This solicitation addendum document pertains to IFB 1100 AGM1008, issued by Austin Financial Services – Central Procurement on behalf of Austin Energy, and contains two addenda that modify the original invitation for bids regarding capacitor banks and associated electrical distribution components. The solicitation seeks qualified contractors to supply and deliver capacitor banks, distribution capacitors, distribution transformers, and associated parts on an as-needed basis for Austin Energy's electrical distribution system maintenance and repair operations. The solicitation includes eight line items with estimated annual quantities ranging from 4 to 130 units, covering components such as 600–1,200 KVAR capacitor banks rated at 7,200 volts, transformers, capacitor controllers, current sensors, antennas, and neutral current sensors. Addendum 1, dated October 15, 2026, incorporated a pre-offer meeting held that same day at 1:00 p.m. via Microsoft Teams and replaced the Scope of Work with Version 1. Addendum 2, dated October 27, 2026, extended the offers due date and opened date to November 3, 2026 at 2:00 p.m. and 3:00 p.m., respectively, and replaced the Solicitation Details and Pricing Submittal documents with Version 1 of each. The contract term is 24 months with options for the City to extend for up to three additional 12-month periods. Deliveries must occur within two calendar days of order placement at two Austin Energy warehouse locations (St. Elmo Warehouse and Cameron Warehouse), Monday through Friday, 7:00 a.m. to 3:00 p.m.
Addendum 2 includes sixteen questions and answers addressing technical specifications, manufacturer qualifications, compliance documentation requirements, delivery terms, insurance requirements, and specification details. Manufacturers must demonstrate at least five years' experience in distribution capacitor manufacture and sale, ten years for distribution transformers, and five years for pre-assembled capacitor bank manufacturing; bidder experience in manufacturing pre-assembled capacitor banks is also required. Contractors must establish required stock levels within 30 days of contract execution and maintain a 95 percent on-time delivery performance goal. Pricing involves fixed unit prices with economic price adjustments permitted after six months based on Producer Price Index data; unit prices must not exceed four decimal places. Bids must be submitted online through eResponse in Austin Finance Online. Local business and small business preferences apply: up to 5 percent discount for bids up to $500,000 and 3 percent for bids between $500,000 and $50 million. The primary contact is Ahide Garcia at Austin Financial Services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_1100_AGM1008_ATT_6_v1.docx | DOCX document | |
| IFB_1100_AGM1008_PAC1_v3.pdf | ||
| IFB_1100_AGM1008_0500_v2.pdf | ||
| IFB_1100_AGM1008_ATT_4_v1.docx | DOCX document | |
| IFB_1100_AGM1008_PAC1_v1.pdf | ||
| IFB_1100_AGM1008_0600_4_v2.xlsx | XLSX spreadsheet | |
| IFB_1100_AGM1008_ATT_2_v1.pdf | ||
| IFB_1100_AGM1008_PAC1_v2.pdf | ||
| IFB_1100_AGM1008_ADD_3_v1.pdf | ||
| IFB_1100_AGM1008_0500_v1.pdf | ||
| IFB_1100_AGM1008_ATT_3_v1.docx | DOCX document | |
| IFB_1100_AGM1008_ATT_7_v1.docx | DOCX document | |
| IFB_1100_AGM1008_ADD_1_v1.pdf | ||
| IFB_1100_AGM1008_ATT_8_v1.docx | DOCX document | |
| IFB_1100_AGM1008_0600_v1.xlsx | XLSX spreadsheet | |
| IFB_1100_AGM1008_ATT_1_v1.pdf | ||
| IFB_1100_AGM1008_ATT_5_v1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION ADDENDUM
AUSTIN FINANCIAL SERVICES – CENTRAL PROCUREMENT
Solicitation: IFB 100 AGM1008 Addendum No: 1 Date: 10/15/2026
This addendum is to incorporate the following changes to the above referenced solicitation:
1.0 The Pre-Offer Meeting attendance is attached.
2.0 Clarification: The Scope of Work published with the solicitation has been deleted and replaced with the following, Scope of Work – Version 1.
3.0 ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
ACKNOWLEDGED BY:
Offeror Name Offeror Authorized Signature Date
RETURN ONE COPY OF THIS ADDENDUM WITH YOUR RESPONSE PRIOR TO THE SOLICITATION CLOSING
DATE. FAILURE TO DO SO MAY CONSTITUTE GROUNDS FOR REJECTION OF YOUR OFFER.
AUSTIN FINANCIAL SERVICES MEETING SIGN-IN SHEET
Solicitation Description: IFB 1100 AGM1008 Meeting Date: 10/15/2026, 1 PM
Purchasing Office Point of Contact: Ahide Garcia Place/Room: Teams
Please Print Legibly
Name Company/Agency/Dept. Phone Email Address
Have you or do you expect to receive compensation for this meeting from your organization?
Ahide Garcia COA - AFS
Yes No
Liz Lock COA - AFS
Joe Kuykendall COA – Austin Energy
Annie Atwood COA – Austin Energy
Khabib Abdullaev COA – Austin Energy
Solicitation: IFB 1100 AGM1008 Addendum No: 2 Date: 10/27/2026
This addendum is to incorporate the following changes to the above referenced solicitation:
1.0 Extension:
The Offers Due date is hereby extended until November 3, 2026 at 2:00 PM.
The Offers Opened date is hereby extended until November 3, 2026 at 3:00 PM.
2.0 Change:
1.0 The Solicitation Details has been replaced with version Solicitation Details Version 1
2.0 The Pricing Submittal has been replaced with version Pricing Submittal Version 1
3.0 Questions:
Q1 Question: Manufacturer experience minimums - bidder or manufacturer? The IFB sets manufacturer experience minimums. Please confirm whether those minimums apply to the bidder itself, or to the manufacturer of the product offered. If bidder-level experience is required, please advise whether an authorized distributor or reseller of an approved manufacturer may satisfy the requirement through the manufacturer's experience, and what documentation Austin Energy would accept as evidence.
Q1 Answer: Per the Solicitation Instructions Section 4.1, Minimum Qualifications and Additional Submittal Requirements, manufacturer experience is required in the manufacture and sale of distribution capacitors and distribution transformers. Bidder experience is required in the manufacture of pre-assembled capacitor banks.
Q2 Question: Line-item composition. Please confirm which of the eight lines are capacitor banks or capacitor units, and which are associated parts (for example fuses, switches, controls, or PCTEL antenna / radio-frequency parts), so bidders may price only the lines they can supply in full compliance, given that award may be made per line.
Q2 Answer:
Line item 1.1: Distribution Capacitor – As per Specification E-1105 Line item 1.2: Distribution Transformer – As per Specification E-1806 Line item 1.3: Pre-assembled Capacitor Bank – As per Specification E-1630 Line item 1.4: Associated Part for Pre-assembled Capacitor Bank – As per Specification E-1630 Line item 1.5: Associated Part for Pre-assembled Capacitor Bank – As per Specification E-1630 Line item 1.6: Associated Part for Pre-assembled Capacitor Bank – As per Specification E-1630 Line item 1.7: Associated Part for Pre-assembled Capacitor Bank – As per Specification E-1630 Line item 1.8: Pre-assembled Capacitor Bank – As per Specification E-1630
Q3 Question: Alternate manufacturers. The approved list is ABB, Howard Industries, HD Electric, PCTEL, and Eaton, with compliant alternates permitted. What compliance evidence must an alternate manufacturer submit, through what channel, and by what date must an alternate be approved in order to be offered in a response by the due date?
Q3 Answer: Per the Solicitation Instructions Section 4.3, Offer Contents, “any Offeror proposing an alternate product shall submit materials specifications or descriptive literature for the non-referenced product as part of their Offer. The submitted materials specifications or descriptive literature shall clearly identify the item(s) in the Offer to which they apply.” Please refer to sections 4.3.1-4.3.4 for additional information.
Q4 Question: Delivery and ordering pattern. Please confirm delivery is FOB destination Austin, the delivery location or locations, Austin Energy's expected lead times, and whether partial shipments against the annual estimated quantities are the normal ordering pattern over the 24-month term.
Q4 Answer: Yes, delivery is FOB destination. The delivery requirements and locations are listed in the Scope of Work, Section 7. Orders will be placed on an as-needed basis throughout the contract term, and individual orders may include partial quantities of the annual estimates. The City does not anticipate ordering the full annual estimates quantities with each order.
Q5 Question: Insurance timing. The IFB requires $1,000,000 insurance lines. Please confirm the exact lines and limits a distributor or reseller must carry, and whether the certificates are required at submission or only at award.
Q5 Answer: If selected for award, the Offeror will be required to submit evidence that they meet the insurance requirements before the City can sign the contract.
Q6 Question: Bonding and distributor documentation. Please confirm that no bid, performance, or payment bond is required for this IFB, and whether an authorized-distributor or reseller statement from the manufacturer must accompany the response or may be provided after award.
Q6 Answer: Bonds are not required for this IFB. Per the Solicitation Instructions Section 4.1, “The offeror shall provide documentation, upon request, demonstrating compliance with each applicable qualification upon request by the City.”
Q7 Question: Specification E-1105, 3.1 – Unit rating: For the specified 200 kvar, 7,200 V, single-phase capacitor unit, does “15 kV” denote the insulation class of the unit and bushings, with a 95 kV BIL?
Q7 Answer: 15kV is the insulation class, and the corresponding 95kV Basic Impulse Level (BIL)
Q8 Question: Specification E-1105, 3.5 – Porcelain color: Will bushing porcelain designated Munsell 5BG 7.0/0.4 satisfy the specified ANSI/IEEE No. 70 light gray requirement?
Q8 Answer: Yes
Q9 Question: Specification E-1105, 3.6 – Terminal range: Must the terminal accommodate the complete specified range from #8 AWG solid through #2 AWG stranded for copper and aluminum conductors, or would a terminal accommodating #6 through #2 AWG be acceptable?
Q9 Answer: The terminal range needs to be from #8 AWG solid through #2 AWG stranded for copper and aluminum conductors, as written.
Q10 Question: Specification E-1105, 3.9 and E-1630, 3.2.9 – Tank Material: Please confirm whether the Type 409 requirement applies to separately supplied capacitor units and the Type 304 requirement applies to units incorporated in capacitor banks. Would Type 430 stainless steel be acceptable for either application? If so, please identify the applicable items.
Q10 Answer: Confirmed Type 409 is required for separate capacitor units and Type 304 for units in pre-assembled banks. Type 430 is not allowed.
Q11 Question: Specification E-1105, 3.9 – Corrosion guarantee: Please identify the environmental exposure conditions that should be used to design and evaluate the five-year rust-free guarantee, including any specified humidity or chloride exposure.
Q11 Answer: Austin Energy is located in Austin, Texas. We don’t specify the humidity or chloride exposure.
Q12 Question: Specification E-1105, 3.7 – PCB analysis: May a certified laboratory analysis using an oil-applicable method, such as US EPA SW-846 Method 8082A, be used in place of EPA Method 608 to demonstrate PCB content below 0.1 ppm? Please confirm the required reporting limit.
Q12 Answer: The reporting limit is certified PCB-free (less than 0.1 ppm). We are only accepting EPA Method 608 for PCB analysis.
Q13 Question: Specification E-1105, 4.3-4.4 and E-1630, 3.8.3-3.8.4 – Design tests: May certified design test reports for representative capacitor designs be submitted with a signed manufacturer statement explaining their applicability to the offered 7,200 V, 200 kvar, 95 kV BIL unit? Or must the reports be for that exact offered model?
Q13 Answer: Yes, design test reports for representative capacitor designs accompanied with a signed manufacturer statement is acceptable.
Q14 Question: Specification E-1105, 3.11 – NON-PCB marking: Is a red “NON-PCB” tank label acceptable in place of the specified blue decal?
Q14 Answer: No, we’ve standardized on the blue decal.
Q15 Question: Specification E-1105, 3.5 – Bushing creepage: Is there a required minimum bushing creepage distance or site pollution classification for these capacitor units?
Q15 Answer: No, there is not a minimum distance or pollution classification. Please follow standard ANSI/IEEE bushing requirements.
Q16 Question: Specification E-1630, 1.1.3 – Bank assembly: Would a capacitor bank assembled, wired, and tested at the offeror’s U.S. factory using capacitor units and racks from one manufacturer and other specified components sourced in the U.S. satisfy the requirement that the bank be shipped fully factory assembled and wired? Please also clarify which entity must demonstrate the specified experience in manufacturing preassembled capacitor banks.
Q16 Answer: Yes, the assembly and different manufacturer scenario in this question satisfies the requirements as long as all other specification requirements are met. The entity needing five years of experience (manufacture and supply) is the entity performing the final integration of the preassembled capacitor bank.
4.0 ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
ACKNOWLEDGED BY:
Offeror Name Offeror Authorized Signature Date
RETURN ONE COPY OF THIS ADDENDUM WITH YOUR RESPONSE PRIOR TO THE SOLICITATION CLOSING
DATE. FAILURE TO DO SO MAY CONSTITUTE GROUNDS FOR REJECTION OF YOUR OFFER.
| Addendum 1_.pdf |
| Addendum 1.pdf |
| Meeting Sign-In Sheet.pdf |
Addendum 2.pdf
File details come from the government source that posted it. Updated .