About this file

This document package includes an amendment to a solicitation and responses to requests for information related to the solicitation. The amendment provides notice of the government's responses to an RFI regarding solicitation number 36C78620B0028 for construction services at Culpeper National Cemetery. The services include construction of a 1,000-niche columbarium, facility renovations, landscaping improvements, and repairs. The responses clarify details regarding wage rates, insulated panels, foundation design, pre-approval of suppliers, soil testing procedures, fencing requirements, relocation of structures, and sequencing of work. Offerors must acknowledge receipt of the amendment by the bid opening date of September 3, 2020.

View the file

Other files

File Type Posted
A0008 Culpeper Nalt Cem Revised Cost Schedule and SF 1442 Sec 17.pdf PDF
A0007 Culpeper Nalt Cem (36C78620B0028).pdf PDF
A0006 Culpeper Nalt Cem (36C78620B0028).pdf PDF
A0005 for Prevailing Wage- Davis Bacon (36C78620B0028) Culpeper Nalt Cem.pdf PDF
A0004 Drawings - Culpeper nalt Cem (36C78620B0028).pdf PDF
AO02 (For Posting-Virtual Bid Opening Info-Culpeper NC).pdf PDF
A001 (For Posting-Culpeper Nalt Cem - 36C78620B0028).pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk02.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk02.pdf PDF
839CM3028_3030 Termite Report Culpeper.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk12.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk11.pdf PDF
839CM3028_3030 Geotech Culpeper Bk B.pdf PDF
36C78620B0028_1.docx DOCX document
839CM3028_3030 SPECS Culpeper Bk06.pdf PDF
839CM3028-3030 Culpeper SOW Const Rev 1.pdf PDF
839CM3028_3030 SPECS Culpeper Bk03.pdf PDF
839CM3028_3030 SPECS Culpeper Bk07.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk10.pdf PDF
839CM3028_3030 SPECS Culpeper Bk04.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk01.pdf PDF
839CM3028_3030 Fuel Tank Closure Culpeper.pdf PDF
839CM3028_3030 Haz Mat Surv Culpeper.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk07.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk06.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk05.pdf PDF
839CM3028_3030 Geotech Culpeper Bk C.pdf PDF
Wage Determination - Davis Bacon (Culpeper County VA ).pdf PDF
839CM3028_3030 SPECS Culpeper Bk05.pdf PDF
839CM3028_3030 SPECS Culpeper Bk01.pdf PDF
IFB Contractor Cost Estimate Worksheet (Culpeper Nalt Cem).xlsx XLSX spreadsheet
839CM3028_3030 Bid Dwg Culpeper Bk08.pdf PDF
839CM3028_3030 SPECS Culpeper Bk02.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk03.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk02.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk04.pdf PDF
839CM3028_3030 Lodge Struct Assessment Culpeper.pdf PDF
839CM3028_3030 Bid Dwg Culpeper Bk09.pdf PDF
839CM3028_3030 Geotech Culpeper Bk A.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 6

A0003 08-20-2020

839CM3028/ 839CM3030

Y 36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

43C1

Department of Veterans Affairs

NCA Contracting Service

18434 Joplin Road

Triangle VA 22172

To all Offerors/Bidders

36C78620B0028

08-21-2020

X

X

X 1

AMENDMENT (A003) | Culpeper National Cemetery

The Purpose of Amendment (A003) is to Notify the Public of The Government's Response to Request For Information (RFI);

IFB Solicitation No. 36C78620B0028 at Culpeper National Cemetery.

Please See Continuation Page for Content.

Sheryl Palacio-Davis

Contracting Officer

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

AMENDMENT AO03

REQUEST FOR INFORMATION (RFI)

SUBJECT: Response to Request for Information (RFI) | IFB Sol No. 36C78620B0028 | Culpeper National Cemetery | Columbarium, Facility Renovation, Improvements, Repairs, and Pre-Placed Crypts | Project No. 839CM3028 & 839CM3030.

1. Provide more detail for Davis Bacon Wages. The wages identified in the original bid package are

“Heavy” which do not include many of the building trades. Are we to use Heavy, Building, or both? To be provided by contracting officer.

2. Confirm that PEMB is not to be insulated. PEMB is not insulated.

3. Confirm that PEMB building design is per the PEMB builder for structural configurations but must sit on foundation designed within contract documents. PEMB fabricator typically does the structural design and shop drawings for the PEMB to be installed on foundation designed within the contract documents. PEMB vendor will provide reactions for the PEMB in the shop drawings, contractor must coordinate exact anchor bolt size configuration and placement.

4. Does PEMB building manufacturer need to be pre-approved prior to bid? No.

5. Will more borings be made available, as there are none in the crypt field area? No.

6. The moisture levels in the soils are very high in surrounding area borings. Will moisture testing be required on top of crypts as backfill? Do not understand the question.

7. What are requirements for crypt subgrade testing procedures? Due to high moisture levels in soils it seems it will be hard to pass proof-roll. There should be a specific direction on what to do to crypt subgrade prior to excavation. We will see what happens after excavation and during proof rolling.

8. Can you recommend a stronger design under crypts to satisfy unstable ground under crypts, such as soil cement, stronger geotextile, or thicker stone base? This can eliminate possible additions to contract after award and delays. Provide what is shown on the contract documents in your pricing.

9. Confirm all testing procedures are to be “standard proctor”. Confirmed.

10. Confirm if 6’ temp chain link fence with privacy screen is acceptable for temporary fence around crypt field areas, in lieu of specified 8’. What is specified is what is required.

11. Temp Fence on CG drawing and LD drawings do not coincide with each other. Which plans do we use? Follow LD drawings.

12. Is temp fence w/privacy screen required as shown on LD106 around PEMB building? It seems to be outside of the public view and will be in the way with construction of building most of time.

Could we substitute for smaller fence or warning flags? No.

13. Confirm contractor to relocate shed but owner relocates storage container, both by PEMB building. Due to the sequence of construction, the shed will need to be relocated two times as the permanent area it is to be placed will not be developed until later in project. Where can shed be stored until permanent place is developed? Owner will relocate storage container as noted on drawings, shed to be moved by contractor however many times required, relocation to be coordinated in field at time of move.

14. Drawing CG-001 note 19 states “95% compaction in pervious areas and 92% compaction in impervious areas”. This conflicts with other information provided in specification 31 20 11.

Please provide requirements of compaction in specific areas including but not limited to pervious areas, impervious areas, against building structures, and against historical walls (if different than building structures). Use 95% compaction thru-out.

15. Has DEQ permit been made available? If not, is it responsibility of client or contractor to generate and pay fees? Designer of record is working with DEQ on getting the environmental permit, the permit will be approved and available before construction start, the contractor will have to pick up and pay for the permit at DEQ.

16. Confirm that line items 1 &2 (same day sod stabilization) on drawing CG-001 only apply to areas not protected by BMPs. Also confirm this only applies to permanent stabilizations. Applies to all areas that have been disturbed during construction operations, temporary and permanent.

17. Missing Drawing LP-502, Doubled Drawing S-101 See attached herewith.

18. Provide more detailed information on the restoration of the historic brick wall. The drawings indicate complete removal/reconstruction of entire wall length (as indicated), but during walk-though meeting it was discussed for new pointing and some reconstruction of walls in major distress. Please indicate. Complete removal, salvage of brick and reconstruction of wall on new concrete footings is required as shown on contract drawings.

19. 02 65 00 – Storage Tank Removal. Specification states “Contractor shall remove oil and petroleum contaminated soils as designated by the contracting officer and/or regulatory officials.” There are no reports stating quantity of contaminated soils to remove. Is there an allowance to include? Or do we strictly include the removal of tank/components/overburden, but the contaminated soils, if any, will be handled in addition to contract? Contaminated soil removal if required will be a contract mod and not included in the base contract.

20. Tank Closure report recommends abandonment of tank in place due to restrictions and close vicinity to structure that can compromise. Please confirm tank must be removed. Tank will be abandoned in place as required by the contract documents.

21. What is the name of the propane supplier who serviced the existing lodge tank last? Is the tank owned by facility or is it owned by local propane company? I don’t have the answer to this question.

22. Is there an environmental report on the fuel tank by Admin building? Is contractor to strictly remove tank, components and concrete pad? There is no environmental report, remove tank, and components, concrete pad is to remain.

23. What is size of fuel tank by admin building? What is anticipated qty of fuel that will be left in it during removal? Is it still in use? Do not know the size, do not know the quantity, it is not in use.

24. What is the name of Fuel supplier who serviced the existing admin tank last? Is the tank owned by facility or is it owned by local fuel supplier? Do not know the answer.

25. 31 20 11 Earth Moving Par 3.6 states “Transport surplus satisfactory soil to designated storage areas on cemetery property. Stockpile or spread as directed by COR.” Pre-bid meeting stated there is no room on site and all materials must be hauled away. Please confirm which direction is correct. All materials must be hauled away.

26. It was mentioned during the pre-bid meeting that the existing area where the PEMB is intended to go was a dumping area at one point for cemetery. Is there an anticipated undercut amount of soil to be removed and replaced? The soils in that location look to be high in moisture, soft and include organics to an unknown depth. Assume normal amount of excavation required per design configuration and the requirement for stable soils under floor slab on grade. If additional undercutting is required, it will be a contract mod.

27. Confirm the solicitation sheet 10 of 61 is incorrect in the statement of 500 niche columbarium.

Confirm the project is to include a total of 1000 niche columbarium. It is a 1,000-niche columbarium per the contract drawings.

28. Confirm benches can be victor Stanley CR-96 for bidding purposes. Confirmed.

29. The second page of the solicitation, item 17 on the SF-1442 shows CLINS 1-4, while the cost schedule on sheets 10&11 have 5 CLINS with an additional 8 bid options. Please clarify which is correct. The intent is to get a break down detail of costs for each element of the project on the cost schedule.

30. The cost schedule shows 5 CLINS and 8 Bid Options. However, at the bottom of the cost schedule there is a row to show Total price (CLINS0001 & 0002 plus Bid options 1-8). Are we to include CLINS 3,4 &5 in this total price? Please revise to show correct if so. Total price is total price, we need the break down in cost for each element and the total cost of all CLINS.

31. CLIN 003 calls for 60 additional cedar trees. Is there a specific area in which these will be installed? Are they same size as called out in plant schedule? Shown on plan LP-102 area B, they are called out on plant list on plan LP-101

32. CLIN005 needs more description to price accurately. Is it based on Drawing GC-101? If so, the construction route direction is vague. Can you provide a SY Qty? Assume 15,000 square feet.

33. BID Options 1-8 need more detail in descriptions or revised drawings to show different areas.

Please provide as well as if a unit price is required, provide qty. Revised drawings to clarify bid options are unavailable, do the best you can with the bid documents to identify the scope items.

34. Where is Columbarium A that is mentioned in Bid option 6? Dimensions need to be given as well as plan view of surrounding areas for access. What are mounting requirements and is permission allowed in existing niches for anchoring similar to new mounting? If other mounting is required, please specify. There is one columbarium for this project, the new one you are building, there are no other columbarium existing at this cemetery.

35. Will the Columbarium A cap replacement listed in Bid option 6 need to include number sandblasting? There is no columbarium cap replacement required for this contract, the new columbarium will have all new caps.

36. Are there any topsoil tests available for reference to determine amendment process for on-site topsoil? No this will have to be done as part of this contract.

37. How long is Landscape plant and turfgrass establishment period? There is no duration mentioned in specification found. Plant and turf establishment is 90 days.

38. Confirm there is no maintenance of landscape after acceptance. Landscaping and turf will have to be maintained by the contractor during the establishment period after acceptance of the project.

39. Due to the project being spread out into different areas as well as sequence of construction not allowing to work in numerous areas at 1 time, will partial acceptance be given as areas are finished? This mainly pertains to landscape areas to cut down on watering and maintenance costs. Partial acceptance can be accommodated if the circumstances allow it.

40. Can lodge renovation work and other interior work start during crypt field/columbarium construction? Can we deviate from Sequence of construction shown in CG-001, which states otherwise? Lodge renovation and Interior work can occur any time during the performance period of the contract, work does not have to be sequential.

41. Geotech Report C letter from Hynes states that sand shall not be used as backfill to crypts.

Please confirm is 3” minimum sand layer is required on top of crypts for identification purposes.

Confirmed, 3” minimum sand as shown on drawing LS-801, maximum should be 4”.

42. Confirm if either sand or stone dust is acceptable for 3” identification layer above crypts. Sand is required.

43. SOW Par 4.2 states all work is to be done during normal operating hours. Note 8 on GC-101 states evening and weekend work will be required for paving operations. Please confirm that weekday paving work can be allowed if traffic can pass. Paving can happen at any time if coordinated in advance with cemetery operations and approved by them.

44. Specification 23 13 23 calls out for a 1000gal combination concrete fuel tank. It was not found on drawings where this should go. Please indicate if it shall be required per the contract or not.

If it is, please provide location and electrical requirements. Not required for this contract.

RFI questions for the Culpeper National Cemetery.

1. LS-601 Note 7A – is the contractor or VA responsible for provision of the observer for historic wall demolition? The contractor is responsible for providing the observer.

2. LS-601 Note 7A – If contractor is to provide the observer for historic wall demolition, please confirm no more than 2 hours a week will be required for the architectural conservator to observe deconstruction of the wall. Confirmed.

3. For the wrought iron handrail on A3/AE-201-LG we are directed to detail 13 on AE-501-LG. On AE-501-LG detail 13 is stated as “Not Used”. Can a detail be provided? No detail available, handrail to be replaced with like and kind.

4. LD-102 Area C Enlargement: 1,000 gal. storage tank is noted to be removed per specification.

The KCI analysis on the tank recommends abandonment in place. Please either is acceptable provided the recommendations and regulations are adhered to. Abandonment in place that complies with environmental mandates is preferred as shown on the drawings.

5. Wage Determination: Stonemason rates are given in the wage determination however there is no rate given for a bricklayer which would be more applicable to the reconstruction work required. Are stonemason rates to be used for all masonry restoration work or will a bricklayer rate be provided? To be answered by Contracting Officer.

1.9 Quality Assurance (B)

States:

REHABILITATION OF HISTORIC BRICKWORK AND AN INTERNATIONAL MASONRY INSTITUTE HISTORIC MASONRY PRESERVATION CERTIFICATE (OR APPROVED EQUAL) AND SHALL PROVIDE EVIDENCE OF

CERTIFICATION PRIOR TO THE START OF THE PROJECT.

International masonry institute Certification is for Union masons only. Very few masons would take a " approved Equal" certificate program. Most masons learn from on the job training. Will you consider previous experience to meet this? No, the preservation certification is required by the VA for historic restoration work.

2.1 52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 2016)

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

(b)(1) Bidders shall acknowledge receipt of any amendment to this solicitation—

(i) By signing and returning the amendment;

(ii) By identifying the amendment number and date in space provided for this purpose on the form for submitting a bid;

(iii) By letter; (NOT APPLICABLE)

(iv) By facsimile, if facsimile bids are authorized in the solicitation; (NOT APPLICABLE)

(v) By email, if email bids are authorized in the solicitation (APPLICABLE). ONLY Approved Bids (By the CO), prior to the Virtual Bid-Opening Date (03 Sept 2020 @ 1:00 P.M. (EST) will be Accepted via email.

(2) The Government must receive the acknowledgement by the time and at the place specified for receipt of Bids.

(End of Provision)

END OF DOCUMENT