VAFB UOQ Dorms Specifications SECTION 01 22 01 Rev 1.pdf

PDF 24 KB Posted

Attached to
Renovate Officer Unaccompanied Housing F641
Solicitation number
IFB266B
Issued by

View the file

Other files

File Type Posted
IFB266B ADD 3.pdf PDF
VAFB UOQ Dorms Specifications SECTION 01 22 00 Rev 1.pdf PDF
PB Minutes IFB266B Renovate Officer Unaccompanied Housing F641.doc DOC document
F641-Winter Storm of 2021 Room Interior.pdf PDF
Microbial Assessment Report 162 Units 20200722.pdf PDF
Vance AFB Project Solicitation Project IFB266B_RFI-Responses.pdf PDF
Microbial Assessment Report 29 Units 20200608.pdf PDF
IFB266B Schedule B.doc DOC document
ADD 2 IFB266B Renovate Officer Accompanied Housing F641.doc DOC document
ADD 2 IFB266B Renovate Officer Accompanied Housing F641.doc DOC document
ADD 2 IFB266B Renovate Officer Accompanied Housing F641.doc DOC document
IFB266B ADDENDUM 1.pdf PDF
General Provisions - Apr 2021.doc DOC document
W-9 as of november 2018 per the IRS.pdf PDF
IFB266B Instructions to Offeror 2 (2).doc DOC document
Q A Form 004.doc DOC document
VAFB UOQ Dorm - Signed Final Design Drawings.pdf PDF
VAFB UOQ Dorm - General Req Specifications.pdf PDF
IFB266B Instructions to Offeror.doc DOC document
PR-FRM-12 Rev 4 Reps and Certs 8 Jan 2018.doc DOC document
Federal Supplement - Apr 2021 .doc DOC document
OK20210038 4-30-2021.pdf PDF
VAFB UOQ Dorm - Signed Final Specifications.pdf PDF
71 SFS DBIDS Application.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovate UOQs XTLF191012

SECTION 01 22 01

SCHEDULE C - F641

XTLF 19-1012

01/21

PART 1 SCHEDULE C

1.1 BID TABLE

Provide lump sum totals for each line for all work associated with XTLF 19-1012 Renovate Officer Unaccompanied Housing - F641.

Line # Description of Line Item Cost

Sustainment (EEIC 524)

1 Repair by replacement of the windows and the exterior aggregate panels near the windows in the facility. Repair damaged drywall near the windows.

2 Repair the roof. $

3 Renovate the existing bathrooms in each unit, including sinks, vanities, toilets, floor tile, shower fixtures, shower surface and drains. Include bidets in various rooms to accommodate international students.

4 Repair the existing Heating, Ventilation, and Air Conditioning (HVAC) system.

5 Repair the fire alarm system. $

6 Upgrade electrical panels. $

7 Install an anti-scaling system to mitigate hard water buildup on kitchen and bathroom fixtures.

8 Replace damaged flooring and repaint the walls in each unit.

9 Reroute existing water, gas, electrical and communications lines as necessary.

10 Repair walks and ramps as necessary to the work being completed in the facility.

11 Sub-total for Sustainment Repairs (EEIC 524) (Sum of lines 1 through 10).

R&M REPAIR (EEIC 522)

SECTION 01 22 01 Page 1

Renovate UOQs XTLF191012

Line # Description of Line Item Cost

12 Renovate two units to make Americans with Disabilities Act (ADA) and ambulatory compliant. This includes comprehensive renovation of the living quarters and bathroom areas to provide a compliant and usable layout. This includes the electrical and plumbing work necessary to the renovation. Renovate the existing kitchen areas to include repair of mold-damaged surfaces. Provide appropriate handrails and handicap signage, markings and symbols.

13 Repair areas damaged by winter storm of 2021 per addendum

14 Sub-total R&M Repair (EEIC 522)(Sum of lines 12 and 13).

Minor Construction (EEIC 529)

15 Fully enclose the breezeways in the facility with an aluminum and glass storefront featuring a new entry canopy.

16 Grand Total (Sum of lines 11, 14 and 15). $

1.2 SOLICITATION NOTICE

FUNDING IS CURRENTLY NOT AVAILABLE FOR THIS SOLICITATION. THE U.S. AIR

FORCE IS SOLELY RESPONSIBLE FOR PROVIDING ALL FUNDING RELATED TO THE

SOLICITATION. SHOULD THE U.S. AIR FORCE NOT FUND THIS PROJECT IN ITS

ENTIRETY, NO CONTRACT WILL RESULT. ASRC ACCEPTS NO RESPONSIBILITY SHOULD

THE U.S. AIR FORCE NOT PROVIDE ALL FUNDING REQUIRED. IF COMPLETE FUNDING

IS PROVIDED, ASRC WILL AWARD ONE AND ONLY ONE CONTRACT AS A RESULT OF THIS

SOLICITATION. AWARD WILL BE BASED ON THE PROJECT'S LUMP SUM BID PROVIDING

THE LOWEST COST, TECHNICALLY ACCEPTABLE TO THE GOVERNMENT AND ASRC. ASRC

RESERVES THE RIGHT TO ACCEPT OR REJECT ANY OR ALL OFFERS. FAILURE TO BID

ON ALL LINE ITEMS WILL RENDER THE BID AS NON-RESPONSIVE. PRICES SHALL BE

EFFECTIVE FOR NINTEY CALENDAR DAYS FROM DATE OF AWARD SHOULD A CONTRACT RESULT.

1.3 COMPANY CONTACT INFO

Company Name Date

Company's Representative's Name Phone Number

Email Address Phyiscal Address

SECTION 01 22 01 Page 2

File details come from the government source that posted it. Updated .