About this file

This document is an amendment to a solicitation providing responses to a Request for Information pertaining to Solicitation Number 36C78620B0028 for construction services at Culpeper National Cemetery. The scope of work includes construction of a new columbarium, facility renovations, improvements, repairs, and installation of pre-placed crypts. The amendment clarifies that the requirement to stabilize disturbed areas outside paving and laydown areas applies only to areas outside construction limits. It also confirms quantities and scope details in response to questions about options and drawings. The Department of Veterans Affairs National Cemetery Administration is the contracting agency.

View the file

Other files

File Type Posted
A0008 Culpeper Nalt Cem Revised Cost Schedule and SF 1442 Sec 17.pdf PDF
A0007 Culpeper Nalt Cem (36C78620B0028).pdf PDF
A0005 for Prevailing Wage- Davis Bacon (36C78620B0028) Culpeper Nalt Cem.pdf PDF
A0004 Drawings - Culpeper nalt Cem (36C78620B0028).pdf PDF
A003 (For Posting-Culpeper Nalt Cem - 36C78620B0028).pdf PDF
AO02 (For Posting-Virtual Bid Opening Info-Culpeper NC).pdf PDF
A001 (For Posting-Culpeper Nalt Cem - 36C78620B0028).pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk02.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk02.pdf PDF
839CM3028_3030 Termite Report Culpeper.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk12.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk11.pdf PDF
839CM3028_3030 Geotech Culpeper Bk B.pdf PDF
36C78620B0028_1.docx DOCX document
839CM3028_3030 SPECS Culpeper Bk06.pdf PDF
839CM3028-3030 Culpeper SOW Const Rev 1.pdf PDF
839CM3028_3030 SPECS Culpeper Bk03.pdf PDF
839CM3028_3030 SPECS Culpeper Bk07.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk10.pdf PDF
839CM3028_3030 SPECS Culpeper Bk04.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk01.pdf PDF
839CM3028_3030 Fuel Tank Closure Culpeper.pdf PDF
839CM3028_3030 Haz Mat Surv Culpeper.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk07.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk06.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk05.pdf PDF
839CM3028_3030 Geotech Culpeper Bk C.pdf PDF
Wage Determination - Davis Bacon (Culpeper County VA ).pdf PDF
839CM3028_3030 SPECS Culpeper Bk05.pdf PDF
839CM3028_3030 SPECS Culpeper Bk01.pdf PDF
IFB Contractor Cost Estimate Worksheet (Culpeper Nalt Cem).xlsx XLSX spreadsheet
839CM3028_3030 Bid Dwg Culpeper Bk08.pdf PDF
839CM3028_3030 SPECS Culpeper Bk02.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk03.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk02.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk04.pdf PDF
839CM3028_3030 Lodge Struct Assessment Culpeper.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk09.pdf PDF
839CM3028_3030 Geotech Culpeper Bk A.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 6

A0006 09-01-2020

839CM3028/ 839CM3030

Y 36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

43C1

Department of Veterans Affairs

NCA Contracting Service

18434 Joplin Road

Triangle VA 22172

To all Offerors/Bidders

36C78620B0028

09-01-2020

X

X

X 1

AMENDMENT (A0006) | Culpeper National Cemetery

The Purpose of Amendment (A0006) is to Notify the Public of The Government's Response to Request For Information (RFI);

IFB Solicitation No. 36C78620B0028 at Culpeper National Cemetery.

Please See Continuation Page for Content.

Sheryl Palacio-Davis

Contracting Officer

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

AMENDMENT A0O06

REQUEST FOR INFORMATION (RFI)

SUBJECT: Response to Request for Information (RFI) | IFB Sol No. 36C78620B0028 | Culpeper National Cemetery | Columbarium, Facility Renovation, Improvements, Repairs, and Pre-Placed Crypts | Project No. 839CM3028 & 839CM3030.

16 – A requirement to stabilize all disturbed areas outside the paving and laydown areas (but still within the limits of construction) with sod by the end of each shift would be extremely labor intensive and costly. Please confirm this requirement applies only to areas outside of BMP erosion controls (outside of limits of construction).

This applies only to areas outside of the limits of construction.

#29-#35 – In general, we feel the bidders should be provided an updated cost schedule addressing some of the VA’s responses to RFIs (RFI 27 response, Contract Line Item Quantity is 1,000 niches; RFI 34 and

35 response, there is no columbarium cap replacement required for this contact, remove option

#6). The terminology in some of the options make it hard to determine scope and we feel your answer for Question 33 is insufficient to identify the scope items. The intent of the options is to get a cost breakdown in fees for these construction elements, break out costs with roll up cost detail for each of these option elements, you are overthinking what the options are, we most likely will award all options and CLINS listed.

Examples:

-Bid option 1&7 = Are these per the drawing requirements, or in addition to items called out in drawings? Some items in drawings called out as options but are not complete. Everything in the Scope is on the drawings.

-Bid option 2 = Concrete is not shown in drawings anywhere, including existing or new. Is it all storm sewers, or only pertaining to that affected area? We have no information on that area at all, including Storm Sewer, if any. If it is not on the drawings it is not in the scope of work.

-Bid option 3 = Any additional detail will be helpful as none found in drawings. Area or qty? If it is not in the drawings it is not in the scope of work.

-Bid option 5 = Is this all Storm Sewer from project? What is included base and what is option? Does this have potential to not be included in with award? It seems it has to be as DEQ would not allow. If its not included must we include additional curbs/stabilizations where storm is not present? If it is not in the drawings it is not in the scope of work.

-Bid option 6 = Should be eliminated or changed with supporting information per RFI #34 and 35 response. There is no removal of stone columbarium caps in this project.

-Bid Option 8 = There are 7 connections to existing storm sewer. Does this option only include the connections, no pipe or structures? If it is not in the drawings it is not in the scope of work, we do have storm water pipes and fittings to be installed as per drawings.

END OF DOCUMENT

File details come from the government source that posted it. Updated .