VAFB UOQ Dorms Specifications SECTION 01 22 00 Rev 1.pdf
PDF 23 KB Posted
- Attached to
- Renovate Officer Unaccompanied Housing F641
- Solicitation number
- IFB266B
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovate UOQs XTLF191012
SECTION 01 22 00
INSTRUCTIONS FOR SCHEDULE C
01/21
PART 1 GENERAL
1.1 SUMMARY
Section includes administrative and procedural requirements for associated items on Schedule C.
1.2 RELATED REQUIREMENTS
Section 01 26 00 "Contract Modification Procedures" for procedures for submitting and handling Change Orders.
1.3 Instructions for Completing Schedule C
Each of the numbered line item costs described below include all necessary material, labor, equipment, delivery, installation, insurance, taxes, bonding, overhead, and profit. The Contracting Officer may require the Contractor to provide a breakout of individual items within each numbered line item, at any time. Description of Schedule C Line Items:
Line
Description of Line Item
Sustainment (EEIC 524)
1 All items associated with, but not limted to: Repair by replacement of the windows and the exterior aggregate panels near the windows in the facility. Repair damaged drywall near the windows.
2 All items associated with, but not limted to: Repair the roof.
3 All items associated with, but not limted to: Renovate the existing bathrooms in each unit, including sinks, vanities, toilets, floor tile, shower fixtures, shower surface and drains. Include bidets in various rooms to accommodate international students.
4 All items associated with, but not limted to: Repair the existing Heating, Ventilation, and Air Conditioning (HVAC) system.
5 All items associated with, but not limted to: Repair the fire alarm system.
6 All items associated with, but not limted to: Upgrade electrical panels.
7 All items associated with, but not limted to: Install an anti-scaling system to mitigate hard water buildup on kitchen and bathroom fixtures.
8 All items associated with, but not limted to: Replace damaged flooring and repaint the walls in each unit.
9 All items associated with, but not limted to: Reroute existing water, gas, electrical and communications lines as necessary.
SECTION 01 22 00 Page 1
XTLF191013
XTLF191014
XTLF191015
XTLF191016
XTLF191013
XTLF191014
XTLF191015
XTLF191016
Renovate UOQs XTLF191012
Line
Description of Line Item
10 All items associated with, but not limted to: Repair walks and ramps as necessary to the work being completed in the facility.
11 Sub-total for Sustainment Repairs (EEIC 524) (Sum of lines 1 through 10).
R&M REPAIR (EEIC 522)
12 All items associated with, but not limted to: Renovate two units to make Americans with Disabilities Act (ADA) and ambulatory compliant. This includes comprehensive renovation of the living quarters and bathroom areas to provide a compliant and usable layout. This includes the electrical and plumbing work necessary to the renovation. Renovate the existing kitchen areas to include repair of mold-damaged surfaces. Provide appropriate handrails and handicap signage, markings and symbols.
13 All items associated with, but not limted to: Repair areas damaged by winter storm of 2021 per addendum
14 Sub-total R&M Repair (EEIC 522)(Sum of lines 12 and 13).
Minor Construction (EEIC 529)
15 All items associated with, but not limted to: Fully enclose the breezeways in the facility with an aluminum and glass storefront featuring a new entry canopy.
16 Grand Total (Sum of lines 11, 14 and 15).
1.4 SCHEDULE C
Refer to following sections, 01 22 01, 01 22 02, 01 22 03, 01 22 04 and 01 22 05 for Schedule C format. Bidders to submit a Schedule C for project XTLF191012, see section 01 22 01 in entirety.
Vance AFB is only offering F641 for bids at this time.
-- End of Section --
SECTION 01 22 00 Page 2
XTLF191013
XTLF191014
XTLF191015
XTLF191016
XTLF191013
XTLF191014
TLF191015TXT
TLF191016TXT
File details come from the government source that posted it. Updated .