TMEP2 Q&A Before the Receipt of Proposals

This document is a Questions and Answers (Q&A) compilation addressing 311 clarifications submitted by prospective offerors regarding the TRICARE for Medicare-Eligible Beneficiaries Phase 2 (TMEP2) solicitation. The solicitation is for professional services to manage claims processing, customer service, and healthcare administration for TRICARE's Medicare-eligible dual beneficiary population. The proposal submission deadline is December 3, 2026, at 5:00 PM Mountain Standard Time. The anticipated contract award date is August 2, 2027, following a 270-day source selection period.

The contract is a fixed-price award covering a base transition-in period and five one-year option periods, with potential six-month extensions. Key contractual performance areas include electronic and paper claims processing tiered by volume, customer service operations (24/7 call center, IVR, portal support), beneficiary and provider communications, eligibility management, provider credentialing, authorization processing, medical necessity review, utilization management, compliance reviews, and transition activities. Electronic claims volumes average approximately 29.2 million annually with roughly 3% processing as TRICARE-primary. The contractor must achieve CMMC Level 2 (Self) status by contract award and maintain compliance with DFARS cybersecurity and privacy requirements. Performance guarantees include claims processing timeliness (98% within 30 days, 100% within 90 days), accuracy standards, customer service metrics (85% first-call resolution, 2-minute maximum hold time), and beneficiary satisfaction. Pricing proposals must address claims processing by tier and claim type (electronic/paper; MERHCF/DHP funding), fixed monthly administration costs, and transition-related services. The solicitation incorporates the TRICARE Operations Manual (TOM) Chapter 20 by reference, establishes detailed transition-in and transition-out requirements across 60-90 day dual-operations periods, and requires submission of Integrated Master Plan/Schedule, website mockups, and past performance information as part of the technical proposal evaluation.

View the file

Other files

File Type Posted
Attachment J-5b QASP Matrix TMEP2 DRAFT 002.xlsx XLSX spreadsheet
Attachment J-1 DMDC Eligibility File Layout TMEP 002.xlsx XLSX spreadsheet
Attachment J-3 CDRLs 002.pdf PDF
Exhibit L-7 - TMEP2 Pricing Template_Revised 20261102 002.xlsx XLSX spreadsheet
Amendment 002 signed.pdf PDF
Attachment J-4 TMEP 2 Chapter 20 Clean Draft Copy 20260730 002.pdf PDF
Exhibit L-3 - RFP-Cross-reference Matrix 002.xlsx XLSX spreadsheet
Exhibit L-2 - Workload Volumes 002.pdf PDF
HT940226R0001-20260923.pdf PDF
Exhibit L-8 - Small Business Participation Commitment.docx DOCX document
HT940226R0001 Amd 0001 20260924.pdf PDF
Exhibit L-9 - TMEP CY24_25_26 Manual Changes Modification Log.xlsx XLSX spreadsheet
HT940226R0001-20260923.pdf PDF
Attachment J-5b QASP Matrix TMEP2 DRAFT.xlsx XLSX spreadsheet
Exhibit L-7 - TMEP2 Pricing Template.xlsx XLSX spreadsheet
Exhibit L-3 - RFP-Cross-reference Matrix.xlsx XLSX spreadsheet
Exhibit L-8 - Small Business Participation Comittment.docx DOCX document
Exhibit L-1 - Beneficiary Data.pdf PDF
Exhibit L-4 - Past Performance Questionnaire.pdf PDF
Attachment J-5a QASP TMEP2 DRAFT.pdf PDF
Attachment J-2 Beneficiary Satisfaction Survey.pdf PDF
Exhibit L-2 - Historical Data.pdf PDF
Attachment J-4 TMEP 2 Chapter 20 Clean Draft Copy 20260730.pdf PDF
Attachment J-5b QASP Matrix TMEP2 DRAFT.xlsx XLSX spreadsheet
Exhibit L-7 - TMEP2 Pricing Template.xlsx XLSX spreadsheet
Attachment J-1 DMDC Eligibility File Layout TMEP.pdf PDF
Exhibit L-6 - Subcontractor Consent Letter.pdf PDF
Exhibit L-9 - TMEP CY24_25_26 Manual Changes Modification Log.xlsx XLSX spreadsheet
HT940226R0001-20260923.pdf PDF
Attachment J-3 CDRLs.pdf PDF
Exhibit L-5 - Sample Client Authorization Letter.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Subject Question/Comment Government Response

1 F.5.1 F.5.1 listsOP4 electronic claims at 67,589,254.

SF 1449 document page 6 (PDF page 7) lists 66,227,097 for "Electronic Claims Processing - Medicare Eligible Retiree Health Care Fund Option Period 4" and 627,917 for "Electronic Claims Processing - Defense Health Program Non-Accrual Option Period 4". The sum of those two is 66,855,014, a difference of 734,240 fewer claims compared to F.5.1.

Should contractors use the SF 1449 figure of 66,855,014 or the F.5.1 figure of 67,589,254?

CLIN 4001 will be updated to 66,961,337 MERHCF Electronic Claims, this will bring total Electronic claims to match F.5.1 and pricing template in a future amendment.

2 H.5 H.5.3, H.5.4, H.5.5, H.5.6, and H.5.10 list tier 1 as "under X.000%" and tier 2 starting at "X.001%" both excluding "X.000%".

Should either Tier 1 be updated to "under X.001%" or should tier 2 should be updated to start at "X.000%"?

Changed tier 1 from "Under XX.000%" to "XX.000% and under "for H.5.3, H.5.4, H.5.5, H.5.6, and H.5.10.

3 H.5.4 In H.5.4 the definition states "…waiting for a LIVE agent…". C.2.2.2.3 states "…speaking to an agent...".

Please confirm that "live agent" refers exclusively to human agents.

Yes, "live agent" is referring to a human agent or speaking to an agent.

4 J-4 TOM CH 20, Section 6 and TOM Ch 11, Section 6 Defense Health Agency Communications

In T-5, Ch 11, Section 6, paragraphs 4.1 and 4.1.1 apply.

Should offerors assume a quarterly newsletter will be produced for TMEP eligible beneficiaries by DHA Communications, or are these to be produced by the contractor?

The Director’s Communications and Public Affairs Division (DCPAD) will develop the quarterly newsletter in coordination with the TMEP2 contractor. The contractor will be responsible for distribution in accordance with the contract requirements.

5 J-4 TOM CH 20, Section 6 and TOM Ch 11, Section 6 Defense Health Agency Communications

In T-5, Ch 11, Section 6, paragraphs 4.1 and 4.1.1 apply. Also, annual open enrollment mailing is excluded, therefore, will a TMEP annual mailing be produced?

Should paragraph 4.1 and 4.1.1 also be listed under the exception?

The annual open enrollment mailing requirement does not apply to TMEP2.

6 J-4 TOM CH 20, Section 6 and TOM Ch 11, Section 6 Defense Health Agency Communications

In T-5, Ch 11, Section 6, paragraphs 4.1 and 4.1.1 apply.

If a beneficiary is paperless, does the annual newsletter still have to be mailed to them?

The annual print-and-mail requirement applies specifically to the open enrollment season newsletter, which is excluded from TMEP2. The quarterly newsletter requirements remain applicable.

7 J-4 TOM CH 20, Section 6 and TOM Ch 11, Section 6 Defense Health Agency Communications

For the quarterly emailed newsletters, will beneficiaries that do not have an email accessible to the contractor be expected to receive a mailed copy of the newsletter?

No. The quarterly newsletter requirement specifies electronic distribution and does not require the contractor to mail printed copies to beneficiaries without an email address.

8 F.2.1 Period of Performance

F.2.1 states "The contractor shall complete Transition-In by September 30, 2028, and begin option period one (1) on October 1, 2028, ...". F.2.2 and Schedule B reflect Option Period One as starting on 10/1/2029. Schedule B has transition in running from 10/1/2028-9/30/29.

Can we assume the references to 2028 in F.2.1 are an error and will be corrected to 2029?

Section B will be updated to remove the option period dates from the CLINs. Option period dates will also be removed from Section F.2.1 and F.2.2 in a future amendment. Option Period dates will be updated at award.

TMEP2 Q&A Before the Receipt of Proposals

9 TOM CH 11 section 6 1.1 What is the volume and frequency of materials expected to be delivered? The Government does not have volume numbers, but for planning purposes, the TRICARE national suite of publications has averaged approximately 4.2-5.2 million printed copies annually (FY24-FY26), across the 3-4 print runs per year. Contractors submit orders based on the print schedule and product list established by Director's Communication and Public Affairs Division (DCPAD). Publications are then delivered to the contractors for distribution. Under TOM Chapter 11, Section 6, paragraph 4.4.1, the contractor is required to distribute relevant DCPAD-developed or approved educational materials to beneficiaries and other designated audiences upon request or government direction. Distribution may occur by mail or other government-approved delivery methods. These numbers represent the combined volume across multiple TRICARE contractors and are provided for reference only. TMEP2 would be responsible for distributing only those publications applicable to the TRICARE For Life population, not the entire national suite. Actual quantities and frequency for TMEP2 will depend on program needs and applicable contract requirements.

10 SF 1449 Box 8 On SF 1449, Box 9 lists 12:00MS as the submission time, without a due date. SAM.gov lists the submission date as 11/5/2026 and time as 5:00pm MST time.

Please confirm the date and time the proposal is due to DHA via an updated SF 1449.

SF 1449 Box 8 will be updated to 1700MS (5 p.m. MST). Future Amendments will reflect a 1700MS on future amendments.

Due date is December 3, 2026

11 J-4 TOM Ch 20, Section 2; TOM Ch 2, Sections 5 and 8 Dual Operations / Final Processing

The incorporated TOM Chapter 2 requirements include 180-day outgoing contractor requirements for claims processing and customer service support, while the TMEP-specific Chapter 20 requirements establish 90-day requirements for certain final claims processing and customer service activities. Which timeframe governs TMEP dual operations and final outgoing claims/customer service support where the 90-day and 180-day requirements differ?

Suggest we change to this and send externally as they have conflicting requirements that will impact pricing: TOM Chapter 20, Section 2, 5.1 states the contractor shall comply with the requirements in Chapter 2, Section 5 except for those listed in Addendum A. Addendum A Chapter 2, Section 5 does not list Paragraphs 2.0-2.3 as a TMEP exception. This would mean the requirement to maintain the toll-free lines and web-based customer service capabilities for 180 days is applicable to TMEP. This conflicts with TOM Chapter 20, Section 2, Paragraph

8.2.1.1 that states the contractor is required to maintain the toll-free lines and web-based customer service capabilities for 90 days. We assume the 90 day requirement is correct and DHA will update Addendum A to exclude Chapter 2, Section 5, Paragraphs 2.0-2.3. Please confirm.

Confirming the 90 day requirement outlined in Attachment J-4 Draft TOM Chapter 20, Section 2, paragraph 8.2.1.1 applies. Attachment J-4 Draft TOM, Chapter 20, Addendum A will be revised to exclude TOM, Chapter 2, Section 5, paragraphs 2.0 through 2.3.

12 J-4 TOM Ch 20, Section 2; TOM Ch 2, Section 5 Customer Service Dual Operations

The incorporated TOM Chapter 2 customer service requirement uses receipt of the DMDC Enrollment Gold File as the event that begins dual operations. The TMEP Chapter 20 requirements and exclusions do not appear to use the same enrollment transition construct.

What event should initiate the TMEP customer service dual-operations period? We assume it would be the first 90 days after the start of the incoming contractor's services delivery. Please confirm.

The TMEP contractor will not receive a DMDC Enrollment Gold File. See response to question #11- Attachment J-4 Draft TOM, Chapter 20 will be revised to exclude Chapter 2, Section 5, paragraphs 2.0 through 2.3.

13 Section B, CLIN 3008 Transition-Out

CLIN

CLIN 3008 is identified as "Transition-Out: Option Period 1," although the 3000-series CLIN and associated Period of Performance correspond to Option Period 3. Please confirm that CLIN 3008 should be identified as the Transition-Out CLIN for Option Period 3.

CLIN 3008 Transition-Out will be updated to reflect the correct Option Period in a future amendment

14 L.2.11; L.5.4; C.2.4.2 Period of Performance / Source Selection / Transition-In

Section L.5.4 states that source selection procedures are projected to require 270 days to complete and requires a minimum 270-day proposal acceptance period. Based on the November 5, 2026 proposal due date, 270 calendar days would be approximately August 2, 2027; however, the solicitation does not identify an anticipated contract award date, and Section L.2.11 states that the contract will be updated to reflect the actual Period of Performance dates prior to award. Because multiple Transition-In requirements and CDRLs are triggered by contract award, what contract award date should offerors assume for purposes of developing the proposal Integrated Master Plan and Integrated Master Schedule and scheduling award-based Transition activities?

Contractors will use a projected award date of August 2, 2027 for proposal development.

15 Section B, CLIN 4001 & 5001 Electronic Claims

CLINS

We identified inconsistencies in the Schedule B Electronic Claims volume projections. For most Option Years the YoY growth for electronic claims is shown at approximately 1.9%. In OY 4 and OY 5 the projected increases differ from that trend. OY3 to OY4 shows a 0.8% increase, while OY4 to OY5 shows a 3.0% increase, then after OY 5 the projections return to the usual 1.9% growth pattern.

Are these variations intentional and correct as written? If so, please provide clarification on the underlying assumptions or operational factors driving these changes so that offerors can accurately prepare proposals.

These trends are what the Government anticipates the trend to be based on previous experience.

16 L.6.1.1 Please confirm that detailed results and descriptions of the effectiveness of specific technical approaches will not be considered or read as "past performance" for purposes of inclusion in Volume 2 Technical Proposal.

Any information related to past experience and performance detailed in Volume II Technical Proposal will not be considered in Volume III Past Performance--as stated in Section L.6.1.1

17 L.6.1.2 In describing particular strengths and establishing risk in the technical proposal that do not lend themselves to quantitative values (e.g., management, transition, etc.), may offerors include evaluations made under previous contracts of the offerors specific technical approaches?

No. The proposal may provide information about the offeror’s experience (for this purpose, experience refers to what an offeror has done, not how well it was accomplished) in performing the proposed processes and procedures. See L.6.1.1

18 L.6.1.1 In reference to "how well" offerors meet requirements, DHA states in RFP Section L.6.1.1 that "any such information in the technical proposal will not be considered for the purpose of evaluating past performance." We understand Volume III Past Performance must include details of performance for reference contracts and will be evaluated separately from Volume II Technical.

So that each volume may be evaluated independently, may offerors detail "how well" they meet requirements in Volume II Technical to both explain the effectiveness of the specific technical approaches and related technical proposal risk?

For Volume II Technical, if an offeror provides information regarding its experience, then the offeror should focus on describing what was done rather than how well it was done (as described in Section L.6.1.1).

19 L.6.1.2 RFP Section L.6.1.2 states "The price proposal, past performance information, and financial information shall not be addressed in the technical proposal volume..." The Volume II Technical Subfactors (Sections L.6.2 - L.6.5) all require offerors to "explain," "ensure," or "describe," various requirements with additional details around accuracy and results.

Please confirm that offerors may include results and effectiveness details of specific technical approaches in Volume II to fully address Sections L.6.2, L.6.3, L.6.4, and L.6.5, and that such inclusion in Volume II will still be compliant with Section L.6.1.1 and L.6.1.2.

Refer to Question #18

20 C.2.4.2 and L.6.5.1 Transition Activities C.2.4.2 - C.2.4.2 states, "The Contractor shall submit an Integrated Master Plan (IMP) and Integrated Master Schedule (IMS) 10 days after contract award (CDRL P040 and P070)." L.6.5.1 - L.6.5.1 states, "The Offeror shall provide an Integrated Master Plan (IMP) and Integrated Master Schedule (IMS), which details the Offeror's approach to meeting transition in requirements (TOM Chapter 20)."

Please confirm the IMP and IMS are both required with proposal submission and after award.

Confirming the IMP and IMS are both required with the proposal submission and after contract award. The IMP and IMS must be congruent with and reference all contract transition requirements and Contract Data Requirements Lists (CDRLs) with due dates prior to the start of healthcare delivery. (Note: The IMP and IMS are separate attachments to the proposal which will not count towards the page limitation for the written technical proposal.)

21 L.6.3.2.1 Technical Proposal L.6.3.2.1 states "The mockup will be counted toward the offeror’s Technical Volume page limitation. Since the mockup is electronic it shall be submitted on 8½ by 11 inches in landscape orientation with one-inch margins on all sides as described in Section L.4.1.5."

Please confirm one (1) landscape page counts as one (1) page for technical proposal page limits.

Yes, one (1) landscape page counts as one (1) page for the technical proposal.

22 Section A Block 20 - CLIN 0001 Transition-In/Phase- In

The overall Period of Performance is stated as 10/1/2028 to 9/30/2029. However, Section F.2.1 states that Transition-In begins at the date of award and must be completed by 9/30/2028.

CLIN 0001 indicated the start date of 10/1/2028.

Could you please confirm whether Transition-In is expected to begin at time of award, or if it formally begins on 10/1/2028 as specified in CLIN 0001?

Refer to question #8.

23 J-4 Ch. 20 Sec 2 , 8.1 & Addendum A Transition Out J-4 TOM Chapter 20, Section 2, Paragraph 8.1 states the requirements in Chapter 2, Sec 8 apply to TMEP except those in Addendum A. Addendum A does not list Chapter 2, Section 8, Paragraph 3.1 as an exception. 3.1 requires the outgoing contractor to process claims for 180 days after the incoming contractors SHCD. This conflicts with J-4 TOM Chapter 20, Section 2, Paragraph 8.3.1.2, which states claims processing shall be complete within 90 days after the start of the incoming contractors service delivery.

We assume the 90 day requirement is correct and Addendum A will be updated to exclude TOM Chapter 2, Section 8, Paragraph 3.1. Please confirm.

Confirming the 90 day requirement outlined in Attachment J-4 Draft TOM Chapter 20, Section 2, paragraph 8.3.1.2 applies. Attachment J-4 Draft TOM, Chapter 20, Addendum A will be revised to exclude TOM, Chapter 2, Section 8, paragraph 3.1.

24 J-4 Ch. 20 Sec 2, 8.3.1.2 Transition Out Pricing

TOM Chapter 20, Section 2, Paragraph 8.3.1.1 notes that claims processing shall be complete within 90 days following the start of the incoming contractor's service delivery (i.e., after the completion of the final option period and transition out period of performance).

Where should the claims received during the contract period of performance but processed after the end of the period of performance be priced, as part of the claims processing claim rate CLIN(s) or as part of the transition out CLIN?

Healthcare benefits are non-underwritten, and the contractor acts solely as a fiscal intermediary;

consequently, the contract itself carries no direct healthcare costs for reimbursement. The outgoing contractor continues claims processing during the 90-day transition, maintaining standard operations throughout the claim run-out and clean-up period. If entitled to a claim rate, the outgoing contractor is reimbursed based on the rates established in the final option period. Administrative costs outside of the claim rate are allocated to the transition-out\ Contract Line Item Number (CLIN) or CLINs.

25 J-4 Ch. 20, Sec 2, 8.2.1.1 Transition Out Pricing

TOM Chapter 20, Section 2, Paragraph 8.2.1.1 notes that the outgoing contractor shall maintain the toll-free lines to respond to inquiries during the first 90 days of dual operations, which we're assuming is defined as 90 days after the incoming contractor's SHCD, after the period of performance of the final option period and transition out CLINs.

Where should the pricing for this call center activity post period of performance be included, as part of the Admin CLIN(s) or as part of the transition out CLIN?

Contract support performance extending beyond the final option period's period of performance must be allocated to the transition-out CLIN. Invoicing aligns with when services are rendered. Consequently, any costs incurred after active health care delivery ends must be charged to the transition-out CLIN.

26 J-4 Ch.20 Attachment J-4 TOM Chapter 20 included with the solicitation is not consistent with the context of TOM Ch 20 published publicly at https://manuals.dha.mil/View- Publication/TOT5/Revision/66/FileName/C20TOC which is to be incorporated into the contract under the performance work statement section C.1.4. For example, the public/online version of TOM Chapter 20, Section 1 , paragraph 3.3 states the TMEP contractor shall comply with the requirements in Chapter 1, Section 3, except for paragraphs 5.2 through 5.2.2.3, 4.0 through 4.2, 3.2.1, 3.2.5, and 7.1, however, the solicitation version of TOM Ch 20, Section 1 does not exclude the same paragraphs or supply the processing standards that replace those listed.

Which version of TOM Chapter 20 is correct and should be used by offerors to prepare proposals?

Attachment J-4 draft TOM Chapter 20 is the version that should be used by offerors to prepare proposals.

27 J-4 Ch.20 Chapter 20 Addendum A has a title of Chapter 18, Addendum A.

Should the header on this document be Chapter 20?

Confirming the header on this document should be Chapter 20 rather than Chapter 18. Addendum A will be revised to reflect Chapter 20.

28 G.6.5.5 Draws on the Federal Reserve Bank (FRB)

RFP Section G.6.5.5 states "The contractor is financially liable for both all amounts drawn by them from the FRB until paid to the authorized payee and for any collections received by them on behalf of DHA until deposited into the FRB. The contractor shall immediately notify DHA TPRM of any loss or suspected loss of DHA funds. Reference TOM Chapter 3, Section 4, paragraph 4 for instructions and steps the contractor shall take regarding financial loss of funds."

Is this requirement meant to obligate the offeror/contractor to underwrite all funds (and price accordingly)?

No, this requirement is not intended to obligate the contractor to underwrite the government's program/benefit funds or to price the proposal to absorb the baseline financial value of those funds.

Rather, Section G.6.5.5 establishes a strict fiduciary custody and operational security standard for Federal Reserve Bank (FRB) drawdowns and collections. The contractor’s financial liability is strictly limited to ensuring that funds drawn from the FRB are securely held, accounted for, and properly dispersed to authorized payees without loss, fraud, or waste while in the contractor's custody. Similarly, the contractor is responsible for safeguarding collections (e.g., copayments, recoveries) from the point of receipt until they are deposited back into the FRB.

Accordingly, the offeror should price for the operational costs associated with maintaining robust internal controls, secure financial/banking systems, administrative compliance with TRICARE Operations Manual (TOM) Chapter 3, Section 4 procedures, and appropriate commercial liability/crime insurance to cover funds in transit. It does not require underwriting the underlying program funds themselves.

29 C 2.1.4.2.2 Provider Participation Agreements

Is the TMEP2 contractor responsible for obtaining and executing a new participation agreement directly with the provider/facility? Please provide historical annual volumes for gathering provider participation agreements.

The contractor does have a role in approving participation agreements. This includes obtaining the participation agreement from the contractor authorizing the provider or, if a participation agreement is not available the contractor must request one from the provider. The contractor must maintain a copy of the participation agreement. See the TRICARE Policy Manual (TPM) for required participation agreements.

The Government does not have access to the historical volume information.

30 C 2.1.4.6-8 Medical Necessity Attachment J-4 states that TOM Chapter 7, Section 4 Utilization Management requirements apply when TMEP processes claims for which TRICARE is the primary payer. The PWS also requires the Contractor, before authorizing care or paying a TRICARE-primary claim, to determine that the care is medically necessary, appropriate, and within the scope of TRICARE benefits, and identifies the Contractor as a multi-function Peer Review Organization under 32 CFR 199.15. Please clarify whether DHA expects the Contractor to maintain a formal Utilization Management function staffed by physicians and other qualified health care professionals to perform medical-necessity review for TRICARE-primary authorizations and claims. If so, please identify the required clinical disciplines, qualifications, coverage expectations, and any applicable physician-review or peer-review requirements.

For Utilization Management, the contractor shall comply with the requirements in TOM Chapter 7, Section 4 when TRICARE is primary payer, excluding those paragraphs listed in the pertinent line in draft TOM, Chapter 20, Addendum A. Offerors should use their expertise in determining the appropriate number and mix of staff necessary to satisfy the requirements of TOM Chapter 7, Section 4.

31 Attachment J-4 Attachment J-4, Ch. 20, Sec. 2; Section F, F.6.7

Integrated Master Schedule and TOM references

J-4 Section 2 incorporates TOM Chapter 2 (Transitions) by reference, and many transition deliverables are due a set number of days before the start of services delivery (e.g., BCRC trading partner agreement at 120 days; Medicare batch testing and Congressional mailer at 90 days; MOUs and bank accounts at 60 days). Please confirm that the Integrated Master Schedule submitted with the proposal should reflect these deadlines relative to the start of services delivery date confirmed in response to Question 1.

Confirming, the IMP and IMS must be congruent with and reference all contract transition requirements and Contract Data Requirements Lists (CDRLs) with due dates prior to the start of healthcare delivery.

32 RFP F.6.3 Provider Moonlight How can the contractor validate if an active-duty military provider or DoD GS is moonlighting in a civil capacity? Will DHA provide a list to the contractor?

The Government has taken this under advisement.

33 RFP Section C.2.2.3 Beneficiary / Provider Training

Section C.2.2.3 requires the Contractor to "develop and implement an education plan for conducting targeted beneficiary and provider education." Please confirm the scope of the education plan, and provide historical information on the types of targeted education provided.

The plan shall identify the communication strategies and tactics the contractor intends to utilize to conduct targeted beneficiary and provider education. The government does not have set required topics. The contractor should use their best practice or lessons learned to educate on topics that will improve the experience for TMEP beneficiaries.

34 SF1449 Block 20, Page 2 of 100 Schedule of Supplies/Services

Will DHA reconcile the period of performance provided in Block 20 with the Period of Performance provided in Section F.2. Period of Performance?

Refer to question #8

35 SF1449 Block 8, Page 1 of 100 Offer Due Date/Local Time

In Block 8, Offer Due Date/ Local Time, the noted time is 1200 MS. The Current Due Date Offer Due on the SAM.gov announcement is listed as 7PM EST on November 5, 2026. Will DHA revise the SF1449 to reflect the correct due date and local time?

Refer to question #10

36 RFP C.2.1.4.2.1 Provider credentialing

What provider participation data will DHA make available (e.g., historical data versus only current-state TEPRV files)?

Historical and current data is included in the Government's centralized provider file, which the TMEP-2 contractor will have access to during the transition period.

37 RFP C.2.1.6 Electronic Funds Transfer

Please provide the current number and percentage of providers receiving payment by EFT versus paper check, the number of provider EFT opt-outs, historical monthly paper-check volume, and average monthly volume of new or changed EFT enrollments. These volumes materially affect provider outreach, payment operations, banking, print/mail, and pricing assumptions.

The Government does not have access to this information.

38 RFP C.2.1.8 Contractor’s Scope of Authority

What specific clinical review responsibilities will the PRO function include (e.g., medical necessity, coding accuracy, DRG validation), how will clinical review guidelines be supplied or developed, and how will liability be allocated for clinical determinations that are later overturned?

Please see Attachment J-4 TMEP 2 Chapter 20 and TOM, Chapter 7 for Clinical Operations requirements.

39 C.2.2.1.3; C.2.4.1–C.2.4.3 Telephone numbers and carrier transition

Does the government expect the incoming contractor retain existing beneficiary, provider, priority-service, fax, and other published telephone numbers? Please provide the number inventory, ownership and current carrier arrangements, identify responsibility for transfer/porting authorization and costs, and specify required incumbent cooperation, transition overlap, and cutover timing.

The Government does not have requirements for the incoming contractor to retain existing published telephone or fax numbers for beneficiaries or providers.

40 C.2.2.1.3; C.2.4.3; F.6.6, CDRLs P020/P050 Availability and recovery

Please identify required availability, recovery time, and recovery point objectives for the contact center, IVR, CRM, and portals, including planned-maintenance rules and failover-testing requirements. What minimum service must continue during an outage of Government eligibility systems, claims interfaces, or the Government CRM, and what notification and reconciliation procedures apply?

The contractor shall address continuity and recovery in the Call Center Risk Mitigation Plan (CDRL PO50) and the Continuity of Operations Plan (COOP, CDRL PO20). CDRL PO50 requires the contractor to address workforce forecasting, operations during outages or disasters, and recovery following weather-related, systemic, or other outages. Under TSM, Chapter 1, Section 1.1 paragraph 8.0, the COOP must address system data availability during hardware, software, or communication failures and provider for restoration of critical functions, including claims within five days of a disaster. The TSM also requires annual disaster recovery testing.

41 C.2.2.2.1–C.2.2.2.4 IVR functions and data freshness

Please identify the minimum IVR self-service transactions required for beneficiaries and providers at service commencement, including claims status, eligibility, and benefits.

All IVR requirements outlined in C.2.2.2.1 through C.2.2.2.4 are required at the start of services delivery.

The self-service transactions are indicated in C.2.2.2.2. which states: Contractor’s IVR unit shall provide beneficiaries access to information in a user-friendly and efficient manner related to the status of claims, eligibility, and benefits in compliance with the TOM.

42 CC.2.2.2; C.2.3.12 Caller authentication What identity-verification requirements apply before disclosing beneficiary or claim-specific information through the IVR or a live agent? Please identify required verification elements and requirements for providers, authorized representatives, caregivers, and callers unable to complete automated verification, including any restrictions on transmitting identifiers between the IVR and contractor CRM.

The Contractor shall operate a HIPAA compliant Interactive Voice Response (IVR) unit that includes analytic capabilities to manage the quality of its IVR set up and capture performance data to ensure compliance with customer standards in the draft TOM, Chapter 20, Section 1. (Per C.2.2.2.1). At a minimum, the process should be HIPAA compliant and require the caller to successfully provide the verification data requested by the TRICARE contractor, typically including: The beneficiary’s identifying information, such as full name and date of birth. A TRICARE identifier, commonly the DoD Benefits Number (DBN) or the sponsor’s Social Security number or permitted portion of it. Authorized representatives must be verified.

43 RFP C.2.3.10 CMMC UID RFP Section C.2.3.10 requires the Contractor to have and maintain CMMC Level 2 (Self) status by contract award. DFARS 252.204-7025(b) similarly states that the required CMMC status is required prior to award; however, paragraph (d) requires offerors to submit applicable CMMC Unique Identifiers (UIDs) with their proposals. Because a CMMC UID is generated only after completion and entry of the applicable self-assessment in SPRS, this requirement may exclude otherwise qualified offerors that are actively completing their Level 2 self-assessment and will satisfy the required CMMC status prior to award.

Given the Government’s projected 270-day source-selection period and the PWS requirement that CMMC Level 2 (Self) be achieved by contract award, would the Government consider revising the solicitation to permit offerors that do not yet have CMMC UIDs at proposal submission to provide evidence that their Level 2 (Self) assessment is underway, with the applicable CMMC UID(s), required Level 2 (Self) status, and affirmation in SPRS provided no later than a date established by the Contracting Officer prior to award?

Government cannot independently revise the solicitation to delay CMMC UID submission until some later pre-award date. Doing so would conflict with the current mandatory provision language requiring UID submission in the proposal. CMMC UID(s) due at proposal submission. Offerors may update their CMMC status and provide updated CMMC UID(s) prior to award if new UID(s) are generated in SPRS.

44 RFP C.2.4 Transition requirements

What technical documentation and format specifications from the incumbent contractor will DHA provide?

See Attachment J-4, draft TOM, Chapter 20, Section 2 and TOM, Chapter 2 for transition activities.

45 C.2.4 Contact center data migration

Please identify the customer service information and configurations the incumbent must transfer, including open cases, contact history, call notes, recordings, correspondence, knowledge articles, IVR call flows/prompts, and routing configurations. For each applicable item, please provide the retention period to be transferred, estimated volume, format, delivery milestones, and whether it must be migrated into production systems or may remain in a searchable archive.

See Attachment J-4, draft TOM, Chapter 20, Section 2 and TOM, Chapter 2 for transition activities.

46 L Exhibit L-2, telephone tables, pp. 2–3

Historical call disposition definitions

Please define and reconcile “attempted,” “received,” and “answered by an agent” calls and identify how received calls not answered by an agent are distributed among successful IVR self-service, abandonment, disconnects, and other dispositions. Please provide available historical busy-hour call volumes and peak simultaneous calls and IVR sessions, separated by beneficiary and provider where available.

Calls received are inbound calls that reach the call center's phone system during the operating hours. Calls attempted are calls initiated by callers to reach the call center, whether or not they reach the phone system or a representative. Calls answered are calls connected to and answered by the IVR or customer service representative. The Government does not have access to busy-hour call volumes and peak simultaneous calls and IVR sessions.

47 Exhibit L-3, rows 51 and 55 (L.7.5 and L.7.6.1.2) Past Performance Exhibit L-3's text for L.7.5 and L.7.6.1.2 describes an optional one-page "additional information" summary per reference that does not count against the page limit. The solicitation requires offerors to explain an unsubmitted PPQ in an attachment to the PPQ, and limits the client's portion to one additional page. Please confirm that the solicitation text governs and whether any offeror-prepared additional-information page is permitted.

Offeror's portion of the PPQ may be filled out in conjunction with the additional page to explain why a PPQ was not completed by the referenced contract client.

The additional page is limited to one (1) page per referenced contract.

48 Exhibit L-3, rows 82–84 (L.9.1–L.9.3 and M.9.1) Past Performance Exhibit L-3's text for L.9.2, L.9.3, and M.9.1 does not match the solicitation (for example, it omits the L.9.2 Minimum Quantitative Requirement and socio-economic targets, labels the AbilityOne provision as L.9.3 rather than L.9.4, omits L.9.5 and M.9.2, and lists different M.9.1 evaluation criteria). Please confirm that the solicitation governs and whether a corrected Exhibit L-3 will be issued.

Language in Section L, Attachment L-3 Cross Reference Matrix and Section L.9.2 will be updated to reflect the correct criteria and the Minimum Quantitative Requirement in a future amendment.

49 Attachment J-2 H.4

Beneficiary Satisfaction Survey

Attachment J-2 states that the survey sample will be drawn from outpatient purchased-care visits, while the incentive is based on overall satisfaction with claims processing, customer service, or other contractor services. Please confirm whether the quarterly incentive sample will be limited to beneficiaries with outpatient purchased-care visits or will represent the broader TMEP beneficiary population receiving contractor services.

Confirming the survey is drawn from beneficiaries with outpatient purchased care visits as stated in Attachment J-2. The incentive is based on the overall satisfaction survey responses related to claims, customer service, or other services.

50 Attachment J-2 H.4

Survey Administration

Please confirm that DHA or a Government-contracted independent survey organization will conduct and fund the beneficiary satisfaction survey and that the TMEP contractor will not be responsible for survey administration, telephone outreach, or obtaining the required 400 completed surveys. Attachment J-2 requires 400 completed responses per period.

Confirming the survey will be conducted by DHA or a Government-contracted entity. The TMEP contractor will not be responsible for any requirements related to the survey administration or funding.

51 RFP

H.5

Timeliness Standards with Financial Penalties

Given the rigidity of the performance guarantees (e.g., 98% of claims within 30 days, 100% within 90 days) with automatic monetary penalties, how does DHA plan to treat outlier claims (e.g., OHI MIA, pending medical documentation, system outages outside contractor control), and how will the Government handle delays that it causes (e.g., delayed DEERS updates, TEPRV outages, missing BCRC crossover data)?

See TOM, Chapter 8, Section 6 for claims that have missing information. For missing OHI, see TRM, Chapter 4, Section 2. The Government will review claims processing delays due to Government systems issues or system outages outside the contractor's control delays on a case-by-case basis.

52 RFP H.5 – Performance Guarantees (General) PG enforcement methodology

How does DHA define an “occurrence” for purposes of PG-related penalties (e.g., event, metric period, claim, phone call, or file)?

Paragraphs in Section H.5 refer to each "occurrence" as each monthly or quarterly performance standard that is not met.

53 RFP H.5 – Performance Guarantees (General) Annual penalty caps What annual or per-metric caps, if any, does DHA impose on performance guarantee penalties? There are no annual caps for performance guarantee penalties.

54 RFP H.5.2 Performance Guarentees

How will DHA communicate performance guarantees to the contractor (e.g., format, frequency, and communication channels)?

Performance guarantees will be communicated to the contractor on a quarterly basis at the end of each contract quarter for performance standards measured on a monthly basis. For performance standards measured based on a Government review (e.g., quarterly claims accuracy reviews), the performance guarantees will be issued upon completion of each review. Performance guarantee results are communicated to the contractor in writing.

55 RFP H.5.2 Performance Guarentees

What is the detailed appeal process for performance reductions, including steps, timelines, and decision authorities?

There is not a formal appeal process for performance guarantees. The contractor will be provided with an opportunity to respond to performance guarantee assessments within 10 days following notification.

56 H.5.2–H.5.4; H.7.4 Telephone metric calculation

Please provide the required calculation rules and reporting templates for telephone metrics, including treatment of short abandons, after-hours attempts to reach an agent, repeat transfers, virtual-hold/callback transactions, and carrier failures. For the 30-second IVR-to-agent standard, please identify the exact measurement start and stop events and whether transfer-related prompts count toward the waiting period.

The contractor shall collect and report customer support data, operational data and analytics in accordance with DD Form 1423, M010 CDRL (See #3 Telephone inquiries), located in Section J of the contract.

57 RFP H.5.3 – Telephone Blockage Rate Blockage definition In calculating the blockage rate, how does DHA define the denominator, particularly with respect to calls abandoned by beneficiaries before system engagement?

As defined in Section H.5.2 the blockage rate is the percentage of calls not allowed in the Contractor's system. This includes busy rates and forced disconnects. See Section J-3 CDRL M010 for reporting telephone inquiries. The denominator for blockage rate is total calls attempting to reach the contractor.

58 RFP H.5.4 – Total Hold Time Typographical error How should the apparent reference error in the section be corrected (currently cited as

“H.3.4.2”; should this reference instead be “H.5.4.2”)?

Section H.5.4 does not have subparagraphs (i.e., H.5.4.2). No typographical error to correct.

59 RFP H.5.8 TED Accuracy Expectations

What detailed crosswalk of current TED edit sets and common error types will DHA provide? The TRICARE Systems Manual contains all TED edit information. The government will not provide a crosswalk of current edits and common errors.

60 RFP H.5.8 – TED Edit Accuracy Edit set transparency

What information on TED edits (e.g., complete list by category and historical fail rate) will DHA provide to allow new entrants to forecast expected error volumes?

The TRICARE Systems Manual contains all TED edit information. The government will not provide TED edit error information.

61 RFP H.6 Documentation Burden

What are the average sample sizes and typical documentation volumes for quarterly accuracy reviews?

Average sample size for the quarterly payment accuracy review is 2,050 (includes denied and paid).

Sample size for the quarterly occurrence error review is 350.

62 RFP H.6 – Quarterly Claims Processing Accuracy Reviews

Documentation burden

What is the average documentation volume per audited claim (e.g., number of documents and typical retrieval steps)?

Basic claim packages for all claims generally include, but are not limited to, the following: claim copy, DEERS screens, provider information screen, discount screen, EOBs, referral screens, reimbursement support, authorization screens, and notes. All documentation used to adjudicate the claim. This can include medical records for some claims. The process for obtaining and organizing the documentation in the claim packages is determined by the TMEP contract. Documentation is to be submitted in accordance with the MOU with the TCRS contractor.

63 RFP H.6 – Sampling Methodologies Sampling predictability

What historical data on sample sizes by category (payment, denied, occurrence) will DHA provide to inform resource allocation?

Average sample size for the quarterly payment accuracy review discussed in Section H.6.2 is 2,050 and includes combined paid and denied samples. Sample size for the quarterly occurrence error review is 350.

64 RFP H.6.2.3 – Error Determinations Use of post-payment actions

How does DHA treat adjustments made after sample selection but before audit review with respect to whether those adjustments are considered valid for error removal?

If adjustments have been processed to completion prior to the date that the sample is created, the corrections will be considered in the results of the compliance review. Any exceptions to this would be on a case-by-case basis, with timing determined based on the circumstance, as directed by the Contracting Officer.

65 RFP H.7 AQL Adjustments If a contractor proposes a higher AQL, how will DHA adjust penalties, including whether those adjustments will be proportional?

If the contractor proposes (and the Government accepts) a higher AQL, then any applicable performance guarantee amounts (or CPAR rating for that performance standard) will not be adjusted. In order for performance to be considered satisfactory, the contractor will be required to meet the higher proposed AQL. See H.7.2 - the new AQL will be the minimally accepted rate used for the purposes of incentive payment, performance guarantees and will be used to determine a CPAR rating.

66 RFP H.7 Performance Metrics

What specific metrics and calculations will DHA use to quantify the performance standards for claims accuracy and timeliness?

The quarterly claims processing accuracy compliance review results will be used to determine claims accuracy. See TOM, Chapter 1, Section 3 for calculation. For claims processing timeliness, TEDs data will be used to calculate monthly performance using the total number of TEDs and the number of processed within 30 or 90 days. See TOM, Chapter 1, Section 3.

67 RFP H.7 – Performance Metrics (AQL) AQL adjustments If a contractor proposes a higher AQL, how will DHA adjust associated incentives and PG thresholds, including whether those adjustments will be proportional?

The tier levels for the associated performance guarantees will be adjusted to reflect higher AQL. See response to question #68.

68 RFP H.7.2 Performance Metrics and CPAR Implications

Under H.7.2, where the Government may increase AQL levels at its discretion, how will any such increases affect contract pricing, and what mechanisms, if any, will be used to address pricing uncertainty resulting from AQL changes?

Section H.7.2 outlines the process if contractors propose an ability to exceed the AQL, not the Government increasing AQLs at its discretion. The higher AQL will be reviewed by the Government and may be added, as proposed to the contract.

69 RFP and TOM H.7.4/TOM Chapter 1, Section 3, para 3.2.1

Customer Service Performance Standards

The solicitation's performance standards state that "all calls answered by an agent shall achieve resolution in one call," while applicable TOM requirements establish an 85% first-contact resolution standard. Please identify the controlling performance standard for first-contact resolution and revise the solicitation or applicable performance matrix as necessary.

The performance standard for this requirement as indicated in the TOM, Chapter 1, Section 3 is: Eighty-five percent (85%) of all telephone caller inquiries shall achieve resolution in one call. (Includes calls transferred to an individual.) RFP H.7.4 will be changed from "all calls" to "% of calls."

70 RFP

H.7.4/TOM Chapter 1, Section 3, para 3.2.1

Customer Service Performance Standards

The performance table references TOM Chapter 10, Section 3, paragraph 3.2.1 for inquiries not resolved on initial contact. Please confirm whether this reference should instead be TOM Chapter 1, Section 3, paragraph 3.2.1, and provide the corrected reference.

Confirming the reference should be TOM, Chapter 1, Section 3, paragraph 3.2.1. RFP H.7.4 will be amended to reflect TOM, Chapter 1.

71 RFP

H.8 – Organizational Conflicts of Interest

OCI between

TRICARE

procurements

In what ways might bidding on other TRICARE contracts (e.g., T‑5 and TRICARE Pharmacy) create prohibited conflicts with TMEP2 participation, and how will DHA determine such conflicts?

Performance on the TMEP2 contract should not preclude a contractor from proposing on other TRICARE solicitations, however, we note that conflict of interest determinations are the domain of the Contracting Officers responsible for each procurement.

72 Section L L.6.3.1, C.1.2., C.2.2.1, C.2.3.3, M.6.3.1, H.4.3

Beneficiary and Provider Satisfaction

L.6.3.1 requires the offeror to describe how its customer service approach "will result in beneficiary and provider satisfaction," but then states, "The offeror shall not propose its own beneficiary and/or provider surveys." Several other provisions expect the Contractor to achieve, measure and improve satisfaction (C.1.2.2, C.2.2.1, C.2.3.3). M.6.3.1 will evaluate the offeror's approach "for ensuring that its services produce high levels of beneficiary and provider satisfaction." H.4.3 bases the incentive on "a DHA administered survey."

Please clarify whether the Contractor may use its own feedback tools to track and improve beneficiary and provider satisfaction for internal quality management, separate from the DHA survey (e.g., post-call IVR questions, website or portal feedback prompts, and follow-up after complaints or inquiries are resolved). If such tools are permitted, may offerors describe them in the proposal? Are there any limits on their frequency, content, or how they could affect DHA survey response rates? If they are not permitted, please confirm whether the Contractor is prohibited from collecting satisfaction feedback at any level, and how offerors should show in their proposals how they will measure and improve provider satisfaction.

See TOM, Chapter 1, Section 4, paragraph 8.0 for beneficiary survey requirements. Paragraph 8.2 states the contractor shall not conduct written or telephonic beneficiary surveys without the approval of the DHA. The contractor can use feedback (complaints or inquiries) received from beneficiaries or providers.

73 L.9 Volume V, Factor 4 L.9.2

Small Business Participation Commitment Plan, Minimum Qualification Requirement

In the paragraph it states "the Offeror's SBPCP must demonstrate a commitment to meet or exceed a Total Small Business participation goal of 10% of Total Contract Value (TCV).

However, the specific socio-economic subcontracting targets detailed below the paragraph equal 12%. What is the correct Total Small Business participation goal?

Refer to Question #48

74 SECTION L EXHIBIT L-2 HISTORICAL DATA

Primary Claims Can DHA break out the claim volume by those processed as primary versus secondary.

Additionally, can claims dollars be broken out as well?

Following is the approximate percentage of primary pay claims based on the processed claims grand total claim volumes provided in Exhibit L-2.

CY23 - 3.32%

CY24 - 3.08%

CY25 - 3.21%

The government will not be providing a claim dollar break out.

75 Section B Section C Section L Section B, CLIN 0001; Section C, C.2.3.8; Section L, L.6.5.1

Security Certifications

CLIN 0001 includes "Security (Physical, Personnel and NIST) Certifications," and L.6.5.1 requires offerors to describe their "process for obtaining security clearances." Section C (C.2.3.8) requires a personnel security program that meets the TSM but does not use the term "security clearance." Please (a) identify the specific personnel security investigations, position designations, and/or clearances required for contractor staff; (b) identify the specific physical security and NIST certifications required under CLIN 0001; and (c) state whether each must be completed before the start of services delivery.

"Security clearances" is not accurate term. Security clearances are primarily government background investigations for position sensitivity designations involving classified information. (a) The PWS prescribes the applicable position sensitivity designation and government tier-level background investigation. (b) Security requirements to safeguard covered defense information, which includes CUI, are prescribed in DFARS clause 252.204-7012. "NIST certifications" is legacy terminology, replaced by compliance with CMMC level requirement (DFARS clause 252.204-7021). (c) Contractor must comply with DFARS 252.204-7012 and DFARS 252.204-7021 requirements by contract award.

76 Section C, C.1.2.2 and C.2.2.5; Section L, L.6.3.2 Accessibility L.6.3.2 requires a timeline for "testing user accessibility," but neither Section C nor Attachment J-4 identifies an accessibility standard. Please identify the accessibility standard(s) the beneficiary website/platform must meet (e.g., Section 508 of the Rehabilitation Act, WCAG

2.1 or 2.2 Level AA).

This refers to the general accessibility of the beneficiary to the portal as well the requirements listed in FAR

39.2 on 508 compliance.

77 Section C Section L Section C, C.1.2.4 and C.2.4.3; Section L, L.6.5.1

Disruption of Services

C.1.2.4 and L.6.5.1 require services to be operational with "minimal disruption," while C.2.4.3 requires fully operational services and systems at the start of services "with no disruption of services to beneficiaries and providers." Please confirm which standard applies.

Both standards…