image (1).png

PNG image 243 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813727R0002
Issued by

About this file

This is a technical architectural drawing document depicting structural steel details for HVAC mechanical unit support and roof opening framing.

Detail 2 illustrates a typical roof opening frame and mechanical unit support assembly, showing the structural configuration for supporting equipment on a roof. The drawing specifies multiple steel angle members (L4x4x½, L3x3x¼) with varying spans, welded connections to supporting members, and roof opening frame installation sequencing. Roof opening frames are installed before the steel deck is in place, while all exposed surfaces are welded after the steel deck installation is complete. The detail includes dimensional annotations for span configurations ranging from 5'-0" to 11'-0" and specifies welding requirements for structural integrity.

Detail 3 presents bracing specifications for steel joists with point loads, establishing design parameters for load concentrations exceeding 50 pounds. The detail includes RTU (rooftop unit) angle frame point load location on top of chord, with specific notation requiring coordination between the contractor and joist manufacturer/engineer prior to load application. The drawing specifies the use of L2x2x⅜ reinforcement angles and establishes the critical requirement that angles must be in place before load application. A note emphasizes that when point loads exceed 50 pounds and the joist manufacturer has designed the joist for full concentrated load, the contractor must coordinate all superimposed loads with both the joist manufacturer and structural engineer before application.

View the file

Other files

File Type Posted
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
250063_ATT 8_Liquidated Damages.pdf PDF
250063_ATT 4_ODS.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
250063_ATT 10_Submittal Register.pdf PDF
23 00 00.pdf PDF
08 11 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 71 00.pdf PDF
01 33 00.pdf PDF
01 50 00.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
ufc_3_601_02_2021.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
afman91-203_oc-alcsup.pdf PDF
afi48-104.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
007200_Attch7b_Monthly Hazardous Usage Report.pdf PDF
007200_Attch9_EMS Awareness Training.pdf PDF
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
250063_ Redline A-502.pdf PDF
HE05IN_Dimension_Drawing.pdf PDF
lrad331965pd_spec.pdf PDF
ELECTRICAL COMBINED.pdf PDF
4500-MUG.pdf PDF
220042 As Built Drawings.pdf PDF
Site Visit Meet Up Location.png PNG image
SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx XLSX spreadsheet
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
23 08 00.pdf PDF
21 13 13.pdf PDF
23 07 00.pdf PDF
23 36 00.00 40.pdf PDF
23 05 48.00 40.pdf PDF
10 14 00.10.pdf PDF
08 81 00.pdf PDF
28 31 76.pdf PDF
06 41 16.00 10.pdf PDF
01 42 00.pdf PDF
01 33 16.00 10.pdf PDF
HAZMAT Reporting at Tinker AFB FEB 2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .