IFB_25-072-JG_Bid_Tabulation.pdf
PDF 176 KB Posted
- Solicitation number
- IFB 25-072-JG
- Issued by
- Florida
About this file
This is a bid tabulation document from the Kissimmee Utility Authority (KUA) in Florida for solicitation IFB 25-072-JG regarding the procurement of transmission and substation steel structures for the Van Meter Substation. The solicitation sought bids for 15 total structures comprising 8 tubular steel transmission structures and 7 substation steel structures, with technical specifications outlined in Sections 33 71 16.23 and 33 72 14. The solicitation was opened on October 14, 2025, at 2:00 PM, with a targeted delivery date of July 1, 2026. Two timely bids were received from Energy Reps Inc. (Klute) and Superior Power Products LLC (Dis-Tran Steel, LLC), with all other submissions rejected as late.
Superior Power Products LLC submitted the apparent low bid at $910,474.00 total, comprising $721,241.00 for tubular steel transmission structures and $189,233.00 for substation steel structures, with a lead time of 56 weeks. Energy Reps Inc. submitted a bid of $952,506.95 total, consisting of $816,584.71 for tubular steel transmission structures and $135,922.24 for substation steel structures, with a lead time of 65 weeks. The contract is structured as a fixed-price agreement with comprehensive pricing requirements including labor, materials, equipment, transportation, overhead, and taxes. All bids were subject to KUA's terms and conditions, with additional vendor-submitted terms rejected unless approved through formal addenda. No set-aside designations, incumbent vendors, or current contractors were identified in the documentation.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kissimmee Utility Authority Finance & Administration 1701 W. Carroll Street Kissimmee, Florida 34741 Phone: (407) 933-9809
VENDOR NAME→ ENERGY REPS INC (KLUTE)
SUPERIOR POWER
PRODUCTS LLC (DIS-
TRAN STEEL, LLC)
N/A N/A N/A N/A N/A
ITEM # 1 - 8 - TUBULAR STEEL
TRANSMISSION STRUCTURES $816,584.71 $721,241.00
ITEM # 9 - 15 - SUBSTATION
STEEL STRUCTURES $135,922.24 $189,233.00
LEAD TIME (IN WEEKS) 65 56
TOTAL $952,506.95 $910,474.00
OPENED BY:JENNIFER GRIEVES VERIFIED BY:
Solicitation Tabulation
Remarks: Offers from the vendors listed herein are the only offers received timely as of the above opening date and time. All other offers submitted in response to this solicitation, if any, are hereby rejected as late. Shaded or circled prices indicates apparent low bidder subject to evaluation and review before an intent to award is made.
Rules: All bids accepted by Kissimmee Utility Authority are subject to the Agencies terms and conditions and any and all additional terms and conditions submitted by the bidders are rejected and shall have no force and effect unless receiving prior consideration and approval of the Authority in the form of Addenda to this bid.
2:00 PM
10/14/25 Transmission & Substation Structures for Van Meter Substation IFB 25-072-JGSolicitation Number:
Solicitation Title Solicitation Opening Date:
Solicitation Opening Time
IFB 25-072-JG Bid Tabulation page 1 of 1
Ramandeep Mann
Tabulation
File details come from the government source that posted it. Updated .