23 82 43.00 40.pdf
PDF 15 KB Posted
- Solicitation number
- WWYK200323-P
About this file
This document is a technical specification for electric duct heaters to be installed at Tinker Air Force Base in Oklahoma. The key details are:
The specification outlines the requirements for electric duct heaters, including performance, components, heating elements, enclosures, controls, and installation. The heaters must conform to UL 1996 standards and be factory pre-wired and ready for field connections. Required submittals include fabrication drawings, equipment and performance data, and manufacturer's instructions. The specification also details requirements for controls, including overheat cutouts, indicator lights, step controllers, and thermostats. Installation instructions and field quality control testing are also provided.
The related federal contract opportunity is for a repair project at Tinker AFB involving HVAC diffuser and ductwork in building B3001. This is a Tinker AFB Multiple Award Contract (MAC) BOA set-aside, with an estimated value between $1,000,000 and $5,000,000. A mandatory site visit is required for MAC BOA holders to be considered responsive, with an RSVP deadline and instructions for providing an entry authorization list.
View the file
Other files
Show 40 more
Latest 50 of 183 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019
SECTI ON 23 82 43. 00 40
ELECTRI C DUCT HEATERS
04/17
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
UNDERWRI TERS LABORATORI ES ( UL)
UL 1996 ( 2009; Repr i nt Jul 2016) UL St andar d f or Saf et y El ect r i c Duct Heat er s
1. 2 ADMI NI STRATI VE REQUI REMENTS
Sect i on 26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS appl i es t o wor k speci f i ed i n t hi s sect i on.
1. 2. 1 Pr e- I nst al l at i on Meet i ngs
The Cont r act i ng Of f i cer wi l l schedul e a pr e- i nst al l at i on meet i ng wi t hi n 30 days of Cont r act Awar d. Pr ovi de t he f ol l owi ng f or r evi ew and appr oval :
a. Submi t f abr i cat i on dr awi ngs f or duct heat er s consi st i ng of f abr i cat i on and assembl y det ai l s t o be per f or med i n t he f act or y.
b. Submi t equi pment and per f or mance dat a f or duct heat er s i ncl udi ng use l i f e, syst em f unct i onal f l ows, saf et y f eat ur es, and mechani cal aut omat ed det ai l s.
c. Submi t manuf act ur er ' s i nst r uct i ons f or duct heat er s i ncl udi ng i nst al l at i on dr awi ngs showi ng any speci al pr ovi s i ons r equi r ed t o i nst al l equi pment component s and syst em packages. Cl ear l y not e i mpedances, hazar ds and saf et y pr ecaut i ons.
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval and i nf or mat i on onl y. Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on
01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Fabr i cat i on Dr awi ngs; G
I nst al l at i on Dr awi ngs; G
SD- 03 Pr oduct Dat a
Equi pment and Per f or mance Dat a; G
Apr i l 2019 Page 1 SECTI ON 23 82 43. 00 40
Duct Heat er s; G
Heat i ng El ement s; G
Encl osur es; G
Cont r ol s; G
SD- 08 Manuf act ur er ' s I nst r uct i ons
Manuf act ur er ' s I nst r uct i ons; G
PART 2 PRODUCTS
2. 1 SYSTEM DESCRI PTI ON
Pr ovi de duct heat er s wi t h t he capaci t y i ndi cat ed, pl us or mi nus 5 per cent . Ensur e duct heat er s ar e f act or y pr ewi r ed, r eady f or f i el d t er mi nal connect i ons.
2. 1. 1 Per f or mance Requi r ement s
Pr ovi de duct heat er s conf or mi ng t o t he r equi r ement s of UL 1996.
2. 2 COMPONENTS
2. 2. 1 Heat i ng El ement s And Encl osur es
I nst al l heat i ng el ement s wi t h a f r amewor k compl et e wi t h t er mi nal , and const r uct j unct i on boxes of mi l l - al umi ni zed or gal vani zed car bon st eel .
Pr ovi de wi t h a magnet i c cont act or i n a separ at e encl osur e i nsul at ed f r om t he duct at duct heat er l ocat i on or at a separ at e, r emot e l ocat i on.
Ensur e al l gasket i ng i s 1/ 16- i nch t hi ck non- asbest os woven- cl ot h t ape, wi t h f l ange dept h sui t abl e f or duct i nsul at i on pr ovi ded. I nsul at e t er mi nal j unct i on box t o pr event el evat ed t emper at ur es.
Pr ovi de open heat i ng- el ement consi st i ng of a hel i x- wound r esi st ance wi r e al l oy appr oxi mat el y 80 per cent ni ckel and 20 per cent chr omi um. Wat t age densi t y i s not t o exceed 50 wat t s per l i near i nch of heat ed el ement .
Ensur e el ement suppor t mi ni mi zes abr asi on and saggi ng. Pr ovi de saf et y scr eens on bot h upst r eam and downst r eam si des of heat er el ement s.
Pr ovi de dummy el ement s or i ncl ude ot her pr ovi s i ons s i mi l ar t o open ar ea per f or at ed scr eens i f r equi r ed t o uni f or ml y di st r i but e ai r f l ow acr oss heat er f ace.
2. 2. 2 Controls
Pr ovi de uni t s wi t h i nt egr al over heat cut out s f or pr i mar y and secondar y pr ot ect i on, wi t h aut omat i c- r eset pr i mar y cut out of t he di sk t ype and sui t abl e f or 277- vol t , 60- her t z ser vi ce.
Pr ovi de di sk t ype manual - r eset secondar y cut out s wi r ed i n ser i es wi t h each circuit.
Pr ovi de i ndi cat i ng l i ght ( s) t o show:
Apr i l 2019 Page 2 SECTI ON 23 82 43. 00 40
a. Heat er on
b. Each ci r cui t on
Local l y pr ovi de pi l ot swi t ch t o cut of f heat er t hr ough i nt egr al magnet i c contactors.
For heat er assembl i es r at ed at 45 amper es and l ar ger , pr ovi de t he heat er assembl y subdi v i ded and f used. Fuse each subdi v i ded 45- amper e heat er l oad sect i on. I n c i r cui t s of l ess t han 45 amper es, f use appr opr i at e sect i ons.
Pr ovi de UL- appr oved magnet i c cont act or s, ( ot her t han i nt egr al over heat - cut out associ at ed uni t s) , r emot el y l ocat ed as i ndi cat ed.
Pr ovi de st ep cont r ol l er s f or sequenci ng heat er l oads of UL- appr oved component s and i ncl ude t he f ol l owi ng:
a. Del ay t o pr event l i ne sur ge when ener gi z i ng l oads
b. I ndi v i dual f usi ng of each st ep
c. I nt er component wi r i ng t o t er mi nal s f or f i el d connect i on cabi net
Pr ovi de st age t ype wal l mount ed t her most at s.
Pr ovi de t her most at s compl et e wi t h t her momet er , mechani cal hi gh- l i mi t st op, cal i br at ed oper at or , and an adj ust abl e heat er t o ef f ect ant i c i pat i on and t o pr event over r i de of space t emper at ur e. Ensur e r ange i s bet ween 55 and 105 degr ees F, wi t h di f f er ent i al not t o exceed 1. 5 degr ees F, r at ed f or oper at i on at 24 vol t s, 60 her t z. Pr ovi de any necessar y t r ansf or mer s, wi r i ng, and devi ces t o meet t hi s r equi r ement . Fi ni sh cases i n br ushed or sat i n chr ome.
Pr ovi de cont r ol of power t o uni t by a UL- l i s t ed sol i d- st at e s i l i con- cont r ol l ed r ect i f i er ( SCR) syst em such t hat vol t age i s cont i nuousl y i mpr essed and var i ed i n mi nut e i ncr ement s over a r ange of zer o t o r at ed vol t age or t o 105 per cent of r at ed vol t age maxi mum.
PART 3 EXECUTI ON
3. 1 INSTALLATION
I nst al l duct heat er s i n accor dance wi t h t he manuf act ur er ' s i nst r uct i ons and l ocat e duct heat er s t o per mi t access t o t he heat er af t er i nst al l at i on.
I nst al l t emper at ur e pr obe r out ed t o t he bui l di ng cont r ol l er i ndi cat i ng when t he uni t i s i n heat i ng mode.
For duct heat er s i nsi de a VAV, di spl ay f an st at us at t he bui l di ng controller.
3. 2 FI ELD QUALI TY CONTROL
Demonst r at e t hat duct heat er s oper at e sat i sf act or i l y i n t he pr esence of t he Cont r act i ng Of f i cer .
Conduct an oper at i onal t est f or a mi ni mum of 6 hour s.
Apr i l 2019 Page 3 SECTI ON 23 82 43. 00 40
Cycl e duct heat er s f i ve t i mes, f r om st ar t t o oper at i ng t her mal condi t i ons t o of f , t o ver i f y adequacy of const r uct i on, syst em cont r ol s, and component performance.
- - End of Sect i on - -
Apr i l 2019 Page 4 SECTI ON 23 82 43. 00 40
File details come from the government source that posted it. Updated .