ROOM RESTROOM Units
105 Remove restroom Gypsum walls and insulation 56 SF
105 Remove restroom floor tile (ceramic) 35 SF
105 Remove restroom wall tile (ceramic) 12 SF
105 New Gypsum walls 56 SF
105 New Batt Insulation 56 SF
105 Texture restroom walls 56 SF
105 Paint restroom walls 56 SF
105 Ceramic tile, floors, glazed, thin set 35 SF
105 Ceramic tile, walls, interior, thin set 12 SF
108 ENTRY Units
108 Remove flooring (VCT) 15 SF
108 Remove base board 6 LF
108 New flooring (VCT) 15 SF
108 New base board 6 LF
109 CLOSET Units
109 Remove closet Gypsum walls and insulation 176 SF
109 Remove closet Gypsum ceiling 26 SF
109 Remove closet flooring (VCT) 26 SF
109 Remove closet base board 19 LF
109 Remove closet shelving 2 EA
109 New Gypsum walls 176 SF
109 New Batt Insulation 176 SF
109 Texture closet walls 176 SF
109 Paint closet walls 176 SF
109 New Gypsum ceiling 26 SF
109 Texture closet ceiling 26 SF
109 Paint closet ceiling 26 SF
109 New closet flooring (VCT) 26 SF
109 New closet base board 19 LF
109 Reinstall closet shelving 2 EA
109 RESTROOM Units
109 Remove restroom Gypsum walls and insulation 180 SF
109 Remove restroom Gypsum ceiling 36 SF
109 Remove restroom floor tile (ceramic) 36 SF
109 Remove restroom wall tile (ceramic) 100 SF
109 Remove shower head 1 EA
109 Remove restroom fixtures 3 EA
109 New Gypsum ceiling 36 SF
109 New Batt Insulation 36 SF
109 Texture restroom ceiling 36 SF
109 Paint restroom ceiling 36 SF
109 New Gypsum walls 180 SF
109 Texture restroom walls 180 SF
109 Paint restroom walls 180 SF
109 Ceramic tile, floors, glazed, thin set 36 SF
109 Ceramic tile, walls, interior, thin set 100 SF
109 New shower head 1 EA
109 Reinstall restroom fixtures 3 EA
109 KITCHEN AND LIVING AREA Units
109 Remove dorm room Gypsum walls and insulation 592 SF
109 Remove dorm room Gypsum Ceiling and insulation 260 SF
109 Remove dorm room flooring (VCT) 260 SF
109 Remove dorm room base board 74 LF
109 Remove base cabinets 8 LF
109 Remove wall cabinets 13 LF
109 Remove countertop 8 LF
109 Remove faucet 1 EA
109 Remove kitchen fixtures 2 EA
109 New Gypsum Ceiling 260 SF
109 New Batt Insulation 260 SF
109 Texture ceiling 260 SF
109 Paint ceiling 260 SF
109 New Gypsum walls 592 SF
109 New Batt Insulation 592 SF
109 Texture walls 592 SF
109 Paint walls 592 SF
109 New flooring (VCT) 260 SF
109 New base board 74 LF
109 New base cabinets 8 LF
109 New wall cabinets 13 LF
109 New solid surface countertop, w/ 4" backsplash, 25" wide 8 LF
109 New faucet 1 EA
109 Reinstall kitchen fixtures 2 EA
206 CLOSET Units
206 Remove closet Gypsum walls and insulation 176 SF
206 Remove closet Gypsum ceiling and insulation 26 SF
206 Remove closet flooring (VCT) 26 SF
206 Remove closet base board 19 LF
206 Remove closet shelving 2 EA
206 New Gypsum walls 176 SF
206 New Batt Insulation 176 SF
206 Texture closet walls 176 SF
206 Paint closet walls 176 SF
206 New Gypsum ceiling 26 SF
206 New Batt Insulation 26 SF
206 Texture closet ceiling 26 SF
206 Paint closet ceiling 26 SF
206 New closet flooring (VCT) 26 SF
206 New closet base board 19 LF
206 Reinstall closet shelving 2 EA
206 RESTROOM Units
206 Remove restroom Gypsum walls and insulation 180 SF
206 Remove restroom Gypsum ceiling and insulation 36 SF
206 Remove restroom floor tile (ceramic) 36 SF
206 Remove restroom wall tile (ceramic) 100 SF
206 Remove shower head 1 EA
206 Remove restroom fixtures 3 EA
206 New Gypsum ceiling 36 SF
206 New Batt Insulation 36 SF
206 Texture restroom ceiling 36 SF
206 Paint restroom ceiling 36 SF
206 New Gypsum walls 180 SF
206 New Batt Insulation 180 SF
206 Texture restroom walls 180 SF
206 Paint restroom walls 180 SF
206 Ceramic tile, floors, glazed, thin set 36 SF
206 Ceramic tile, walls, interior, thin set 100 SF
206 New shower head 1 EA
206 Reinstall restroom fixtures 3 EA
206 KITCHEN AND LIVING AREA Units
206 Remove dorm room Gypsum walls and insulation 592 SF
206 Remove dorm room Gypsum Ceiling and insulation 260 SF
206 Remove dorm room flooring (VCT) 260 SF
206 Remove dorm room base board 74 LF
206 Remove base cabinets 8 LF
206 Remove wall cabinets 13 LF
206 Remove countertop 8 LF
206 Remove faucet 1 EA
206 Remove kitchen fixtures 2 EA
206 New Gypsum Ceiling 260 SF
206 New Batt Insulation 260 SF
206 Texture ceiling 260 SF
206 Paint ceiling 260 SF
206 New Batt Insulation 260 SF
206 New Gypsum walls 592 SF
206 New Batt Insulation 592 SF
206 Texture walls 592 SF
206 Paint walls 592 SF
206 New flooring (VCT) 260 SF
206 New base board 74 LF
206 New base cabinets 8 LF
206 New wall cabinets 13 LF
206 New solid surface countertop, w/ 4" backsplash, 25" wide 8 LF
206 New faucet 1 EA
206 Reinstall kitchen fixtures 2 EA
210 ENTRY Units
210 Remove flooring (VCT) 15 SF
210 Remove base board 6 LF
210 New flooring (VCT) 15 SF
210 New base board 6 LF
TOTALS Units
New Gypsum Board 2,596 SF
New Batt Insulation 2,596 SF
New Flooring (VCT) 601 SF
New Base Board 186 LF
New Wall Tile 212 SF
New Floor Tile 107 SF
New Base Cabinets 16 LF
New Wall Cabinets 26 LF
New Countertop 16 LF
New Plumbing Fixtures 4 EA
Reinstall Fixtures 10 EA