07 31 13.pdf

PDF 31 KB Posted

Attached to
TINKER AFB MAC BOA WWYK200323 REPAIR HVAC DIFFUSER AND DUCTWORK B3001
Solicitation number
WWYK200323-P
Issued by

About this file

This document is a technical specification for asphalt shingle roof systems to be installed at Tinker Air Force Base. The key details are:

The specification covers requirements for asphalt shingle products, underlayment, fasteners, and other accessories. Shingles must meet performance standards for fire resistance, wind resistance, and impact resistance. Shingles must also be Energy Star labeled and meet solar reflectance requirements. The specification includes detailed application instructions for underlayment, starter strips, shingle courses, hips/ridges, and flashings. A 30-year manufacturer's warranty and 5-year contractor's warranty are required. This technical specification will be used for a federal contract opportunity related to repairing HVAC systems in Building 3001 at Tinker AFB. The contract is a small business set-aside with an estimated value between $1-5 million.

View the file

Other files

File Type Posted
Attachment 1 EAL List - BLANK to Contractor_WWYK200323 .xlsx XLSX spreadsheet
32 13 11.pdf PDF
23 82 01.pdf PDF
07 72 20.pdf PDF
08 11 13.pdf PDF
23 08 01.00 20.pdf PDF
08 33 23.pdf PDF
23 05 48.00 40.pdf PDF
10 44 16.pdf PDF
26 05 48.00 10.pdf PDF
01 33 16.00 10.pdf PDF
06 61 16.pdf PDF
23 25 00.pdf PDF
Tinker General Req Specs Nov22ChLog.pdf PDF
23 64 26.pdf PDF
07 41 13.pdf PDF
03 30 00.pdf PDF
26 28 01.00 10.pdf PDF
40 17 26.00 20.pdf PDF
06 20 00.pdf PDF
23 05 15.pdf PDF
09 29 00.pdf PDF
21 13 13.pdf PDF
07 52 00.pdf PDF
07 62 13.pdf PDF
000 TABLE OF CONTENTS.pdf PDF
200323_Submittal Register.pdf PDF
23 82 43.00 40.pdf PDF
00 70 00.pdf PDF
32 01 17.pdf PDF
03 11 13.00 10.pdf PDF
03 20 00.00 10.pdf PDF
31 23 06.pdf PDF
09 72 00.pdf PDF
13 48 00.pdf PDF
04 20 00.pdf PDF
23 31 13.00 40.pdf PDF
08 52 00.pdf PDF
08 51 13.pdf PDF
32 92 23.pdf PDF
26 08 00.pdf PDF
10 28 13.pdf PDF
23 81 23.pdf PDF
32 11 23.pdf PDF
01 45 00.00 10.pdf PDF
05 40 00.pdf PDF
07 53 23.pdf PDF
10 26 00.pdf PDF
23 11 25.pdf PDF
23 57 10.pdf PDF
Show 40 more

Latest 50 of 183 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 07 31 13

ASPHALT SHI NGLES

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM D1970/ D1970M ( 2017) St andar d Speci f i cat i on f or Sel f - Adher i ng Pol ymer Modi f i ed Bi t umi nous Sheet Mat er i al s Used as St eep Roof i ng Under l ayment f or I ce Dam Pr ot ect i on

ASTM D226/ D226M ( 2009) St andar d Speci f i cat i on f or Asphal t - Sat ur at ed Or gani c Fel t Used i n Roof i ng and Wat er pr oof i ng

ASTM D3018/ D3018M ( 2011) St andar d Speci f i cat i on f or Cl ass A Asphal t Shi ngl es Sur f aced Wi t h Mi ner al Granules

ASTM D3161/ D3161M ( 2016a) St andar d Test Met hod f or Wi nd- Resi st ance of St eep Sl ope Roof i ng Pr oduct s ( Fan- I nduced Met hod)

ASTM D3462/ D3462M ( 2016) St andar d Speci f i cat i on f or Asphal t Shi ngl es Made Fr om Gl ass Fel t and Sur f aced wi t h Mi ner al Gr anul es

ASTM D41/ D41M ( 2011; R 2016) St andar d Speci f i cat i on f or Asphal t Pr i mer Used i n Roof i ng, Damppr oof i ng, and Wat er pr oof i ng

ASTM D4586/ D4586M ( 2007; E 2012; R 2012) Asphal t Roof Cement , Asbest os- Fr ee

ASTM D4869/ D4869M ( 2016a) St andar d Speci f i cat i on f or Asphal t - Sat ur at ed Or gani c Fel t Under l ayment Used i n St eep Sl ope Roof i ng

ASTM D6380/ D6380M ( 2003; E 2013; R 2013) St andar d Speci f i cat i on f or Asphal t Rol l Roof i ng ( Or gani c Fel t )

ASTM D7158/ D7158M ( 2016) St andar d Test Met hod f or Wi nd Resi st ance of Asphal t Shi ngl es ( Upl i f t For ce/ Upl i f t Resi st ance Met hod)

NATI ONAL ROOFI NG CONTRACTORS ASSOCI ATI ON ( NRCA)

NRCA 0418 ( 2009) St eep- sl ope Roof Syst em Manual

Apr i l 2019 Page 1 SECTI ON 07 31 13

U. S. DEPARTMENT OF ENERGY ( DOE)

Ener gy St ar ( 1992; R 2006) Ener gy St ar Ener gy Ef f i c i ency Label i ng Syst em ( FEMP)

UNDERWRI TERS LABORATORI ES ( UL)

UL 2218 ( 2010; Repr i nt May 2012) UL St andar d f or Saf et y I mpact Resi st ance of Pr epar ed Roof Cover i ng Mat er i al s

UL 790 ( 2004; Repr i nt Jul 2014) St andar d Test Met hods f or Fi r e Test s of Roof Cover i ngs

1. 2 DEFINITIONS

1. 2. 1 Top Lap

That por t i on of shi ngl e over l appi ng shi ngl e i n cour se bel ow.

1. 2. 2 Head Lap

The t r i pl e cover age por t i on of t op l ap whi ch i s t he shor t est di st ance f r om t he but t edge of an over l appi ng shi ngl e t o t he upper edge of a shi ngl e i n t he second cour se bel ow.

1. 2. 3 Exposure

That por t i on of a shi ngl e exposed t o t he weat her af t er i nst al l at i on.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 03 Pr oduct Dat a

Shingles

Submi t dat a i ncl udi ng t ype, wei ght , c l ass, UL l abel s, and speci al t ypes of under l ayment and eave f l ashi ng.

SD- 04 Sampl es

Shi ngl es; G

Ful l shi ngl e sampl e and manuf act ur er ' s st andar d s i ze sampl es of mat er i al s and pr oduct s r equi r i ng col or or f i ni sh sel ect i on.

Col or Char t s; G

SD- 08 Manuf act ur er ' s I nst r uct i ons

Application

SD- 11 Cl oseout Submi t t al s

Apr i l 2019 Page 2 SECTI ON 07 31 13

Ener gy St ar Label f or Asphal t Shi ngl e;

Heat I s l and Reduct i on;

Manuf act ur er ' s War r ant y; G

Cont r act or ' s War r ant y; G

1. 4 DELI VERY AND STORAGE

Del i ver mat er i al s i n t he manuf act ur er ' s unopened bundl es and cont ai ner s bear i ng t he manuf act ur er ' s br and name. Keep mat er i al s dr y, compl et el y cover ed, and pr ot ect ed f r om t he weat her . St or e accor di ng t o manuf act ur er ' s wr i t t en i nst r uct i ons. St or e r ol l goods on end i n an upr i ght posi t i on or i n accor dance wi t h manuf act ur er ' s r ecommendat i ons.

I mmedi at el y bef or e l ayi ng, st or e r oof i ng f el t f or 24 hour s i n an ar ea mai nt ai ned at a t emper at ur e not l ower t han 50 degr ees F.

1. 5 WARRANTIES

War r ant i es must begi n on t he dat e of Gover nment accept ance of t he wor k.

1. 5. 1 Manuf act ur er ' s War r ant y

Fur ni sh t he asphal t shi ngl e manuf act ur er ' s st andar d 30 year war r ant y f or t he asphal t shi ngl es. The war r ant y must r un di r ect l y t o t he Gover nment .

1. 5. 2 Cont r act or ' s War r ant y

Pr ovi de war r ant y f or 5 year s t hat t he asphal t shi ngl e r oof i ng syst em, as i nst al l ed, i s f r ee f r om def ect s i n wor kmanshi p. When r epai r s due t o def ect i ve wor kmanshi p ar e r equi r ed dur i ng t he Cont r act or ' s war r ant y per i od, t he Cont r act or must make such r epai r s wi t hi n 72 hour s of not i f i cat i on. When r epai r s ar e not per f or med wi t hi n t he speci f i ed t i me, emer gency r epai r s per f or med by ot her s wi l l not voi d t he war r ant y.

PART 2 PRODUCTS

2. 1 PRODUCT SUSTAI NABI LI TY CRI TERI A

For pr oduct s i n t hi s sect i on, wher e appl i cabl e and t o ext ent al l owed by per f or mance cr i t er i a, pr ovi de and document t he f ol l owi ng:

2. 1. 1 Ener gy Ef f i c i ent Asphal t Roof i ng Pr oduct s

Ener gy St ar Label r equi r ement i s i dent i f i ed f or some pr oduct s i n t hi s sect i on; pr ovi de document at i on i n accor dance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG par agr aph ENERGY EFFI CI ENT EQUI PMENT. Ot her pr oduct s l i s t ed i n t hi s sect i on may be avai l abl e wi t h Ener gy St ar Label ;

i dent i f y t hose pr oduct s t hat meet pr oj ect r equi r ement s f or ener gy ef f i c i ent equi pment , and pr ovi de document at i on i n accor dance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG par agr aph ENERGY EFFI CI ENT EQUI PMENT.

2. 2 MATERIALS

2. 2. 1 Shingles

Mi ner al gr anul e- sur f aced asphal t shi ngl es, sel f - seal i ng, squar e t ab, st r i p , Apr i l 2019 Page 3 SECTI ON 07 31 13 f ungus- r esi st ant i mpact r esi st ant shi ngl es conf or mi ng t o UL 2218, Cl ass 4.

ASTM D3018/ D3018M, Type I , and ASTM D3462/ D3462M , ar chi t ect ur al shi ngl es wei ghi ng not l ess t han 290 pounds per 100 squar e f eet . Shi ngl es must meet t he f i r e r esi st ance r equi r ement s of UL 790 f or Cl ass A and t he wi nd r esi st ance r equi r ement s of ASTM D3161/ D3161M, Cl ass F. Col or must be as sel ect ed f r om t he manuf act ur er ' s st andar d col or char t s. Pr ovi de asphal t shi ngl e t hat i s Ener gy St ar l abel ed. Pr ovi de dat a i dent i f y i ng Ener gy St ar l abel f or asphal t shi ngl e pr oduct . Pr ovi de sol ar r ef l ect ance pr oduct wi t h an i ni t i al sol ar r ef l ect ance gr eat er t han or equal t o 0. 25 and a sol ar r ef l ect ance gr eat er t han or equal t o 0. 15 t hr ee year s af t er i nst al l at i on under nor mal condi t i ons.

2. 2. 2 Mi ner al - Sur f aced Asphal t Rol l Roof i ng

ASTM D6380/ D6380M.

2. 2. 3 Smoot h- Sur f aced Asphal t Rol l Roof i ng

ASTM D6380/ D6380M, Type I I .

2. 2. 4 Underlayment

Asphal t - sat ur at ed f el t conf or mi ng t o ASTM D4869/ D4869M or ASTM D226/ D226M, Type I I , number 30, wi t hout per f or at i ons or ot her mat er i al speci f i ed by t he shi ngl e manuf act ur er f or use as under l ayment .

2. 2. 4. 1 Leak Bar r i er Under l ayment

Sel f - adher i ng l eak bar r i er or i ce dam under l ayment must compl y wi t h ASTM D1970/ D1970M f or seal abi l i t y ar ound nai l s.

2. 2. 5 Sel f - Adher i ng Membr ane

Sel f - adher i ng r ubber i zed asphal t i c membr ane, a mi ni mum of 40 mi l s t hi ck, and r ecommended by t he shi ngl e manuf act ur er f or use as eaves f l ashi ng.

2. 2. 6 Nai l s f or Appl y i ng Shi ngl es and Asphal t - Sat ur at ed Fel t

Al umi num or hot - di pped gal vani zed st eel or equi val ent cor r osi on r esi st ant wi t h shar p poi nt s and f l at heads 3/ 8 t o 7/ 16 i nch i n di amet er . Shank di amet er of nai l s must be a mi ni mum of 0. 105 i nch and a maxi mum of 0. 135 i nch wi t h gar b or ot her wi se def or med f or added pul l - out r esi st ance. Nai l s must be l ong enough t o penet r at e compl et el y t hr ough or ext end a mi ni mum of 3/ 4 i nch i nt o r oof deck, whi chever i s l ess, when dr i ven t hr ough mat er i al s t o be f ast ened.

2. 2. 7 Asphal t Roof Cement

ASTM D4586/ D4586M, Type I I .

2. 2. 8 Asphal t Pr i mer

ASTM D41/ D41M.

2. 2. 9 Ventilators

2. 2. 9. 1 Nai l abl e Pl ast i c Shi ngl e Over Type Ri dge Vent s

Ri dge vent s must be const r uct ed of UV st abi l i zed nai l abl e r i gi d

Apr i l 2019 Page 4 SECTI ON 07 31 13 pol ypr opyl ene mat er i al , appr oxi mat el y 1 f oot wi de and 1 i nch t hi ck, and must be i n 4 f oot l ong i nt er l ocki ng sect i ons wi t h sel f - al i gni ng ends or cor r ugat ed pol yet hyl ene r i gi d r ol l or r i gi d st r i p r i dge vent wi t h al umi num wi nd def l ect or s on each si de. Vent s must be desi gned t o pr event i nf i l t r at i on of i nsect s, r ai n, and snow.

2. 2. 9. 2 Nai l abl e Mesh Shi ngl e Over Type Ri dge Vent s

Ri dge vent s must be const r uct ed of UV st abi l i zed nai l abl e pol yest er mesh mat er i al , appr oxi mat el y 1 f oot wi de. Vent s must be desi gned t o pr event i nf i l t r at i on of i nsect s, r ai n, and snow.

PART 3 EXECUTI ON

3. 1 VERI FI CATI ON OF CONDI TI ONS

Do not i nst al l bui l di ng const r uct i on mat er i al s t hat show vi sual evi dence of bi ol ogi cal gr owt h.

Ensur e t hat r oof deck i s smoot h, c l ean, dr y, and wi t hout l oose knot s.

Roof sur f aces must be f i r m and f r ee f r om l oose boar ds, l ar ge cr acks, and pr oj ect i ng ends t hat mi ght damage t he r oof i ng. Vent s and ot her pr oj ect i ons t hr ough r oof s must be pr oper l y f l ashed and secur ed i n posi t i on, and pr oj ect i ng nai l s must be dr i ven f l ush wi t h t he deck.

3. 2 SURFACE PREPARATI ON

Cover knot hol es and cr acks wi t h sheet met al nai l ed secur el y t o sheat hi ng.

Fl ash and secur e vent s and ot her r oof pr oj ect i ons, and dr i ve pr oj ect i ng nai l s f i r ml y home.

3. 3 APPLICATION

Appl y r oof i ng mat er i al s as speci f i ed her ei n unl ess speci f i ed or r ecommended ot her wi se by shi ngl e manuf act ur er ' s wr i t t en i nst r uct i ons or by

NRCA 0418.

3. 3. 1 Underlayment

Pr ovi de f or r oof s l opes bet ween 2 i nches per f oot and 4 i nches per f oot .

Appl y t wo l ayer s t o r oof deck. Pr ovi de a 19 i nch wi de st r i p as st ar t er sheet t o mai nt ai n speci f i ed number of l ayer s t hr oughout r oof . Lay par al l el t o eaves, st ar t i ng at eaves. Pr ovi de mi ni mum 19 i nch head l aps, 6 i nch l aps f r om bot h s i des over hi ps and r i dges, and 12 i nch end l aps i n t he f i el d of t he r oof . Nai l suf f i c i ent l y t o hol d unt i l shi ngl es ar e appl i ed. Tur n up ver t i cal sur f aces a mi ni mum of 4 i nches. When a sel f - adher i ng membr ane i s used f or eave f l ashi ng, st ar t under l ayment f r om upper edge of eave f l ashi ng.

3. 3. 2 Dr i p Edges

Pr ovi de met al dr i p edges as speci f i ed i n Sect i on 07 60 00 FLASHI NG AND SHEET METAL appl i ed di r ect l y on t he wood deck at eaves and over t he under l ayment at r akes. Ext end back f r om edge of deck a mi ni mum of 3 i nches, and secur e wi t h nai l s spaced a maxi mum of 4 i nches o. c. al ong i nner edge.

Apr i l 2019 Page 5 SECTI ON 07 31 13

3. 3. 3 St ar t er St r i p

Appl y st ar t er st r i p at eaves, usi ng 9 i nch wi de st r i p of mi ner al - sur f aced r ol l r oof i ng of a col or t o mat ch shi ngl es. Opt i onal l y, use a r ow of shi ngl es wi t h t abs r emoved and t r i mmed t o ensur e t hat j oi nt s ar e not exposed at shi ngl e cut out s. Appl y st ar t er st r i p al ong eaves, over hangi ng t he met al dr i p edge at eaves and r ake edges 1/ 4 i nch t o 3/ 8 i nch; f ast en i n a l i ne par al l el t o and 3 t o 4 i nches above eave edge. Pl ace nai l s so t op of nai l i s not exposed i n cut out s of f i r st cour se of shi ngl es. Fast en wi t h 6 nai l s per st r i p of shi ngl es or space nai l s at 6 i nches o. c. f or r ol l r oof i ng. Seal t abs of f i r st cour se of shi ngl es wi t h asphal t r oof cement as speci f i ed bel ow.

3. 3. 4 Shi ngl e Cour ses

St ar t f i r st cour se wi t h f ul l shi ngl e, and appl y succeedi ng cour ses wi t h j oi nt s st agger ed at t hi r ds or hal ves. But t - end j oi nt s of shi ngl es must not al i gn ver t i cal l y mor e of t en t han ever y f our t h cour se. Appl y shi ngl e cour ses as f ol l ows:

a. Fast eni ng: Do not dr i ve f ast ener s i nt o or above t he f act or y- appl i ed adhesi ve unl ess adhesi ve i s l ocat ed 5/ 8 i nch or c l oser t o t op of cut out s. Pl ace f ast ener s so t hey ar e conceal ed by shi ngl e t op l ap and penet r at e t he head l ap.

b. Shi ngl es appl i ed wi t h nai l s: Nomi nal 5 i nch exposur e. Appl y each shi ngl e wi t h mi ni mum of f our nai l s. Pl ace one nai l 1 i nch f r om each end, and evenl y space nai l s on a hor i zont al l i ne a mi ni mum of 5/ 8 i nch above t op of cut out s. Cement each t ab wi t h one spot of asphal t r oof cement pl aced 1 t o 2 i nches f r om bot t om edge of shi ngl e.

3. 3. 5 Hi ps and Ri dges

For m wi t h 9 by 12 i nch i ndi v i dual shi ngl es or wi t h 12 by 12 i nch shi ngl es cut f r om 12 by 36 i nch st r i p shi ngl es. Bend shi ngl es l engt hwi se down cent er wi t h equal exposur e on each si de of hi p or r i dge. Lap shi ngl es t o pr ovi de a maxi mum 5 i nch exposur e, and nai l each si de i n unexposed ar ea 5- 1/ 2 i nches f r om but t and 1 i nch i n f r om edge.

3. 3. 6 Valleys open sheet met al val l eys.

3. 3. 6. 1 Open Sheet Met al Val l eys

Sheet met al f l ashi ng f or val l eys i s speci f i ed i n Sect i on 07 60 00 FLASHI NG AND SHEET METAL. Bef or e i nst al l i ng and f ast eni ng f l ashi ng i n pl ace wi t h met al c l eat s:

a. I nst al l s i ngl e l ayer of 36 i nch wi de, i ce and wat er shei l d under l ayemnt , cent er ed on val l ey and ext endi ng ent i r e l engt h of val l ey over f el t underlayment.

b. Cut r egul ar shi ngl e cour ses on each r oof on t r ue l i ne 2 i nches f r om val l ey cent er l i ne at t op of val l ey, and i ncr ease wi dt h bet ween l i nes by 1 i nch f or each 8 f eet of val l ey l engt h, cont i nui ng t o eaves.

c. Appl y 2 i nch band of asphal t r oof cement over f l ashi ng, al ong and under s i de of shi ngl es adj oi ni ng val l ey.

Apr i l 2019 Page 6 SECTI ON 07 31 13

d. Pr ess shi ngl es t i ght l y i nt o cement , and nai l i n nor mal manner , except appl y nai l s not c l oser t han 5 i nches t o val l ey cent er l i ne. Do not dr i ve nai l s t hr ough val l ey f l ashi ng.

e. Pr ovi de a 4 i nch band of asphal t r oof cement f or f ast eni ng shi ngl e t abs down al ong open met al gut t er s.

3. 3. 7 Flashing

3. 3. 7. 1 Eave Fl ashi ng

Pr ovi de f or r oof s l opes bet ween 2 i nches per f oot and 4 i nches per f oot .

Pr ovi de ei t her of t he f ol l owi ng t ypes of eave f l ashi ng:

a. Fr om t he eaves t o a poi nt 24 i nches i nsi de i nt er i or wal l l i ne, appl y sol i d coat i ng of asphal t r oof cement bet ween over l appi ng l ayer s of under l ayment . Spr ead cement t o a uni f or m t hi ckness at r at e of 2 gal l ons per 100 squar e f eet of cement ed r oof ar ea.

b. Fr om t he eaves t o a poi nt 24 i nches i nsi de i nt er i or wal l l i ne, appl y one l ayer of sel f - adher i ng membr ane. Fol l ow membr ane manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons.

3. 3. 7. 2 St epped Fl ashi ng

For s l opi ng r oof s whi ch abut ver t i cal sur f aces, pr ovi de st epped met al f l ashi ng as speci f i ed i n Sect i on 07 60 00 FLASHI NG AND SHEET METAL.

3. 3. 7. 3 Vent and St ack Fl ashi ng

Appl y shi ngl es up t o poi nt wher e vent or st ack pi pe pr oj ect s t hr ough r oof , and cut near est shi ngl e t o f i t ar ound pi pe. Bef or e appl y i ng shi ngl es beyond pi pe, pr epar e f l ange of met al pi pe vent f l ashi ng as speci f i ed i n Sect i on 07 60 00 FLASHI NG AND SHEET METAL, by appl y i ng a 1/ 8 i nch t hi ck coat i ng of asphal t r oof cement on bot t om si de of f l ashi ng f l ange. Sl i p f l ashi ng col l ar and f l ange over pi pe, and set coat ed f l ange i n 1/ 16 i nch coat i ng of asphal t r oof cement . Af t er appl y i ng f l ashi ng f l ange, cont i nue shi ngl i ng up r oof . Lap l ower par t of f l ange over shi ngl es. Over l ap f l ange wi t h s i de and upper shi ngl es. Fi t shi ngl es ar ound pi pe, and embed i n 1/ 16 i nch t hi ck coat i ng of asphal t r oof cement wher e shi ngl es over l ay flange.

- - End of Sect i on - -

Apr i l 2019 Page 7 SECTI ON 07 31 13

File details come from the government source that posted it. Updated .