The document is an Exhibit A Price Sheet for an Invitation for Bid (IFB 25-072-JG) issued by Kissimmee Utility Authority (KUA) in Florida for transmission and substation structures for the Van Meter Substation. The bid covers 15 total structures, including 8 tubular steel transmission structures and 7 substation steel structures, with specific requirements for structure types, lengths, and embedment depths. The project aims to procure these structures with a delivery target of July 1, 2026, and requires bidders to complete all highlighted cells in the pricing sheet, with failure to do so potentially invalidating the bid.
The pricing sheet specifies that all unit prices are firm-fixed and inclusive of comprehensive costs such as labor, materials, equipment, transportation, overhead, and taxes. Bidders must provide detailed information including manufacturer plant location, method of shipment, and delivery capability. The structures are to be shipped FOB destination, with bidders required to indicate whether freight costs are firm or estimated. The total bid will be calculated by summing the unit prices for transmission and substation structures, with each structure having specific technical specifications outlined in Sections 33 71 16.23 and 33 72 14 of the contract documents.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Acerno_Cache_XXXXX
Exhibit A
| COMPANY NAME: | |||||||||
| Exhibit "A" Price Sheet | |||||||||
| NOTE: PROPOSER MUST FILL IN ALL BLANK CELLS THAT ARE COLORED WITH LIGHT BLUE HIGHLIGHT. FAILURE TO PROVIDE ALL INFO MAY INVALIDATE YOUR BID. | |||||||||
| The following prices are all inclusive but not limited to purchase and delivery. | |||||||||
| IFB 25-072-JG Transmission & Substation Structures for Van Meter Substation | |||||||||
| NOTE: THE UNIT PRICE FOR EACH ITEM IS A "FIRM-FIXED" PRICE, AND INCLUSIVE OF ALL LABOR, SUPERVISION, PLANNING, SCHEDULING, INVOICING, OVERHEAD, PROFIT, MATERIALS, SUPPLIES, EQUIPMENT, TOOLS, MOBILIZATION/DEMOBILIZATION, TRAVEL, FREIGHT, HANDLING, FUEL, POWER, ASSESSMENTS, FEES, TARIFFS, AND TAXES ETC. | |||||||||
| TUBULAR STEEL TRANSMISSION STRUCTURES - PER SPECIFICATION SECTION 33 71 16.23 | |||||||||
| Item # | Structure Type | Structure Number | Overall Length (feet) | Embedment Depth (feet) | Total Weight (pound) | Unit Price | *Freight | ||
| (DO NOT INCLUDE IN UNIT PRICE) | Bid Price | ||||||||
| 1 | TR4-DE-1033.5 KCMIL 55-7 ACSS | [1] 47955 | 75 | 0 | $ - 0 | ||||
| 2 | TR4-AGS-1033.5 KCMIL 55-7 ACSS | [2] 47956 | 105 | 0 | $ - 0 | ||||
| 3 | TR4-AGS-1033.5 KCMIL 55-7 ACSS | [3] 47957 | 105 | 0 | $ - 0 | ||||
| 4 | TR4-DE-1033.5 KCMIL 55-7 ACSS, | [4] 47958 | 105 | 0 | $ - 0 | ||||
| 5 | TR4-DE-1033.5 KCMIL 55-7 ACSS, | [5] 47959 | 105 | 0 | $ - 0 | ||||
| 6 | TR4-DE-1033.5 KCMIL 55-7 ACSS, | [6] 47960 | 105 | 0 | $ - 0 | ||||
| 7 | TR4-DE-1033.5 KCMIL 55-7 ACSS | [7] 47961 | 45 | 0 | $ - 0 | ||||
| 8 | TR4-DE-1033.5 KCMIL 55-7 ACSS | [8] 47962 | 90 | 0 | $ - 0 | ||||
| SUB TOTAL | $ - 0 | ||||||||
| REQUIRED INFORMATION | |||||||||
| Item # | Transmission Structures 1-8 | Manufacturer | Plant location | Method of Shipment | Can Deliver by 7/1/2026: | ||||
| YES or NO | If No, Lead Time |
(in weeks)
ARO
| 8-Jan | Transmission Structures | |
| SHIPPING REQUIREMENT IS FOB DESTINATION | *IS FREIGHT FIRM OR ESTIMATED (INDICATE BELOW) |
| SUBSTATION STEEL STRUCTURES - PER SPECIFICATION SECTION SECTION 33 72 14 | |||||||||
| Item # | Structure Type | Structure Number | Overall Length (feet) | Embedment Depth (feet) | Total Weight (pound) | Unit Price | *Freight | ||
| (DO NOT INCLUDE IN UNIT PRICE) | Bid Price | ||||||||
| 9 | TAKEOFF STRUCTURE | T123 | 48 | PIER | $ - 0 | ||||
| 10 | LIGHTNING MAST | LM1 | 45 | 0 | $ - 0 | ||||
| 11 | LIGHTNING MAST | LM2 | 45 | 0 | $ - 0 | ||||
| 12 | LIGHTNING MAST | LM3 | 45 | 0 | $ - 0 | ||||
| 13 | LIGHTNING MAST | LM4 | 45 | 0 | $ - 0 | ||||
| 14 | LIGHTNING MAST | LM5 | 45 | 0 | $ - 0 | ||||
| 15 | LIGHTNING MAST | LM6 | 45 | 0 | $ - 0 | ||||
| SUB TOTAL | $ - 0 | ||||||||
| REQUIRED INFORMATION | |||||||||
| Item # | Substation Structures 9-15 | Manufacturer | Plant location | Method of Shipment | Can Deliver by 7/1/2026: | ||||
| YES or NO | If No, Lead Time |
(in weeks)
ARO
| 9-15 | Substation Structures | |
| SHIPPING REQUIREMENT IS FOB DESTINATION | *IS FREIGHT FIRM OR ESTIMATED (INDICATE BELOW) |
GRAND TOTAL $ - 0
Proposer Information
| Company Name: |
| Contact Name: |
| Phone Number: |
| E-mail Address: |
| Signature: |
File details come from the government source that posted it. Updated .