About this file

This document contains a cost estimate worksheet for a federal construction project. The worksheet requires lump sum cost estimates for 14 construction divisions that will be utilized to renovate and improve the columbarium and facilities at the Culpeper National Cemetery. Divisions included are general requirements, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, plumbing, HVAC, electrical, and communications. In addition to division costs, lump sums are required for bonds, overhead, and profit. The total estimated costs across the base bid and three contract line items will be entered at the bottom.

The related federal contract opportunity is a solicitation to perform columbarium construction, facility renovation, improvements, repairs, and installation of pre-placed crypts at the Culpeper National Cemetery. The solicitation number is 36C78620B0028 and involves projects 839CM3028 and 839CM3030, subject to availability of FY20 funds. The contracting agency is the Department of Veterans Affairs National Cemetery Administration.

View the file

Other files

File Type Posted
A0008 Culpeper Nalt Cem Revised Cost Schedule and SF 1442 Sec 17.pdf PDF
A0007 Culpeper Nalt Cem (36C78620B0028).pdf PDF
A0006 Culpeper Nalt Cem (36C78620B0028).pdf PDF
A0005 for Prevailing Wage- Davis Bacon (36C78620B0028) Culpeper Nalt Cem.pdf PDF
A0004 Drawings - Culpeper nalt Cem (36C78620B0028).pdf PDF
A003 (For Posting-Culpeper Nalt Cem - 36C78620B0028).pdf PDF
AO02 (For Posting-Virtual Bid Opening Info-Culpeper NC).pdf PDF
A001 (For Posting-Culpeper Nalt Cem - 36C78620B0028).pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk02.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk02.pdf PDF
839CM3028_3030 Termite Report Culpeper.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk12.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk11.pdf PDF
839CM3028_3030 Geotech Culpeper Bk B.pdf PDF
36C78620B0028_1.docx DOCX document
839CM3028_3030 SPECS Culpeper Bk06.pdf PDF
839CM3028-3030 Culpeper SOW Const Rev 1.pdf PDF
839CM3028_3030 SPECS Culpeper Bk03.pdf PDF
839CM3028_3030 SPECS Culpeper Bk07.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk10.pdf PDF
839CM3028_3030 SPECS Culpeper Bk04.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk01.pdf PDF
839CM3028_3030 Fuel Tank Closure Culpeper.pdf PDF
839CM3028_3030 Haz Mat Surv Culpeper.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk07.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk06.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk05.pdf PDF
839CM3028_3030 Geotech Culpeper Bk C.pdf PDF
Wage Determination - Davis Bacon (Culpeper County VA ).pdf PDF
839CM3028_3030 SPECS Culpeper Bk05.pdf PDF
839CM3028_3030 SPECS Culpeper Bk01.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk08.pdf PDF
839CM3028_3030 SPECS Culpeper Bk02.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk03.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk02.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk04.pdf PDF
839CM3028_3030 Lodge Struct Assessment Culpeper.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk09.pdf PDF
839CM3028_3030 Geotech Culpeper Bk A.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp)
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

IFB Number36C78620B0028
Project NameColumbarium, Facility Renovation, Improvements, Repairs, and Pre-Placed Crypts
DivisionBase BidCLIN1CLIN 2CLIN3Total
Division 0
Special Sections
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds

Overhead

Profit

GRAND TOTALS $ $ $ $ $

File details come from the government source that posted it. Updated .