Independent_Cost_Estimate_(ICE)_idedits.pdf
PDF 220 KB Posted
- Attached to
- Prescription Safety Eyewear Program (RFQ)
- Solicitation number
- B250021
- Issued by
- Orange County, California
About this file
This is an Independent Cost Estimate (ICE) document prepared by the Orange County Transportation Authority (OCTA) for a Prescription Safety Eyewear procurement. The project involves providing prescription safety eyewear to designated OCTA employees who are required to wear eye protection under the OCTA Eye Protection Policy. Employees are eligible to purchase new eyewear every two years or when specific conditions are met, including new job assignments with different safety requirements, work-related damage verified by line management and approved by the Health, Safety, and Environmental Control (HSEC) Department, or changes in prescription verified by an optician. The five-year contract term runs from December 1, 2025 through November 30, 2030, with no guaranteed usage on an as-needed basis. The requisition number is 035373, and the requestor is Olivia Salters, Safety Specialist.
The total estimated cost for the five-year contract period is $26,250.00, with equal annual allocations of $5,250.00 per year across all five years. This estimate is based on current spending patterns and covers safety glasses and prescription eyewear for eligible employees, including all associated costs such as shipping, handling, and taxes. The cost estimate was prepared on June 6, 2025, and was derived from historical spending data and current usage requirements. No direct labor, overhead, information technology support, travel, subcontractor, or other direct costs are included in this estimate; the entire budget is allocated solely to materials and services for the prescription eyewear program.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_250021__Procurement_Plan-APPROVED.pdf | ||
| RFQ_250021__Prescription_Safety_Eyewear_Program.pdf | ||
| RFQ_250021__Procurement_Plan.pdf | ||
| B______Revised_ICE.pdf | ||
| RFQ_250021__Prescription_Safety_Eyewear_Program_idedits.docx | DOCX document | |
| RFQ_250021__Procurement_Plan_idedits.docx | DOCX document | |
| __FE_Req._R000444.pdf | ||
| ICE.pdf | ||
| RFQ_250021__Prescription_Safety_Eyewear_Program.docx | DOCX document | |
| RFQ_250021__Procurement_Plan.docx | DOCX document | |
| RFQ_250021__Procurement_Schedule_for_Release.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEPENDENT COST ESTIMATE (ICE)
FA-CAMM-006.docm (09/25/15) Page 1 of 3
INSTRUCTIONS
Complete and submit all three pages to Contracts Administration & Materials Management (CAMM), along with your requisition and scope of work. CAMM will not start the procurement until all three documents have been received.
PART I – GENERAL INFORMATION
Project Description: Prescription Safety Eyewear SHADED AREA FOR PROCUREMENT USE ONLY
Assigned Buyer No.:
D/M/WBE%:
Purchase Requisition No.: 035373
New Contract / Procurement
Contract Amendment Current IFAS Printout Contract / PO No.:
(Required for Amendments)
Contract Task Order
Option Term
Date: 6/6/2025
Requestor: Olivia Salters Safety Specialist. Phone Ext.: 5911
Name Title
Signature:
Cost
Estimate: $ 26,250.00 (include shipping, handling and taxes, if applicable)
PART II – ESTIMATE GUIDE
Please substantiate the estimate using the following information.
Estimate Type Items to Include Where to Find Supporting Information
Services (Other than A&E)
1. Tasks you want done
2. Types of people needed (i.e., supervisor, administrative assistant, other)
3. Positions required (i.e., Project Manager, Deputy PM, Senior Engineer / Planner, other)
4. Estimated hours by position
5. Salary / billing rates applied
6. Prevailing wage rate category applied
7. Profit / applied fee
8. Direct expenses
9. Completion schedule
1. Current or past contracts for similar services
2. Other properties / departments doing similar work
3. Historical price and cost data
Estimate Guide Continued ideneau Sticky Note Update with FE req number
FA-CAMM-006.docm (09/25/15) Page 2 of 3
Estimate Type Items to Include Where to Find Supporting Information
Architects, Engineers, Designers
1. Tasks you want done
2. Types of people needed (i.e., engineers, administrative assistant, other)
3. Positions (Project Manager, Deputy PM, Senior Engineer / Planner, other)
4. Estimated hours by position
5. Salary / billing rates applied
6. Profit / applied fee
7. Overhead rate (%)
8. Direct expenses
9. Completion schedule
1. Current or past contracts for similar services
2. Other properties / departments doing similar work
3. Historical price and cost data
Goods/Equipment 1. Product needed
2. Quantity
3. Unit price
4. Markups, overhead, profit
5. Delivery schedule desired
6. Warranty
1. Vendor survey / market survey
2. Current or past contracts for the same or similar product
3. Historical price and cost data
4. Various published indices
Construction 1. Product needed
2. Labor (at a minimum use Davis Bacon)
3. Materials
4. Bonds
5. Insurance
6. Mobilization
7. Equipment
8. Markups, fringes, overheads, profit
9. Completion schedule
1. “Means Book”
2. “Blue Book”
3. Davis Bacon wage rates / prevailing wages
4. Current or past contracts for the same project
5. Historical price and cost data
Additional Information:
According to the OCTA Eye Protection Policy, desingatied employees are required to wear safety eyewear. This contract covers safety eyewear for individuals wearing prescription eyewear. Employees may purchase new eyewear every two years and/or when the following conditions apply:
- new job or task with differing safety glass requirements
- work-related damage, verified by line management, and approved by HSEC Department
- change in prescription, verified by optician.
Based off of current spending the total contract would be $26,250.00 for a 5 year term. Year 1 - $5250.00, Year 2 - $5250.00, Year 3 - $5250.00, Year 3 - $5250.00, Year 4 - $5250.00, Year 5 - $5250.00
FA-CAMM-006.docm (09/25/15) Page 3 of 3
PART III – INDEPENDENT COST ESTIMATE
Using the information provided in Part II, prepare the ICE for your procurement.
Use any or all of the categories listed below.
Prepared By: Olivia Salters Date: 6/6/2025
Signature:
DESCRIPTION OF COST ELEMENTS
1. DIRECT LABOR
(List of Labor Categories)
Estimated Hours
Rate Per Hour ($)
Estimated Cost ($)
Total Est.
Cost ($)
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
$ $ 0.00
Total Direct Labor: $ 0.00
2. OVERHEAD
Rate (%)
(use decimal input)
Total Labor ($)
Estimated Cost ($)
Total Est.
Cost ($)
% $ 0.00 $ 0.00 $ 0.00
3. MATERIALS/SERVICES (Excluding Information Technology [IT]) Estimated Cost ($)
Total Est.
Cost ($)
Safety glasses prescription eyewear for employees $ 26,250.00 $ 26,250.00
4. INFORMATION TECHNOLOGY SUPPORT
Estimated Cost ($)
Total Est.
Cost ($)
Total IT Support: $ 0.00
5. TRAVEL
Estimated
Cost ($) Total Est.
Cost ($)
$ $ 0.00
6. SUBCONTRACTOR(S) / CONSULTANT(S)
Estimated
Cost ($) Total Est.
Cost ($)
Total Subcontractor(s) / Consultant(s): $ 0.00
7. OTHER DIRECT COSTS
Estimated
Cost ($) Total Est.
Cost ($)
$ $ 0.00
8. TOTAL ESTIMATED COST: $ 26,250.00