This is a technical specification document for structural welding and fastening requirements, presented as an engineering drawing with plan details, cross-section views, and assembly diagrams.

The document specifies welding and fastening standards for structural assembly work. Key details include the use of 5/8" diameter puddle weld support fasteners and #10 TEK screws as side lap fasteners for structural connections. The drawing shows two zones (A and B) with varying numbers of weld supports and side lap fasteners between supports, illustrated through a plan detail view and corresponding section view. A 34" coverage span is indicated in the diagram section. The document includes a weld pattern example showing the spacing and arrangement of welds across the structural assembly. The specification references structural supports positioned at intervals, with fastening requirements documented in a tabular format linking zones to the quantity of welds and side lap fasteners required. This appears to be a standard engineering specification for metal building or structural steel assembly work, detailing the fastening methodology and weld placement requirements for construction purposes.

View the file

Other files

File Type Posted
WWYK250063 - Site Visit Sign In Sheet.jpg JPG image
Site Visit Meet Up Location.png PNG image
SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx XLSX spreadsheet
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
23 08 00.pdf PDF
21 13 13.pdf PDF
23 07 00.pdf PDF
23 36 00.00 40.pdf PDF
23 05 48.00 40.pdf PDF
10 14 00.10.pdf PDF
08 81 00.pdf PDF
28 31 76.pdf PDF
06 41 16.00 10.pdf PDF
01 42 00.pdf PDF
01 33 16.00 10.pdf PDF
HAZMAT Reporting at Tinker AFB FEB 2025.pdf PDF
afi91-202_afmcsup.pdf PDF
tinkerafb_HWMP.pdf PDF
TAFB_SOP_outages_v2.pdf PDF
007200_Attch14_Information for New Boilers.pdf PDF
017800_Attch1_DD1354.pdf PDF
007200_Attch7a_AF3952.pdf PDF
image (1).png PNG image
Room finish schedule.xlsx XLSX spreadsheet
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
z400i.pdf_safe.pdf PDF
overall plan 04.15.2021.pdf PDF
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
250063_ATT 8_Liquidated Damages.pdf PDF
250063_ATT 4_ODS.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
250063_ATT 10_Submittal Register.pdf PDF
23 00 00.pdf PDF
08 11 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 71 00.pdf PDF
01 33 00.pdf PDF
01 50 00.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
ufc_3_601_02_2021.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .