IFB_24__25-33_Addendum_4.pdf

PDF 487 KB Posted

Attached to
Amphitheater Audio, Visual, & Lighting at Ft. Mellon Park
Solicitation number
IFB 24/25-33
Issued by
Seminole County, Florida

About this file

This document is an Addendum (#4) issued by the City of Sanford's Finance Department, Purchasing Division for Invitation for Bid (IFB) 24/25-33 concerning Amphitheater Audio, Visual, & Lighting at Ft. Mellon Park. The addendum, dated October 8, 2025, maintains the original solicitation response due date of Tuesday, October 21, 2025, at 2:00 P.M. Local Time. The primary update includes a second design layout of the proposed amphitheater, which is explicitly noted as a preliminary design subject to change.

The addendum contains a standard acknowledgment form for bidders to complete, requiring company details, contact information, and an authorized signature. No specific questions were received or addressed in this addendum (marked as N/A), and no additional attachments were included. The document emphasizes that failure to acknowledge receipt of the addendum may result in disqualification of the bidder's response. The architectural and structural drawings accompanying the addendum provide preliminary design details, including dimensions, roof specifications, and structural framing considerations for the amphitheater project.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Sanford | Finance Department | Purchasing Division 300 N. Park Avenue Suite 236, Sanford, Florida 32771

Phone: 407-688-5028 or 5030 | Fax: 407-688-5021 | Email: purchasing@sanfordfl.gov ADDENDUM

#4 IFB 24/25-33 AMPHITHEATER AUDIO, VISUAL, &

LIGHTING AT FT. MELLON PARK

DATE: October 8, 2025

TO: All Bidders/Proposers

FROM: Frank Mascola Purchasing Coordinator

City of Sanford Purchasing Division

SUBJECT: IFB 24/25-33 Amphitheater Audio, Visual, & Lighting at Ft. Mellon Park| ADDENDUM #4

This addendum is issued to provide additional information, clarification, corrections, additions, deletions and/or answers to questions concerning the above referenced solicitation. All information provided in this addendum is incorporated into the solicitation document as set forth therein. All other parts of the solicitation have been maintained as originally distributed. This addendum supersedes any verbal and/or other instructions given to any bidder/proposer qualified to respond pursuant to the requirements set forth in the solicitation document.

I. DUE DATE

This Addendum does not change the solicitation due date. As such, the solicitation response is due no later than Tuesday, October 21, 2025, at 2:00 P.M. Local Time.

II. QUESTIONS AND ANSWERS (Q&A)

The City has received the following question(s) concerning the solicitation:

N/A

III. CHANGES, ADDITIONS AND/OR CLARIFICATIONS

Second design layout of the proposed amphitheater. This is a preliminary design and is subject to change.

IV. SIGN-IN SHEET

V. ATTACHMENTS

Respondents must acknowledge receipt of this Addendum by signing this form below and returning it to the Procurement Division prior to the hour and date specified for receipt of bids/proposals or by including this Addendum with your submittal. Failure to comply may result in disqualification of your response.

Acknowledgment is hereby made of Addendum #4 to IFB 24/25-33 Amphitheater Audio, Visual, & Lighting at Ft. Mellon Park mailto:purchasing@sanfordfl.gov

City of Sanford | Finance Department | Purchasing Division 300 N. Park Avenue Suite 236, Sanford, Florida 32771

Phone: 407-688-5028 or 5030 | Fax: 407-688-5021 | Email: purchasing@sanfordfl.gov ADDENDUM

#4 IFB 24/25-33 AMPHITHEATER AUDIO, VISUAL, &

LIGHTING AT FT. MELLON PARK

Name of Firm/Company Contact Email

Street Address City, State, Zip Code

Telephone Number Fax Number

Authorized Person Printed Name Authorized Person Title

Authorized Person Signature Date of Signature mailto:purchasing@sanfordfl.gov

STOP!!

USE FOR PRELIMINARY

PLANNING AND ESTIMATING

ONLY

NOT FOR CONSTRUCTION

R

PORTER

PATENTED OR PATENTS PENDING

(616)399-1963 by

PORTERCORP 4240 N. 136th AVE HOLLAND, MI 49424 www.poligon.com

CORPCOPYRIGHT 2016

10'-0"

CLEAR

18'-7"

REF

ARCHITECTURAL ELEVATIONS

GENERAL ROOF NOTES:

METAL ROOFING:1.

24 GAUGE•

GALVALUME COATED•

KYNAR 500 PAINTED•

TRIM COLOR MATCHES ROOF2.

SEE POLIGON.COM FOR 3.

COLOR OPTIONS

1:96

SCALE: REV LEVEL:

A

DRAWING:

SHEET

40'-0"

30'-0"

26'-8"

FINISH GRADE.

MOUNTING VARIES

BASED ON ENGINEERING

REQUIREMENTS.

perryrc Rectangle perryrc Line perryrc Rectangle perryrc Rectangle perryrc Rectangle perryrc Line perryrc Line perryrc Rectangle perryrc Rectangle perryrc Text Box 3 panels LED screen height perryrc Rectangle perryrc Rectangle perryrc Rectangle perryrc Rectangle perryrc Rectangle perryrc Rectangle perryrc Line perryrc Callout slopped grade back to stage perryrc Dimension 24" perryrc Callout stage height above finished grade perryrc Rectangle perryrc Callout column wraps perryrc Callout free standing wall to accomodate exterior LED screen perryrc Callout view angle perryrc Line perryrc Rectangle perryrc Rectangle perryrc Rectangle perryrc Rectangle perryrc Rectangle perryrc Callout slab on grade perryrc Rectangle perryrc Callout retaining wall to catch slope

STOP!!

USE FOR PRELIMINARY

PLANNING AND ESTIMATING

ONLY

NOT FOR CONSTRUCTION

R

PORTER

PATENTED OR PATENTS PENDING

(616)399-1963 by

PORTERCORP 4240 N. 136th AVE HOLLAND, MI 49424 www.poligon.com

CORPCOPYRIGHT 2016

STRUCTURAL FRAMING PLAN

SHEET

DRAWING:

SHEET

SCALE:

1:96 A

REV LEVEL:

FINISH GRADE.

MOUNTING VARIES

BASED ON ENGINEERING

REQUIREMENTS.

x xx x xx xx

Access holes on all main cross beams.

Access holes at the top inside of all columns.

Access holes on the main center beam at each end.

x x x beallr Arrow beallr Arrow beallr Arrow beallr Arrow beallr Typewriter Need to be able to oull wire from the bottom of the column up through the top framework.

File details come from the government source that posted it. Updated .