h may be heavy dut y " waf f l e box" t ype, const r uct ed of par af f i n i mpr egnat ed cor r ugat ed f i ber boar d.

Submi t one sampl e uni t of f i ber voi ds pr i or t o i nst al l at i on of t he voi ds and cer t i f i cat es at t est i ng t hat f i ber voi ds conf or m t o t he speci f i ed requirements.

2. 3 FI BER VOI D RETAI NERS

2. 3. 1 Pol yst yr ene Ri gi d I nsul at i on

Pol yst yr ene r i gi d i nsul at i on must conf or m t o ASTM C578, Type V, VI , or VI I , squar e edged. Si ze: 1- 1/ 2 i nches t hi ck by 16 i nches i n hei ght by 3 f eet i n l engt h, unl ess ot her wi se i ndi cat ed.

2. 3. 2 Pr ecast Concr et e

Pr ecast concr et e uni t s must have a compr essi ve st r engt h of not l ess t han 2500 psi , r ei nf or ced wi t h 6 i nch by 6 i nch by W1. 4 WWF wi r e mesh, and 12 i nches ( hei ght ) by 3 f eet ( l engt h) by 1- 5/ 8 i nches ( t hi ckness) i n s i ze unl ess i ndi cat ed.

PART 3 EXECUTI ON

3. 1 INSTALLATION

3. 1. 1 Formwork

Compl y wi t h ACI 301 Sect i on 2 wi t h sur f ace t ol er ances i n accor dance wi t h

ACI 117.

3. 1. 2 Fi ber Voi ds

Pl ace voi ds on a smoot h f i r m dr y bed of sui t abl e mat er i al , t o avoi d bei ng di spl aced ver t i cal l y, and set t i ght , wi t h no buckl ed car t ons, i n or der t hat hor i zont al di spl acement cannot t ake pl ace. Seal t he ends of each sect i on of voi d by di ppi ng i n par af f i n, wi t h any addi t i onal cut t i ng of voi ds at t he j obsi t e f i el d di p i n t he same t ype of seal er , unl ess l i ner s and f l ut es ar e compl et el y i mpr egnat ed wi t h par af f i n. Pr i or t o pl aci ng r ei nf or cement , cover t he ent i r e f or med ar ea f or s l abs wi t h a 4 x 8 f eet mi ni mum f l at sheet s of f i ber voi d cor r ugat ed f i ber boar d. Seal j oi nt s wi t h a moi st ur e r esi st ant t ape havi ng a mi ni mum wi dt h of 3 i nches. I f voi ds ar e dest r oyed or damaged and ar e not capabl e of suppor t i ng t he desi gn l oad, r epl ace pr i or t o pl aci ng of concr et e.

Apr i l 2019 Page 3 SECTI ON 03 11 13. 00 10

3. 1. 3 Fi ber Voi d Ret ai ner s

I nst al l f i ber voi d r et ai ner s, cont i nuousl y, on bot h s i des of f i ber voi ds pl aced under gr ade beams i n or der t o r et ai n t he cavi t y af t er t he f i ber voi ds bi odegr ade.

3. 2 INSPECTION

I nspect f or ms and embedded i t ems i n suf f i c i ent t i me pr i or t o each concr et e pl acement t o cer t i f y t o t he Cont r act i ng Of f i cer t hat t hey ar e r eady t o r ecei ve concr et e. Repor t t he r esul t s of each i nspect i on i n wr i t i ng.

Submi t f i el d i nspect i on r epor t s f or concr et e f or ms and embedded i t ems.

- - End of Sect i on - -

Apr i l 2019 Page 4 SECTI ON 03 11 13. 00 10

File details come from the government source that posted it. Updated .