VANCE AFB
UOQ DORMITORY RENOVATIONS
VANCE AFB, ENID OK
XTLF 19-1012, 1013, 1014, 1015, 1016
SEPTEMBER 25, 2020ISSUED FOR CONSTRUCTION
PROJECT INFORMATION:
Project Name:
Project Location:
Project No:
Issue Date:Project Status:
PROJECT NAME: UOQ DORMITORY RENOVATIONSProject # XTLF 19-1012 - 1016
DATE
DESIGN APPROVED BY
SIGNATUREPRINTED NAMEFUNCTION
THERE IS KNOWN CONTAMINATION IN THE PROJECT AREA.
SPECIAL REQUIREMENTS ARE NEEDED.
THERE IS NO KNOWN CONTAMINATION IN THE PROJECT AREA
USER/FACILITY
MANAGER:
IRP-REMEDIAL PROJECT MANAGER DATE
IRP REMEDIAL PROGRAM (IRP)LEAD BASED PAINT (LBP)
THERE IS NO KNOWN LBP MATERIALS IN THE PROJECT AREA
THIS FACILITY CONTAINS LBP MATERIALS. HOWEVER, NOT IN
THE AREA OF CONSTRUCTION
THIS FACILITY CONTAINS LBP MATERIALS. THAT WILL BE IN
LEFT IN PLACE FOR THIS PROJECT.
THIS FACILITY CONTAINS LBP MATERIALS. THAT WILL BE
REMOVED BY THE AIR FORCE.
THIS FACILITY CONTAINS LBP MATERIALS. THAT WILL BE
REMOVED BY ACM/LBP REMOVAL CONTRACTOR.
THIS FACILITY CONTAINS LBP MATERIALS. THAT WILL BE
REMOVED UNDER THIS CONTRACT.
BASE ENVIRONMENTAL ENGINEER DATE
ASBESTOS CONTAINING MATERIAL (ACM)
THERE IS NO KNOWN ACM MATERIALS IN THE PROJECT AREA
THIS FACILITY CONTAINS ACM MATERIALS. HOWEVER, NOT IN
THE AREA OF CONSTRUCTION
THIS FACILITY CONTAINS ACM MATERIALS. THAT WILL BE IN
LEFT IN PLACE FOR THIS PROJECT.
THIS FACILITY CONTAINS ACM MATERIALS. THAT WILL BE
REMOVED BY THE AIR FORCE.
THIS FACILITY CONTAINS ACM MATERIALS. THAT WILL BE
REMOVED BY ACM/LBP REMOVAL CONTRACTOR.
THIS FACILITY CONTAINS ACM MATERIALS. THAT WILL BE
REMOVED UNDER THIS CONTRACT.
BASE ENVIRONMENTAL ENGINEER DATE
RELEVANT CODE DOCUMENTS
Communications
140 Channel St. Suite 205 Vance AFB, OK 73705
(580) 213-7772 CA# 7864 Expires: JUNE 30, 2020
UNITED STATES AIR FORCE AIR EDUCATION TRAINING COMMAND
VANCE AFB, OK
7ST S5X - ATPM
ENGEINEERING BRANCH
MANAGER ASRC/CEE
JAMES KITE
71 ISS/CE STEPHEN STIMSON
DAVID HATHCOAT
DAWN DEVLIN
ARCHITECTURAL/INTERIORS DESIGN
•Architectural Barriers Act (ABA) Standards (2015)
•IBC 2018 (as amended by UFC 1-200-01)
•IEBC 2018
•NFPA 101 Life Safety Code (2018)
•UFC 1-200-01 DoD Building Code (2019)
•UFC 1-200-02 High Performance and Sustainable Building Requirements
•UFC 3-101-01 Architecture
•UFC 3-110-03 Roofing
•UFC 3-120-10 Interior Design
•UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings (2018)
•Uniform Federal Accessibility Standards (UFAS)
•VAFB Installation Facility Standards
STRUCTURAL DESIGN
•IBC 2018 (as amended by UFC 1-200-01)
•UFC 1-200-01 DoD Building Code (2019)
•UFC 3-301-01 Structural Engineering
•UFC 3-310-04 Seismic Design of Buildings
•UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings (2018)
FIRE PROTECTION DESIGN
•IBC 2018 (as amended by UFC 1-200-01)
•NFPA 1 Fire Code (2018)
•NFPA 72 National Fire Alarm Code (2020)
•NFPA 101 Life Safety code (2018)
•UFC 1-200-01 DoD Building Code (2019)
•UFC 3-600-01 Fire Protection Engineering for Facilities, With Change 2 (2018)
•UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings (2018)
•UFC 4-021-01 Design And O&M: Mass Notification Systems, With Change 1 (2010)
•USACE ECB 2018-17 New Requirements for Visual Notification for Mass Notification Systems (2018)
MECHANICAL/PLUMBING DESIGN
•ANSI B31.8 (1968) and B31.8b (1969) Gar Transmission and Distribution Piping System
•ASHRAE 62.1 Ventilation for Acceptable Indoor Air Quality
•ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings
•Energy Policy Act of 2005
•International Mechanical Code (IMC)
•International Plumbing Code (IPC)
•UFC 1-200-01 DoD Building Code
•UFC 1-200-02 High Performance and Sustainable Building Requirements
•UFC 3-401-01 Mechanical Engineering
•UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems
•UFC 3-410-02 Direct Digital Control for HVAC and Other Building Control Systems
•UFC 3-420-01 Plumbing Systems
•UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings (2018)
ELECTRICAL DESIGN
•NFPA 70 National Electric Code
•UFC 1-200-02 High Performance and Sustainable Building Requirements
•UFC 3-501-01 Electrical Engineering
•UFC 3-520-01 Interior Electrical Systems
•UFC 3-530-01 Interior and Exterior Lighting Systems and Controls
•UFC 3-550-01 Exterior Electrical Power Distribution
•UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings (2018)
CIVIL DESIGN
•Architectural Barriers Act (ABA) Standards (2015)
•UFC 3-201-01 Civil Engineering
•UFC 3-210-10 Low Impact Development
•UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings (2018)
•Uniform Federal Accessibility Standards (UFAS)
PROJECT TEAM
PRINCIPAL IN CHARGE
ROBERT DAY, PE, BCEE, NCEES
PROJECT MANAGER
KENT BRAY, PE, PMP
LEAD ARCHITECT OF RECORD
DAVID PHELPS, AIA, NCARB
INTERIOR DESIGN
STEPHANIE PUTZKE, RID, ASSOC. AIA
LEAD CIVIL ENGINEER
ROBERT DAY, PCE, BCEE, NCEES
LEAD STRUCTURAL ENGINEER
LARRY VORBA, PE, PMP
LEAD ELECTRICAL ENGINEER
MATT RUTKOWSKI, PE, NCEES
LEAD MECHANICAL ENGINEER
MIKE OBERMARK, PE, NCEES
LEAD FIRE PROTECTION ENGINEER
JAMES SPRADLING, PE/FPE, NCEES
CONSTRUCTION SERVICES
STEPHEN BURGIN, LEED AP, ASSOC. DBIA
VICINITY MAP KEYPLAN
W
ILLIA
M S A
V E.H
A N C O
C K A
V E.
SA
Y W
E R A
VE
F641
F642
F643
F644
F645
SHEET ISSUE MATRIX
● ISSUED
○ ISSUED FOR REFERENCE ONLY
/2
/2
I S
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
SHEET
NO SHEET TITLE
GENERAL
G-001 COVER SHEET ●
G-002 GENERAL NOTES, ABBREVIATIONS ●
G-003 LOCATION AND HAUL ROUTE ●
G-101 LIFE SAFETY PLAN - F641, F644, F645 ●
G-102 LIFE SAFETY PLAN - F642, F643 ●
CIVIL
CD401 SITE DEMOLITION PLAN - F641 ●
CS401 SITE PLAN - F641 ●
CG401 GRADING PLAN - F641 ●
CU401 UTILITY PLAN - F641 ●
CD402 SITE DEMOLITION PLAN - F642 ●
CS402 SITE PLAN - F642 ●
CG402 GRADING PLAN - F642 ●
CU402 UTILITY PLAN - F642 ●
CD403 SITE DEMOLITION PLAN - F643 ●
CS403 SITE PLAN - F643 ●
CG403 GRADING PLAN - F643 ●
CU403 UTILITY PLAN - F643 ●
CD404 SITE DEMOLITION PLAN - F644 ●
CS404 SITE PLAN - F644 ●
CG404 GRADING PLAN - F644 ●
CU404 UTILITY PLAN - F644 ●
CD405 SITE DEMOLITION PLAN - F645 ●
CS405 SITE PLAN - F645 ●
CG405 GRADING PLAN - F645 ●
CU405 UTILITY PLAN - F645 ●
CS501 SITE DETAILS I ●
CS502 LANDING AND RAMP DETAILS ●
CS503 RAMP AND STAIR DETAILS ●
CS504 LANDING RAMP DETAILS ●
CS505 SITE DETAILS II ●
STRUCTURAL
S-001 GENERAL NOTES AND DIAGRAMS ●
S-002 GENERAL NOTES AND TYPICAL DETAIL ●
S-003 EXISTING BUILDING PLANS ●
S-101 FOUNDATION PLANS ●
S-102 FRAMING PLANS ●
S-501 DETAILS ●
ARCHITECTURAL
AD101 DEMOLITION PLAN - F641, F644, F645 ●
AD102 DEMOLITION PLAN - F642, F643 ●
AD103 DEMOLITION WALL SECTIONS ●
AD104 DEMOLITION WALL SECTIONS ●
A-101 FLOOR PLAN - F641, F644, F645 ●
A-102 FLOOR PLAN - F642, F643 ●
A-105 REFLECTED CEILING PLAN - F641, F644, F645 ●
A-106 REFLECTED CEILING PLAN - F642, F643 ●
A-201 EXTERIOR ELEVATIONS - F641, F644, F645 ●
A-202 EXTERIOR ELEVATIONS - F642, F643 ●
A-301 BUILDING CROSS SECTION ●
A-310 WALL SECTIONS ●
A-401 ENLARGED TYP VESTIBULE ●
A-402 ENLARGED ACC VESTIBULE ●
A-403 ENLARGED TYP UNIT PLANS ●
A-404 ENLARGED ABA UNIT PLANS ●
A-405 ENLARGED STAIR PLANS AND SECTIONS ●
A-510 EXTERIOR DETAILS ●
A-511 EXTERIOR DETAILS ●
A-601 PARTITION, WINDOW, DOOR TYPES & DETAILS ●
A-701 ROOM SCOPE MATRIX - F641 ●
A-702 ROOM SCOPE MATRIX - F642 ●
A-703 ROOM SCOPE MATRIX - F643 ●
A-704 ROOM SCOPE MATRIX - F644 ●
A-705 ROOM SCOPE MATRIX - F645 - FIRST FLOOR ●
A-706 ROOM SCOPE MATRIX - F645 - 2ND FLOOR ●
A-707 BASIS OF DESIGN PHOTOS ●
FIRE PROTECTION
FA001 FIRE ALARM NOTES AND DETAILS ●
FA101 FIRE ALARM PLAN ●
PLUMBING
P-001 PLUMBING NOTES, SYMBOLS, AND ABBREVIATIONS ●
PD101 PLUMBING DEMOLITION PLAN ●
P-101 PLUMBING PLAN ●
P-501 PLUMBING DETAILS ●
P-601 PLUMBING SCHEDULES ●
MECHANICAL
M-001 MECHANICAL NOTES, SYMBOLS, AND ABBREVIATIONS ●
MD101 MECHANICAL DEMOLITION PLANS ●
M-101 MECHANICAL PLANS ●
M-501 MECHANICAL DETAILS ●
M-601 MECHANICAL SCHEDULES ●
ELECTRICAL
E-001 NOTES, LEGENDS, AND ABBREVIATIONS ●
E-201 ELECTRICAL PLANS ●
E-301 ENLARGED PLANS ●
E-501 LIGHTING SCHEDULES & DETAILS ●
E-601 ELECTRICAL ONE-LINE DIAGRAMS ●
E-602 ELECTRICAL PANEL SCHEDULES ●
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
N
2004 QUAIL CREEK
SUITE 200
WICHITA FALLS, TX 76308
940.767.7478 www.slatx.us
S T
A
TE OF OKLAHOM
A
LIC
ENSED A RCHIT
EC
T
DAVID F.
PHELPS
L
IC
E N
S E
D P
R
O FE S S IO N A
L
E N
G I N
E E
R
O K L A HO M A
LARRY LEE
VORBA
11654
L
IC
E N
S E
D P
R O FE S S IO N A
L
E N
G
IN
E E
R
O K L A HO M A
MICHAEL
DAVID
OBERMARK
17187
DRAWING ABBREVIATIONS
INDEX OF DRAWINGS
BUILDING SUMMARY
NUMBERING SYSTEM:
XX100
DISCIPLINE:
C - CIVIL
L - LANDSCAPE
S - STRUCTURAL
A - ARCHITECTURE
F - FIRE PROTECTION
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
DISCIPLINE MODIFIER
ANNOTATION CALLOUTS/DRAWING SYMBOLS
GENERAL NOTES
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL
SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ABA ARCHITECTURAL BARRIERS
ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL
WOODW ORK
AWT ACOUSTICAL WALL
TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE
MANUFACTURER'S
ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER)
BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CFE CONTRACTOR FURNISHED
EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL
FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORD COORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CPCI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
CY CUBIC YARD
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE
BOARD (INSULATION)
EQ EQUAL
EWC ELECTRIC W ATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GR EXTERIOR GRADE
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR
PANEL
FAS BD FASCIA BOARD
FC BRK FACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED
PLASTIC
FRTW FIRE RETARDANT TREATED
WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FW C FABRIC WALLCOVERING
G ---------------------g GRAMS
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT INSTALLED
GOVERNMENT INSTALLED
GFRG GLASS-FIBER-REINFORCED
GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY
POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY
PARTICULATE
AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING
CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
K KIPS
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
KSI KIPS PER SQUARE INCH
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MB MOISTURE BARRIER
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MPH MILES PER HOUR
MR MOLD RESISTANT
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE
WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTI
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OW SJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER
AND RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
R RADIUS
RB RESILIENT BASE
RBM REINFORCED BRICK
MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
REFER TO A/E/C CAD STANDARD FOR
SHEET NUMBERINGSTANDARDS
REVISION TAG
NORTH ARROW W/
TRUE NORTH
INDICATION
ROOM TAG
ELEVATION NUMBER
SECTION
EXTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
LEVEL NAME
SHEET NUMBER
SHEET NUMBER
SHEET NUMBER
A
SHEET KEYNOTE
INTERIOR ELEVATION
SHEET NUMBER
N
PLAN
NORTH
A101
SIM
A101
A101
1 Ref
R e f
1Ref
R e f
Name
Elevation
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
SHEET NUMBER WITHIN SERIES
A101 __________________________________________ Room name
THIS PROJECT IS IN SUPPORT OF THE VANCE AFB'S SUSTAINMENT, RESTORATION
AND MODERNIZATION (SRM) PROGRAM AT FACILITIES F641 THROUGH G645. THE
FACILITY IS LOCATED AT VANCE AIR FORCE BASE, ENID, OK. THE MAIN INTENT OF THE
WORK IS TO BRING FIVE (5) OFFICER DORMITORY FACILITIES INTO COMPLIANCE WITH
AIR FORCE AND CODE REQUIREMENTS, BASED ON THE FOLLOWING SCOPE OF WORK:
1. REPLACE EXISTING HVAC SYSTEM WITH PTAC SYSTEM.
2. REPLACE WINDOWS IN EACH ROOM AND EXTERIOR AGGREGATE PANELS NEAR
WINDOW.
3. RENOVATE KITCHENS, INCLUDING REPAIR/REPLACE MOLD DAMAGED ITEMS,
INSTALL ANTI-SCALING SYSTEM, AND INDICATE EXTINGUISHING SYSTEM PER
UFC-3-600-01.
4. RENOVATE BATHROOMS INCLUDING SINKS WITH VANITIES, TOILETS WITH FULL
LIDS, FLOOR TILE, SHOWER FIXTURES, BIDETS IN EIGHT (8) ROOMS PER FACILITY.
5. ENCLOSE BREEZEWAYS, REPAIR STAIRS. DESIGN COMPLIANT WITH ABA.
6. ELECTRICAL PANELS UPGRADED.
7. RENOVATE TW O ROOMS PER FACILITY TO MAKE ACCESSIBLE.
8. ASSESSMENT OF MOLD DAMAGE PROVIDED.
1. ALL MOLD REMEDIATION MUST BE COMPLETED PRIOR TO COMMENCEMENT OF CONSTRUCTION.
PLEASE SEE MICROBIAL ASSESSMENT FOR FULL MOLD ASSESSMENT AS WELL AS SPECIFICATION
SECTION 02 85 00.
2. ALL CONSTRUCTION SHALL MEET ALL APPLICABLE NATIONAL, STATE, AND LOCAL CODES (LATEST
EDITIONS). THE CONTRACTOR SHALL INVESTIGATE LOCAL CODES AND PROCEDURES AND SHALL
COMPLY WITH THESE REQUIREMENTS. A COPY OF CONSTRUCTION MANAGER-APPROVED
CONSTRUCTION DOCUMENTS MUST BE AVAILABLE ON SITE DURING CONSTRUCTION. ALL CONDUIT, EQUIPMENT AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH THE LATEST SAFETY RULES AND REGULATIONS OF ALL AUTHORITIES AND AGENCIES HAVING JURISDICTIONS AND/OR THE LATEST
ADOPTED CODE.
3. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL GENERAL CONDITIONS AND PROJECT
REQUIREMENTS WITH THE CONSTRUCTION MANAGER PRIOR TO CONSTRUCTION START.
CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE AND VERIFYING EXISTING CONDITIONS AND
CONTRACT DOCUMENTS PRIOR TO CONSTRUCTION START.
4. ALL CONTRACTORS AND SUBCONTRACTORS, VENDORS AND MATERIAL SUPPLIERS SHALL BE
RESPONSIBLE FOR REVIEWING THE COMPLETE SET OF DOCUMENTS. FAILURE TO REVIEW ALL
CONSTRUCTION DOCUMENTS WILL NOT RELIEVE ANY CONTRACTORS OR SUBCONTRACTORS FROM
PERFORMING WORK OR PROVIDING MATERIALS REQUIRED FOR THE COMPLETION ON THIS PROJECT AS DEFINED WITHIN THE DOCUMENTS AT TIME OF BID. GENERAL CONTRACTOR SHALL COORDINATE ALL WORK PERFORMED BY OTHER SUBCONTRACTORS. ANY DISCREPANCIES SHALL BE BROUGHT TO
THE CONSTRUCTION MANAGER'S ATTENTION BEFORE PROCEEDING WITH WORK
5. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DRAWINGS. ARCHITECTURAL DRAWINGS
TAKE PRECEDENCE OVER OTHER DRAWINGS FOR LAYOUT DIMENSIONS AND NUMBER OF ITEMS
PROVIDED. IF ANY ERRORS OR OMISSIONS APPEAR IN CONTRACT DOCUMENTS, CONTRACTOR SHALL NOTIFY CONSTRUCTION MANAGER AND ARCHITECT IN WRITING OF SUCH ERRORS OR OMISSIONS.
THE CONTRACTOR SHALL REVIEW ALL DOCUMENTS, VERIFY ALL DIMENSIONS AND FIELD CONDITIONS, AND CONFIRM W ORK IS BUILDABLE AS SHOWN. DO NOT SCALE OFF PLANS.
6. EACH CONTRACTOR SHALL LEAVE THE SITE IN A NEAT, CLEAN, AND ORDERLY CONDITION UPON THE COMPLETION OF HIS WORK ON A DAILY BASIS. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR REMOVAL AND DISPOSAL OF ALL TRASH IN ACCORDANCE WITH LOCAL JURISDICTIONAL
AUTHORITIES.
7. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED SPECIAL INSPECTIONS.
8. THE CONTRACTOR IS TO VERIFY THAT THE EXTERIOR STUD WALLS AND EXTERIOR SHEATHING
BETWEEN THE APARTMENT UNITS AND THE VESTIBULE ARE CONTINUOUS FROM FLOOR TO
STRUCTURE ABOVE. CONTRACTOR IS TO PATCH OR FILL VOIDS WHERE PIPES OR DUCTS HAVE BEEN
REMOVED, WITH 1 HOUR RATED CONSTRUCTION OR FIRE STOPPING MATERIALS.
9. AT SECOND FLOOR PENETRATIONS WHERE PIPING IS BEING REMOVED PROVIDE 1 HOUR FIRE
STOPPING MATERIAL.
V A
N C
E A
F B
U O
Q D
O R
M
IT
O R
Y R
E N
O V
A T
IO
N
S
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
XTLF 19-1012, 1013,
1014, 1015, 1016
DESIGN STAGE:
UOQ DORMITORY RENOVATIONS
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 07864 EXPIRES
JUNE 30, 2020
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
Communications
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
G-002
GARCETE GARCETE
SEPTEMBER 25, 2020
DATE: SEPTEMBER 25, 2020
ISSUED FOR
CONSTRUCTION
S T
A
TE OF OKLAHOM
A
LIC
ENSED A RCHIT
EC
T
DAVID F.
PHELPS
R e v is io n
N u m b e r
D e s c ri p ti o n
D a te
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
/2 /2
B72
B75
FOX DR.
G O
T T
R D
.EL
AM
R D
THIS GATE ENTRANCE
ONLY, NO EXIT
YOUNG RD.
YOUNG R
D.
E
LA
M R
D
G O
T T
R D
F645
F641
F642
F643
F644
NO
EXIT
THIS GATE EXIT ONLY, NO
CONSTRUCTION ENTRANCE.
OVERALL PROJECT MATERIAL
STORAGE AND STAGING AREA
ELAM
RD.
47TH EAST WEST ROAD
F641
F642
F643
F644
F645
EXISTING PARKING LOT
EXISTING PARKING LOT
EXISTING PARKING LOT
EXISTING PARKING LOT
EXISTING PARKING LOT
FACILITY STAGING AREA (TYP.)
NSCALE:
LOCATION AND HAUL ROUTE
1" = 400'-0"1
R ev is io n N um be r D es cr ip tio n D at e
VA
NC
E
AF
B
UO
Q
DO
RM
IT
OR
Y
RE
NO
VA
TI
ON
S
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
SEPTEMBER 25, 2020
XTLF 19-1012, 1013,
1014, 1015, 1016
DESIGN STAGE:
DATE: SEPTEMBER 25, 2020
ISSUED FOR
CONSTRUCTION
UOQ DORMITORY RENOVATIONS
BDCRHR
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 07864 EXPIRES
JUNE 30, 2020
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
Communications
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
9/
/2
ROBERT L.
DAY
12532LI
C
E N
S E
D
PROFESSIONAL
EN
G
I N E
E R
OKL A HOMA
CYNTERGY ENGINEERING, PLLC
LICENSE # CA3537 | EXPIRES 6/30/22
G-003
LO
CA
TI
ON
A
ND
H
AU
L R
OU
TE
PRIMARY HAUL ROUTE.
SECONDARY HAUL ROUTE TO BE USED ONLY WHEN PRIMARY ROUTE GATE IS
CLOSED.
POV ONLY LANE
PROJECT LOCATION. F641 - F645
FACILITY 288 CIVIL ENGINEERING INCLUDING CONSTRUCTION MANAGEMENT.
FACILITY 200 PROCUREMENT.
FACILITY 72 VISITOR'S CENTER, USE FOR PASS APPROVAL PRIOR TO BEGINNING
WORK.
FACILITY 75 COMMERCIAL VEHICLE INSPECTION.
PROJECT LOCATION
PRIMARY INDUSTRIAL INSPECTION ENTRY
SECONDARY BASE ENTRY AND ALL VEHICLE EXIT ROUTE
POV BASE ENTRY ONLY (RESTRICTED HOURS)
LEGEND
KEYNOTES
1. APPROVED HAUL AND ACCESS ROUTES ARE NOTED ON THE PLAN. THE CONTRACTOR
SHALL USE ONLY ACCESS ROUTES THAT ARE PREVIOUSLY APPROVED BY CONSTRUCTION
MANAGEMENT.
2. CONSTRUCTION MANAGERS OFFICE IS LOCATED ON THE FIRST FLOOR NORTH-WEST
CORNER OF BUILDING 288
3. CONTRACTING/LOCAL PURCHASE IS LOCATED IN BUILDING 200 FIRST FLOOR SOUTH-WEST
CORNER OF BUILDING.
4. REFER TO SPEC SECTION 010000 - GENERAL PROVISIONS FOR BASE ACCESS
PROCEDURES AND RULES.
5. EXECUTION OF WORK DESCRIBED WITHIN THIS PLAN SET SHALL BE IAW 48 CFR SUBPART
25.2 - BUY AMERICAN - CONSTRUCTION MATERIALS AND ALL SUBSEQUENT PARTS RELATED
TO SUCH REFERENCE.
6. LAYDOWN AREA SHALL BE COORDINATED THROUGH CONSTRUCTION MANAGER
GENERAL NOTES
0 400' 800'
SCALE: 1" = 400'-0"
G-003
NSCALE:
FACILITY STORAGE AREA
1" = 100'-0"2 0 100' 200'
SCALE: 1" = 100'-0"
FACILITY STORAGE AREA NOTES
1. THE CONTRACTOR MAY USE THE EXISTING PARKING LOT AS AN INDIVIDUAL FACILITY STORAGE AREA. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE SURE THE PROPERTY IS NOT DAMAGED AND
IS ACCESSIBLE FOR EMERGENCY VEHICLES AT ALL TIMES.
2. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR AND SHALL TAKE ALL PRECAUTIONS
NECESSARY TO AVOID PROPERTY DAMAGE TO THE PROPERTY AND PARKING LOT DURING THE
CONSTRUCTION PHASES OF THIS PROJECT. ALL REPAIRS AND REPLACEMENTS SHALL BE AT CONTRACTOR'S
SOLE EXPENSE.
DN
TYPICAL VESTIBULE
F641.6 F644.6 F645.6
ACCESSIBLE VESTIBULE
F641.5
F644.5 DOOR OPPOSITE SIDE
F645.5
TYPICAL VESTIBULE
F641.3 F644.3 F645.3
TYPICAL VESTIBULE
F641.2
F644.2 DOOR OPPOSITE SIDE
F645.2 DOOR OPPOSITE SIDE
TYPICAL VESTIBULE
F641.1
F644.1 DOOR OPPOSITE SIDE
F645.1
UNIT 101 UNIT 102
UNIT 103 UNIT 104
UNIT 105 UNIT 106
UNIT 107 UNIT 108
UNIT 109 UNIT 110
UNIT 111 UNIT 112
UNIT 113
UNIT 114
UNIT 115
UNIT 116
UNIT 117 UNIT 118
UNIT 119 UNIT 120
NIC
TYPICAL EGRESS
CAPACITY 36"
OPENING = 8
TYPICAL EGRESS
CAPACITY 69"
OPENING = 14
PATH A
PATH B
TYPICAL VESTIBULE
F641.6 F644.6 F645.6
ACCESSIBLE VESTIBULE
F641.5 F644.5 F645.5
TYPICAL VESTIBULE
F641.3 F644.3 F645.3
TYPICAL VESTIBULE
F641.2 F644.2 F645.2
TYPICAL VESTIBULE
F641.1 F644.1 F645.1
UNIT 201 UNIT 202
UNIT 203 UNIT 204
UNIT 205 UNIT 206
UNIT 207 UNIT 208
UNIT 209 UNIT 210
UNIT 211 UNIT 212
UNIT 213 UNIT 214
UNIT 215 UNIT 216
UNIT 217 UNIT 218
UNIT 219 UNIT 220
NIC
PATH B
APPLICABLE CODES
SEE SHEET G-001 RELEVANT CODE DOCUMENTS
USE AND OCCUPANCY CLASSIFICATION - IBC CHAPTER 3
RESIDENTIAL (R-2) SECTION 306
GENERAL BUILDING INFORMATION - IBC
GENERAL BUILDING HEIGHTS AND AREAS - IBC CHAPTER 5
CODE INFORMATION
CONSTRUCTION TYPE: IIB
NON-SPRINKLERED
MEANS OF EGRESS - NFPA 101
EGRESS W IDTH - WITH NON-SPRINKLER
EGRESS COMPONENTS STAIRS
57 OCCUPANTS X 0.3 = 17.1 INCHES REQUIRED
42 INCHES PROVIDED
EGRESS COMPONENTS EXTERIOR DOORS
57 OCCUPANTS X 0.2 = 11.4 INCHES REQUIRED
168 INCHES PROVIDED IN 3 EXITS
REQUIRED NUMBER OF MEANS OF ESCAPE
1 PRIMARY AND 1 SECONDARY REQUIRED
FOR ACCESSIBLE UNITS AT LEAST ONE UNIT MEANS OF EGRESS SHALL BE
ACCESSIBLE PER ABA SECTION F202.2
EXIT ACCESS TRAVEL DISTANCE
200' (NON-SPRINKLERED) MAXIMUM
102'-6" MAXIMUM PROVIDED
DEAD END CORRIDORS - IBC 2015 SECTION 1020.4
NO DEAD END CORRIDORS IN EXCESS OF 50'
PROVIDE MINIMUM 1 FC EMERGENCY LIGHTING ALONG PATHS OF EXIT ACCESS
PLUMBING SYSTEMS - IBC CHAPTER 29
SAFETY GLAZING - CHAPTER 24
ALL GLAZING SHALL MEET REQUIREMENTS OF SECTION 2406
AND SHALL PASS THE TEST REQUIREMENTS OF CPSC 16
CFR 1201. ALL GLAZING SHALL BE A MINIMUM CATEGORY II.
INTERNATIONAL MECHANICAL CODE - SECTION 403
VENTILATION SYSTEMS SHALL BE DESIGNED TO HAVE THE
CAPACITY TO SUPPLY THE MINIMUM OUTDOOR AIR FLOW RATE
DETERMINED IN ACCORDANCE WITH TABLE 403.3 BASED ON
THE OCCUPANCY OF THE SPACE AND THE OCCUPANT LOAD OR
OTHER PARAMETER AS STATED THEREIN.
WATER CLOSETS: (1) PER DW ELLING UNIT
LAVATORIES: (1) PER DW ELLING UNIT
SHOWERS: (1) PER DW ELLING UNIT
SERVICE SINK: (1) KITCHEN SINK PER DWELLING UNIT
(1) AUTOMATIC CLOTHES WASHER CONNECTION
PER 20 DWELLING UNITS
PRIMARY STRUCTURAL FRAME 0 IBC 2018 TABLE 601
BEARING WALLS
EXTERIOR 0 IBC 2018 TABLE 601
INTERIOR 0 IBC 2018 TABLE 601
NON-BEARING WALLS AND PARTITIONS
EXTERIOR 0 IBC 2018 TABLE 601
(1-HR EXTERIOR BARRIER WALL AT VESTIBULE)
INTERIOR 0 IBC 2018 TABLE 601
(1-HR INTERIOR DWELLING UNIT SEPARATION REQUIRED)
FLOOR CONSTRUCTION
( 1-HR BARRIER SEPARATION BETW EEN FLOORS)
AND SECONDARY MEMBERS 0 IBC 2018 TABLE 601
ROOF CONSTRUCTION
AND SECONDARY MEMBERS 0 IBC 2018 TABLE 601
SHAFT ENCLOSURES 0 NFPA SECTION 8.6.5 (2)
FIRE RESISTANCE RATING REQUIREMENTSREQUIRED OCCUPANT LOAD FOR EGRESS - NFPA 101
ALLOWABLE AND PROVIDED BUILDING HEIGHT - TABLE 504.3
RESIDENTIAL (R-2) ALLOWABLE = 55'-0" PROVIDED = 22'-0"
ALLOWABLE AND PROVIDED STORIES - TABLE 504.4
RESIDENTIAL (R-2) ALLOWABLE = 4 PROVIDED = 2
ALLOWABLE AREA - TABLE 506.2
RESIDENTIAL (R-2) ALLOWABLE = 16,000 SQ FT PROVIDED = 11,353 SQ FT
APARTMENT BUILDINGS 332 AT 200 PER = 2 OCCUPANTS PER DWELLING UNIT
PORTABLE FIRE EXTINGUISHERS - SECTION 906
EACH DWELLING UNIT TO BE EQUIPPED WITH A PORTABLE FIRE
EXTINGUISHER - GFGI
BATTERY BACKED UP EXIT SIGN / EMERGENCY LIGHT
FIRE BARRIER - 1 HR Fire Rating
FIRE BARRIER - 2 HR Fire Rating
FIRE WALL SYMBOLS:
LIFE SAFETY SYMBOLS
BATTERY BACKED UP EMERGENCY LIGHT
PATH OF TRAVEL
V A
N C
E A
F B
U O
Q D
O R
M
IT
O R
Y R
E N
O V
A T
IO
N
S
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
XTLF 19-1012, 1013,
1014, 1015, 1016
DESIGN STAGE:
UOQ DORMITORY RENOVATIONS
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 07864 EXPIRES
JUNE 30, 2020
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
Communications
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
L
IF
E S
A F
E T
Y P
L A
N
F
F
F
G-101
WALLACE GARCETE
SEPTEMBER 25, 2020
DATE: SEPTEMBER 25, 2020
ISSUED FOR
CONSTRUCTION
S T
A
TE OF OKLAHOM
A
LIC
ENSED A RCHIT
EC
T
DAVID F.
PHELPS
W
ILLIAM
S AV
E.H
A N C
O C K
AV
E.
S
AYW
ER
A
V E.
F642
F641
F643
F644
F645
KEYPLAN
3/32" = 1'-0"1
FIRST FLOOR LIFE SAFETY PLAN - F641, F644, F645
3/32" = 1'-0"2
SECOND FLOOR LIFE SAFETY PLAN - F641, F644, F645
0 4' 8' 16' 24'
0 4' 8' 16' 24' N
N
EGRESS PATH SCHEDULE
PATH A 58'-0"
PATH B 76'-9"
R e v is io n
N u m b e r
D e s c ri p ti o n
D a te
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
/2 /2
DN
TYPICAL VESTIBULE
F642.6
F643.6 DOOR OPPOSITE SIDE
ACCESSIBLE VESTIBULE
F642.4
F643.4 DOOR OPPOSITE SIDE
TYPICAL VESTIBULE
F642.2 F643.2
TYPICAL VESTIBULE
F642.1 F643.1
TYPICAL VESTIBULE
F642.5
F643.5 DOOR OPPOSITE SIDE
UNIT 101 UNIT 102
UNIT 103 UNIT 104
UNIT 105 UNIT 106
UNIT 107 UNIT 108
UNIT 109
UNIT 110
UNIT 111
UNIT 112
UNIT 113 UNIT 114
UNIT 115 UNIT 116
UNIT 117 UNIT 118
UNIT 119 UNIT 120
NIC
TYPICAL EGRESS
CAPACITY 36"
OPENING = 8
TYPICAL EGRESS
CAPACITY 69"
OPENING = 14
PATH A
PATH B
TYPICAL VESTIBULE
F642.6 F643.6
ACCESSIBLE VESTIBULE
F642.4 F643.4
TYPICAL VESTIBULE
F642.2 F643.2
TYPICAL VESTIBULE
F642.1 F643.1
TYPICAL VESTIBULE
F642.5 F643.5
UNIT 201 UNIT 202
UNIT 203 UNIT 204
UNIT 205 UNIT 206
UNIT 207 UNIT 208
UNIT 210
UNIT 212
UNIT 213 UNIT 214
UNIT 215 UNIT 216
UNIT 217 UNIT 218
UNIT 219 UNIT 220
UNIT 209
UNIT 211
PATH B
BATTERY BACKED UP EXIT SIGN / EMERGENCY LIGHT
FIRE BARRIER - 1 HR Fire Rating
FIRE BARRIER - 2 HR Fire Rating
FIRE WALL SYMBOLS:
LIFE SAFETY SYMBOLS
BATTERY BACKED UP EMERGENCY LIGHT
PATH OF TRAVEL
V A
N C
E A
F B
U O
Q D
O R
M
IT
O R
Y R
E N
O V
A T
IO
N
S
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
XTLF 19-1012, 1013,
1014, 1015, 1016
DESIGN STAGE:
UOQ DORMITORY RENOVATIONS
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 07864 EXPIRES
JUNE 30, 2020
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
Communications
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
L
IF
E S
A F
E T
Y P
L A
N
F
F
G-102
WALLACE GARCETE
SEPTEMBER 25, 2020
DATE: SEPTEMBER 25, 2020
ISSUED FOR
CONSTRUCTION
S T
A
TE OF OKLAHOM
A
LIC
ENSED A RCHIT
EC
T
DAVID F.
PHELPS
W
ILLIAM
S AV
E.H
A N C
O C K
AV
E.
S
AYW
ER
A
V E.
F642
F641
F643
F644
F645
KEYPLAN
3/32" = 1'-0"1
FIRST FLOOR LIFE SAFETY PLAN - F642, F643
3/32" = 1'-0"2
SECOND FLOOR LIFE SAFETY PLAN - F642, F643
0 4' 8' 16' 24'
0 4' 8' 16' 24' N
N
EGRESS PATH SCHEDULE
PATH A 58'-0"
PATH B 76'-9"
R e v is io n
N u m b e r
D e s c ri p ti o n
D a te
IS
S
U E
D F
O R
C O
N S
T R
U C
T
IO
N
/2 /2
R D x
R D x
RD
x
RD x
RD
x
R D x
R D x
XXX
XXX
W
WW
W
F641 F6
.1
F6
.2
F6
.3
F6
.4
F6
.5
F6
.6
3 3 3
REMOVE PAVEMENT MARKINGS
25'
25' 25'
6 6
9 9 9
9 9
4'
4'
4'
4'
4'
NSCALE:
SITE DEMOLITION PLAN - F641
1" = 10'-0"1 0 10' 20'
SCALE: 1" = 10'-0"
REMOVE CONCRETE SIDEWALL AND STEPS
REMOVE CONCRETE ACCESSIBLE RAMP
SAW-CUT FULL DEPTH AND PROVIDE A CLEAN FINISH
REMOVE EXISTING SIGN
REMOVE PAVEMENT MARKINGS
PARTIAL UTILITY LINE REMOVAL - RE: CU401-CU405
CURB AND GUTTER REMOVAL
REMOVE TRANSFORMER
DE-ENERGIZE AND REMOVE BUILDING ELEC PANEL
REMOVE LANDSCAPE ROCK FOR INSTALLATION OF
ELECTRICAL CONDUIT - RE: CU401-CU405
REMOVE EXISTING SIDEWALK TO THE NEAREST JOINT
KEY NOTES:
DEMOLITION LEGEND:DEMOLITION NOTES:
REMOVE CONCRETE CURB AND GUTTER
REMOVE CONCRETE SIDEWALK FULL DEPTH
REMOVE ASPHALT PAVEMENT FULL DEPTH
REMOVE AND REPLACE ROCK (STOCKPILE FOR RE-USE)
1. PRIOR TO ANY WORK, CONTRACTOR SHALL CONTACT A
UTILITY LOCATE COMPANY TO FIELD VERIFY ALL EXISTING
UTILITIES.
2. PROVIDE UTILITY POTHOLE TO DETERMINE EXISTING UTILITY
BURY DEPTH UNDER PROPOSED FOUNDATIONS.
3. CONTRACTOR SHALL ABIDE BY ALL FEDERAL, STATE, AND
LOCAL CODES FOR THE DEMOLITION AND DISPOSAL OF ALL
MATERIALS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER
DISPOSAL OF ALL TRASH AND BUILDING MATERIALS. ALL
WASTE MATERIAL GENERATED BY DEMOLITION AND
CONSTRUCTION ACTIVITIES SHALL BE HAULED OFF-SITE TO A
LEGAL DUMP SITE AND DEPOSITED AT THE CONTRACTORS
EXPENSE. THE HAUL ROUTE SHALL BE MAINTAINED FREE OF
DEBRIS, MUD, ROCK, AND TRASH AT ALL TIMES.
5. REMOVAL OF EXISTING PAVEMENT MARKINGS SHALL BE
ACCOMPLISHED BY A METHOD THAT DOES NOT MATERIALLY
DAMAGE THE SURFACE OR TEXTURE OF THE PAVEMENT. THE
MARKINGS SHALL BE REMOVED TO THE EXTENT THAT THEY
WILL NOT BE VISIBLE UNDER DAY OR NIGHT CONDITIONS.
UNDER NO CIRCUMSTANCES SHALL BLACK PAINT BE USED TO
COVER EXISTING PAVING MARKINGS, OR MISTAKES IN
STRIPING.
R ev is io n N um be r D es cr ip tio n D at e
VA
NC
E
AF
B
UO
Q
DO
RM
IT
OR
Y
RE
NO
VA
TI
ON
S
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
SEPTEMBER 25, 2020
XTLF 19-1012, 1013,
1014, 1015, 1016
DESIGN STAGE:
DATE: SEPTEMBER 25, 2020
ISSUED FOR
CONSTRUCTION
UOQ DORMITORY RENOVATIONS
BDCRHR
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 07864 EXPIRES
JUNE 30, 2020
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
Communications
WILLIAMS AVE.HANCOCK AVE.
SAYWER AVE.
KEY PLAN- F641
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
9/
/2
ROBERT L.
DAY
12532LI
C
E N
S E
D
PROFESSIONAL
EN
G
IN
E
E R
OKL AHOMA
CYNTERGY ENGINEERING, PLLC
LICENSE # CA3537 | EXPIRES 6/30/22
CD401
SI
TE
D
EM
OL
IT
IO
N
PL
AN
F6
W
WW
W
F641 F6
.1
F6
.2
F6
.3
F6
.4
F6
.5
F6
.6
.5
6.
6'
6'
TY
P.
10'
TYP.
6'
9'
TY
P.
6'
TYP.
6.
5'
7'
TYP.
5'
9'
5 15 10
TYP.
1 1
TYP.
8'6'
TYP.
6.
5' 11'
6'
7'
TYP.
7'
5.
25 25
25 25
L=8'
8.5'
27 27
27 27
5'
6.
6'
TY
P.
28 TYPICAL
5 PLACES
29 TYP. ALL
CANOPIES
30 TYP. AT ROOF
DRAIN TIE-INS
26 26
13 13
TYP.
13 13
NSCALE:
SITE PLAN - F641
1" = 10'-0"1 0 10' 20'
SCALE: 1" = 10'-0"
NEW 36-INCH CORRIDOR VESTIBULE EXTENSION WITH
ABA DOUBLE SWING DOORS - RE: A-401 & A-402
NEW CANOPY OVERHANG ( TYPICAL )
5 - FOOT LANDING ( 2% MAX. SLOPE )
NEW EXTERIOR LANDING WITH 3 STEPS AND HANDRAILS
NEW EXTERIOR LANDING WITH 2 STEPS AND HANDRAILS
SLOPE SIDEWALK TO STAIR ( 5% MAX.SLOPE )
NEW 7 - FOOT SIDEWALK WITH 3 STAIR STEPS WITH TWO
HANDRAILS
NEW 7 - FOOT SIDEWALK WITH 2 STAIR STEPS WITH TWO
HANDRAILS
NEW ACCESSIBLE RAMP WITH HANDRAILS ( MAX. RAMP
SLOPE 8.33% OR 12:1 )
NEW EXTERIOR LANDING WITH SIDEWALK RAMP
NEW SIDEWALK CONCRETE - RE: 2/CS501
NEW CURB TRANSITION ( FROM 0” TO 6” ). CURB
TRANSITION IS 6' UNLESS NOTED OTHERWISE
MEET AND MATCH PAVEMENT FLUSH
EXISTING SIDEWALK TO REMAIN
SAW-CUT AND REMOVE A PORTION OF EXISTING
SIDEWALK FOR NEW LANDING FOUNDATION. REPLACE
SIDEWALK AS REQUIRED ( TYPICAL )
REMOVE EXISTING RAMP AND REPLACE WITH ASPHALT
PAVEMENT (RE: 1 / CS501) OR CONCRETE OPTION (10 /
CS501) COORDINATE WITH CONSTRUCTION MANAGER.
NEW 6 - INCH HIGH CURB AND GUTTER
NEW ACCESSIBLE SIGN & POST - RE: 8/CS501
NEW ACCESSIBLE PAVEMENT SYMBOL - RE: 6/CS501
NEW ABA VAN ACCESSIBLE PARKING - RE: 9/CS501
NEW 4' X 2' DETECTABLE WARNING TRUNCATED DOMES
NEW ACCESSIBLE 4-INCH AISLE STRIPING WITH DIAGONAL
STRIPE AT 2-FOOT ON CENTER ( COLOR ACCESSIBLE
BLUE )
NEW 4-INCH WIDE ACCESSIBLE BLUE PAINT STRIPE
NEW 4-INCH WIDE WHITE PAINT STRIPE
NEW EGRESS DOOR - RE: A-101 & A-102
5' x 3.67' CONCRETE STOOP AT EGRESS DOOR
LANDSCAPE ROCK REPAIR - RE: CU401-CU405
NEW 4'-6" L x 2'-6" W CONCRETE PAD WITH MINI-SPLIT
OUTDOOR UNITS - RE: CU401-CU405
NEW CANOPY DOWNSPOUT
NEW SIDEWALK PANEL
KEY NOTES: KEY NOTES CONTINUED: KEY NOTES CONTINUED:
R ev is io n N um be r D es cr ip tio n D at e
VA
NC
E
AF
B
UO
Q
DO
RM
IT
OR
Y
RE
NO
VA
TI
ON
S
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
SEPTEMBER 25, 2020
XTLF 19-1012, 1013,
1014, 1015, 1016
DESIGN STAGE:
DATE: SEPTEMBER 25, 2020
ISSUED FOR
CONSTRUCTION
UOQ DORMITORY RENOVATIONS
BDCRHR
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 07864 EXPIRES
JUNE 30, 2020
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
Communications
WILLIAMS AVE.HANCOCK AVE.
SAYWER AVE.
KEY PLAN- F641
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
9/
/2
ROBERT L.
DAY
12532LI
C
E N
S E
D
PROFESSIONAL
EN
G
IN
E
E R
OKL AHOMA
CYNTERGY ENGINEERING, PLLC
LICENSE # CA3537 | EXPIRES 6/30/22
CS401
SI
TE
P
LA
N
- F
SDx SDx SDx SDx SDx SDx
SD x
SD x
R D x
R D x
RD
x
RD x
RD
x
R D x
R D x
W
WW
W
F641 F6
.1
F6
.2
F6
.3
F6
.4
F6
.5
F6
.6
1289.31 1289.36 1289.36
1289.32 1289.32
1287.961288.351288.641288.361288.33
1289.29
1288.741288.621288.431288.38
1288.02
1288.12
1287.99
1288.32
1288.61
1288.54 1288.72
-1 .4%
-0.5%
-4 .1
1289.25
1289.31
1289.30 1289.30
1289.32
1289.261288.31
12:1
MAX.
RAMP
12:1
RAMP
12:1
1288.39
1288.00
1289.32
1289.36
1289.00 1289.22
1289.20
1288.42
1289.36
CURB INLET (TYP.)
RE: NOTE 3 & DETAIL
11 / CS501
1289 1289
3 TYPICAL ROOF
DRAIN TIE-INS
CANOPY
DOWNSPOUT
TYP.
WYE
2 2
EXISTING 15" CMP
STORM PIPE
NSCALE:
GRADING PLAN - F641
1" = 10'-0"1 0 10' 20'
SCALE: 1" = 10'-0"
GRADING LEGEND:
NEW SPOT ELEVATION
EXISTING SPOT ELEVATION
APPROXIMATE LIMITS OF SOD
INLET PROTECTION RE: 11/CS501
1289.30
1289.10
GRADING NOTES:
1. PROVIDE AND INSTALL SOLID SOD IN ALL DISTURBED GRASS
AREAS.
2. MAXIMUM FINISH GRADES SHALL NOT EXCEED 3:1 SLOPE.
3. PROVIDE EROSION SEDIMENT PROTECTION AT CURB INLET
FOR THE DURATION OF GRADING ACTIVITIES AND UNTIL SOD
IS STABILIZED - RE: 11 / CS501
NEW CANOPY ROOF DRAIN - REFER TO DETAIL 1 / CS505
6-INCH ROOF DRAIN PIPE SCHEDULE 40 PVC WITH
APPROPRIATE PIPE FITTINGS. 12-INCH MIN. BURY DEPTH
AND 50:1 (2%) MINIMUM PIPE SLOPE.
CONNECT NEW 6-INCH ROOF DRAIN TO EXISTING 15"
CORRUGATED METAL STORM PIPE. USE INSERTA TEE
FOR STORM PIPE TIE-IN OR APPROVED EQUAL.
6-INCH ROOF DRAIN PIPE ( SCH. 40 PVC ) UNDER
LANDING FOUNDATION FOOTING. BURY DEPTH OF PIPE
SHALL CLEAR BOTTOM OF FOOTING 6-INCH MINIMUM.
PROVIDE MINIMUM PIPE SLOPE 50:1 (2%) .
KEY NOTES:
R ev is io n N um be r D es cr ip tio n D at e
VA
NC
E
AF
B
UO
Q
DO
RM
IT
OR
Y
RE
NO
VA
TI
ON
S
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
SEPTEMBER 25, 2020
XTLF 19-1012, 1013,
1014, 1015, 1016
DESIGN STAGE:
DATE: SEPTEMBER 25, 2020
ISSUED FOR
CONSTRUCTION
UOQ DORMITORY RENOVATIONS
BDCRHR
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 07864 EXPIRES
JUNE 30, 2020
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
Communications
WILLIAMS AVE.HANCOCK AVE.
SAYWER AVE.
KEY PLAN- F641
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
9/
/2
ROBERT L.
DAY
12532LI
C
E N
S E
D
PROFESSIONAL
EN
G
IN
E
E R
OKL AHOMA
CYNTERGY ENGINEERING, PLLC
LICENSE # CA3537 | EXPIRES 6/30/22
CG401
GR
AD
IN
G
PL
AN
x
R D x
RD
x
RD x
RD
x
R D x
R D x
W
WW
W
F641 F6
.1
F6
.2
F6
.3
F6
.4
F6
.5
F6
.6
XFMR
XFMR
ES
ES
ES
ES
ES
ES
ES
ES
ES
X4X5
1 1 1
1 1
X1
X3
3 3X1
U1
U2 U2 U2
X8
U1
X3X9 X1
U1
X4
X6
X2
X7
X7
TYP.
TYP.
X5
4' 4' 4'
X8
5 TRANSFORMER 2
5 TRANSFORMER 1
PANEL A
PANEL B
PANEL C
PANEL D
PANEL N
PANEL F
PANEL G
PANEL J
PANEL K
PANEL L
PANEL M
7 6
8 8
8 8
ODU-1 ODU-2 ODU-3
ODU-4 ODU-5
10 TYPICAL
5 PLACES
11 11 11
U1 U1
EXISTING WATER SUPPLY LINE
EXISTING DOMESTIC HOT WATER "CIRCULATION" LINES
EXISTING WATER SERVICE LINE
EXISTING 15 - INCH STORM PIPE
EXISTING TYPE II CATCH BASIN INLET (8' L x 3.5' W)
EXISTING GAS PIPE (SIZE UNKNOWN) - USE CAUTION
EXISTING COMMUNICATION LINE - USE CAUTION
EXISTING UG POWER (SECONDARY) - USE CAUTION
EXISTING ROOF DRAIN
NOT USED
NEW 36-INCH CORRIDOR VESTIBULE EXTENSION WITH ABA
DOUBLE SWING DOORS - RE: A-401 & A-402
NEW EXTERIOR LANDING WITH STAIRS - RE: CS101-CS105
NEW SIDEWALK WITH STAIRS - RE: CS101-CS105
NEW ACCESSIBLE RAMP WITH HANDRAILS
NEW TRANSFORMER- RE: E-201
NEW ELECTRICAL CONDUIT AND CONDUCTOR- RE: E-601
EXISTING ELECTRICAL CONDUIT AND NEW CONDUCTOR
REMOVE AND REPLACE LANDSCAPE ROCK FOR
INSTALLATION FOR ELECTRICAL CONDUIT. MATCH NEW
ROCK WITH LIKE KIND.
SAW-CUT AND REMOVE CONCRETE. REPLACE CONCRETE
RE: 1 / S-002 (TYPICAL EACH CORRIDOR)
NEW 4'-6" L x 2'-6" W CONCRETE PAD WITH MINI-SPLIT
OUTDOOR UNITS - RE: 2 / S-002
NEW ROOF DRAIN PIPE - RE: CG101- CG105
PROTECT UTILITY LINE WITH "PVC PROTECTION SLEEVES"
AS MANUFACTURED BY BINGHAM & TAYLOR OR
APPROVED EQUAL.
VERIFY UTILITY LOCATION AND DEPTH. REROUTE UTILITY
AS REQUIRED. FOR RELOCATED UTILITY REMOVE THE
EXISTING LINE.
X1
KEY NOTES: KEY NOTES CONTINUED:
X2
X3
X4
X5
X6
X7
X8
X9
X10
U1
U2
UTILITY NOTES CONTINUED:
3. EXISTING UTILITY LOCATIONS ARE SHOWN APPROXIMATELY
AND ARE FOR GENERAL INFORMATION PURPOSES ONLY. THE
CONTRACTOR IS TO VERIFY THE LOCATION, DEPTH AND
INVERT OF ALL EXISTING UTILITIES AND FACILITIES.
4. NO EXISTING UTILITIES SHALL REMAIN UNDER THE NEW
CORRIDOR VESTIBULE EXTENSION. ANY EXISTING UTILITY
UNDER THE NEW BUILDING SLAB OR FOUNDATION WITH THE
EXCEPTION OF SERVICE LINES SHALL BE RE-ROUTED.
5. ALL EXISTING PRESSURE PIPES OR GRAVITY FLOW PIPES
UNDER NEW LANDING, STAIR OR RAMP FOUNDATIONS SHALL
HAVE A MINIMUM CLEARANCE OF ONE FOOT. PROVIDE AND
INSTALL PIPE PROTECTION IF MINIMUM CLEARANCE IS
UNATTAINABLE.
6. TRANSFORMER PROVIDED BY CONTRACTOR. CONTRACTOR
TO CONSTRUCT TRANSFORMER PAD AND PROVIDE AND
INSTALL CONDUIT AND CONDUCTOR TO EACH PANEL. REFER
TO E-601 FOR ELECTRICAL DIAGRAM. RE 2 / CS505 FOR
TRENCHING DETAIL.
KEY NOTES CONTINUED:
UTILITY NOTES:
1. THE LOCATION OF EXISTING UTILITIES SHOWN ON THESE
PLANS ARE BASED ON INFORMATION PROVIDED BY THE
GOVERNMENT AND FIELD SURVEY. UTILITY LOCATES ARE
PROVIDED BY THE BASE. UTILITY LOCATES TO BE
COORDINATED WITH CONSTRUCTION MANAGER 14 DAYS
PRIOR TO EXCAVATION.
2. DOMESTIC WATER LINES SHOWN ON 1995 AS-BUILT
DRAWINGS, PROJECT NO. XTLF-96-1036, PROJECT NAME:
REPLACE WATER PIPING OUPH'S INDICATE A MINIMUM WATER
LINE BURY DEPTH OF 3-FOOT.
R ev is io n N um be r D es cr ip tio n D at e
VA
NC
E
AF
B
UO
Q
DO
RM
IT
OR
Y
RE
NO
VA
TI
ON
S
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
SEPTEMBER 25, 2020
XTLF 19-1012, 1013,
1014, 1015, 1016
DESIGN STAGE:
DATE: SEPTEMBER 25, 2020
ISSUED FOR
CONSTRUCTION
UOQ DORMITORY RENOVATIONS
BDCRHR
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 07864 EXPIRES
JUNE 30, 2020
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
Communications
WILLIAMS AVE.HANCOCK AVE.
SAYWER AVE.
KEY PLAN- F641
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
9/
/2
ROBERT L.
DAY
12532LI
C
E N
S E
D
PROFESSIONAL
EN
G
IN
E
E R
OKL AHOMA
CYNTERGY ENGINEERING, PLLC
LICENSE # CA3537 | EXPIRES 6/30/22
CU401
UT
ILI
TY
P
LA
N
- F
NSCALE:
UTILITY PLAN - F641
1" = 10'-0"1 0 10' 20'
SCALE: 1" = 10'-0"
RD
x
R D x
R D x
R D x
RD
x
E
XXX
XXX
W
F642 F6
.1
F6
.2 F6
.3
F6
.4
F6
.5
F6
.6
3 3
3 3 3
REMOVE PAVEMENT MARKINGS
25'
25'
9 9
9 9 9
4'
4'
4'
4'
4'
1111111111
NSCALE:
SITE DEMOLITION PLAN - F642
1" = 10'-0"1 0 10' 20'
SCALE: 1" = 10'-0"
REMOVE CONCRETE SIDEWALL AND STEPS
REMOVE CONCRETE ACCESSIBLE RAMP
SAW-CUT FULL DEPTH AND PROVIDE A CLEAN FINISH
REMOVE EXISTING SIGN
REMOVE PAVEMENT MARKINGS
PARTIAL UTILITY LINE REMOVAL - RE: CU401-CU405
CURB AND GUTTER REMOVAL
REMOVE TRANSFORMER
DE-ENERGIZE AND REMOVE BUILDING ELEC PANEL
REMOVE LANDSCAPE ROCK FOR INSTALLATION OF
ELECTRICAL CONDUIT - RE: CU401-CU405
REMOVE EXISTING SIDEWALK TO THE NEAREST JOINT
KEY NOTES:
DEMOLITION LEGEND:DEMOLITION NOTES:
REMOVE CONCRETE CURB AND GUTTER
REMOVE CONCRETE SIDEWALK FULL DEPTH
REMOVE ASPHALT PAVEMENT FULL DEPTH
REMOVE AND REPLACE ROCK (STOCKPILE FOR RE-USE)
1. PRIOR TO ANY WORK, CONTRACTOR SHALL CONTACT A
UTILITY LOCATE COMPANY TO FIELD VERIFY ALL EXISTING
UTILITIES.
2. PROVIDE UTILITY POTHOLE TO DETERMINE EXISTING UTILITY
BURY DEPTH UNDER PROPOSED FOUNDATIONS.
3. CONTRACTOR SHALL ABIDE BY ALL FEDERAL, STATE, AND
LOCAL CODES FOR THE DEMOLITION AND DISPOSAL OF ALL
MATERIALS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER
DISPOSAL OF ALL TRASH AND BUILDING MATERIALS. ALL
WASTE MATERIAL GENERATED BY DEMOLITION AND
CONSTRUCTION ACTIVITIES SHALL BE HAULED OFF-SITE TO A
LEGAL DUMP SITE AND DEPOSITED AT THE CONTRACTORS
EXPENSE. THE HAUL ROUTE SHALL BE MAINTAINED FREE OF
DEBRIS, MUD, ROCK, AND TRASH AT ALL TIMES.
5. REMOVAL OF EXISTING PAVEMENT MARKINGS SHALL BE
ACCOMPLISHED BY A METHOD THAT DOES NOT MATERIALLY
DAMAGE THE SURFACE OR TEXTURE OF THE PAVEMENT. THE
MARKINGS SHALL BE REMOVED TO THE EXTENT THAT THEY
WILL NOT BE VISIBLE UNDER DAY OR NIGHT CONDITIONS.
UNDER NO CIRCUMSTANCES SHALL BLACK PAINT BE USED TO
COVER EXISTING PAVING MARKINGS, OR MISTAKES IN
STRIPING.
R ev is io n N um be r D es cr ip tio n D at e
VA
NC
E
AF
B
UO
Q
DO
RM
IT
OR
Y
RE
NO
VA
TI
ON
S
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
SEPTEMBER 25, 2020
XTLF 19-1012, 1013,
1014, 1015, 1016
DESIGN STAGE:
DATE: SEPTEMBER 25, 2020
ISSUED FOR
CONSTRUCTION
UOQ DORMITORY RENOVATIONS
BDCRHR
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 07864 EXPIRES
JUNE 30, 2020
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
Communications
WILLIAMS AVE.HANCOCK AVE.
SAYWER AVE.
KEY PLAN- F642
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
9/
/2
ROBERT L.
DAY
12532LI
C
E N
S E
D
PROFESSIONAL
EN
G
IN
E
E R
OKL AHOMA
CYNTERGY ENGINEERING, PLLC
LICENSE # CA3537 | EXPIRES 6/30/22
CD402
SI
TE
D
EM
OL
IT
IO
N
PL
AN
E
F642 F6
.1
F6
.2 F6
.3
F6
.4
F6
.5
F6
.6
6'
6'
TY
P.
10'
TYP.
7'
9'
11' 5' 9'
TY
P.
6'
TYP.
6.
7'
TYP.
TYP.
5' 8.
6'
TYP.
8'
147'
TYP.
25 25
25 25
TYP.
13 13
L=7.5'
7.2'
27 27
27 27 27
5.
28 TYPICAL
5 PLACES
29 TYP. ALL
CANOPIES
30 TYP. AT ROOF
DRAIN TIE-INS
13 13 13
TYP.
NSCALE:
SITE PLAN - F642
1" = 10'-0"1 0 10' 20'
SCALE: 1" = 10'-0"
NEW 36-INCH CORRIDOR VESTIBULE EXTENSION WITH
ABA DOUBLE SWING DOORS - RE: A-401 & A-402
NEW CANOPY OVERHANG ( TYPICAL )
5 - FOOT LANDING ( 2% MAX. SLOPE )
NEW EXTERIOR LANDING WITH 3 STEPS AND HANDRAILS
NEW EXTERIOR LANDING WITH 2 STEPS AND HANDRAILS
SLOPE SIDEWALK TO STAIR ( 5% MAX.SLOPE )
NEW 7 - FOOT SIDEWALK WITH 3 STAIR STEPS WITH TWO
HANDRAILS
NEW 7 - FOOT SIDEWALK WITH 2 STAIR STEPS WITH TWO
HANDRAILS
NEW ACCESSIBLE RAMP WITH HANDRAILS ( MAX. RAMP
SLOPE 8.33% OR 12:1 )
NEW EXTERIOR LANDING WITH SIDEWALK RAMP
NEW SIDEWALK CONCRETE - RE: 2/CS501
NEW CURB TRANSITION ( FROM 0” TO 6” ). CURB
TRANSITION IS 6' UNLESS NOTED OTHERWISE
MEET AND MATCH PAVEMENT FLUSH
EXISTING SIDEWALK TO REMAIN
SAW-CUT AND REMOVE A PORTION OF EXISTING
SIDEWALK FOR NEW LANDING FOUNDATION. REPLACE
SIDEWALK AS REQUIRED ( TYPICAL )
REMOVE EXISTING RAMP AND REPLACE WITH ASPHALT
PAVEMENT (RE: 1 / CS501) OR CONCRETE OPTION (10 /
CS501) COORDINATE WITH CONSTRUCTION MANAGER.
NEW 6 - INCH HIGH CURB AND GUTTER
NEW ACCESSIBLE SIGN & POST - RE: 8/CS501
NEW ACCESSIBLE PAVEMENT SYMBOL - RE: 6/CS501
NEW ABA VAN ACCESSIBLE PARKING - RE: 9/CS501
NEW 4' X 2' DETECTABLE WARNING TRUNCATED DOMES
NEW ACCESSIBLE 4-INCH AISLE STRIPING WITH DIAGONAL
STRIPE AT 2-FOOT ON CENTER ( COLOR ACCESSIBLE
BLUE )
NEW 4-INCH WIDE ACCESSIBLE BLUE PAINT STRIPE
NEW 4-INCH WIDE WHITE PAINT STRIPE
NEW EGRESS DOOR - RE: A-101 & A-102
5' x 3.67' CONCRETE STOOP AT EGRESS DOOR
LANDSCAPE ROCK REPAIR - RE: CU401-CU405
NEW 4'-6" L x 2'-6" W CONCRETE PAD WITH MINI-SPLIT
OUTDOOR UNITS - RE: CU401-CU405
NEW CANOPY DOWNSPOUT
NEW SIDEWALK PANEL
KEY NOTES: KEY NOTES CONTINUED: KEY NOTES CONTINUED:
R ev is io n N um be r D es cr ip tio n D at e
VA
NC
E
AF
B
UO
Q
DO
RM
IT
OR
Y
RE
NO
VA
TI
ON
S
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
SEPTEMBER 25, 2020
XTLF 19-1012, 1013,
1014, 1015, 1016
DESIGN STAGE:
DATE: SEPTEMBER 25, 2020
ISSUED FOR
CONSTRUCTION
UOQ DORMITORY RENOVATIONS
BDCRHR
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 07864 EXPIRES
JUNE 30, 2020
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
Communications
WILLIAMS AVE.HANCOCK AVE.
SAYWER AVE.
KEY PLAN- F642
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
9/
/2
ROBERT L.
DAY
12532LI
C
E N
S E
D
PROFESSIONAL
EN
G
IN
E
E R
OKL AHOMA
CYNTERGY ENGINEERING, PLLC
LICENSE # CA3537 | EXPIRES 6/30/22
CS402
SI
TE
P
LA
N
- F
SDx SDx SDx SDx SDx SDx SDx SDx SDx
RD
x
R D x
R D x
R D x
RD
x
E
W
F642 F6
.1
F6
.2 F6
.3
F6
.4
F6
.5
F6
.6
1290.36
1289.21
1290.38
1289.56
1290.36 1290.34 1290.32
1289.54 1289.14 1288.71
1289.18
1289.10
1290.23
1289.69 1289.87
1289.331289.43
1289.111289.26
1289.80 1289.67
-1 .0%
-0.7%
-2 .8
1290.36
1290.30
1290.38
1290.28
1290.36 1290.34
1290.24
1290.32
RAMP
12:1
RAMP
12:1
1289.16 1288.73
:1
M
AX
12:1
MAX.1289.25 1289.60
1290.26
1289.55
1290.12 1290.12
1290.22
CURB INLET (TYP.)
RE: NOTE 3 & DETAIL
11 / CS501
3TYPICAL ROOF
DRAIN TIE-INS
CANOPY
DOWNSPOUT
TYP.
2 2
EXISTING 15" CMP
STORM PIPE
NSCALE:
GRADING PLAN - F642
1" = 10'-0"1 0 10' 20'
SCALE: 1" = 10'-0"
GRADING LEGEND:
NEW SPOT ELEVATION
EXISTING SPOT ELEVATION
APPROXIMATE LIMITS OF SOD
INLET PROTECTION RE: 11/CS501
1289.30
1289.10
GRADING NOTES:
1. PROVIDE AND INSTALL SOLID SOD IN ALL DISTURBED GRASS
AREAS.
2. MAXIMUM FINISH GRADES SHALL NOT EXCEED 3:1 SLOPE.
3. PROVIDE EROSION SEDIMENT PROTECTION AT CURB INLET
FOR THE DURATION OF GRADING ACTIVITIES AND UNTIL SOD
IS STABILIZED - RE: 11 / CS501
NEW CANOPY ROOF DRAIN - REFER TO DETAIL 1 / CS505
6-INCH ROOF DRAIN PIPE SCHEDULE 40 PVC WITH
APPROPRIATE PIPE FITTINGS. 12-INCH MIN. BURY DEPTH
AND 50:1 (2%) MINIMUM PIPE SLOPE.
CONNECT NEW 6-INCH ROOF DRAIN TO EXISTING 15"
CORRUGATED METAL STORM PIPE. USE INSERTA TEE
FOR STORM PIPE TIE-IN OR APPROVED EQUAL.
6-INCH ROOF DRAIN PIPE ( SCH. 40 PVC ) UNDER
LANDING FOUNDATION FOOTING. BURY DEPTH OF PIPE
SHALL CLEAR BOTTOM OF FOOTING 6-INCH MINIMUM.
PROVIDE MINIMUM PIPE SLOPE 50:1 (2%) .
KEY NOTES:
R ev is io n N um be r D es cr ip tio n D at e
VA
NC
E
AF
B
UO
Q
DO
RM
IT
OR
Y
RE
NO
VA
TI
ON
S
DRAWN BY:
DATE:
PROJECT NO.:
CHECKED BY:
SEPTEMBER 25, 2020
XTLF 19-1012, 1013,
1014, 1015, 1016
DESIGN STAGE:
DATE: SEPTEMBER 25, 2020
ISSUED FOR
CONSTRUCTION
UOQ DORMITORY RENOVATIONS
BDCRHR
140 Channel St., Suite 205 Vance AFB, OK 73705
(580) 213-7772
CA# 07864 EXPIRES
JUNE 30, 2020
UNITED STATES AIR FORCE
AIR EDUCATION
TRAINING COMMAND
VANCE AIR FORCE BASE
ENID, OKLAHOMA
DRAWING SIZE INTENDED TO BE
24" x 36"
1 1/2"(ACTUAL SIZE)
Communications
WILLIAMS AVE.HANCOCK AVE.
SAYWER AVE.
KEY PLAN- F642
810 SOUTH CINCINNATI
SECOND FLOOR
TULSA, OK 74119
918.877.6000 www.cyntergy.com
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
9/
/2
ROBERT L.
DAY
12532LI
C
E N
S E
D
PROFESSIONAL
EN
G
IN
E
E R
OKL AHOMA
CYNTERGY ENGINEERING, PLLC
LICENSE # CA3537 | EXPIRES 6/30/22
CG402
GR
AD
IN
G
PL
AN
RD
x
R D x
R D x
R D x
RD
x
E
W
F642 F6
.1
F6
.2 F6
.3
F6
.4
F6
.5
F6
.6
XFMR
XFMR
ES
ES
ES ES
ES
ES
ES
ES
X4
X5
1 1
X1
X3
U2 U2 1 1
X9
U1
U1
X7
X8
X5
3 3U1 X1
X2
TYP.
X3 TYP.
X4
X74' 4'
5 TRANSFORMER 1
5 TRANSFORMER 2
PANEL A
PANEL B
PANEL C
PANEL D
PANEL N
PANEL F
PANEL G
PANEL J
PANEL K
PANEL L
PANEL M
7 7
8 8
9 9
9 9 9
ODU-1 ODU-2
ODU-3 ODU-4 ODU-5
10 TYPICAL
5 PLACES
11 11
U1
U1
EXISTING WATER SUPPLY LINE
EXISTING DOMESTIC HOT WATER "CIRCULATION" LINES
EXISTING WATER SERVICE LINE
EXISTING 15 - INCH STORM PIPE
EXISTING TYPE II CATCH BASIN INLET (8' L x 3.5' W)
EXISTING GAS PIPE (SIZE UNKNOWN) - USE CAUTION
EXISTING COMMUNICATION LINE - USE CAUTION
EXISTING UG POWER (SECONDARY) - USE CAUTION
EXISTING ROOF DRAIN
NOT USED
NEW 36-INCH CORRIDOR VESTIBULE EXTENSION WITH ABA
DOUBLE SWING DOORS - RE: A-401 & A-402
NEW EXTERIOR LANDING WITH STAIRS - RE: CS101-CS105
NEW SIDEWALK WITH STAIRS - RE: CS101-CS105
NEW ACCESSIBLE RAMP WITH HANDRAILS
NEW TRANSFORMER- RE: E-201
NEW ELECTRICAL CONDUIT AND CONDUCTOR- RE: E-601
EXISTING ELECTRICAL CONDUIT AND NEW CONDUCTOR
REMOVE AND REPLACE LANDSCAPE ROCK FOR
INSTALLATION FOR ELECTRICAL CONDUIT. MATCH NEW
ROCK WITH LIKE KIND.
SAW-CUT AND REMOVE CONCRETE. REPLACE CONCRETE
RE: 1 / S-002 (TYPICAL EACH CORRIDOR)
NEW 4'-6" L x 2'-6" W CONCRETE PAD WITH MINI-SPLIT
OUTDOOR UNITS - RE: 2 / S-002
NEW ROOF DRAIN PIPE - RE: CG101- CG105
PROTECT UTILITY LINE WITH "PVC PROTECTION SLEEVES"
AS MANUFACTURED BY BINGHAM & TAYLOR OR
APPROVED EQUAL.
VERIFY UTILITY LOCATION AND DEPTH. REROUTE UTILITY
AS REQUIRED. FOR RELOCATED UTILITY REMOVE THE
EXISTING LINE.
X1
KEY NOTES: KEY NOTES CONTINUED:
X2
X3
X4
X5
X6
X7
X8
X9
X…