007200_Attch14_Information for New Boilers.pdf

PDF 144 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813727R0002
Issued by

About this file

This is an information template for documenting new boiler installation and ongoing maintenance requirements at federal facilities. The form captures essential boiler specifications including manufacturer, model, MMBtu/hr input rating, serial number, boiler type, and primary and secondary fuel sources. Installation documentation requirements include dates for construction commencement, boiler installation, initial startup for operational verification, and official continuous operation startup.

The template requires detailed boiler stack information including diameter, height, rated flow rate in cubic feet per minute, and stack temperature, along with submission of manufacturer brochures and specifications. Continuous maintenance and recordkeeping requirements mandate tune-up frequency based on rated heat input capacity: annual tune-ups for boilers rated ≥10 MMBtu/hr, tune-ups every two years for boilers rated between 5-10 MMBtu/hr, and tune-ups every five years for boilers ≤5 MMBtu/hr. CEAN must be notified each time tune-ups are performed. Facilities must maintain detailed records of all boiler startups and shutdowns, including date, time, duration, fuel type, and fuel quantity. For dual fuel boilers operating on natural gas with liquid fuel backup, documentation must include dates, types, amounts of alternative fuel usage, and reasons for alternative fuel use, with immediate notification to CEAN if alternative fuel is necessitated by natural gas curtailment.

View the file

Other files

File Type Posted
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
250063_ATT 8_Liquidated Damages.pdf PDF
250063_ATT 4_ODS.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
250063_ATT 10_Submittal Register.pdf PDF
23 00 00.pdf PDF
08 11 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 71 00.pdf PDF
01 33 00.pdf PDF
01 50 00.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
ufc_3_601_02_2021.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
afman91-203_oc-alcsup.pdf PDF
afi48-104.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
007200_Attch7b_Monthly Hazardous Usage Report.pdf PDF
007200_Attch9_EMS Awareness Training.pdf PDF
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
250063_ Redline A-502.pdf PDF
HE05IN_Dimension_Drawing.pdf PDF
lrad331965pd_spec.pdf PDF
ELECTRICAL COMBINED.pdf PDF
4500-MUG.pdf PDF
220042 As Built Drawings.pdf PDF
Solicitation - FA813727R0002.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
250063_ATT 3_RMDF.pdf PDF
23 05 15.pdf PDF
23 09 13.pdf PDF
09 90 00.pdf PDF
26 20 00.pdf PDF
08 51 23.pdf PDF
07 92 00.pdf PDF
07 14 00.pdf PDF
08 71 00.pdf PDF
23 05 93.pdf PDF
07 84 00.pdf PDF
03 01 00.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INFORMATION REQUIRED FOR NEW BOILER

INFORMATION REQUIRED FOR INSTALLATION/START‐UP OF THE BOILER IN BLDG_____

POST LOCATION______

Boiler Information Manufacturer:

Model and MMBtu/hr input:

Serial Number:

Type of Boiler:

Primary Fuel:

Secondary/Alternative Fuel:

Dates of construction/installation/startup Date construction commenced:

Date of installation of boiler:

Date of boiler startup (initial startup to check if the boiler is operating properly):

Date of boiler startup for continuous operation (official startup date):

Boiler Stack Information (note units, if different than shown) Stack Diameter (ft):

Stack Height (ft):

Rated Stack Flow (cfm):

Stack temperature (°F):

Provide brochures and specifications available for the boiler

CONTINUOUS MAINTENANCE AND RECORDKEEPING REQUIREMENTS

Tune‐up requirement‐

Frequency is dependent on the Rated Heat Input Capacity of the Boiler, as follows:

> =10MMBtu/hr Annual tuneups

< 10 but >5MMBtu/hr Tune‐ups every 2 years

<= 5MMBtu/hr Tune‐ups every 5 years

CEAN must be informed every time tune‐ups are performed in the boilers

Date, time, and duration of every startup and shutdown of the boiler Type of fuel and amount of fuel used during every startup and shutdown of the boiler

For dual fuel boilers (boilers that operate using NG and have liquid fuel as backup) Date, type and amount of alternative fuel usage. Reason for using alternative fuel. If alternative fuel is used due to a natural gas curtailment, it needs to be notified immediately to CEAN.

INFORMATION REQUIRED FOR INSTALLATIONSTARTUP OF THE BOILER IN BLDG:
Boiler Information:
Model and MMBtuhr input:
Serial Number:
Type of Boiler:
Primary Fuel:
SecondaryAlternative Fuel:
Dates of constructioninstallationstartup:
Date of installation of boiler:
Date of boiler startup initial startup to check if the boiler is operating properly:
Date of boiler startup for continuous operation official startup date:
Boiler Stack Information note units if different than shown:
Provide brochures and specifications available for the boiler:
Frequency is dependent on the Rated Heat Input Capacity of the Boiler as follows:
Rated Stack Flow cfm:
Stack Diameter:
Stack Height: